About selecting Scheduling Agreement and Forecast delivery schedule

Hi Experts,
i want to write a Report, with 2 parameters for the selection : Sold-to-party and Period
For this Sold-to-party/Period, I want to list all scheduling agreement + Forecast delivery schedule.
I already found the Function SD_VBEP_READ_WITH_VBELN to read all Forecast delivery schedule lines using Sales Doc.No. , but how can I select all Scheduling Agreement for the Period ?
Regards,
David

Solution:
by selecting data from table VEPVG (Delivery Due Index) and using function SD_VBEP_READ_WITH_VBELN for each SD Document.
Regards,
David

Similar Messages

  • Return process in Scheduling agreement and correction delivery creation

    Hi Experts,
    I have couple of Questions:
    1) I want to know the return process in case of scheduling agreement, how exactly we should go about it.
    2) Regarding creation correction deliveries in the scheduling agreements.
    I enter in a valid scheduling agreement number into transaction VA32, click the "JIT DlSch" button, click "Corr. Delivery" button and then enter in a date and quantity.
    After I hit "Save" button, I am taken back to the initial VA32 screen and see the following message...
    Sched. Agr. w/ Rel. ####### has been saved (no delivery created)
    Message no. V1261
    Does anybody have any insight to why this is happening? Thanks in advance.
    Sourabh

    Whether it is a scheduling agreement or sale order, in case of returns, you need to generate the following:-
    a)  Return Sale order or scheduling agreement referencing the parent billing document
    b)  Return delivery if goods are taken back in parent plant via VL01N
    c)  Credit note to customer via VF01
    d)  Excise credit via J1IH
    Last but not least, please spell the name correctly.
    thanks
    G. Lakshmipathi

  • Planning delivery schedule , forecast delivery schedule , JIT delivery sche

    Hi
    could any one tell me the difference  between Planning delivery schedule , forecast delivery schedule , JIT delivery schedule & their respective ways of processing delivery???????????????????????????????????????????????/

    Hello Friend,
    Planning Delivery Schedule:
    You want to plan requirements for a certain customer for the next 16 weeks. You create a planning delivery schedule on the basis of information that you have gathered in an internal planning system. A few days later, the customer sends you a forecast delivery schedule that covers only 12 weeks. You decide to generate a planning delivery schedule by copying the schedule lines from the forecast delivery schedule for those 12 weeks, splitting them into units and days that fit your production schedule. For the remaining four weeks that you require, you simply adopt schedule lines from the previous planning delivery schedule in the scheduling agreement.
    For another customer, you create a six-week planning delivery schedule on the basis of internal data. When the customer sends in a forecast delivery schedule for the same six weeks, you notice that the first four weeks of schedule lines in the customer delivery schedule are detailed enough for production, but the last two are inaccurate. You decide to copy the first four weeks of schedule lines unchanged into the new planning delivery schedule. You adopt the remaining two weeks of schedule lines from the previous planning delivery schedule, which already exists in the scheduling agreement.
    Forecast Delivery Schedule:
    For an SD scheduling agreement, a customer sends a forecast delivery schedule containing requests for individual schedule lines. On the SD side, a delivery can be created automatically from this.
    JIT Delivery Schedule:
    A release carried out at an exact point in time of quantities in a schedule line (of a delivery schedule).
    The JIT delivery schedule is way of fine tuning production for the customer and shipping for the vendor.
    The term is used predominantly in the automobile component supplier industry.
    Delivery in Forecast in done through VL10 & VL01N and Delivery through JIT is done from JITK.

  • SCHEDULING AGREEMENT AND SCHEDULING LINE CREATION

    Hello Guys,
    I trying creating a scheduling agreement(SA) for vendor & material combination.
    I have created a Scheduling agreement in ME31L then maintained in ME38.
    In ME38 i have also mentioned the delivery date. when i am checking EKKO for Purchasing document , its created with the delivery date specified.
    My question is how to create a schedule line ? Do we need to maintain a source list of that material, plant and vendor.
    If we have the source list maintained, then what is the next step after SA is created and maintained.
    Do we need to do MIGO? because i tested by creating one SA in ME31L and maintained in ME38. I mentioned the delivery date as today and when i checked EKKO table the Purchasing document is created.
    Do i need to create a Purchase Order?
    If no then do i need to do MIGO? If i need to do MIGO, for what reference do i need to do MIGO???
    My client never maintained a Scheduling agreement, they want the scheduled lines to be created and sent to vendor and we need to receive  the goods on specified delivery date.
    Help will be appreciated.
    Thanks.

    Hi,
    You need to make a distinction between the scheduling agreement (ME31L/ME32L) and the delivery schedule creation (ME38/ME84)
    With ME31L you create the scheduling agreement. In the scheduling agreement which is created for a vendor you maintain the parts that you will order at this vendor, the target quantity that you will order over a certain period and the price.
    In ME38 you use the scheduling agreement number that is created with ME31L to create schedule lines (manually). These schedule lines consist of a date and an quantity. This is the data that needs to be transmitted to the vendor and against which the vendor is shipping the ordered materials.
    Once the vendor ships the materials you post the goods receipt in Migo against the scheduling agreement number.
    That is the basic working of the scheduling agreement and the delivery schedule.
    Now some remarks.
    You need to set-up the required output conditions for transmitting the data to the vendor either via print, fax, email or EDI.
    You can do this manually in each scheduling agreement and each release but typically you maintain the output condition records.
    For scheduling agreement contract (ME31L) you use transaction MN07.
    For the delivery schedule (ME38/ME84) you use transaction MN10.
    In order for you to be able to post the goods receipt the delivery schedule needs to have been transmitted otherwise you will get a message that not requirement are found when trying to post goods receipt.
    Also the goods receipt can only be posted if the requirements are valid on the day that you are performing MIGO. This means if you would post GR today then the open requirements in the scheduling agreement need to be for today or already from previous dates. The system will not allow you to post GR for quantities that are only due tomorrow (if this is required a user exit needs to be set-up).
    If you want schedule lines created via MRP then you need to set-up a source list using ME01. You have to make sure that the MRP key is set to 2 in orer for the system to generate schedule lines and you also have to make sure that you have the correct MRP parameters set-up.
    You can use ME84 to transmit the delivery schedule lines generated by MRP if no changes are required. With the ME84 you can transmit multiple releases at once, however this transaction can not be used to make manual changes to the MRP proposal.
    The scheduling agreement offers lot's more possibilities but the above should get you going with the basics.
    Hope this will help you on your way.

  • Scheduling agreement and SUS

    Hi
    Can anybody let me know,
    What are the steps involve in creation of scheduling agreement and distributing the scheduline lines to SUS.
    Regards
    Ashish

    In R/3 go to transaction -->
    ME31L ---> Create Scheduling Agreement
    ME38   ---> Maintain Delivery Schedule
    ME84  ---> Create SA Releases
    Once this is done --> and all the configurations are in place , system will SEND
    SAR to SUS.

  • Forecast delivery schedules and JIT deliveries

    Hi Gurus,
    Got a question on sales scheduling agreements schedule lines. Our customer sends 10 weeks of forecast delivery schedules and 2 weeks of JIT deliveries. which one of these two are passed to MD04?
    Assuming only forecast delivery schedules are seen in MD04:
    Assuming customer sends forecast delivery schedule for week2 as 50. but in JIT deliveries he only sent 40 for that week. if only forecast deliveries are see in md04, then my forecast and planning quantity is 50 , but actually my JIT delivery is only 40.  AM I  producing 10 extra? that  means my planning is wrong?

    925,
    so in system it will show on 3/21 monday
    I guess this means that you are entering using a Day format rather than Week format.
    You have answered you own question already.  If the online SAP help, which you have read and reasonably paraphrased, is not clear enough to make you understand this, I cannot help you.
    JIT horizon is 3/23, Forecast is for 3/21. 
    As I stated before, even though it may in your mind represent a week's demand, it is still for one day.  There is no bucketing, nor time-based disaggregation, nor consumption.  It is just a scheduling agreement.
    You wrote
    am using MRP indicator D. that means within jit horizon, consider my jit quanity for requirements. and after jit horizon consider my forecast delivery schedules as requirements.
    .  This is a reasonable paraphrase of the SAP online help.  Do you believe this?
    Forecast schedule is for 3/21.  NOT for W 12/2011.  This is before the JIT horizon, isn't it?  What do you think will happen to the forecast schedule, looking at the last 'rules' you just wrote? and as stated in the SAP help that you read?
    Now you want to enter JIT schedules. 21/22/23/24/25/26.  JIT horizon is 23.  24/25/26 are after JIT horizon.  What do you think will happen, based on the 'rules' you just wrote? 
    I feel my time is being wasted when you keep asking me these questions, already having the answers explicitly stated in SAP oinline help.  Since you do not have access to a system, this cannot be a support issue, it is a evidently a matter of idle curiosity for you.  I therefore believe I will will move onto other forum questions, where there is a possibility that the questioners will get some business benefit from my answers.
    Best Regards,
    DB49

  • Forecast delivery schdule and JIT delivery schedule difference

    Hi All,
    What isthe difference between Forecast delivery schdule and JIT delivery schedule in JIT scheduling agreement (LZJ)?? 
    I am doing JIT Inbound process now. Is it necesary to update both the schedule lines(Forecast delivery schedule&JIT delivery schedule)??
    Thanks,
    Anbazhagan E

    Hello,
    Forecast Schedule updates your planning , i.e. in MD04 you could see system is planning for quantities updated in forecast schedule.
    regards,
    amol

  • Importance of Forecast Delivery Schedules in SD scheduling agreements

    Hi ALL,
    I would just like to consult you a scenario that I'm facing.
    When I create a JIT scheduling agreement, even though that schedule lines are maintained for the JIT delivery schedule tab, if the Forecast delivery schedule tab has no schedule lines, the NET value of the document will be zero.
    Can you explain the Logic behind this?
    Also, why am I not allowed to create an outbound delivery and invoice if the Forecast Delivery schedule tab has no schedule lines?
    I know that the document will be incomplete without the net value, but why is it even though schedule lines are created in the JIT tab?
    Please help me with this.
    Thanks in advance guys!

    This is what I found out in an SAP “Knowledge Base Article" (1472965), indicating that there has to be requirements in the forecast delivery schedule in order for the schedujle agreement line item to not be considered incomplete for price.
    https://websmp230.sap-ag.de/sap/support/notes/convert2pdf/002007204200000153012010?sap-language=EN
    Resolution
    l You have to enter schedule lines for the forecast delivery schedule
    l The VBAP-NETWR is calculated based on forecast delivery schedule and not according to the JIT delivery schedule
    Regards,
    Jeff

  • Forecast delivery schedule lines consumption

    Hi,
    I cannot fully understand what is the logic behind the consumption of the forecast delivery schedule lines. This is how the problem can be exactly defined:
    - scheduling agreement with delivery orders (LZM)
    - JIT delivery schedules are not used and no delivery schedule is maintained... just a forecast delivery schedule
    - the whole process is manual, there is no EDI implied
    - the cumulative received quantity is updated by an ABAP development that is triggered at delivery goods issue
    The rest, happens normal - forecast schedule lines are updated weekly, the customer send pick-up sheets, a TAM delivery order is created, then delivery, GI...
    The problem: not always the MRP requirements generated by the forecast delivery schedule lines are consumed by the delivery order/GI. If the delivery orders / deliveries are made on the exact quantity of the schedule lines everything works fine. It is also ok when there are two successive delivery orders with a cumulative quantity that matches exactly the forecast line. As soon as a over-delivery is made, everything turns upside-down: older delivered schedule lines appear again in planning as if nothing was delivered until now...
    I suspect that the problem is related to the fact that the whole process is manual and updating the cumulative received quantity is not the only parameter that is counting... is it so? Or the forecast delivery schedule has to be respected 100% in terms of quantities and timing?
    I would really appreciate your help.
    Regards,
    H.

    Also please clarify whether delivery schedule lines in ME38 (even it is created automatically), in Planning time fence, will get affected by MRP run.

  • Forecast delivery schedules incorrect cumulative release quantity.

    Hi Gurus,
    We implemented the standard LZM - Scheduling agreement with delivery orders solution for component suppliers.
    The entire SAP standard configuration activated and the functionality is working correct.
    u2022     Scheduling agreement type LZM  / Item category LZMA / Schedule line category  L2
    u2022     Order Type TAM  / / Item category TAMA / Schedule line category  CP
    Example:
    Scheduling agreement forecast delivery schedule for 1000 units./ Md04 show SchAgr of 1000 units
    Delivery order for 250 units (MD04 Shows Order for 250 units and SchAgr for 750 Units)
    Created delivery for the order (MD04 shows Deliv. For 250 units SchAgr for 750 Units)
    Goods issue the delivery / MD04 shows the SchAgr for 750 units.
    *Issue:*
    When we update the Cumulative quantity received by the customer it is summing up with the forecast quantity (double counting the shipped quantity).
    When the Cumulative quantity received by the customer updated to remove the in-transit quantity, the forecast is adding by 250 units and   MD04 shows SchAgr for 1000 units.
    Thanks & Regards
    Suresh

    Hi Suresh
    The *** issued qty gets updated when the PGI for the delivery happens. There is a field called *** received by customer and it gets updated when customer sends the *** back in the 830 or 862 as the case may be.
    The difference between the *** issued and the *** recieved is always shown in transit.
    If you do not want the schedule line to be opened up, then in *** recd change it to the *** issued or ideal option is populate the last delivery PGI'd on the delivery number field next to *** recd field. Hope this helps and let me know if you need any more informataion
    Regards

  • Contract , scheduling agreement and service order

    Hi all,
          Can anybody tell me about the contract scheduling  agreement and when we can suggest our client to go for schedule or contract agreement ?
    Pls tell me elaborately .
    Also Pls explain me about service order and when can i go for service order . whether it is restricted to AMC ?
    Pls explain me elaborately.
    pls explain me steps for creating contract or scheduling agreement and service order..........................
    points to be rewarded.
    Regards,
    Girish.

    Hi,
    Contract is outline purchasing agreement where you have a contract with the vendor,may be a for a predetermined quantity or predefined value. So everytime you need the matl,  you need to make PO ref the contract asking for the delivery of the matl. In such instance when PO is ref with contract its called contract release orders or call off orders. So Process are ME01, ME11, ME31K with aggnrement type, ME51,ME21 & MIGO,
    Scheduling agreement is a long term purchase agreement, where you will keep issuing the delivery schedules whenever there is a change in requirement or at predetermined time intervals. The delivery schedule can be on hour/daily/weekly/monthly basis. SA is also an agreement with the vendor for the supply of matl, may be a quanity or value. The delivery dates will be maintained in ME38 ref the SA which are called delivery schedules.So you can maintain the delivery schedule and communicate the vendor on Forecase basis or JIT basis. And when you need some more matl then will only create SA deliveries using ME38. SA could be of 2 types:- without release documentation-system will transmit the delivery info to the vendor once you save the document.
    With release documentation- after creating the delivery schedules you need to create SA release using ME84.So Process are ME01, ME11, ME31K with aggnrement type, ME38 & MIGO,
    Service order or service PO is created with item Category "D" and an account assignment category as per ur requirement. U can not enter ur material here only u have to maintain short text of material. Example: You want to clean the boiler and u given contract to your Vendor. Vendor sends quotation mentioning that Rs.100/hr/Man head. Now how you will measure the cleaning activities of furnace? You can pay to contractor based on the hourly basis/ man head spent in cleaning activities. So in this case create the Purchase Order mentioning "Cleaning" in the short text in Item overview(Acc assignment ' K' or “C” or “P” and Item category 'D) and item details " Man Head" Service No , Gross price - Rs.100.00 and unit - hour ( or pick from Service master) and Quantity-number of hours spent by all man head.
    The steps to create Service PO are:
    1) Maintain Item Category as D & account assignment such as cost center “K”or slaes order”C”
    2) Keep material code field blank.
    3) Enter description of service & other fields in the PO Item Overview level. Press Enter.
    4) System will prompt you to maintain services at Item Level. Maintain your service master number / service description & other fields (quantity / rate /)
    5) Save the PO.
    For more follow the links;
    For more follow the link;
    http://esoadocu.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/render.asp?packageid=DBBB6D8AA3B382F191E0000F20F64781&id=EB65A89F1AFD4C46AB61C6161BAF
    http://www.sap-img.com/sap-sd/sap-sd-scheduling-agreement-vs-contract.htm
    http://www.copacustomhelp.state.pa.us/infopak/nav/procurement/contracting/file1499/index.htm
    http://www.sap-img.com/materials/what-is-outline-and-scheduling-agreement.htm
    Regards,
    Biju K

  • Creation Profile in Scheduling Agreement and Schedule LIne

    Dear Experts,
    Currently I'm working on Scheduling Agreement and Schedule Line.In standard SAP gives the provision of creation profile.I've gone through the SAP help documentation but I'm not clear on that.I've few doubts on creation profile.
    1. I've created a profile say XXXX for 14 days JIT and 6 months Forecast.And I maintain the same on Scheduling Agreement additional data.
    2.I'm creating delivery schedule respect ot Scheduling agrrement.
    3. I maintain the aggregation horiozon in creation profile as 10 days daily aggregation for JIT and 120 days for monthly aggregation for forecast.
    4.I run MRP for the header material and I maintain the necessary SA number in Source list.
    5. After MRP run I'm not getting the respective schedule lines for JIT and Forecast.
    6. What is the use of creation profile in Scheduling Agrrement and schedule line and is it determine ant schedule lines after MRP run.
    Please clarify me on creaion profile.
    Thanks in advance
    PKB

    Dear Experts,
    I'm not getting any response regarding Creation profile which I posted last week.
    Can anybody explain me the use of Creation profile in Schedule line?
    From Standard SAP help documentation I'm not convince.
    Best Regards
    PKB

  • Sales scheduling agreements and subsequent sales orders in MD04

    We would like to use sales scheduling agreements. For planification purposes, we need that forecast delivery schedule quantities in the agreement, appear in MD04 transaction, so corresponding schedule line type has flag "Transfer of requirements" active. In customizing for the agreement type, subsequent documents are sales orders, not deliveries, as we need always to have a sales order. We need that when creating subsequent sales order by reference to the scheduling agreement, quantity required related to the agreement is reduced. Or, at least, when this subsequent sales order is delivered.
    Example: In the agreement we can have 1000 KG and 2000 KG as forecast, for different dates. If a sales order of  800 KG is created, then we will get a new line of 800 KG in MD04. Required quantity related to the agreement, should be changed from 1000 to 200.
    Another option would be that subsequent sales order and delivery don't appear in MD04 (so requested quantity is not increased) and then, when the goods issue is posted, the available quantity is reduced and also the quantity required related to the agreement. I know how to make that sales order item is not relevant for MD04 using  flag "Transfer of requirements" for the sales order schedule item type, but I don't know how to make that delivery doesn't appear.
    Edited by: CH Spain on Dec 28, 2007 1:08 PM

    Hi
    In the given logic include another comment 
    If zfield value = 01, then allow creation of subsequent document.
    If zfield value # 01, then subsequent document creation should not be allowed.
    If AUART = Z sales document types then allow creation of subsequent document
    If VKORG  (Sales organisation) =1000 then allow creation of subsequent document
    If VTWEG  (Distribution channel) = 01then allow creation of subsequent document
    If SPART (Division) = 01then allow creation of subsequent document
    It wont affect if you change the copy control requirement routine,but instead of changing the copy control requirement routine
    use the user exit at sales order level only.
    Regards
    Srinath

  • Scheduling Agreements and relevant schedule lines configuration !

    Dear Sapients,
    I request you all to help me in providing the configuration steps for Scheduling Agreements and relevant Schedule lines configuration.
    Its urgent please help me !!
    Regards,
    Sreedhar.
    kodalisreedhar----
    com

    Hi Sreedhar,
    Scheduling Agreement with Delivery Schedules
    Definition
    An outline agreement that is created for one or more materials and outlines the overall expected quantity of the material(s) to be delivered to the customer over a specific period of time.
    Use
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Structure
    The structure of scheduling agreements with delivery schedules resemble that of other sales documents in the R/3 System, in particular the standard scheduling agreement.
    Data that applies to the entire document appears in the header; data about materials appears at item level; and delivery dates and quantities appear in the schedule lines within the delivery schedule. Additionally, the system maintains a history that permits you to compare and contrast various generations of delivery schedules.
    Integration
    Data in scheduling agreements comes from three sources:
    The customer sends in requested quantities and dates, normally by Electronic Data Interchange (EDI)
    The component supplier enters data manually
    The system automatically copies data into the scheduling agreement from master records
    Please go through the below link for further information
    http://help.sap.com/saphelp_47x200/helpdata/en/93/7439fb546011d1a7020000e829fd11/frameset.htm.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Problems in GR for forecast delivery schedule

    Hi all,
    Whenever i try to post GR for forecast delivery schedule the systeme proposes a quantity equals to 0 evev though i sent the form to the vendor(using trans me9e &me9l).
    Anubody knows why?

    Hi Moshe,
    If you are using your scheduling agreement type LPA(with document).Check wheather you have released the FC schedule in ME38.In the delivery schedule>edit>generate forecast schedule.
    Then only you will get your message output in ME9E and MIGO.
    regards
    venkadesh