ATP Based on ASCP Planned data - how to exclude Subiventory

We are moving from ATP based on ASCP collected data to ATP based on planned data.
In our major warehouses, we have subinventory 'DOCK' , it is not checked ( not enabled) to Include in ATP, but it is flagged ( enabled ) as Nettable subinventory.
In ATP based on collected data, the on hand balance for this subinventory was not included.
But ATP based on planned data includes on hand balance in this subinventory. This is issue because warehouse takes processing time to bring from DOCK subinventory to warehouse FG subinventory and ATP gives immediately available to customer which in actual is available to customer after two days.
We can not change this subinventory as non-netable then ASCP advises more to bring more supply.
Please advise/help.

Hi Mahesh
I'm not convinced with your assumption and Sandeep's suggestion of adding 2 days of post-processing LT.
You'll notice even ASCP considers this invenotry available right now without any delay unless it shows as 'In Receiving" and not On-Hand. if this shows "In Recieving, even ATP will consider the same due date as suggested by plan.
There are a few options to model this additonal time but each requires some additional maintenance. You'll require an extra level of supply chain bill where you model this inventory one level below final level. This can either be achieved by modelling this as a component while adding a new level in the bill as FG.
Another option may be to default your request date at least today + 2 days thereby making sure ATP never returns today's date. Please note this is more like an honor system as order entry person may override it and can be handled via user training. Again this will work if you always need 2 days before an order can be shipped. If you've a mixed mode scenario where some inventory may be shippable right now, you may be out of luck here.
There are a few more options that may be possible but will require little more one-on-one discussion.
Thanks
Navneet Goel
[email protected]

Similar Messages

  • Export large ASCP plan data to excel

    Hi,
    We have a need to export plan results from ASCP Plan to excel. Export option takes too long. I would like to know if there is an alternate method in Oracle EBS R12.1 ASCP to get the results of Plan in excel or similar format.
    Thanks,
    Ash

    If you are exporting a substantial number of records to excel the best option id to use CSV format and then process the generated CSV file with excel.
    Exporting directly to excel format works well with small amounts of data, but with a large number of records system memory becomes an issue.
    If you feel the need to export directly into excel format you can try to increase the maximum memory allocated to SQLDeveloper by adding something like the following
    AddVMOption -Xmx1024Mto the sqldeveloper.conf file usually located in
    [SQLDEveloper_install_dir]\sqldeveloper\binadjust the number as you see fit, but bear in mind that there have been issues reported while meddling with this parameter.
    The default value for the parameter is stored in the ide.conf file usually located in
    [SQLDEveloper_install_dir]\ide\bin

  • ATP based on an availability date without APO

    Hello
    we have mateirals that mature/cure for n days. We need to include that n days (availability date) in our ATP at order entry time. we do not have/use APO. Is this possible?? If so can you please share the details of how it can be achieved???
    thank you

    Linda,
    Simplest solution. Do all three of the following. Works in any system, including SAP:
    1. Include the mature/cure time in your Total Replenishment lead time.
    2. Confirm your orders based upon availability of FGs stock or excess replenishment orders; or lacking those, upon Total replenishment lead time.
    3. Do not receive the product into FG stock until the mature/cure time has elapsed.
    Rgds,
    DB49

  • Planning Data how to Update

    Dear All,
    Through which transaction code do I update  planned figures so that the same may appear business area wise in the undermentioned reports
    S_ALR_87012253 - Annual Plan/Actual Comparison
    S_ALR_87012254 - Half-Year Plan/Actual Comparison
    S_ALR_87012255 - Quarterly Plan/Actual Comparison
    S_ALR_87012256 - Periodic Plan/Actual Comparison
    We are using ECC 5.0 version of SAP R3 , also pls guide if there is any configuration settings for the same.
    Regards
    Milind Nair

    Dear All,
    Pls provide some inputs on this as its urgent.
    Regards
    Milind Nair

  • Selective deletion and plan data

    Hello Gurus,
    I am having some doubts
    Any one of  them,could you please  clarify my doubts.
    1.By using the selective deletion (for Infocube),I have deleted some records.
    when i checked it on the log,In Deletion mode its showing the different values such as D,N and R....
    When I deleted the records,it has created 2 requests in log .
    onething its showing the status as 'N' and another thing as 'R'
    What is this mean.why its differing by requests.
    2.Reg plan data,How we are getting this plan data.(I know,based on actual data we are creating),But what is the procedure,how and  where we are creating this plan data like R/3 or BW.
    Will assign points.
    Thanks in advance
    Brgds
    Kumar

    Hi,
    As far as plan data is concern, there would be various plan data requirements for an org. let's say 'sales budget' / 'Production Planning' / 'Procurement plan' /
    'inventory status'..and so on so forth..
    basically when ever there is plan data requirement normaly the concern department has to prepare the paln data for the quater/Half/fiscal year, on either
    a legacy system or R/3 system..
    If it is from R/3 you are suppose to create a DS and then an infosource and so on..
    If it is a Legacy system - then go for the File Upload, after making your flat file
    infosource.
    Hope this helps..
    assign points if useful..
    cheers,
    Pattan.

  • ATP/CTP Based on Planning Data- Clarifications

    Hi gurus,
    All below are ATP/CTP Based on Planning Data:
    1)Implications of enabling ATP(Enable ATP check box) in while running plan and not enabling ATP check box.?
    2)I am running a Plan with ATP enabled, what benefits we get if i run with 24x7 ATP and what benefits we get if without 24x7 ATP. Basically would like to know the functionality of 24x7 ATP.
    3)Have set up plan without ATP,
    After plan run if i create new sales order will it be shown in planning workbench?
    If it is not showing up what could be the reason.
    When this new sales order is expected to be shown as Majenta color in planning workbench.
    4)After plan run if my new sales order ATP to get occurate(Supply/Demand) data from planning output, what are all necessary setups i have to do (May be simple typical setup)?
    Otherway around: what are all the necessary steps and concurrent programs to be done in order get current supply/demand picture.
    Please do the needful.
    Thanks.

    Hi
    Do want to use priority based on demand class? The prioritization of ASCP is diffrent from demand class prioritization. You will need to have a customization to assign demand class based prioity and update the demand lines to respect it by ASCP .
    Please try to use Allocated ATP . The use allocated ATP profile needs to be set to yes. There should be proper allcoation rule also setup based on demand class. But you cannot guarantee that the ASCP and ATP will be in sync
    Thnx
    partha

  • ATP based on planning output

    Hello,
    Appreciate if you could help me to understand how ATP based on planning output works in following scenario.
    ATP-enabled plan is an ECC plan with supplier capacity constraints. The ATP plan has both forecast and sales order demand. When ATP plan runs, supply planned orders will be generated based on supplier capacity constraints.
    If a new sales order is scheduled, will ATP suggest a promise date by
    1) considering the supply planned orders generated for the unconsumed forecast
    OR
    2) generating a new supply planned order for the new sales order
    If (2) is used, will the sales order be scheduled out to a later date if the supplier capacity has already been taken up by the planned orders generated for the forecast demand?
    Cheers!

    ATP will suggest a Schedule Ship Date / Schedule Arrival Date (based on scheduling setup in Order Management) considering the supply planned orders generated for the unconsumed forecast.
    If all the planned ordres are already allocated to other newly scheduled sales orders (i.e. entered in the system after last plan run), then for the newest sales order which you are trying to schedule, ATP calculation will be done to check the earliest availability using the ATP Rule defined for your item in the Org where you want to schedule the sales order. If no ATP rule is assigned to the item, then default ATP rule from Org Parameters is used. When you accept the new suggested date for scheduling the sales order, the sales order starts appearing in the ATP plan (in pink color text) but no new planned order is created. New planned order creation will happen only when you run the data collection and plan again. Similarly, consumption of unconsumed forecast will also happen during this new plan run.
    In the above scenario, if you have a multi level BOM for the sales order item with
    -  the child items ASCP planned and ATP enabled and
    -  resources in the routings of BOM items at different BOM levels CTP enabled
    then ATP will explode thru' the supply chain bill, check availability of each child item and resources required for those and accordingly return an availability date.
    Newest sales order will be scheduled out to a later date if
    -  the supplier capacity has already been taken up by the planned orders generated for the forecast demand and
    -  such planned orders are fully allocated for new sales orders scheduled after the last plan run but before your newest order

  • "CLOSED": HOW TO LOAD FIRM PLANNED ORDERS OF ANOTHER PLAN INTO ASCP PLAN?

    Hi everybody,
    How to load firm planned orders of plan 1 into plan 2?
    Business Case:
    Customer uses a separate planning for order intake. During order intake the requested due date is validated based on ASCP Gantt Chart. Bottlenecks are resolved. For make items firm discrete jobs are created, if adjusted suggested due dates are manually changed. For buy items firm planned orders are created for manually changed suggested due dates.
    If the order is accepted the demand is transferred from the Order Intake MDS into the so called Operational MDS. The firm discrete job will be automatically visible in the operational ASCP Plan (after data collection/running ASCP Plan).
    But how is it possible to include ONLY firm planned orders of another plan into your current plan?
    PLAN1 asigned master demand schedules
    - O_MDS1
    - O_MDS2
    PLAN2 assigned master demand schedules
    - O_MDS1
    - O_MDS2
    - T_MDS
    I want to transfer the firm planned orders from plan2 to plan1.
    Thanks for all your inputs,
    Catalina
    Message was edited by:
    user447176

    Since you need to run a data collection to load the new discrete job, I suggest you to add a custom step in the data collection.
    This custom step will
    1) select all firmed planned order in plan 2
    2) put the firm planned order into a new schedule through staging tables (MST_ST_SUPPLIES) .
    3) collect the data
    Then run plan1 with this schedule defined as demand schedule for your new plan.

  • How to compute Maintenance Plan's Plan Date

    Dear Gurus,
    I would like to request help from you.  I have a problem wherein I would like to know how is the Maintenance Plan's Plan Date is computed.
    Below is the parameters of the Maintenance Plan:
    cycle = 1500
    offset = 1478
    annual estimate = 5070
    first meas reading = 22.5
    Start of cycle is = Jun 16, 2011
    The plan date computed is = Sept 7, 2011
    Please let me know if there are other information needed.
    I hope you can share your knowledge on my problem.  Thank you.

    Hi,
        Please note that for Plant date calculate in Counter Based Plans system takes the below into preference for calculation :-
    1. Start of Counter reading value
    2. Date of Last counter reading udpate ..
    If you maintain offset then system first plans the offset then starts the cycle
    If ur annual estimate is  5070  , if scheduling is done by time then daily activity is 5070/365 = 13.89  round to 14
    Now if your start of counter reading value is 0KM
    And if your date of last counter reading is :- 2/3/2012
    Then your first planned date would be based on the offset :- 1478 -22.5 = 1455.5 /daily activity =1455.5/14 =104days
    So counting 104days from 2/3/2012 you would getting your First Plan date ..
    If u put call horizon as 100% then it will be in HOLD status
    regards
    giri

  • HT201250 Hello i am using TimeMachine to back-up entire Mac image (data + system) on an usb-local drive. I would like (on top of it) add a specific plan to back up some files on a remote network drive. Does TimeMachine support multiple back-up plans ? How

    Hello i am using TimeMachine to back-up entire Mac image (data + system) on an usb-local drive. I would like (on top of it) add a specific plan to back up some files on a remote network drive. Does TimeMachine support multiple back-up plans ? How ?

    Time Machine is capable of backing up to multiple locations, and can be used to back up to both a local hard drive and a networked drive (provided that that drive is in or connected to a Time Capsule or another Mac that is sharing it over the network). The catch, though, is that you can't specify different things to back up to different destinations. Whatever you exclude from Time Machine backups is excluded from ALL backups, and whatever is included is included on all.
    So, get a large enough drive that you can back up everything you want in all locations, or use something else for maintaining the network backup.
    More information on these topics can be found here:
    How do I set up Time Machine to a shared drive on another Mac?
    How do I set up Time Machine to a Time Capsule or Airport Extreme?
    "Rotating" Time Machine backup disks

  • How Distinguish planning data and Actual data in a Planning cube

    Hi,
    I want to dispaly planning data & actaul data in a query how can i do it?
    in my query it is showing all the requests it is not distinguishing.

    Well use infoobject 0VTYPE for actual and plan differentiation
    and 0VERSION to categorise which version of Plan data it is,typically you might have different planning versions .
    Example
    0VTYPE = 10 actual
    0VTYPE = 20  plan
    0VERSION = 001
    0VERSION = 002
    0VERSION = 003
    Business decides which 0version value to be taken as final planning version once freezed.0VTYPE = 10 for actuals is always one ,it do not have 0VERSION to be taken in to account.
    Hope it Helps
    Chetan
    @CP..

  • How to set start of cycle/next planned date at the Maintenance Item level??

    Hi All,
    We are uploading a bulk of Strategy Maintenance Plans into the system. Each plan has multiple maintenance items and each maintenance item in a plan having different next due dates. Now if we set the Start of cycle at the Maintenance Plan level, then the next due dates of the maintenance items in that plan would be calculated on the basis on Start of Cycle (Common for all) and frequency as set in MPackages in an item Task list. Since each Maintenance item may have different Frequency and next due date, generating a call object while scheduling the plan correctly to satisfy at the Maintenance item level is not seeming possible.
    Can someone please suggest as to how do I set the Start of cycle or say Next Planned Date or Last Scheduled date at the Maintenance Item level either through configuration or programmatically.We are working on an SAP 4.6C version.It is urgent!!!

    hi
    i think specifying start of the cycle for each maintenance level is not possible ,since start of the cycle refers to maintenance plan only .
    for SAP standard kindly refer the following [link|http://help.sap.com/saphelp_46c/helpdata/en/94/43a968abc011d395bd00a0c93029cf/content.htm]
    it is better to create one maintenance item per maintenance plan,if you want to control each maintenance item independently
    regards
    thyagarajan

  • Where and how to enter plan data cost and profit center wise to get data in grr1

    Hi Gurus,
    Appreciate you can tell me where and how to enter plan amount cost center wise for cost elements and profit center wise for revenue elements????
    So that we can get this data in grr1 report.....
    Can we upload this planned data, if yes how??
    Thank you

    Hi..
    If you use classic PCA, refer to Plan Data Transfer - Profit Center Accounting (EC-PCA) - SAP Library.
    If you use new gl pca, refer to Transferring Plan Data from Controlling - General Ledger Accounting (FI-GL) (New) - SAP Library

  • How to write plan data into Transactional Cube from Visual Composer ?

    Dear experts,
    Visual Composer is very powerfull to build a 'nice-looking' web-report (I think is much better than Web Application Designer in term of freely position the chart/graph/table/selection parameter in anywhere we like. We can't have this flexibility in WAD) plus it also has strong integration to R/3 for posting the  transactions via RFC-Enabled Function Module (such as changing customer credit limit, approve PO, approve Sales Order, etc), so that the R/3 user won't even have to know the TrxCode.
    In addition to this, I just wondering if VC also capable to write plan data into transactional cube via Write-Enable Query. We can simply insert a BW Query into VC as planning layout (set the edit-mode to "editable") plus having some Wizards to make it more user-friendly and self-explanatory for the users.
    But I am not sure how to save the changes back to transactional cube from VC.
    Could anyone please kindly advise how to achieve this.
    "Seeing is believing" is always my learning method, so I would appreciate some "actioanable" explanation or hints.
    Many thanks,
    Sen

    Hi Sen,
    As far as I know, it's not possible to write data into transactional cubes directly from a table in Visual Composer through standar method, but it's possible to integrate a WAD with your input ready query into a URL element in VC (You can fill entry variables in VC and call WAD dinamically), so it's possible to create a planning application in VC calling dinamically WAD's.
    Another way to interact through VC is creating button objects that calls planning sequences (with BAPI calling RSPLS_PLSEQ_EXECUTE). Also can fill variables in VC and pass them to sequence.
    Regards,
    Enrique

  • How to show two different aliases in planning data form

    I have two alias members in the Alias dimension-Default,alias-1.
    Alias is associated with all the dimensions.
    For ENTITY dimension i have values for both the aliases.
    Now my requirement is to show Default alias member in one planning data form and alias-1 member in another data form.
    How can this be achieved ?

    If this is a consistant requirement, you could create another alias table and assign the aliases as a concatenation of the two aliases you need to see at the same time.
    IOW, export both tables, and in excel or a text editor, concatenate the two existing aliases for each member into one string, then import that list into yet another alias table.

Maybe you are looking for

  • Setting an attribute back to null

    Hi All. During provisioning to certain resource, I set an attribute to some value (It gets set properly), Now I want to set it back to null(empty string). It is not setting back to null and still displays the old value <set name='user.global.attr1'>

  • I can't seem to sign into the store on my iPod and can't do anything with my account at all for iTunes

    Since this morning ive been having a rough go with my iPod. The e-mail aspect of it wasn't working correctly, and still isnt. It takes a long time for it to load. Then a friend tried to message my iMessage and instead of coming to my iPod it went to

  • Send html email with image embedded

    Hi Guys, I want send an email using class CL_BCS. Can someone please help me to tell me how can we send the email with image embedded in the body? The image is stored in the mime repository and was uploaded through se78. I have searched online but am

  • HT201700 Voltage input range for original Macbook air 2008/2009

    My charger (A1244 | 45w) no longer works. And I need to buy a new charger. Since this is for an old 2008 macbook air, the smart thing to do is buy a charger that will work with new models (that require 85w). Apple doesn't make this power tolerance sp

  • How do I back up file on external Portable Hard drive

    I recently dropped my laptop on the floor doing damage to the screen. I took it to Apple store and they were able to back my hard drive onto an external hard drive. It has been a couple weeks since then and I would like to update all the files since