ARQ: Are "Valid From" and "Valid To" dates are considered for risk analysis???

Hi All,
I have one question w.r.t. risk analysis of user while raising a request in ARQ.
I have noticed that, when a user is assigned 2 conflicting roles in a request (with "Valid From" and "Valid To" fields being the same), ARQ shows risk violations properly.
This is quite logical, because user is assigned conflicting roles within the same dates.
In another scenario, if a user is assigned 2 conflicting roles in a request (with "Valid From" and "Valid To" fields being different)
Example:
Time Administration : Valid From=15.06.2014 and Valid To= 31.12.2014
Payroll Administrator: Valid From=20.06.2014 and Valid To= 31.12.2014
ARA still shows as violations (in ARQ)! Though the "Valid From" dates are different.
Logically, user is not assigned these roles at the same time to cause a risk violations. However, system is showing violations.
May I know if validity dates are considered while performing risk analysis in ARQ? If no, then what could be the justification?
Please advise.
Regards,
Faisal

Rafal,
Thanks for your reply.
Does it mean that all future dates will be considered while analysis?
OR
Does ARA consider these dates?
Regards,
Faisal

Similar Messages

  • How are valid-from and valid-to dates set in TRPROD table in APO during CIF

    First question:
    How are the valid-from and valid-to dates set in the APO TRPROD table?
    For example, if I activate a transportaion lane model on March 1, 2008, will the valid-from and valid-to in TRPROD be 20080301 and 99991231?
    Or are these dates defined in the model itself? Or in APO config somewhere?
    Next question:
    Suppose I rerun the model on May 1 2008 to add some records that didn't get added in the March 1 run.  But suppose I want to back-date the valid-from of these records to March 1, rather than use May 1 as the valid-from.
    Can this be done?
    Or is the valid-from always the date of the CIF that creates the TRPROD records?
    Please advise. 
    Thanks

    Hi Srinivas -
    Thanks very much for replying so quickly, but your response didn't answer the questions.
    Let me try again.
    1)
    If I run a CIF on March 1 2008 based on a model that will generate APO TLane data, will the TRPROD valid-from and valid-to get automatically set to 20080301 and 99991231?
    2) 
    If the answer to this question is yes, then is it also true that if I run a new set of records in on May 1, 2008 (no duplications with the original set), then the valid-from and valid-to dates will be 20080501 and 99991231.
    3)
    But if (1) and (2) are both true (if you answer them both "yes", then suppose I want the May 1 record set to have valid-from dates of March 1 (for example, if the May 1 record set includes records that didn't get included in the March 1 set due to an error in selection criteria).  How do I get the valid-from to be March 1 when I run the CIF on May 1?
    On the other hand, if (1) and (2) are NOT true, then how DO the two dates get set during a CIF ????
    Thanks
    djh

  • Valid from and Valid to are not getting copied to follow up document.

    Hi Experts,
    I am creating job quote as a follow up document from master quote.All are getting copied from the master quote to job quote,but valid from and valid to dates are not getting copied from master quote,instead it is calculating the date from date profile rules.
    But I need to transport the dates from Master Quote to Job Quote.
    Please advice.
    Thanks,
    Adi.

    Hi,
    You need to implement CRM_COPY_BADY for that. Please refer to:
    Re: create a new follow up complaint to the earlier completed complaint
    Regards,
    Nicolas.

  • How to pass Valid from and Valid to Dates in CS_BOM_EXPLOSION

    Hii Experts,
    My requirement is to explode BOM using CMC LDB and generating files for all the remaining months by varying Valid from and Valid to dates. For this I am using CS_BOM_EXPLOSION but it has provision for a single date field.
    Can you please guide me how to pass both Valid from and Valid to dates in CS_BOM_EXPLOSION ? And if you can suggest any other alternative, its most welcome...
    Regards,
    Vikas

    Hi Vikas,
    There is a tables parameter STBP which is of type CSXGEN.
    This structure CSXGEN contains two fields valid from date(DATUV) and valid to date(DATUB).
    Is this what something you are looking for?
    Regards,
    Swarna Munukoti

  • Table containing 'Valid From' and 'Valid To' dates --  tcode SU01

    Hi All,
    I want to know the Table containing 'Valid From' and 'Valid To' dates -- In tcode SU01 ---Tab Logon Data there are 'Valid From' and 'Valid To' dates. I want to know the table(s) where this info is stored.
    thanks
    Naved

    Looks like you have two userids. Login to SDN using your userid that created the post and assign the points. If you don't see the radio button then change your original post to a question.
    Message was edited by: Prakash  Singh

  • Date entered between valid from and valid to it should throw error

    HI  i have a doubt in the dates see
    i have a column for the valid  from and valid to date
    EXAMPLE
    customer  cform NO                 SUBMITTED               VALID FROM            VALID TO         uSER
    17     OUIIUYUIY     02.04.2008     03.04.2008     03.12.2008    SAB_BEGUM
    WHEN I GIVE  the dates in between the period it has to give throw the error
    example if i give like as shown below it should pass the error
    17      FHGFF2                   02.04.2008                     03.04.2008              03.06.2008         SAB_BEGUM
    now how can i pass and check the the dates, it has to accept ones the date is after 04.12.2008 , in between the period it should throw the error. please help me out

    have a look at this:
    http://help.sap.com/saphelp_nw70/helpdata/EN/a7/5139ef407a11d1893b0000e8323c4f/frameset.htm
    and search for the pre defined events in table maintenance dialog.
    generate table maintenance->create a maintenance dialog->Maintaining and changing an existing maintenance dialog ->Extended Table Maintenance Events.

  • Name of the table where can get the two fields Valid-From and Valid-to for

    Hi gurus
    I want name of the table where I can get the two fields Valid-From and Valid-To and their relation ship with the header table in BOM
    Regards
    Kaisar

    You can only get the Valid from date from the table STKO.
    To get the valid to date, you have to take one day less than the valid-from date of the next record for the same BOM.
    Alternatively use the Function module:
    CSAP_MAT_BOM_READ
    It will give both valid from and valid to dates in the tables parameter: T_STKO
    Regards,
    Ravi
    Edited by: Ravi Kanth Talagana on Jul 2, 2008 4:37 PM

  • Valid from and valid to properties under history preservation transform

    I have created_dt and last_updated both date columns in source table and also in target table.
    Now under history preservation transform for Date columns:
    For "Valid from" and "valid to" properties: which column should i pick?
    how can i use created_dt and last_updated columns under history preservation?
    What is current flag property, should i leave this blank if i don't have any flag "bit type" column like indicator in source or target table.
    My Dataflow has:
    Source_table -> Qry_Transform -> Table_comparison > history_preservation - > Key_gen - > Target_table.

    Valid from and Valid to in History Preservation transform deals with SCD (slowly changing dimensions).
    In most of the scenarios, Valid From comes from the source (as Effective From date) for which the dimension has a particular value.
    Eg:
    SALES REP, Region, Effective From
    A, California, 01.01.2011
    Valid To column in History Preservation is the default value that you provide inside. In case of preserving history of an update, Valid To column of the old record can have the Valid From value of the new record, or one day before that. You have option to set the same in History Preservation.

  • How to change dateformat of VALID FROM and VALID TO properties in xml forms

    Hi all,
                I have created a news using xml form bulider and i have given lifetime for that news ,also displaying the VALID FROM and VALID TO  in news.By default it is in mm.dd.yyyy format but i need to display the dateformat as dd.mm.yyyy in show form.Is there any possiblity to change the format in XSLT or any other solutions.
    Regards
    Bala

    Hi Bala
    Check this XML FORMS - Date Format.
    Its a quite easy way.
    Regards
    BP

  • Text messages and phone calls from March 2012 to date are missing after activating iphone5

    text messages and phone calls from March 2012 to date are missing after activating iphone5. I backed up my 4 before activating my 5. Can i retrieve them somehow?

    i would not want to bet on nokia ever releasing a patch or update in the software to allow this function on this particular phone.
    if you look at nokia phones over the years, they have added functionality like this across a wide range all at once, take for example timed profiles on symbian phones. these have only just been phased in.
    i do not think it is a development cop out, more along the lines that nokia is a huge company and as such would have a huge effor in market research. if they didnt pick this out through their market researc, why spend the money adding it?
    the comment on annoyance is entirely personal to me, as it is important to you - you may want to consider moving to a symbian (series 60) based handset as these give you a lot of expansion for this sort of need.

  • Validity start and Validity End date in PO

    HI  gurus
       can you plz tell me how to activate  validity start and Validity End date in PO
    Neha

    Hi,
    It is applicable for PO done for Frame work oder with Doc type - FO(Frame work order)as its an agreement of supply of stock only between specified period.For this kind of Doc type system makes it mandatory to enter the valisity start and end date.
    Thanks

  • How to create the verify.der file in portal ? valid to and valid from

    hi Experts,
    am facing the problem in SAP logon method without user mapping but it's having a problem, The problem is  create the Transaction iview it's not there . Back end server is not response how to create the Valid TO and Valid From in portal.
    Thanks & Regards
    Chandu

    Chandu,
           1.      Start the SAP J2EE Engine Visual Administrator: C:\usr\sap\<SID>\JC00\j2ee\admin\go.bat.
           2.      Navigate in the left tree panel to Cluster -Server -Services -Key Storage - Runtime  TicketKeystore - SAPLogonTicketKeypair u2013cert.
    Here you can go ahead and create a new ticket.
    Hope that helps.
    Cheers,
    Sandeep Tudumu

  • How PO validity start and validity end works

    In the PO Header (tab Additional data), there are fields: validity start and validity end.  The help text states the following:
    Start of validity period
    Date as of which services can be performed or materials delivered.
    In the case of purchase orders:
    Start of the period in which the service is to be performed or thematerial delivered.
    End of validity period
    Date up to which services can be performed or materials delivered.
    In the case of POs:
    End of the period in which the service is to be performed or thematerial delivered.
    I maintained a validity date range 01/01/2007 to 01/10/2007.  When i tried to receive the item with posting date 01/15/2007, the system saved the GR without even a warning message that the GR was outside the PO validity date.
    How does this field work?  Is this standard configuration or does this only work with a user-exit?
    I would appreciate any input.
    Regards,
    Dominique

    hi ,
    use transaction OMCQ,
    set the status of message for M7 163 to error. if this message is not present in the list , then go to new entries and select  this message and enter it into the list
    after this set the status to "E".
    let me know if this works
    Regards
    Mangesh.

  • Add Validity Start and Validity End On PO Header

    Dear SAP,
    need your help, I am trying to add Validity Start and Validity End Field on Additional Tab in Purchase Order header.
    How do i add this field ?
    i already check on MM define screen layout a document level, but there is not setting for this two field.

    Hi Nizam,
    The validity start date & end date are used only for service orders. In configuration goto IMG>MM>Purchasing>PO>Define screen layout at document level and check into Administrative data, header of ME21N , the field selection key attached to your document type (Say NBF) and for field selection key AKTH.
    The fields Start of validity period & Validity period end of field selection key ME21N, NBF & AKTH should be set as optional then only required fields will be visible on screen.

  • After editing file in ACR 8.6 (Mac) , the file (NEF and XMP) modification dates are not updated

    With both my Mac's, reset Photoshop C  (2014) to previous version 2014.0. Now find that after editing file in ACR 8.6 (Mac) , the file (NEF and XMP) modification dates are not updated. Reloaded camera raw, etc., but still find modification dates are not updated, either using Finder or using Bridge to view dates. Editing other files, PSD, DNG, TIFF, etc., are updated and the information is correctly displayed.

    Ok, not entirely sure what I did but it's now working (Bizarre!). The only thing I did was 'eject' the ACR 8.6 .dmg file from the finder side bar and restart PS CC, so that may have been where I was going wrong all along!
    However, I now have another issue in that there is no preview of the shot in Finder on my iMac when I highlight the NEF file. I assume this is simply because Apple haven't yet released an update for the new D810 NEF files and so the computer doesn't know what it's looking at?!?
    If anyone has any other ideas though, then I'm more than willing to listen.
    Thanks again.

Maybe you are looking for

  • How can I remove a message that was posted by mistake?

    I was composing a question, and when I switched out of Safari to look at something in the Finder, the incomplete message got posted as a question. I saw an "edit" button, and tried deleting all the content of the message, but now am told "You can not

  • Would like to wipe HD clean

    I can't wip it clean I would like to zero out my hard drive before Apple replaces it next week. Please take a look "Here" This will tell you what is wrong with my Hard drive - Nothing works in Disk Utility - the iMac right now is working OK -

  • NVL and no rows returned

    Hi, i found a little error in coded in an SQL-Construct equivalent to this one: SELECT NVL(dummy, 'A') from dual where 1=2 This will return nothing instead of the expected 'A', because in my understanding no rows are returned and though no NULL could

  • How can delete iCloud Calendar?

    I have Outlook 2010 and would like to delet the iCloud calendar because I don't use it. However, I can't figure out how to delete it...

  • Sorting by keyword

    A strange thing is happening when I sort using keywords: I have my iPhoto "view" set to display film rolls in ascending order. Before I do a keyword sort, everything is in the order it should be - however, once I sort by highlighting a keyword, the r