Actual costs posted to work order without maintaining costing variant

hi,
i havent maintained costing variant for work order(maintenance order) type i used to create the work order. so when i posted goods issue, how does the actual costs get posted with out maintaining the costing variant for work order type. what is the role of costing variant configuration in work order type settings.
thanks,
monica

Hi monica,
Costing variant forms the link between the application and Customizing, since all cost estimates are carried out and saved with reference to a costing variant. The costing variant contains all the control parameters for costing.
The configuration parameters are maintained for costing type, valuation variants, date control, and quantity structure control.In costing type we specify which field in the material master must the price be updated,
In valuation variant we specify in what order the system should go about accessing prices for the material master planned price, standard price, moving average price etc. Further which is the price which should be considered for activity price. How the system should select BOM and routing.
assign points if useful
Regards
Genie

Similar Messages

  • Is there a process for moving costs from maintenance work orders to capital

    Is there a process for moving costs from maintenance work orders to capital projects?
    We have reversed the settlements on the work orders, and then trying to put the relevant NWA in , then receive error message :
    Rule for allocation of PM order to PS network is not maintained.

    hi
    check the allocation structure and the settlement related customization settings.

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • Can you post GR to Work order without it being released??

    HI, Currently if a work order in PM hasn't been safety checked and released no GR can be applied.  Ihave looked at all our setting and can not find anything that would suggest I can change the settings to allow GR even though teh WO hasn't been released.
    Can you please advise??
    thanks
    helen

    I did understand what you were asking. I was talking about linking the movie to the netstream variable/object. The problem is as you stated at the bottom. The server doesn't like when I use an FLV file. I don't think it particularly cares if I useany other format, but it doesn't like the reference to the flv. It sees both files individually, but when the swf tries to connect to the flv, either through the flvplayback or the netstream, it sees the swf as an MP4 container. Since I can't control the movie without coding the AS3 for the Movie load in the first frame, the swf is trying to load/link to the movie from the start. Do you know anything about how it would work if I changed over to silverlight? I love flash, but if this place doesn't allow the video to work, I need to change to a video format that does work.

  • Outline agreement Cost on multiple work order

    Normally annual maintenance contracts are created at the start of year but the maintenance work orders are created as they are  required.We need to reflect the cost of single annual maintenance contract on multiple maintenance work orders for proper documentation of equipment life cycle costing. How it can be achieved in SAP PM ?
    Regards,
    Tehsin

    Hi Tehsil
    We have mapped a scenario as per your reqirement as follows-
    1. Create Rate contract in the year begining- with reference to it create PR then PO with account assignment category F
    OR
    2. Create PR then PO in the year begining with account assignment category F
    3. when you create maintenance order assign the service items of a particular PO to one operation with control key PM03. However change the settings for creation of reservation/purchase requisition to never so that PR do not get triggered.
    Then select the operation click on external to assign services from the PO you have already made. In this way you will get the plan cost of the external services.
    4. Then go for service entry - ML81N - create service entry sheet with respect to the maintenance order. After service entry you will find the actual cost is debited to the order. In this way you can flow cot to your order & technical objects.
    I think this will fulfill your reqirement
    Regards
    Shakti

  • Check and fix the cost flow in work order

    Hi Gurus,
    When I am processing the work order, at final stage after TECO the actual cost is showing very high.
    ex : If i use 2 labors for the work and paid 200/- each (only service work order) but when i execute the work it is showing as 3000/- in actual cost.
    please help me how to fix this.
    thanks

    Hi VARA
    Are you using internal labor for these expenses? If so, make sure your activity types carry the correct costs on them. Check transaction code KP26. Activity Rates are calcuklated for Cost Center-Activity Type couples for each financial period.
    Regards
    Savas

  • Cost Centers for Work Orders

    HI Guru's,
    I have an issue with work orders for our maintenance team. The orders are being settled to the incorrect cost center.  I believe this is happening because they have not been set up correctly.  Please can you tell me if there a way to transfer these into the correct cost center?  and how can I change the set up on these work orders?
    Please can you help.
    Best Regards,
    Yasmeen

    It sounds like you need to change the settlement rule on the work orders so they settle to the correct cost center.  Go to IW32 -> Goto->Settlement rule
    To move previous postings, you can do an CO only reposting using transaction KB11 to move CO postings to the correct cost object.
    Good luck!
    Tammy

  • Complete work orders without complete notifications from Overall Completion

    We have a work order assigned to a notification type and we need to complete the work order from the overall completion transaction  (IW42) without completing the notification when clicking on technical completion button.
    Is it possible?

    You can check with your netweaver team if this could be controlled from user authorizations. Do check if the following Business Transactions are available against the tcode "iw42"
    PMM2     Put notification in process     
    PMM4     Complete notification     
    PMM6     Put notif. in process again     
    I hope this will help.
    Regards

  • Standard Work Order without requirements

    Hello
    How or what do I need to do in order to generate a Standard Work Order for an item and NOT have or allow Oracle to automatically create material requirements?
    Thank you in advance for your time.
    Bob

    The three possibilities
    If you never want to use the bill of material for this part number then just create the jobs and the system will allow you to do so (even though you don't have a BOM defined).
    You can use an alternate as suggested above.
    If you want the BOM to be present for the item and don't want any material requirements then you have to manually delete the requirements for this job using Job/Schedule details>Material requirements.

  • No release of production order without standard cost estimate

    Hi All,
    I have an requirement, that is production order for a material should not be released or saved if standard cost estimate for that period is not released. Basically it should not allow to release or save the production for that material, is SCE is not run for that period. I tried various options, i also overheard its possible through user exit and many people have succeed in that.
    Has anybody overcome this problem, please do let me know. And which user exit??
    Thanks in advance
    With Best Regards
    GJ.

    Hi...
    I have faced the same problem in my previous project. What i have instructed to my client is to take control of Master data and put the status as "03" Blocked for movement till the statndard cost is released for this material.
    You can relase the status to "E2" in Cross Plant Status Field in Costing one view once the cost estimate is released for the material.
    I hope this works for you.
    Please let me know if you require any fruther information.
    Thank you,
    Regards,
    Santosh
    Rewards points if helpful.

  • Tables to view costs posted in the order

    Hi Team,
    I have a requirement wherein the customer wants to create a BI report with the following data:
    Total Internal Material costs
    Total Internal Wage costs
    Total Actual costs
    Total Service costs
    Input criteria: Date range and Planning Plant or Maintenance Plant
    they do not want to use the MCI3 report since they want other information also alongwith the above data.
    Please help to get these fields.
    Thanks,
    Beryl

    Hi,
    Please use Table -
    Total actual cost --
    COEJ                           CO Object: Line Items (by Fiscal Year)
    COEJL                          CO Object: Line Items for Activity Types
    COEJR                          CO Object: Line Items for Stat. Key Figures
    COEJT                          CO Object: Line Items for Prices (by Fiscal year)
    Total Internal Wage costs -
    T512W Wage Type Valuation
    total service order cost table: -  COEJ
    and Use COOI table
    Thanking you
    Mahesh

  • Unplanned Delivery Costs Post to a different GL Account Cost Center err

    Hi,
    We added GL account  in config (OBYC >> UPF Transaction key ) such that 'Unplanned Delivery Costs' entered during invoice entry in MIRO will be posted a different GL account. We also changed in config from 'Distribute among invoice items' to 'Different GL Line'.
    When we try to post Invoice and add amount in 'Unplanned delivery costs' field in MIRO, system is giving error to enter 'Cost Center' since GL account characteristics is such  that Cost center is mandatory. The Cost Center field at item level in MIRO is disabled. Remember, we want to process this for INVENTORY items only, meaning items that go to stock and later issued, and not for POs created with 'Cost center' as Account assignment. We can create another GL and no cost element and assign that GL Account in OBYC for UPF Transaction key, but the client's requirement is to create 'Cost Accounting Doc' too when invoice is posted, along with Accounting and profit center docs.
    How do we fix above error ?
    Niranjan

    Closing this thread as the heading of the 'message' did not appear properly. Posting another message so heading of 'message' shows correctly.
    Niranjan

  • Work Order & Cost Center Commitment Management

    We have a business requirement to be able to view our work order commitments (Reqs and POs) from the work order as well as from the cost center assigned to the work order via a settlement rule. Our business users do not like the work order collecting all of the costs instead of the cost center where they perform their cost controlling.
    The actuals will settle to the cost center eventually but without the commitments they have no way of planning for future costs. Commitments management is activated for both the cost centers and work orders involved. I am open to any suggestions on how to achive this requirement. Thanks!

    Any thoughts?

  • Transfering the Cost from Cost center to PM Work order

    Hi all,
    We have a scenario.
    we are doing material consumption from storage locaiton to a cost center using 201.
    when the material requirement comes from work order, we are doing reverse consumption posting from Cost center to storage location using 202. and then issue the material to work order using 261.
    Is there any way, that we can move the cost directly from cost center to work order (skipping the storage location in between).
    Thanks in advance.
    Piyush

    Hi,
    I guess Initially you are transferring material (201 movement) from Central Warehouse to Cost Center assigned to each department. After that, if you get any reservation from the particular department work order, you are issuing the components to work order by doing 202 & 261 movements.
    You can follow either one way.
    1. Without doing 201 movement type, once you create a order, based on reservation you can do 261 movement to order from central warehouse directly.
    OR
    2. Define storage location, do the stock transfer between storage locations. While creating maintenance order, assign the concern storage location in the order. So from that storage location, you can do 261 movement. Also by Material valuation, you can find the value of materials as well.
    Regards,
    Maheswaran.

  • View labor and material costs in plant maintenance work order

    Hi
    I am aware we can bring in the costs in the work order through Activity types and assigning the costs to the acitvity type.
    Is there anyway we can bring in the actual cost for the work performed by the associate? should we link the work center to HRMS?
    Please advise. I need your valuable input for all the points below.
    Main points that need to be addressed:
    1. Each associate that is capable of confirming hours to a work order needs to be assigned an hourly rate that is reflective of the actual cost for the work performed by this associate. These hours are then tracked through the work order to give a cost for labor assigned to that particular job.
    2.Any materials used in the performance of the required task(s) dictated by the work order will be assigned to that order. These materials can be assigned through SAP purchase requisitions, tool crib spot buys, or procurement with a purchase card.
    3.Standard reports need to be created so we can track the total maintenance costs for any level of the equipment hierarchy as currently set up in SAP. When this report is created it should show the total maintenace costs for all the levels of the equipment hierarchy broken down into labor cost and material cost.  I am using Tcode IW37N and IW40 . Is there any suggestion?

    Greetings Chandra,
    1) You will need to create Work Centres for your associates and create the Activity Types. You can default the Activity Type for each Work Centre and maintain the rate for the activity via t-code KP26 planning.
    2) Planned and unplanned Purchase Requisitions for Components with category N will debit the order with material costs. But what do you mean by "tool crib spot buys" and "procurement with a purchase card"? You may need to develop a solution to do such postings to the Order (or for purposes of Cost controlling, manual activity allocation similar to confirming work may be desired such as Manual Activity Allocations via CO transactions (KB21N), unless you can cover that with Purchase Requisitions and POs with "F Order" account assignment.
    3) MCI8 Cost Report should be suitable for you, once you set up the Value Categories & Cost Key Figures.
    See
    PMIS Cost Analysis Reporting Overview
    Maintenance Cost Key Figures in MCI3 and MCI8 Reports
    PM Order Value categories and costs display

Maybe you are looking for