AR & AP Data migration from legacy

Hi,
1.What are the precaution to be taken for Data migration from legacy system?
2.We intend to use a conversion ac ( Dr conv ac cr Vendor ) Is it Correct way of doing it ?
3.How do i ensure that all my invoices uploaded correctlt ?
4.What is the best Standard program to get it doen ?.
5.Is LSMW is best to do it or shall I have to go for custom development?
Any piece of yr advice is appreciated.
Thanks, Chitra

Hi Chitra,
Following link are helpful in understanding LSMW:
Note 105244 - LSMW 1.0: known problems, tips and tricks
Re: LSMW and error handling
/community [original link is broken]
For Data Migration:
Note 400257 - Data Migration and Upload Report
Note 739860 - Data migration from a legacy system to SAP
Hope this helps.
Please assign points as way to say thanks

Similar Messages

  • Data migration from legacy system to SAP

    hi all,
      could you please post some docs on migration from legacy system to SAP system., also the problems faced while migration and best practices in data migration
    regards
    sridharan

    Hi ,
    I require few details from you.
    1. What ETL tool you are using, If Informatica, it already have PowerConnect to connect to SAP. So you can create source and Target Structure and also you can use RFC's to send data to R/3. Else, for other ETL tools, can you prepare RFC's or any other way to send data to R/3. let me know the tool.
    2. Does R/3 contains the master data tables? If yes, then try to use LSMW for Mass upload of data to tables.
    If your client don't want to use either of these options please elaborate, what is the case.
    Regards
    Aashish Sinha

  • Data Migration from Legacy system to ECC systems via ETL through SAP PI

    Hi All,
    I wanted to know if we can migrate the data from Legacy systems to ECC systems via PI.
    What I understand is there is ETL tool is used to extract the data from legacy system, and what client is looking to load that data via PI?
    Can we do that ? I am concerned because this will involve mass data?
    If I have to use PI , I see option of  PROXY / IDOC /FILE as receiver in ECC system (take the data from ETL)?
    Can somebody has done this earlier , please share the approach.
    Thanks,
    Pushkar Patel

    Hi ,
    I require few details from you.
    1. What ETL tool you are using, If Informatica, it already have PowerConnect to connect to SAP. So you can create source and Target Structure and also you can use RFC's to send data to R/3. Else, for other ETL tools, can you prepare RFC's or any other way to send data to R/3. let me know the tool.
    2. Does R/3 contains the master data tables? If yes, then try to use LSMW for Mass upload of data to tables.
    If your client don't want to use either of these options please elaborate, what is the case.
    Regards
    Aashish Sinha

  • Data Migration from Legacy System in CRM

    Hi All,
    We are going to Implement a new CRM project, I have a problem with LSMW(Legacy System Migration Workbench ), I have some Conversion Objects of CRM and I need to know whether Data Migration is possible or not, please tell me how to find these Objects and how to know Data Migration is possible or not.
    Objects are like.,
    1. Accounts
    2. Actuate Reports
    3. Active Campaigns/Campaign Content/Dispositions
    4. Contacts
    5. Contracts
    6. Opportunities
    7. Payment Arrangement History
    8. Payments
    9. Premises
    10. Rate Changes
    11. Security Deposits
    12. Business Partner Relationships
    13. Web self-service information
    14. Usage that has been used for quotes
    15. Tax history information, including AXCIS
    17. Service Requests
    18. Service Order History
    19. Security Deposits
    20. Reference Values
    21. Rate Changes
    Can anybody please tell any transaction code in CRM where can I find the Data migration for the above objects is possible or not.
    Thanks in Advance,
    Sai.

    Hello,
    for migration into CRM I would suggest the 'XIF-Interfaces'; these are interfaces provided in CRM for connection to external systems. I'm not sure if this will cover all objects mentioned above, but at least some of them should exist.
    Some information about existing interfaces can be found in the integration repository under http://ifr.sap.com/index.html; from the start screen first select 'Enter the repository' and then have a look under 'generic components' and 'SAP CRM'.
    Regards, Katja Ohliger

  • Data Migration from Legacy System in IS-U

    Hi All,
    We are going to Implement a new IS-U project,  I have a problem with LSMW(Legacy System Migration Workbench ),  I have some Conversion Objects of IS-U and I need to know whether Data Migration is possible or not, please tell me how to find these Objects and how to know Data Migration is possible or not.
    Objects are like.,
    1. Accounts
    2. Actuate Reports
    3. Business Partner Relationships
    4. Active Campaigns/Campaign Content/Dispositions
    5. Connection Object
    6. Contacts
    7. Contracts
    8. Opportunities
    9. Payment Arrangement History
    10. Payments
    11. Premises
    12. Rate Changes
    13. Security Deposits
    these are few and there are some more..,
    Thanks in Advance,
    Sai.

    Hi Ram,
    Use Transaction Code EMIGALL. It will ask for company code. By default Company Code is SAP. If you entered with the SAP you will get all the objects.Then goto menu IS-U Migration-->User Handbook. It will give you details Idea.
    Also Check the following Procedure
    You can find detailed documentation of EMIGALL in SAP itself. Use Transaction EQ81 to display it. It provides all the concepts and procedures to work with EMIGALL.
    Here are some points about EMIGALL :
    1. It Migrates data Business Object wise
    2. It uses Direct Input Technique
    3. It has more than 100 objects of IS-U
    and the steps for implementation goes like this:
    1)You have to create a user specially for migration which will have all the authorizations related to migration workbench, BASIS and IS-U
    2)You have to create your own company in EMIGALL. There is a default company called SAP.
    3)Company SAP contains all the Business Objects
    4)You have to figure out what business objects u need and then u have to copy those business objects to ur company from Standard Company SAP
    5)Each objects contains more than one structure and each structure can contain more than one fields. The relation goes like this
    Object ---> Structure ---> Field
    6)You have to define field rules for each required field of the object. You have to mark "Not required" for fields u don't need
    7)After field rules for a given object is set u have to generate load report i.e. actual Direct Input Program which will migrate data. This program is generated on basis of field rules set by u.
    8)After the load report is generated u have to prepare an input file (import File) for migration. The import file should be according to structure provided by SAP and must be in binary format. SAP Provides the structure of file according to your configurations. You have to write ur own Data conversion program(in any language) for this task.
    9)You take import file as input and migrate the data using generated load program
    10)Finally u can check the Migration Statistics and Error Log
    Thanks and Regards,
    Jyotishankar Dutta
    Message was edited by:
            Jyotishankar Dutta
    Message was edited by:
            Jyotishankar Dutta

  • Date migration from Legacy system (excel file) to CRM 7.0

    Hi,
    Can any one guide me on the below:
    I am provided with excel files having prospect data with 63 fields and most of them are not the part of standard fields available.
    The requirement is to create the same data in CRM. I am unable to use ELM as most of the fields are not available. I suppose i need to get the fields created by technical team. However need some knowledge sharing on this. I think even BAPI approach would need fields to be created first.
    Should i revert back to the client asking for detailed information on the tabs or sections under which the missing fileds have to be created?
    Also guide me with alternate solution to map the data from legacy to CRM
    Please mark your solution on this
    thanks

    Agarwal,
    In your situation you need to have the additional attributes created in CRM, before you can do an upload.  Now if the new attributes are marketing attributes for the business partner, you can use ELM.  Otherwise if you still want to do ELM then you need to use the BADI.
    Your other option is use XIF adapter with LSMW to perform the upload, but the custom fields must appear in the bdoc structure on the CRM for them to appear.  Normally this won't be a problem if the CRM system has been extended via EEWB or AET.
    Take care,
    Stephen

  • Data conversion from legacy : through BOM or recipe for a process industry?

    Hi all
    I am working on  data migration document for BOM , ROUTING, PROD VER. My question is whether during migration from legacy we should first migrate the Recipe and add the comp no for creating BOM in mass creation , Or that we should bring the BOMs directly from the legacy? Which method is better from strategic point ?

    Hello,
    for migration into CRM I would suggest the 'XIF-Interfaces'; these are interfaces provided in CRM for connection to external systems. I'm not sure if this will cover all objects mentioned above, but at least some of them should exist.
    Some information about existing interfaces can be found in the integration repository under http://ifr.sap.com/index.html; from the start screen first select 'Enter the repository' and then have a look under 'generic components' and 'SAP CRM'.
    Regards, Katja Ohliger

  • Data Migration from CRM 5.0 to CRM 7.0

    Hi Friends,
    We are into a re-implementation on CRM 7.0. The old system was on CRM 5.0.
    Since this is not an upgrade, the data will not copied over from the old system into the new system.
    So, now I would like to know how to migrate data (master/transaction) from CRM 5.0 into 7.0.
    I have read that we can make use of BAPI/LSMW/IDOC/XIF adapters to push info into CRM.
    But, the customer wants all the historical data to be in the new system.
    I think master data can be handled....  but how to migrate the transaction data?.... i mean the number ranges/document flow.. and other relationships.. how can we maintain the same links into the new system?
    If it was a migration from legacy system into the SAP CRM, we could have gone ahead with new number ranges etc... but this migration is from SAP to SAP.
    Also, we will have ECC6.0 connected to CRM 7.0. ANy additional things to be taken care of when the connection is live in DEV/QA/PROd instances?
    Any pointers to this ?

    Hi Gary,
    As per my understanding, your data migration involves quite complex scenarios covering the CRM and ERP box. As the customer needs the old data to be present in the new implementation, the old data needs to be migrated from the CRM 5.0 to CRM 7.0. For the migration to happen, you need to setup the customization (like the number ranges,Condition Data Tables, etc ). Then only you can proceed with the data migration. Also, you need a proper backup plan as this involves proper backup of the data.
    Once the setup is complete, you need to configure the ECC6.0 with the CRM7.0 system. Here also, you need to do a lot of settings and performing the Initial loading of the Adapter Objects. But before you proceed with the entire operation, the entire system landscape must be properly defined with appropriate settings.
    My recomendation is to take help of SAP Consultants and data migration experts as they are the best persons to guide you on this. Also it would be great if you can go through the SAP Best Practices documents which are best repository documents to guide you on this.
    Have a look on this link for an overview of the CRM Data Migration
    http://help.sap.com/saphelp_crm60/helpdata/en/1a/023d63b8387c4a8dfea6592f3a23a7/frameset.htm
    Hope this helps.
    Thanks,
    Samantak.

  • Data migration from 4.7 system to ECC 6.0

    Hi All,
    I am a Solution Architect. Currently working on a typical pursuit requirement. the requirement is as below:
    One of our customer is currently on SAP 4.7 system.  Their current system is shared by 2 companies & the companies got demerged now. Hence they are palnning for fresh ECC 6.0 implementation & migrating Master data & transactional data related to this customer from the current 4.7 system to ECC 6.0.
    I am seeing possible way for data migration is through ALE or LSMW. But I am not confident about the execution plan & process.
    I would wish to know from you people is:
    1. The different methods to do data migration from 4.7 to ECC 6.0 with pros & cons
    2. How to plan for data migration
    3. Risks & mitigations during data migration
    4. different kind of skill set & duration required to accomplish this requirement
    Currently we are planning for 6 months for the ECC 6.0 core modules implementation.
    If you have undergone this kind of project then request you to share your experience. Any information on this regard is appreciated.
    Thanks & Regards,
    Suresh

    Hi
    Go through eh below link for Best Practices
    http://help.sap.com/bp_hcmv1600/HCM_US/HTML/master_data.htm
    [Risk Factors|http://www.informatica.com/INFA_Resources/article_sap_netweaver_mag_data_migration.pdf]
    [Different Methods|http://www.sap-img.com/general/what-are-the-methods-to-migrate-data-from-a-legacy-system-to-sap.htm]
    [Best Practices|http://partners.netapp.com/go/techontap/NGS_migration.pdf]
    Regards
    Pavan

  • Migration from Legacy to APO Demand Planning

    Hi,
    Currently Client uses legacy system for Forecasting. The forecasted value from legacy system will be given as input to APO DP for further Planning. Now, Client wants to do Forecasting and Planning in APO DP. That said they want to use the APO DP Forecasting functionality. How it can be handled in terms of.....
    - They want simplified solution for their sales person to enter sales data, which will inturn uploaded into APO DP Planning book,
    - which forecasting technique
    - other settings or configurations or pre-requisites to be considered..
    Appreciate your help questions and any additional inputs being migrating from Legacy to APO DP.
    Thanks,
    Sai Ganesh

    Hi
    The sales person can upload the sales information in excel file which can be easily upload into APO DP planning book. This sales history can be used as reference for forecasting
    Please find enclosed herewith DP technical configuration guide for you. You can check BW part in detail.
    http://help.sap.com/bp_scmv250/index.htm
    There are different FCST tech avaiavble in APO DP. Forecast planners can assign different FCST tech based on sales history.  Please find below the more information regarding it.
    http://help.sap.com/saphelp_scm70/helpdata/EN/73/3e1164347111d398290000e8a49608/frameset.htm
    http://help.sap.com/saphelp_scm70/helpdata/en/19/98ad1765354d7ba54b1eb164c377e0/frameset.htm
    Please let us know if it help you. Please also let me know if you require more info regarding it.
    Thanks
    Amol

  • Data load from Legacy system to BW Server through BAPI

    Requirements: We have different kind of legacy systems and SAP BW server. We want to load all legacy system data into SAP BW server using BAPI. Before loading we have to validate all data. If there are bad data, data missing we have to let the legacy system user/ operator knows to fix the data into their system with detail explanation. When it is fixed, we have to load the data again.
    Load Scenario:  We have two options to load data from legacy systems to BW Server.
    1.     We need to load data directly from legacy system to BW Server using BAPI program.
    2.     Legacy Systems data would be in workstations or flash drive as .txt (one line separated by comma) or .csv file. Need to load from .txt /.csv file to BW Server using BAPI program.
    What we want in the BAPI program code?
    It will Read / Retrieve data from text / csv file and will put into the Internal table. Internal table structure would be based on BAPI InfoObject structure.
    Call BAPI InfoObject function module ‘BAPI_IOBJ_CREATE’ to create InfoObject, include all necessary / default components, do the error check, load the data and return the status.
    Could some one help me with the sample code please? I am new in ABAP / BAPI coding.
    Is there any other better idea to load data from legacy system to BW server? BTW we are using BW 3.10. Is there any better option with BI 7.0 to resolve the issue? I appreciate your help.

    my answers:
    1. this is a scendario for a data push into SAP BW. You can only use SOAP-Based Transfer of Data.
    http://help.sap.com/saphelp_nw04/helpdata/en/fd/8012403dbedd5fe10000000a155106/frameset.htm
    (here for BW 3.5, but you'll find similar for 7.0)
    In this scenario you'll have an RFC dinamically created for every Infosource you need to transfer data.
    2. You can make a chain for each data load, so you can call the RFC "RSPC_API_CHAIN_START" to start the chain from external.
    the second solution is more simply and available on every release.
    Regards,
    Sergio

  • Data Migration from 11i to R12 Global - Open POs,lines, receipts & on hand upload, Is it possible to do the onhand qty upload with over riding of all receipts which uploaded against Open PO lines?

    Hi Friends,
    We are in a phase of data migration from 11i to R12 
    I was discussed with client & they wants extraction of all open POs which was generated after 01 Jan 2014 to till date in 11i.
    Condition for open POs is PO qty-received qty=>0
    critical Example for open PO is :PO no: 10 has 4 lines, 3lines full qty has been received & for 1 line partial qty(say 50 out of 100) received.
    in this case he wants in R12 uploading as PO no:10 should entered as open PO with all 4lines & 3 lines complete receipt should be done, for 4th line partial qty i.e 50 should be received.
    the question is if we upload on hand qty first, then open POs & receipts, it will increase the onhand qty in new system(mismatch of on hand qty's 11i to R12) 
    Is it possible to do the onhand qty upload with over riding of all receipts which uploaded against Open PO lines.
    Or Please advice best solution.
    Thanks & Regards
    Giri

    adetoye50 wrote:
    Dear Contacts Journal Support Team,
    FYI, this is a user to user support forum.  You are NOT addressing Apple here.
    Honestly, I doubt anyone is really going to take the time to read the novel you have written.

  • Data  Migration from 4.7 to ECC 6.0

    Dear Friends,
    We are doing upgration from sap4.7 to ECC6.0.
    We have activated new gl. We have configured all ecc6.0 functionality.
    But we stuck on data migration from classic gl to new gl.
    We want to activate the migration cockpit but system is asking license key.
    My question is, which license key it is?
    From where we will get this?
    Kindly don't send me any links and any documents related to ecc6 functionality.
    Please guide us on this.
    Thanks & Regards,
    Reva Naik

    Hi,
    following link may give you some hints:
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/2e/9e4638a28b2763e10000009b38f8cf/frameset.htm
    Regards
    Bernd

  • I have a problem with Imovie. Just brought an macbook 15 retina , iLife install and Imovie was working. I than did a data migration from my old macbook pro and now it crashes on start up. I tried to re-install from app store but no option to re-install

    I have a problem with Imovie. Just brought an macbook 15 retina , iLife install and Imovie was working. I than did a data migration from my old macbook pro and now it crashes on start up. I tried to re-install from app store but no option to re-install, just installed and it greyed out.

    Well, my two-month-old MBP has no qualms about booting from a no-name external USB HD I put together...
    Given that is is a common point of failure, I would imagine a large Apple Store should keep a stock of HD's on hand.
    Now since you're a bit desperate and the genie pops up til Saturday and you seem to be the enterprising kind, let's try an experiment: if you have room enough in the external HD and assuming it isn't a Time Machine volume, why don't you plug it in, stick the Install CD and see if the installer lets you select the external drive as the install target. If you can install Leopard on it, on top of the backup without reformatting, and the Mac can boot from the drive afterwards, at least you would have some functionality restored and would be able to pull your stuff from the internal HD. Apple says booting from USB drives is not supported but that does not equate to not possible; some brands do work. Risks? Always. You can always lose your backup. Like I said, a challenge for an enterprising gal....
    Next time around, consider having a bootable external clone at hand for rainy days. I keep three myself...
    P.S. Since I'll be in the Dallas-FW area in late June, I can volunteer with the confetti....

  • Date Migration from IBM DB2/400 V4R3M0 to Oracle 11.2G

    Dear ALL<
    We have a requirement for Date Migration from IBM DB2/400 V4R3M0 to Oracle 11.2g. Can you guys please share your experiences with similar activities done in the past ? We do not have environment at present to try out with Oracle Migration workbench.
    http://www.oracle.com/technetwork/topics/index-095746.html
    You experiece sharing will really help ...!!
    Regards,
    VKMP
    Edited by: 909016 on Jan 31, 2013 5:52 AM

    Hi VKMP,
    As well as reading the documentation thoroughly the following note available in My Oracle Support may be useful -
    Problem To Migrate Table With Table Type P From DB/AS400 With OMWB (Doc ID 466271.1)
    as OMWB does not support migrating physical files.
    Regards,
    Mike