Activating transfer rules for new source system

Hi
we are having 2 R/3 source system in BI. I had activated all the transfer rules with the first source system and now i have created a new source sytem connecting to a different R/3 client. I tried to change the transfer rules point to the new source system using the program RS_TRANSTRU_ACTIVATE_ALL giving the new source system and the infosource name. But i get the error "No Transfer Structure Selected" when i execute the prg.
how can i change the source system without creating the transfer rules for the new source but use the existing transfer rules and just change the source system assigned to it????
Regards
Sujai

Hi Sujai,
There are many cases when this program is used.
When the Trans rules get de-activated due to impact,we need to first replicate the data source and activate the TR using this program.This generally occurs during the data loads in prd.
It does not makes sense to transport it when there r no changes done to the TR.So simply,u can use this program to activate.
If the program does not work,then you are left with the transport option.
Thanks & Regards,
Suchitra.V

Similar Messages

  • Transfer Rules for two Source System in Production

    Hi All,
    I have a question.
    I have source system ECDCLNT230 (ECC Devlopment) which is connected to BIDCLNT200(BID Devlopment) I have two production source system ECPCLNT410 (ECP Pre Production Client) & ECPCLNT400 (ECP Production Client) which i want to connect with BIPCLNT400. when i transport my content from ECDCLNT230 to ECPCLNT410 and ECPCLNT400 , it works fine. i created 2 source system in BIPCLNT400 and replicated data source in to BIPCLNT400 so all data source has replicated.
    Now when i transport the request from BIDCLNT200 to BIPCLNT400, i need two transfer rules, two transformation one for each source system. for that what kind of settings are required.
    Thanks is advance.
    Regards,
    Komik Shah

    Hi,
    If I understand correctly, in your BW Production system, you want to connect / load data from your ECC Pre Production and Production system.
    In this case, to automate the transport needed for changes of transfer rules for both source system, you will need to have two tranfer rules in your BW Dev. You can either create two source system in Dev pointing to the same ECC Dev system, or one to ECC Dev and the second to ECC QA. Use different name for this two source system.
    In BW Production, you then then maintain the source system conversion of both source system.
    Thanks.

  • How to transfer all the transfer structure to new source system ?

    Hello
    I have created a new source system on my BW system with new RFC connection .
    I want to replace all my old transfer structure with old source system to this new system .
    can u plz let me know how can i do this ?
    Regards,

    can u plz many help in this ?

  • Transfer rules are missing for selected source system in BI content

    Hi All!
    The problem is: in BI content (Release 704, level 0003, SP SAPK-70403INBICONT) when I select needed source system (for example, A) only I can not find any transfer rules (0RPM area, 3.X transfer rules). When I select more than 1 source system (B, C..), I can see lot of different transfer rules for 0RPM area, but with assignment to another systems (B, C..). How can I get in Business Content transfer rules for data sources from needed source system (A)? Any help appreciated!
    Regards, Iryna.

    Hi Rathy!
    Thank you very much for your quick help! Usually I do the same. Now I faced with BI system, where data source were already activated in system A and replicated. I can see all needed active sata source un BI already. But I can not see transfer rules in content!
    What you can advise?
    Reagrds, Iryna.

  • Why no transfer rules in our BI system

    Hi.experts:
        I have a BI system,and the patch level is BI_CONT 703 patch 8..and My SAP BW version is SAP_BW 700 patch 0018.I found that no transfer rules for 3.X datasource and 3.X infosource.
        Any body has the same situation?
    Best Regards
    Martin Xie

    Hi,
    Not sure if this helps.
    Check in BI Content tab --> Source system assignment button. Flag the source system for which you are installing the transfer rules. Then you will get transfer rules for the source sytem.
    If nothing is flagged in the source system assignment, you can find transfer rules for all the systems.
    Regards,
    Murali.

  • Transfer rules to the new source system not visible in Transport connection

    Dear All,
    Recently our source system has been changed from R3 4.7 to ECC 6.O. Corresponding to that all the activities in BI have finished successfully. All my datasources in 4.7 have been replicated in ECC 6 in BI and transfer rules re-assigned. I have also collected them in a Transport request.
    Now when I am checking the entire flow in Transport connection, it shows me the transfer rules pointing to the old system only. That is, in RSA1 it shows the new system assignment. But in Transport connection not.
    What I have to do so that I can crosscheck in Transport connection all my objects having transfer rules to new system ?
    Regards,
    Srinivas

    I think you should check the source system assignment in the transport connection. It might have directed to the old sytem.
    Cheers
    Chanda

  • No transfer rules for FI master data sources

    Hi all
    I didnt get transfer rules for some of the FI master datasources.
    0GLACCEXT_T011_HIER
    0NEG_POSTNG_TEXT
    0ITEMSELFLG_TEXT
    When I right click on datasource->create transfer rules->Only other option is enabled.WHen I say continue I am getting this error
    *Infosource(transaction data) is not known.
    How to resolve this isssue.
    Thanks.

    Double click on the data source and go to edit mode, system automatically provides the corresponding BI content infosources if  any and install the same.
    Not all the fields will be mapped with BI info objects.  Only necessary ones as defined in BI content will be available for you.
    If you feel the mapping is incomplete you can modify the same according to the requirement.
    Hope this helps.
    Regards,
    Rangz

  • How to find unsued Transfer Rules and Data Sources for a Master Table...??

    How to find unsued Transfer Rules and Data Sources for a Master Table...?? My requirement is i need to delete those Transfer rules and Data Sources which are not in use

    Hi
    Go to manage of the Text or attirbute of the master data object, see what are being loaded daily from there and delete the remaining.
    Cheer
    Ans as expected, Please reward

  • New Source System Client for BW

    Hi All,
    Currently we have R/3 QAS Clint 102 connected to BW QAS. We want to get rid of this Client 102 and connect a new QAS Client 100 (same server but different Client) to BW QAS. I created a new Source System (QAS100) in BW QAS and did a restore. 
    My question: How do I get all the Source system dependent Objects like InfoSurces, InfoPackages etc for the new Client 100 in BW QAS? Please help me and I promse to generously reward points. 
    Thanks, very much in advance.
    Srini

    Hi A.H.P,
    I am pretty sure this will resolve the issue. I will come back again and reward 10 points once we apply a working solution.
    Thank you for a quick reply.
    Srini

  • Steps for creating new source system

    Hi guys
    We are on BI 7 and ECC 6 now...We are planning to get the data from other source systems (R/3 4.6)which are existed in different place.
    Now my question is what are the steps to get the data from this new Source system and whats BI developer role for this...
    Example: Inorder to establish the connection between BI and R/3 we need an RFC connection (Is this done by BASIS / BI )? If its BI , then what do I need to ask for ?
    afterthat what are all the questions or points that I need to raise to the folks in the meeting...
    Please advice
    regards

    Hi
    refer to this link below
    http://help.sap.com/saphelp_nw04s/helpdata/en/ac/4a4e38493e4774e10000009b38f889/frameset.htm
    Exactly this will be taken up by BASIS team so that at any time if we have any issues with RFCs like RFC connection failure we will not get any data to our targets.
    Then we have to raise ticket to basis stating this failure

  • How can I activate the transfer rules for the ODS updating a data target.

    We are on BW 3.5 and I'm loading data into the 0FIGL_O10 ODS  and then uploading the data into the cube 0FIGL_C10. The data loads just fine to the ODS but when I try to <u><b>'update the data target'</b></u> I get a date & time stamp' error on the info-package transfer rules.
    I then Replicate the datasource 80FIGL_O01.
    I must then <u><b>'activate' the transfer rules</b></u>.
    However I cannot get the transfer rules for 80FIGL_O10 in CHANGE MODE to activate them.
    How can I activate the transfer rules for the ODS updating a data target.
    The error text is as follows:
    DataSource 80FIGL_O10 has to be replicated (time stamp, see long text)
    Message no. R3016
    Diagnosis
    DataSource 80FIGL_O10 does not have the same status as the source system in the Business Information Warehouse.
    The time stamp in the source system is 02/15/2007 10:42:33.
    The time stamp in the BW system is 11/07/2006 13:11:54.
    System response
    The load process has been terminated.
    <b>Procedure
    Copy the DataSource again and then activate the transfer rules that belong to it. You have to activate the transfer rules in every case, even if they are still active after the DataSource has been copied.</b>
    Thanks for your assistance.
    Denny

    Hi Dennis,
           Try, using Business Content to activate your data source
           hope this will help you
    How activate business content?
    http://help.sap.com/saphelp_nw04/helpdata/en/80/1a66d5e07211d2acb80000e829fbfe/frameset.htm

  • Configuring of a new source system in BW

    Hi Experts
    We have to set up a BW system,  which will have 2 source systems( ECC)  clients 550 and 590 of the same ECC ( ECC QUALITY). One client is already there and we have to configure another client of source system with the sane BW Client 350. I understand that the dataflow is partly different (e.g transfer rules and datasources are source system dependent). My question are
    1.     How we can configure a Source System on BW.
    2.     What changes if any I have to make in the existing system (BW)
    3.     What will happens to the Existing Data-sources ( Do I have to replicate each and every data-source of the existing ECC clients to New ECC client.)
    4.     Do I have to create New transfer and update rule for the new client
    Any other point Pl. advice.
    Thanks in advance.
    Dinesh Sharma

    You can more than one source system to onw BW client.
    You have to use source system compounding to differentiate between characterstics values if you are loading to the same object. Otherwise you need to use separate characterstics for ex : Yxxxx object for one source system and Zxxxx object for another.
    Also the dataload timing should be setup properly. Otherwise it may leads to object locks.

  • Transport InfoSources to New Source System

    Hi.
    When implementing BW in our QA environment, all InfoSources, and their related InfoPackages, Transfer Rules, Update Rules, etc.) were created using a temporary R3 QAS source system mapping (ex.TMP).  We are now removing this temporary client and  I now need to change my InfoSources (along with customized Start Routines, InfoPackages, etc.) to point to a new QAS source system (ex. PRM). 
    Note that this new source system is already identified as a source system for BW and all DataSources created on TMP have been transported to PRM.  Subsequently, all DataSources have been replicated from PRM to BW. 
    However, I'm having trouble on the BW end.  I can't easily
    transfer the InfoSources, etc. to the new source system.  I've asked some BW / Basis folks and they suggest transporting the InfoPackages out-of and then back-into the BW QA client.  Is this possible?  Is there a better way to push my InfoSources, InfoPackages, etc. from the old source client (TMP) to the new one (PRM)?  Thanks!

    Dear Dave
    Please do not attempt to change the logical system name your self, as I feel that you have not tried it before.
    This is some thing that your basis people have to do. Depending on the size of database this change can take from 2-24 hours (not exact times, but just some thing to show the magnitude of the task).
    Good luck
    /FZA
    Message was edited by: Fariborz Zangoui

  • Add new source system to BI

    Hello,
    Our requirement is to load data from a different R3 client to which we dont have a connection yet.
    The idea is to create a new connection but keep the existing one.
    Is there any automated tool to do this? We would like to avoid the manual creation of all infosources and transformations from the new source system, but to copy them from the existing one.
    We found that there is a tool for replacing the current source system with another one (BDLS), but we just want to create this new one in paralel with the current source.
    Thanks!!
    Pablo

    Hi,
    what you can do is, create a transport request containing all source system related things like the infosource/datasource assignment, transfer rules... and import that transport back into your dev system. Before the import you should maintain the settings for source system after transport accordingly.
    Siggi

  • Duplicating the existing sourcesystem assignments to a new source-system

    Hi all
    We have another new sourcesystem (logical system) in our BI system.
    This is a copy of the productive erp-sytsem, upgraded to EHP4.
    Now we want to test the connectivities and data load procedures.
    Is there a possibility to "copy" all the existing datasources/transformations of an existing system
    to this new system without using transports?
    We already tried using report 'RBDLSMAP' but it seems to overwrite the existing assignments.
    Any idea??
    Thanks
    Thomas

    Hello Thomas,
    You have to use a transport , to transport the source system dependent objects normally the following procedure is used:
    RSA1
    Transport Connection
    Button 'Collection mode'  set to 'start manual collection'
    Press 'Source system assignment' button (it's the one left of the
    'Request BEx' button)
    Select the source systems you want to save the transfer rules for
    Continue
    Button 'Grouping' set to 'Save for system copy'
    At the left border click on 'Object Types'
    Extend tree  'Source system' LSYS
    Double click on 'Select objects'
    Select the source systems you want to collect objects for
    the source system is now displayed in the right box
    Press collecting button ('gather dependent objects')
    this may take a while
    Right click on the root of the tree and select
    Transport all below
    Expand the whole tree and check if there isn't an object which is locked
    by an other open transport request !!
    (the column 'Transport request' has to be empty (BEFORE deleting the corresponding source system
    connection!)
    Kind Regards,
    Des

Maybe you are looking for

  • I think I bought a fake or counterfeit version of Photoshop CS6 extended.  How do I find out for sure.

    i am using windows 7 on an HP Pavilion dv6-6108.   I purchased Photoshop CS6 extended.  The guy said it is a full Retail version and "self installs" the serial number and activates.  It doesn't fully install into my control panel programs, instead it

  • Os x yosemites 10.10.3 vs os x mavericks 10.9.5

    Hi mac people, I still on mavericks 10.9.5 and I happy with it, few day ago apple released 10.10.3 with photo, and I think I would like to give it a try, but first I need some real user's opinion, does it faster or slower compare to mavericks? and in

  • Hyperlink won't open

    I have inserted several hyperlinks in a 2010 Word document. The links will not open, but a balloon pops up saying I need to press cntrl + click. Tried that and it does nothing. All my Trust Center settings are set up correctly in Word. I don't use IE

  • Can an AIR application pop in front of all other application ?

    There is a lot of method to bring an AIR window ahead of the other AIR windows but what about bringing an AIR window in front of the desktop ? My application need a fast response from the user when it received some network events. The users do not fi

  • Here's a really stupid question re servers.

    I am a techie on individual computers with no experience on servers. The aim is to have a server for 5 computers with the following features- ALL files stored on the server, e-mail server, print sharing, remote access away from the office for both ma