Allocation structure issue

Dear sap,
cost elements that have been used for postings to our projects but the cost elements are not included in the allocation structures.
As a consequense are the settlements ot the projects malfunctioning.
Cost element     Allocation structure     Malfunctioning WBS             
190198           KO                                  389001938.00002            
497162          KP                                   47800439.04                 
How to update the allocation structures to include the above cost elements.
Reg
Umi

Hi,
Go to Allocation Structure which you are using for this and see what is the cost element group or range you entered in the Allocation structure.
Once you find the range or cost element group, you need to include the above cost elements into the Ranges or cost element groups.
Your issue will be solved..
Thanks

Similar Messages

  • Allocation Structure, Settlement issue

    Dear All,
    I have created a Allocation Structure with following details:
    Allocation Structure: XX
    Assignment: 01, 02, 03...
    Co AREA: YYYY
    In Source: I assigned relevant Cosat element groups
    In Settelment Cost Elements: I assigned Secondary Cost elements
    I have maintained the Settlement rule to settle WBS to CTR in CJ20N.
    I have also checked that Allocation Structure XX is comming in Settlement paramters in the WBS (CJ20N)
    After few postings on WBS element i get an error "Maintain sources for allocation structure A1 (this is pointing to a different allocation structure) in controlling area YYYY"
    Ques 1: Is there any other config to be maintained required to Settle the Project to CTR.
    Ques 2: In the settlement Profile what Document type i need to maintain?? Is this mandatory?
    Ques 3: Is it must to create a source structure? 
    Warm Regards,
    Jatinder

    Dear Gokul,
    Yes this is newly configured allocation structure.
    I have created a new settlement profile (where i have also assigned the new allocation structure) and assigned the Project profile. 
    Regards,
    Jatinder

  • WBS settlement issue:Complete allocation structure A1.Message no. KD503

    hi all
    I created an WBS  600041 and through FB60 posted the JV by assigning the WBS 600041.
    Then I saw in CJI3 the posting is done and it is showing there and I created a settlement rule and gave the 100 % cost settlement on AUC and saved it. Now when I go to CJ88 and do the actual settlement and gave all the parameters for full settlement and execute it is giving the following error
    Complete allocation structure A1.Message no. KD503
    Is this problem due to cost elements? How do I go about it.please suggest.
    kind regards
    Aman

    HI,
    Check  your allocation structure OKO6 transaction. see whether your allocation structure is having the expense cost element  you posted listed in it
    OKO6- select your allocation structure-Assignments-source
    Here the GL account should be listed
    Regards,
    Radha

  • Message no. KD503 - Complete allocation structure K1 for Internal Order

    Hi,
    During Internal order settlement through KO88 I am getting this error as :
    Message no. KD503 - Complete allocation structure K1
    Diagnosis :
    During settlement, the system puts the sender debits into groups  (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters). Cost element 430500 cannot be assigned to a settlement cost assignment in allocation structure K1, and therefore it cannot be assigned to a  settlement cost element.
    Procedure :
        Possible solutions are as follows:
        o   If the posting under cost element 430500 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
        o   If the posting was made correctly, you can do the following:
    a)  You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose
        "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.  If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted  in the settlement profile when you create sender master data or when you maintain the settlement  rule.
    -   You can update allocation structure K1
    The same configuration in  Development Server there is no error but problem occurs in Quality server. Here the process is Internal Order creation - Creation of Reservation through MB21- Goods Issue against reservation  through MB1A and finally settlement through KO88.  During settlement this error occur. In configuration setting of allocation structure under Internal Order I have mentioned only revenue settlement (as per business) against assignments. Under source mentioned cost element group and under settlement cost elment Receiver Cat is "CTR" and tick "By Cost Element".
    During MB1A i.e, goods issue accounting entry is generated as
    81(Dr). 430500 Constimptuion Saprae and Stores
    99(Cr). 310411 Inventory Machinery and Spare.
    During settlement this debit figure should credit. But not allowiing to credit. Even in configuration under settlement cost element if I remove the tick of "By cost element" and mention secondary gl account whose cost element category is 21, still showing the same error in QA server. What may be the probabale solution ? Even if i remove allocation structure K1 from settlement profile 20 still same error exist. How this link gets during settlment inspite of removing allocation structure from settlement profile...
    NB.. COPA is not implemented in our company. So PA structure should not arrise here....
    Thanks & regards,
    Samrat
    Edited by: Samrat Roy on Aug 30, 2010 7:28 PM

    Hi Samrat,
    The issue is very simple.. Cost element 430500  is posted in your IO...
    While settling you have 2 options... Either you can credit the original GL account 430500.. This happens when you tick "By Cost element".. This you have done already...
    2nd option is not to tick "By Cost element" and assign a secondary cost ele category 21...
    But for any of these options to work, you have to include GL 430500 in the "source"... The above 2 options apply only to those GL accounts which are mentioned in the "Source".... for rest of the GL accounts, system gives this error
    Include 430500 in your "source" cost ele group.. Error will be resolved
    Regards
    Ajay M

  • Complete Allocation Structure A1

    Hi everyone,
    I have a problem concerning settlement of orders. Running transaction va88 gives me an error message stating that I should complete allocation structure a1. However, this is not the allocation structure I want to use. The message says that I can assign a different allocaton structure to the sender by chosing Settlement Rule --> Goto --> Settlement Parameters in the master data of the sender.
    Now my question is where to find the master data of the sender!? Thanks for your help!
    Regards,
    Martin

    Hi,
    I have solved this issue now. Changed the allocation structure. Now I still have one problem concerning an account which is not maintained in the strucutre. However, to assign this cost element to the right part of the structure is something my controlling people have to figure out.
    Thanks anyway for all you help.
    Regards,
    martin

  • Complete Allocation Structure A1 in K088

    Every month end, we settle IO unused supplies to inventory accounts (using KO88) but last July 2011 until today, system prompts this error: "Complete Allocation Structure A1"? Can anyone please help me resolve the error? Upon checking the settlement allocation structure, the master data and parameters seems all accurate. Please help resolve this issue. Thank you all in advance.

    hi Gracey
    your error msg. must be showing some cost element missing in the allocation structure.
    Kindly maintain the same in A1...
    Check the link below
    Message no. KD503 - Complete allocation structure K1 for Internal Order
    Regards,
    Divraj

  • Allocation Structure in CO Assignment Settlement Missing

    Hi,
    Pls help i am facing an issue to allocation Structure in CO Assignment Settlement while CO88
    For referance error massage no. KD506. i got to know i need to assign the cost elements but where and which ? That help i need from experts with bit more understandable. If possible document with screenshots is help to get resolve the issue.
    Thanks in advance.
    Milind Joshi

    Hi...
    if you double-click on the message it will show you what are the cost elements that are not assigned yet.
    You need to access the allocation structure you use (it should be in the error message) and proceed with adding the respective cost element to complete the settlement. (transaction OKO6->pick allocation structure)
    Hope it helps.
    Panagiotis
    ps...in case you still have issues could you write down the entire message as it appears when you double click on it?

  • Complete allocation structure Z4 Message no. KD503

    Complete allocation structure Z4
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 90001000 cannot be assigned to a settlement cost assignment in allocation structure Z4, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element 90001000 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure Z4
    Please help resolve error below.
    What do I need to reverse?
    Is there a different way to enter actual cost for this?
    What do you think is missing in my allocation structure?

    Hi paul
    This error message you are getting KD503
    This message comes up at the time of settlement of the order when you are transferring the cost from on cost object to the other. Here you are giving the final cost settlement on the asset so the final asset is where all the cost is going to get settle for the cost which you have taken in the internal order. you have to define a roadmap for the cost elements which is carrying the cost from the IO to the final asset.
    The resolution Is do the following: go to KO88 and explore the juke box where you have booked all the jv take note of all those cost elements now come to KSES and here under Z4 allocation structure give CO  area and go to source tab and give the range of cost elements that you have used in ko88 and save it
    This will resolve your issue.
    Kind regards
    Arman
    SAP FICO

  • KO88 - message KD503 'Complete allocation structure ZD'

    Hello,
    Need some help regarding settlement error KD503 a user is getting via KO88.  User made posting to an incorrect primary cost element (611010).  That cost element is NOT included in the allocation structure and it should not be included.  The user reversed out the incorrect posting and tried to settle the IO.  The KO88 transaction still yields KD503 error.  Any ideas what the problem is?
    Both transactions were made in currency 'SGD'.  When running S_ALR_87012993 to check line item total for 611010 in IO, balance is 0 in 'SGD' but $.06 in CO area currency.  Would this be causing the issue?
    I'd appreciate your immediate help!  I've attached files in case it helps.

    Hi Mathew
    Nice to be talking to you again
    The balance of .06 is not the issue.. You posted a line item in the IO... And then reversed it
    So, from system's point of view, it has 2 line items in the IO to be settled..
    You will have to include this cost element temporarily in your allocation structure, as a formality.. Once the settlement is done, you can remove it again
    Include this Cost ele under any assignment in your allocation structure.. Impact would be null because the 2 line items nullify each other
    Br. Ajay M

  • We are getting the following error "Complete allocation structure GA"

    Hi,
    Please help on the below issue:-
    We are carrying settlement of order  (Period end activities ) for  CO88 .  We are getting the following error complete allocation structure GA.
    Please guide us.
    Regards
    Srinivas

    Hi,
    Go to Allocation structure and maintain the Source and Settlement cost element for various cost groups in the structure.
    And maintain this Allocation Structure in the settlement profile for your Production/Process orders.
    Regards
    Balaji

  • CJ20n - Allocation structure substitution

    CJ20n - Allocation structure substitution
    Hi,
    We need to substitute allocation stucture (under settlemement rule ;parameters). Could you suggest me how can this be possible.
    As in GGB1, we have only project defination/WBS substitition but not allocation structure (COBRA table).
    Please advice how technical we can resolve this?
    Cheers
    Manohar

    Hi Manohar,
    I was thinking to maintain subtitution rule for Allocation structure depending on project type. Please could you advise me how you resolved your issue.
    Thank you.
    Regards,
    Leanne

  • How to remove overlap of cost element in allocation structure?

    hi experts,
    on KSES the source has double entry of cost element. those cost elements were defined under cost element group. when i checked on the Source screen the entries under the cost element group there is no double entry but when checked on Extras > Overview List i can see two entries of the cost element. how can i remove on the double entry of cost element on the source of the allocation structure?
    thanks!

    Hi,
    Go to KAH2 . enter cost element group.
    Select the cost element to be deleted , then select arrow (upwars left , 3rd button from top left) , right click and then remove.
    Regards,
    Mrinal

  • Error : complete allocation structure while doing Ko88 settlement.

    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element S10100 cannot be assigned to a settlement cost assignment in allocation structure A2, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element S10100 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure A2

    Dear,
    Please refer my reply in this thread,
    Error in Rework order settlement
    Regards,
    R.Brahmankar

  • While Doing Production Order Settlement "Complete Allocation structure" :

    Dear Experts
    I am Getting This Problem ,
    please give me A suitable Solution.
    I am created Another Allocation Structure And Assigned to Settllement Profile . But it is not trigering. Not Capturing That allocation
    Complete allocation structure Z1
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 40512006 cannot be assigned to a settlement cost assignment in allocation structure Z1, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    u2022     If the posting under cost element 40512006 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    Edited by: rajamallu on Jul 2, 2010 10:41 AM

    Hi,
    within allocation structure customizing you create assignments for allocation structure Z1.
    Each assignment has a source (cost element, cost element range, cost element group).
    The cost element 40512006 is not included in the source definition of allocation structure Z1 but there are values to be settled available on your sender.
    Thus they cannot be settled and thats why the message occurs. So maintain alloc. structure Z1 completely.
    Best regards, Christian

  • What command would you use to check for allocation, structural, or logical integrity problems?

    What command would you use to check for allocation, structural, or logical integrity problems?

    Wondering if you are looking for DBCC CHECKDB command? For more information, on that command, try to look at this:
    http://technet.microsoft.com/en-us/library/ms176064.aspx

Maybe you are looking for

  • My deactivation button is grey, like when you can't click it in the drop down, how do i deactivate now??

    I desperately need help!! my old laptop is about to die, it barely moves, i cant load anything at all, the most i have is photo shop open on my browser and i went to Help>Deactivate like i always do when I get a new computer, but it won't let me sele

  • Sky phone security - shooting itself in the foot?

    I just had a call from Sky (?), but it didn't go well. I made a call recently about some tech issue with my box, and this was a supposed follow up call. For a start, the caller ID came up as 'unknown'. Then, the girl wanted ME to verify who I was. No

  • Prematurely exit enumeration loop

    i am enumerating thru a loop upon a certain condition, i want to exit the loop, while keeping the object of the current enumeration in tact. Foo foo = null; Enumeration = fooVector.elements(); while(Enumeration.hasMoreElements())   foo = (Foo) enumer

  • Error in CC 5.2 (Java.lang.indexOutOfBoundException)

    Hello All, When i logon to CC 5.2, I always get the following error on the bottom of the page:  java.lang.IndexOutOfBoundsException: Index: 2, Size: 1 Does anybody have any idea how to fix it ? Best Regards, Amol Bharti

  • Interface Bug with 2 monitors in LP8

    I use 2 monitors tiled vertically to display a large track layout - in 7.2 I'd have to open the screenset and drag the window across to the 2nd screen - once I did this it would stay in place (across the 2 monitors) I LP 8 I tried the same thing - on