Adding new system in transport route

Hi,
I want to add new system in transport domain. Please advice me .
I have done through SE06--PERFORM POST INSTALLATION ACTIVITYS
but in STMS iam getting message as TMS configuration is not for this system.
Regards,
Asif
Edited by: Asif Ahamed on Nov 30, 2009 10:44 AM

Hi,
Take a look:
http://www.tamboly.com/ExpandTheTransportDomain.html
Regards
Mark

Similar Messages

  • SMSY generating runtime error on adding new system

    In our solution manager system, while trying to add a new system details
    via SMSY transaction we are getting the Runtime Errors
    OBJECTS_OBJREF_NOT_ASSIGNED.
    Please find the dump details.
    Runtime Errors         OBJECTS_OBJREF_NOT_ASSIGNED
    Exception              CX_SY_REF_IS_INITIAL
    Date and Time          29.05.2008 10:47:54
    Short text
        Access via 'NULL' object reference not possible.
    What happened?
        Error in the ABAP Application Program
        The current ABAP program "SAPLSMSY_ACTUALIZE_DATA" had to be terminated because
         it has
        come across a statement that unfortunately cannot be executed.
    Error analysis
        An exception occurred that is explained in detail below.
        The exception, which is assigned to class 'CX_SY_REF_IS_INITIAL', was not
         caught in
        procedure "UPDATE_HOST_LCR" "(FORM)", nor was it propagated by a RAISING
         clause.
        Since the caller of the procedure could not have anticipated that the
        exception would occur, the current program is terminated.
        The reason for the exception is:
        You attempted to use a 'NULL' object reference (points to 'nothing')
        access a component (variable: "ACCESSOR").
        An object reference must point to an object (an instance of a class)
        before it can be used to access components.
        Either the reference was never set or it was set to 'NULL' using the
        CLEAR statement.
    Information on where terminated
        Termination occurred in the ABAP program "SAPLSMSY_ACTUALIZE_DATA" - in
         "UPDATE_HOST_LCR".
        The main program was "SAPLSMSY_MAIN ".
        In the source code you have the termination point in line 2013
        of the (Include) program "LSMSY_ACTUALIZE_DATAF01".
        The termination is caused because exception "CX_SY_REF_IS_INITIAL" occurred in
        procedure "UPDATE_HOST_LCR" "(FORM)", but it was neither handled locally nor
         declared
        in the RAISING clause of its signature.
        The procedure is in program "SAPLSMSY_ACTUALIZE_DATA "; its source code begins
         in line
        1983 of the (Include program "LSMSY_ACTUALIZE_DATAF01 ".
    Source Code Extract
    Line  SourceCde
    1983 FORM UPDATE_HOST_LCR  USING    IV_HOST STRUCTURE SMSY_HOST.
    1984
    1985   DATA:
    1986         ACCESSOR        TYPE REF TO CL_SLD_ACCESSOR,
    1987         VALUE           TYPE STRING,
    1988         VALUE1          TYPE STRING,
    1989         EX              TYPE REF TO CX_SLD_API_EXCEPTION,
    1990         T_INAMES        TYPE SLD_T_STRING,
    1991         INSTREF         TYPE REF TO CL_SLD_CIM_INSTANCE,
    1992         SYSTREF         TYPE REF TO CL_SLD_CIM_INSTANCE,
    1993         CLNTREF         TYPE REF TO CL_SLD_CIM_INSTANCE,
    1994         LINKREF         TYPE REF TO CL_SLD_CIM_INSTANCE,
    1995         INSTHANDLE      TYPE STRING,
    1996         SYSTHANDLE      TYPE STRING,
    1997         CLNTHANDLE      TYPE STRING,
    1998         LINKHANDLE      TYPE STRING,
    1999         T_KEYPROP       TYPE SLD_T_VALUELIST,
    2000         I               TYPE I,
    2001         PROPLIST        TYPE SLD_T_VALUELIST,
    2002         PROPERTY        TYPE SLD_S_VALUELIST,
    2003         FILTER          TYPE REF TO CL_SLD_FILTER.
    2004
    2005   DATA STRING          TYPE STRING.
    2006   DATA IV_SYSTEM       TYPE SMSY_SYSTEM_SAP.
    2007
    2008   GET_SLD_TOP_INFO.
    2009
    2010 * Test the connection to the SLD server:
    2011   TRY.
    2012
    >>>>>       ACCESSOR->PING( ).
    2014
    2015     CATCH CX_SLD_API_EXCEPTION INTO EX.
    2016       VALUE = EX->GET_TEXT( ).
    2017       MSGMACRO 'SCDT_LIS_IF' 'E' 11 'LCR_ERROR'.
    2018   ENDTRY.
    2019
    2020
    2021 * Catch all exceptions potentially triggered by the API:
    2022   TRY.
    2023
    2024
    2025 *   Create a new instance representation object for class SAP_BCSystem.
    2026 *   If an accessor object is supplied in the constructor, the object
    2027 *   reference of the representation can be used in other accessor
    2028 *   methods.
    2029       CREATE OBJECT SYSTREF
    2030         EXPORTING
    2031           CLASSNAME      = 'SAP_ComputerSystem'
    2032           ACCESSOR       = ACCESSOR.
    I am already at the latest support package i.e13
    Regards
    Anthony

    Hi Anthony
      Is your problem solved . I M facing the same problem . I found another thread which is suggesting to follow SAP note 1042815. But it seems that we need to change Some standard include to get it fixed .
    Does SAP suggest to change their own program .
    Waiting for your reply .

  • How to add new system call in solaris ?

    Hi,
    I want to add new system call in solaris. please inform me steps for adding new system call in solaris.
    Thanks in advance,
    Mahantesh.

    Here's a Solaris 7 example I know there are others ...
    http://access1.sun.com/cgi-bin/rinfo2html?267899.faq
    I haven't seen a good example of how to support both the 32 and 63-bit environment.

  • All Values Deleted from Target System when transporting new values added

    Hi,
    Wasn't really sure where to put this question.
    I created a maintenance view between two Z tables. A main key table and a text table.
    I added the new values to the maintenance view and transported successfully.
    I then had a request to create 3 more values.
    I added these three and transported these to the target QA system.
    However when the transport completed, all entries bar one had been deleted from the Z table but the Z text table had all existing entries plus the three new ones.
    I've tried manually creating a transport and adding all 10 entries but this has the same problems.
    If I SCC1 the entry from one dev client to another it works fine.
    Has anyone come across this problem befor and know how to resolve it?
    Many Thanks
    David

    Yes, I managed to sort it.
    This is what I did:
    I created a new blank transport.
    For the task created under the transport I then opened the task object list.
    I then added two entries in this list. i.e. one for each table that was in the view.
    My entries where:
    Entry 1:
    Program ID: R3TR
    Object Type: TABU
    Object Name: ZNR_REASON
    Then click on the key icon and add:
    Table Name: ZNR_REASON
    Table Keys: 200* (NOTE 200 is our development client). The '*' is needed to that ALL entries are included in the transport.
    Entry 2:
    Program ID: R3TR
    Object Type: TABU
    Object Name: ZNR_REASONT
    Then click on the key icon and add:
    Table Name: ZNR_REASONT
    Table Keys: 200* (As above 200 is our development client). Again the '*' is needed to that ALL entries are included in the transport.
    I hope this helps.
    Regards
    David

  • Adding a new system to the transport domain

    Gurus ,
       currently our landscape is a 3 system landscape . We are SAP BUSINESS SUITE users  . we are using ECC 6.0 on AIX with AS ABAP .
       we are planning for one sand box system on AIX with both AS ABAP and AS JAVA . but we  have certain confusions and lack of clarity on certain portions . hope over which you all can throw light ,
       - Will there be any difference in license info for using ECC with AS ABAP (or) ECC with AS ABAP + JAVA .
      -  would be able to add this system to our transport domain without including the system in solution manager
    - can we make clinet copies from a ECC system with ABAP alone to a ECC system with ABAP +JAVA
    - How to get more clarity on the license perspective of adding this system 
    please guide us

    1. Will there be any difference in license info for using ECC with AS ABAP (or) ECC with AS ABAP + JAVA .
    According to me there is not any differences in license, when you apply for the license you have to select the system as ABAP+JAVA and i dont think that you need to install any license for java in ECC
    2. would be able to add this system to our transport domain without including the system in solution manager
    Yes if Solution manager is not your domain controller. You can add the system into your domain, For the transport between 2 system is the requriement is that both system should be same relase with Same ABAP support pack and Kernel (as per my understnading).
    3. can we make clinet copies from a ECC system with ABAP alone to a ECC system with ABAP +JAVA
    This is think might not be possible but not sure for this, becuase there must be some ddic difference in both system.
    Please correct me if i am wrong.
    Regards,
    Subhash

  • Adding system with same name as existing in transport routes

    Hello,
    I have following tms scenario, (DD1 is tms domain):
    DD1->DQ1->DP1
    I need to include copy of DP1 system in the transport routes to have situation like this :
    DD1->DQ1->DP1
                    |->DP1 (copy)
    My question is: Is it possible for two systems with the same name to exist in tms, or if it is not possible how to resolve this ?
    Thank You and best regards!

    You should have changed the SID during the system copy... SID stands for System ID... you can't have two systems with the same SID in the TMS
    Regards
    Juan

  • How can I add a system to the transport route?

    Hi,
          I have a DBP --> PBQ --> PBP systems and now I have a new environment TRN (Training system) and I want to include this system in the transport route.
    Right now the transport route is configured like I said 'DBP --> PBQ --> PBP' and I want to include this environment (TRN) to the transport route because I want that the system pass automatically the orders that going to PBP system to TRN too in the same time that pass it to PBP. For example, like this:
                     PBP
    DBP --> PBQ ==>
                     TRN
    How can I do that?
    <removed_by_moderator>
    Read the "Rules of Engagement"
    Thanks people!!
    Edited by: Juan Reyes on Apr 16, 2009 8:57 AM

    Hi Carlos,
    whatever be the environment, whether it is DEV, QA or PRD, when you login into an ABAP SAP system and run transaction STMS,
    In the initial screen, it always shows two fields, System and Transport domain.
    System field contains the SID in which you are currently logged in.
    Transpor Domain shows value like this: DOMAIN_SID
    here this SID is the domain controller for the system in which you are logged in
    However, if you are logged in the domain controller system itself and then run STMS, then it will show in the lower half of the screen, that, you are logged in as a Domain Controller.
    To be more clear, run STMS in any system and Menu->Overview->Systems->Second column 'TMS system type' must contain a 'domain controller symbol' against one sytem SID. this SID is the domain controller.
    thanks
    Bhudev

  • Adding a new system to existing ChaRM Project

    Hi,
    We have configured Charm in our landscape and we use Solution Manager 7.1 SP08.
    Requirements:
    Add a new system to the existing ChaRM Project.
    Edit the logical components for e.g. To replace current SID (QA1) with another SID (QA2)
    Add items (Systems or Tasks)to the existing task list
    We faced problems (duplicate record dumps), while configuring as per our requirements above. SAP suggested us to
    Close the Project and create a new one to include a new system. [This is not feasible for us]
    Close the current maintenance cycle and create a new one if you want to edit the logical systems or to add any task or system to the existing task list.
    So we have the following questions
    What is the impact on closing the current maintenance cycle? We have half of transports in released and half in locked status.What happens to the transports that are not yet released?
    Will they automatically get released or
    Will they not get impacted or
    Will they get assigned to the new maintenance cycle automatically or
    Do we need to do it manually or does it not matter
    Since we are close to starting our ITC, how do we go about that? How will we bundle our transports for our ITC with different maintenance cycles holding transports
    What is the impact on locking a maintenance cycle?
    What is the impact on project team members on creating a new maintenance cycle?
    How does the maintenance cycle get impacted if we refresh existing systems?
    Have you faced a similar problem? Is there an alternate solution?
    If we need to add a new development system to the Project do we need to close the current project or just add it to a new maintenance cycle?
    Reporting
    How do we run a report for stats by Maintenance cycle
    --> System --> Transport released
    --> System --> Transports created (not released)
    How does reporting get impacted if we make the changes stated above

    Hi Nanada,
    check the below blog,to adding - Add a new system to the existing ChaRM Project.
    Charm task list creation for newly added system... | SCN
    So we have the following questions
    What is the impact on closing the current maintenance cycle? We have half of transports in released and half in locked status. - dont close the MC with out proper TR movement in PRD. it will make the system inconsistency. if it is released TR not able to unassigned from MC . this feature available from SP10. What happens to the transports that are not yet released?
    Will they automatically get released or - no
    Will they not get impacted or - make solman inconsistency
    Will they get assigned to the new maintenance cycle automatically or- if not released from DEv, it needs to assign manually from one MC to other MC
    https://websmp106.sap-ag.de/~sapidb/011000358700000611352012E/index.htm
    Do we need to do it manually or does it not matter - yes, check the above link
    Since we are close to starting our ITC, how do we go about that? How will we bundle our transports for our ITC with different maintenance cycles holding transports
    What is the impact on locking a maintenance cycle?
    What is the impact on project team members on creating a new maintenance cycle?
    How does the maintenance cycle get impacted if we refresh existing systems?
    Have you faced a similar problem? Is there an alternate solution?
    If we need to add a new development system to the Project do we need to close the current project or just add it to a new maintenance cycle?
    Check the Dolores blog -
    Change Request Management scenario: Usual questions and known errors
    Rg,
    Karthik

  • Need Transport route for two systems(Urgent)

    Hi All,
    I have configured everthing like configuring domain controller and added to to domain controller.
    Now i need to do below steps
    I have Development (client) and Quality(client) in same system and Production as separate server.
    I want to configure transport route from Development client to Quality client and from Quality client to Production Server.
    Development Server SID is DEV ( Dev Client 100 and Quality Client 140) and Production Server SID is PRD
    Transport route must be configured like below:
    DEV( Dev client 100) -> DEV (QAS client 140) -> PRD
    We are struck with this
    Best Regards,
    Pratyusha

    Hi Pratyusha,
    As far as configuring Development and Quality systems concern, in one system is not suggested. I think you are aware of this.
    However, I need some more information on your question like the operating systems which you are using in DEV/QAS and in PRD.
    First, configure the Domain Controller in either DEV/QAS or PRD.
    Irrespective of the OS, you need to maintain IP address along with the host name and fully qualified domain in the etc/hosts file.
    for example DEV/QAS system ip address is 172.16.23.14 and host name is abc007, then you need to make an entry in etc/hosts file at the OS level as follows.
    172.16.23.14 abc007 abc007.yourcompany.com
    where in abc007.yourcompany.com is the fully qualified domain name.
    Once you done this in both, DEV/QAS and PRD, systems, then configure 3 system landscape from STMS tcode in the other system which is not a Domain controller.
    I hope this is helpful. Getin touch if you have any more questions or doubts.
    Regards,
    Satish.
    Edited by: Satish Arram on Jul 31, 2008 2:06 PM

  • Adding new Remote System unavailable in Web Service Request

    Hi,
        I created a CRUD Web service from a table using web service generator.I added a new remote system to the repository.When I invoke the create operation (which has key mapping "Yes"),it says "Remote System not found in the repository"
    I am able to view the Remote System via Data Manage though.
    Any ideas?
    Regards,
    Premjit

    Hi Premjit,
    When did you added new remote system?
    Before generating web services.
    Or After generating web services.
    If you have added remote system after generating web services.
    Then try re-generating web services using web service generator.
    Regards,
    - Shailesh

  • Adding new Computer to my Home Network and I have a WRT54GS .V5 Router

    I have a existing home network connecting a HP laptop and a Dell desktop and all is well. Now however I bought a new Lenovo laptop with the Vista OS with SP1 and I would like to connect it to my home existing home network. I know this might be a rather simple question BUT I am not great with networks and I set up my home network years ago and I draw a blank on how I did it. There is one CD I found that I marked with the words Remote Linksys Install on it and there is one file on it named NetSetClient. Not sure why I kept it and I do not remember what it does but might help in getting my solution.
    Please help the network novice

    As your linksys router is configured and its working on 2 other computers perfectly fine, so you dont have to run the CD again on your new computer. Is your new computer is a Wireless computer, So on your New computer, in the system tray, Right click on Two computer Icon and select "Connect to a Network".. selecte your Wireless network... type in your security key and click on Connect. After this try going online.
    If you new computer is a Wired computer, Just plug in the cable from your New computer to the Router and you will be able to go Online.

  • ChaRM transport route, one development, 2 QA, 2 PRD system landscape

    Hello,
    We have a customer who has an ERP system with a transport route which is the following:
    One single Development system which feeds, 2 QA systems and then 2 PRD systems.
    We are to implement ChaRM and we want to customize the tickets so that every time you execute the import action of a transport request into QA (and later into PRD) both systems QA1 and QA2 are updated and later on with PR1 and PR2.
    We would like to know how to support this scenario in Solution Manager using ChaRM.  How do we set up the logical component at SAP, how we define the transport route and layers, and how we define the actions in the SDHF ticket.
    I appreciate your help.
    Regards
    Esteban

    Hello,
    We set up a testing environment for change request management. In a solution manager we created five clients.  One single development which feeds two quality systems, and final two production system.  As it was said in the thread we used transport groups in the transport route.  The development system feeds this transport group which feed to import queus in quality systems.  We tested this transport route and transports worked well and arrives into both production 1 and production 2 systems.
    Then created a logical component for that landscape, with five sytems.  Then we created a maintenance project using that logical component.  We created a maintenance cycle and then a task list was created which shows two delivery system, and the two productive  systems.  All the groups have the right actions.
    However when we created a SDHF correction the system creates the task list only for 3 systems, not for the five of them. 
    we see that only action groups are created for development, quality 1, and production 1.  No entries for quality 2 and production 2 
    We try to run the action which is in the general part of the task list to execute the import in multiple systems, it cames out with the correct selection of importing in quality 2 system because it is the transport group.  However an error is raised saying that the actions for  quality 2 are not there in the task list which is true.  Finally, as short term solution, we were able to import into quality 2 and later on pr1 but done manually in the stms transactions which is not what we want to do.
    Regards
    Esteban Hartzstein
    Edited by: Esteban Hartzstein on Aug 24, 2010 2:06 AM
    Edited by: Esteban Hartzstein on Aug 24, 2010 2:07 AM

  • Configuring  Transport route in Java system

    Hi,
    Pls let me know the steps to configuring transport routes in Java System.

    Hi,
    Please look at the following pdf which tells you about CTS+ in portal with only java and non abap objects.
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/90d3b550-b6fb-2910-0fa5-ece5d61fb9c3
    Rakesh

  • GuiXT:  Recently we have added new SAP system EIQ

    Hi,
    Our client is using GuiXT since long time. Recently my firm started
    taking care of GuiXT operations. Recently we have added new SAP system EIQ. GuiXT is not working on the new system. It is working fine with other existing SAP system EIT and EIK. Please let me know what all GuiXT related settings need to be done on the new server.
    Thanks in Advance
    Regards
    Gaurav Raghuvanshi
    Message was edited by: Matthew Billingham - Please read the Terms and Conditions re: "urgent"

    Hi Gaurav,
    You need an additional key for the new system, which Synactive will provide as part of your client contract. Once you have the new key configured in the guixt ini file, everything should work as desired.
    Good luck.
    Best,
    Vishal

  • Just moved to new home, updated router and new system with Time Warner and now we cannot get the appl

    just moved to new home, updated router and new system with Time Warner and now we cannot get the apple any ideas?

    Castle15 wrote:
    just moved to new home, updated router and new system with Time Warner and now we cannot get the apple any ideas?
    Cannot get the Apple.. what?
    Model and actual device you are talking about?
    Apple covers a pretty huge range.. If you mean extreme.. did you reset it to factory and start over.. that is always necessary when you change a network. You cannot pick up a router from one home and network and plonk it into another and have it work.. aint gonna happen.
    You also need to power down any pure cable modem for 20min or so to get it to forget the old MAC address that captured the IP so the Apple ??? has a chance to work.

Maybe you are looking for