Allocation structure changes at settlement (KO88)

Guys,
Here's a question from the PM contingent...
Is it possible to determine the <i>allocation structure</i> at the point of performing <i>settlement</i> for a PM order (e.g. KO88).
I've had a quick look for user-exits, but couldn't find anything.
Thanks in advance

Allocation Structure is define under settlement profile and this settlement profile is assigned to PM order Type.
Pl check and define your allocation structure and assinged to you allocation rule .
Thanks
Rajiv Pandey

Similar Messages

  • Error In allocation Structure when doing settlement to GL from WBS

    Hi All,
    I got this error message. What should i do? I try to check my allocation structure...but it seem correct.
    Complete allocation structure Z3
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 901000 cannot be assigned to a settlement cost assignment in allocation structure Z3, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element 901000 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure Z3

    Hi Sreenivas ,
    The accounting document looks weird :
    Hi,
    Settlement profile : ZPS001
    GL, CC, Order, WBSE and FXA optional
    Document type : SA (GL Account doc)
    Distribution rule : 10
    Residence time : 24
    Allocation strucutre Z3
    Default object type : FXA
    tick on % settlement and equivalence no
    to be settled in full
    Allocation structure : Z3
    Assignment : 1.Labour ,2.MAterial, 3. Subcontract
    Source       : 1. PSlabour , 2.PSmaterial 3. PSsubcon 4.Cost
    Settlement cost center : FXA (ticl by CE), CTR (settlement cost element 90200) ; ORD (Settlement cost element 902001); GL put 747100f
    I already successfully settle from WBS to GL 747100(settlement receiver)  However, when i check FB03 it shows that
    GL account 747100 
    Posting key 40
    Amount 25000
    GL Account 747100
    Posting key 50
    Amount -25000
    What the problem ?
    Cheers,
    Nies

  • Message no. KD503 - Complete allocation structure K1 for Internal Order

    Hi,
    During Internal order settlement through KO88 I am getting this error as :
    Message no. KD503 - Complete allocation structure K1
    Diagnosis :
    During settlement, the system puts the sender debits into groups  (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters). Cost element 430500 cannot be assigned to a settlement cost assignment in allocation structure K1, and therefore it cannot be assigned to a  settlement cost element.
    Procedure :
        Possible solutions are as follows:
        o   If the posting under cost element 430500 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
        o   If the posting was made correctly, you can do the following:
    a)  You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose
        "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.  If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted  in the settlement profile when you create sender master data or when you maintain the settlement  rule.
    -   You can update allocation structure K1
    The same configuration in  Development Server there is no error but problem occurs in Quality server. Here the process is Internal Order creation - Creation of Reservation through MB21- Goods Issue against reservation  through MB1A and finally settlement through KO88.  During settlement this error occur. In configuration setting of allocation structure under Internal Order I have mentioned only revenue settlement (as per business) against assignments. Under source mentioned cost element group and under settlement cost elment Receiver Cat is "CTR" and tick "By Cost Element".
    During MB1A i.e, goods issue accounting entry is generated as
    81(Dr). 430500 Constimptuion Saprae and Stores
    99(Cr). 310411 Inventory Machinery and Spare.
    During settlement this debit figure should credit. But not allowiing to credit. Even in configuration under settlement cost element if I remove the tick of "By cost element" and mention secondary gl account whose cost element category is 21, still showing the same error in QA server. What may be the probabale solution ? Even if i remove allocation structure K1 from settlement profile 20 still same error exist. How this link gets during settlment inspite of removing allocation structure from settlement profile...
    NB.. COPA is not implemented in our company. So PA structure should not arrise here....
    Thanks & regards,
    Samrat
    Edited by: Samrat Roy on Aug 30, 2010 7:28 PM

    Hi Samrat,
    The issue is very simple.. Cost element 430500  is posted in your IO...
    While settling you have 2 options... Either you can credit the original GL account 430500.. This happens when you tick "By Cost element".. This you have done already...
    2nd option is not to tick "By Cost element" and assign a secondary cost ele category 21...
    But for any of these options to work, you have to include GL 430500 in the "source"... The above 2 options apply only to those GL accounts which are mentioned in the "Source".... for rest of the GL accounts, system gives this error
    Include 430500 in your "source" cost ele group.. Error will be resolved
    Regards
    Ajay M

  • Error in AUC Settlement -KO88

    Hi,
    Here in allocation structure -for source,i have given one cost element a/c # 809001
    for settlement cost element,i have given diffferent costelement 809002
    Note:This is because,we want all debits to capital internal orders through a/c # 809001 and all settlements to AUC through 809002(I gave this in allocation structure,aginst -FXA.
    While doing the AUC Settlement in KO88,i am getting the below error.Kindy advice me how to fix this issue.
    Define a settlement cost element for receiver type FXA
    Message no. KD506
    Diagnosis
    In allocation structure A1 (controlling area 1000), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type FXA.
    Procedure
    Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
    Thanks
    Supriya

    Hello,
    OKO6, hope you must have defined your allocation structure properly.
    Please go to OKO6,
    select your allocation structure.
    click on assignments.
    select the assignment relevant
    double click on settlement cost elements
    Put receiver category FXA
    Select if you want to settle it to the same cost element then tick by cost element.
    Otherwise, if you have already created settlement cost element you can use that CE created with cost element cateogyr 21 (KA06)
    But you cannot use both (either you can tick primary cost element or secondary cost element)
    Please recheck your settlement profile settings and order type settings.
    Hope you should be able to solve
    Regards,
    Ravi

  • We are getting the following error "Complete allocation structure GA"

    Hi,
    Please help on the below issue:-
    We are carrying settlement of order  (Period end activities ) for  CO88 .  We are getting the following error complete allocation structure GA.
    Please guide us.
    Regards
    Srinivas

    Hi,
    Go to Allocation structure and maintain the Source and Settlement cost element for various cost groups in the structure.
    And maintain this Allocation Structure in the settlement profile for your Production/Process orders.
    Regards
    Balaji

  • Error : complete allocation structure while doing Ko88 settlement.

    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element S10100 cannot be assigned to a settlement cost assignment in allocation structure A2, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element S10100 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure A2

    Dear,
    Please refer my reply in this thread,
    Error in Rework order settlement
    Regards,
    R.Brahmankar

  • KO88 - message KD503 'Complete allocation structure ZD'

    Hello,
    Need some help regarding settlement error KD503 a user is getting via KO88.  User made posting to an incorrect primary cost element (611010).  That cost element is NOT included in the allocation structure and it should not be included.  The user reversed out the incorrect posting and tried to settle the IO.  The KO88 transaction still yields KD503 error.  Any ideas what the problem is?
    Both transactions were made in currency 'SGD'.  When running S_ALR_87012993 to check line item total for 611010 in IO, balance is 0 in 'SGD' but $.06 in CO area currency.  Would this be causing the issue?
    I'd appreciate your immediate help!  I've attached files in case it helps.

    Hi Mathew
    Nice to be talking to you again
    The balance of .06 is not the issue.. You posted a line item in the IO... And then reversed it
    So, from system's point of view, it has 2 line items in the IO to be settled..
    You will have to include this cost element temporarily in your allocation structure, as a formality.. Once the settlement is done, you can remove it again
    Include this Cost ele under any assignment in your allocation structure.. Impact would be null because the 2 line items nullify each other
    Br. Ajay M

  • While Doing Production Order Settlement "Complete Allocation structure" :

    Dear Experts
    I am Getting This Problem ,
    please give me A suitable Solution.
    I am created Another Allocation Structure And Assigned to Settllement Profile . But it is not trigering. Not Capturing That allocation
    Complete allocation structure Z1
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 40512006 cannot be assigned to a settlement cost assignment in allocation structure Z1, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    u2022     If the posting under cost element 40512006 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    Edited by: rajamallu on Jul 2, 2010 10:41 AM

    Hi,
    within allocation structure customizing you create assignments for allocation structure Z1.
    Each assignment has a source (cost element, cost element range, cost element group).
    The cost element 40512006 is not included in the source definition of allocation structure Z1 but there are values to be settled available on your sender.
    Thus they cannot be settled and thats why the message occurs. So maintain alloc. structure Z1 completely.
    Best regards, Christian

  • Change of Source Structure for Partial Settled WBS elements - CJ02

    Hi
    As per standard SAP, the change of source structure under settlement perameters of WBS element is not supported when the settlement of WBS element is done either partial / full.
    However, the client needs this change by doing any Z-Development as one time activity (since the source structure was changed for certain WBS elements as per change in business process).
    Can i Know procedure to do the Z development to modify the source structure for partial settled WBS elements and also let me know the any side effects in this regard.
    Regards
    Anil

    Hi Anil,
    I agree with Ajay. You can try to change it in Debugging mode.
    The values are handed over from include LCJWBF5Q (form project_settle_single using)      
    Some customer have also made a modification as a permanent solution.    
    Unfortunately in the standard it is not possible.
    regards Bernhard

  • Allocation Structure, Settlement issue

    Dear All,
    I have created a Allocation Structure with following details:
    Allocation Structure: XX
    Assignment: 01, 02, 03...
    Co AREA: YYYY
    In Source: I assigned relevant Cosat element groups
    In Settelment Cost Elements: I assigned Secondary Cost elements
    I have maintained the Settlement rule to settle WBS to CTR in CJ20N.
    I have also checked that Allocation Structure XX is comming in Settlement paramters in the WBS (CJ20N)
    After few postings on WBS element i get an error "Maintain sources for allocation structure A1 (this is pointing to a different allocation structure) in controlling area YYYY"
    Ques 1: Is there any other config to be maintained required to Settle the Project to CTR.
    Ques 2: In the settlement Profile what Document type i need to maintain?? Is this mandatory?
    Ques 3: Is it must to create a source structure? 
    Warm Regards,
    Jatinder

    Dear Gokul,
    Yes this is newly configured allocation structure.
    I have created a new settlement profile (where i have also assigned the new allocation structure) and assigned the Project profile. 
    Regards,
    Jatinder

  • WBS settlement issue:Complete allocation structure A1.Message no. KD503

    hi all
    I created an WBS  600041 and through FB60 posted the JV by assigning the WBS 600041.
    Then I saw in CJI3 the posting is done and it is showing there and I created a settlement rule and gave the 100 % cost settlement on AUC and saved it. Now when I go to CJ88 and do the actual settlement and gave all the parameters for full settlement and execute it is giving the following error
    Complete allocation structure A1.Message no. KD503
    Is this problem due to cost elements? How do I go about it.please suggest.
    kind regards
    Aman

    HI,
    Check  your allocation structure OKO6 transaction. see whether your allocation structure is having the expense cost element  you posted listed in it
    OKO6- select your allocation structure-Assignments-source
    Here the GL account should be listed
    Regards,
    Radha

  • Allocation Structure in CO Assignment Settlement Missing

    Hi,
    Pls help i am facing an issue to allocation Structure in CO Assignment Settlement while CO88
    For referance error massage no. KD506. i got to know i need to assign the cost elements but where and which ? That help i need from experts with bit more understandable. If possible document with screenshots is help to get resolve the issue.
    Thanks in advance.
    Milind Joshi

    Hi...
    if you double-click on the message it will show you what are the cost elements that are not assigned yet.
    You need to access the allocation structure you use (it should be in the error message) and proceed with adding the respective cost element to complete the settlement. (transaction OKO6->pick allocation structure)
    Hope it helps.
    Panagiotis
    ps...in case you still have issues could you write down the entire message as it appears when you double click on it?

  • Allocation Structure

    Hi,
    When we execute the T.code KO88(Order Settlement for AUC), showing the below Error Message.
    Complete allocation structure A1
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 410006 cannot be assigned to a settlement cost assignment in allocation structure A1, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element 410006 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure A1
    We have assigned Cost element for Receiver Cat. FXA.
    What is the Problem?
    Thanks in advance

    In the allocation structure you need to include the source CE 410006.
    Allocation Structure>Assignments (double click)>Source (double click)
    Here in source you should have the CE mention in From else you should have created a CE group including this CE.
    And now for this source ensure you've maintained the Settlement cost element (for FXA) either 'By Cost Element' or Settlement cost element.
    Regards
    Sreenivas

  • Pa allocation structure for pm orders

    hi fico experts,
    can any one tell us how to configure the pa allocation structure for pm orders for revenues billing thru dip profile use for service orders.
    pl help
    thanx in advance
    regards
    srihari

    hi
    I need to  post to COPA at the time of settlement of PM order thru KO88 with multiple order line items in PM order.
    to clarify further,
    Currently I am able to do  settlement to cost center as per settlement rule in pm order with one order line item, when i have 2nd line item in same order, we are not able to do settlement thru ko88 because this has been linked to dip profile.
    pl revert if u need more info
    thanks in advance
    regards
    srihari

  • Complete Allocation Structure A1

    Hi everyone,
    I have a problem concerning settlement of orders. Running transaction va88 gives me an error message stating that I should complete allocation structure a1. However, this is not the allocation structure I want to use. The message says that I can assign a different allocaton structure to the sender by chosing Settlement Rule --> Goto --> Settlement Parameters in the master data of the sender.
    Now my question is where to find the master data of the sender!? Thanks for your help!
    Regards,
    Martin

    Hi,
    I have solved this issue now. Changed the allocation structure. Now I still have one problem concerning an account which is not maintained in the strucutre. However, to assign this cost element to the right part of the structure is something my controlling people have to figure out.
    Thanks anyway for all you help.
    Regards,
    martin

Maybe you are looking for

  • G500 problem in windows 8.1 With dolby

    I just purchased a brand new G500 with windows 8.1 There is a sticker that indicates dolby advanced v2 but i see no application whatsoever (like I do in my daughter's Acer win7 laptop with dolby). Am i missing a driver or application? Laptop     3rd

  • SOLMAN user

    Hello everybody,    I have some confusion about the SOLMAN user is  must required in solution manager? because i had delete some users in the solution manager. If SOLMAN user is must required then please tell me the        user type        What shoul

  • Can I remove protected mode ..reader X

    Is it possible to shut off the protected mode in Adobe Reader X that was introduced in Acorbat 10.1 ?

  • Inerface to BAPI Interface

    Hi All, I have a requirement where in i need to create a BAPI as a separate interface and then call this BAPI in a BPM created in another interface. This BAPI interface is to be created in a genaralized format for reusability. Is it possible to achie

  • I found a solution to Photoshop CS6, Windows 8.1 HiDPI, Small UI problem

    I found a solution and here it is - I have been struggling to find a solution to the small UI on Photoshop and Illustrator CS6 issue since May 2014 when I purchased a Dell XPS15 with high resolution.  Like many, I've spent countless hours searching f