Automatic creation of project from Sales Order?

hi..
can someone guide me how to automatically generate PS Projects from SO USING TCODE HBS0?
i have been able to generate projects automatically when i use tcode VA41 but my need is to do this for RE using sales browser and creation of Sales Order is by Tcode HBS0.
when i save the sales order, no project is created. ( Note: Material i used is same one i used successfully in VA41+)
thanks in advance..

Hi Ramesh,
Creation of project from sales order in SAP Project system is described as assembly processing.
In the Project System only networks can be generated directly from a sales document during assembly processing. Indirectly the system can also generate work breakdown structures, when it creates the network.
1.You start assembly processing by creating a sales document for a material. This sales
   document can be inquiry,quotation, sales order.
2. The system then
    Configures the material, if necessary
    Creates a network using the standard network as a template
    Configures the network, if necessary
    Schedules the network backwards from the required delivery date
    Checks material availability
    Costs the network and transfers these costs to the sales document.
3. When you save the sales document, the system saves the network together with the sales
    document. If applicable, it also generates a project definition and work breakdown structure.
    The project number is derived from the sales document number.
Please refer link mentioned below to know more details
http://help.sap.com/saphelp_47x200/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm
Regards
Tushar

Similar Messages

  • Creation of Project from Sales Order

    Dear All,
    I am doing Customer Project.
    My Client want to Create a Project Directly from Sales Order. I think we can do it using Assembly Processing. But, I have not worked on it.
    If any one worked on this scenario kindly guide me in this case. Also, let me know any documents are avialble in this scenario.
    Thanks and Regards,
    Atul R. Rajmane

    Hi,
    Transaction Flow
    As per prerequisite we need to create following:
    1-       Standard WBS
    2-       Standard Network
    3-       Material
    4-       Link between the Network, Material and Standard WBS;o
    5-       Create Sales Order
    Create Standard WBS
    TCode : CJ91
    Path:  Choose Logistics ® Project management ® Basic data and then Standard structures ® Standard WBS® Create
    After entering the data press enter.
    Now select   icon to display the WBS element.
    You can add / delete the WBS element here.
    Remember that For All WBS Element, Operative indicator Account Assigned & Planning Element should be ticked.  Billing element should be ticked for the WBS element that will be assigned in the allocation of material to Std. Network
    Click on   icon to go back to the header.
    Here release the WBS elements.
    Make sure to release the WBS elements. (Remember without Release Status system will not allow to post any actual cost to new created project)
    Create Standard Network
    TCode: CN01 
    Path: Choose Logistics ® Project management ® Basic data and then Standard structures ® Standard networkà Create
    Select the   icon to copy from Template.
    Now enter standard Network (Which one you want to copy).
    Here you will link WBS to Network.( it is very important to create a new operative project from sale order ) Then press Enter
    Select the     for choose activities:
    You can create activity here as per requirement.
    You can maintain the relationship among the activities. Now Press the Total Tab :
    Now here you can decide that under which WBS element activity will assigned .
    Save the network
    Create Material
    TCode: MM01
    Path: Logistics ® Production ® Master data ® Material master or Logistics ® Material management ® Material master and then Material and create (special or general)
    Create material with using already exist material
    Maintain the necessary setting in Material Master. (It is necessary for Assembly processing).
    Select Sales ORG 1
    Press the conditions :
    The amount which enters here will be the sale value of material. During creation of sale order system take the sale order value from here.
    Select the relevant Item Category Group.
    Maintain Strategy in MRP3 View and save then Exit.
    Assignment of Material to Network:
    TCode: CN08
    Path: Logistics ® Project management ® Basic data and then Standard structures ® Network parameters from sales order ® Edit.
    Click the   icon to enter new line.
    Here we will link material to Standard Network & Standard WBS. 
    Assembly Processing
    Create Sales Order:
    TC: VA01/VA41
    Path: SAP Menu àLogistic àSales and DistributionàSalesàOrderàCreate
    Select the Order Type / Sale organization and Distribution Channel
    Enter
    Enter the Required field like Ship to party, PO No. , Required Delivery Date, Material No. and Quantity .Then Press Enter.
    Save the Sales Order and note down the Sale Order Number.
    Sales order number will use the project number
    Check in Project Builder.( CJ20N)
    Now we can see that System has created new operative project in background.
    And it has assigned activities to WBS accordingly.
    **source-somewhere at SDN,i forgot.will try to find original source then post here for reference and proper acknowledgement*
    regards.

  • Automatic creation of PR from sales order (SO) for the materials compement

    Hi
    I would like to create un PR from a sales order , but only for the material component (defined on Tcod CS01)
    I already know how to create un automatic PR from SO By using the TAS post type
    But the problem is that this method create only a PR for the material in SO him self and not for his component "what I really want"
    I search every where in VOV6  and VOV7 but I didn't find what Iu2019m looking for
    Thanks in advance For your advices and help
    S.Ghafai

    hello
    did you have any idea about this problem?
    I want to create automatically an PR for the Component of the Production BOM on saving my sales order
    exp :
    Material component = 1010 Qte 2  and 1011 Qte 25
    Sales material = 10XX Qte 1
    In my PR created the materials must be 1010 Qte 2 & 1011 Qte 25
    I hope my question is more clear now
    thanks in advanve

  • Automatcally create Project from Sales Order

    We are on SAP R/3 4.7. We are currently using Project system for customer projects. We are manually linking the WBS element to the sales order item.
    We are considering to automatically creating project from sale order.
    Can someone offer any suggestions or recommendations?
    If you have already done in the past, did you encounter any issues or concerns that need to be considered?
    Thank You
    Sanjay

    Hi,
    As per standard configuration:
    1.) Maintain requirement class in OVZG as 80
    2) Maintain Requirement type in OVZH as KP and assign 80 there
    3) Strategy in SPRO->Project System->material->Strategy and maintain requirment class and requirement type and account assignment there.
    4).Then maintain strategy in strategy group...it would be same as 85.
    5). Then you can maintain item category from SD side and item category group from MM and assign these item categories to SD document type .
    6). Now create standard templates(Project and network activities and make assignment to standard project)
    7). Create configurable material(Variant configurator) in MM01 as KMAT and maintain item category group as same defined above and maintain strategy group in MRP tab same as defined above.
    8). Now assign these Variant configurator to standard network and projects in CN08.
    Look into these setting would definately help you.
    Regards
    Abhinay

  • Report for each project from sales order

    Hi All,
    I am creating a project network from sales order.
    Now i want a report from the sales order showing what is invoiced and the balance in each line item for the sales order.
    Is there any standard report available.
    Thanks in advance.
    Amit

    Dear Amit,
    I think S_ALR_87013564  report will help u.
    plz check.
    Regards
    Lallan

  • Creation of PO from Sales Order

    Hi
    Please let me know if there is any standard oracle functionality by which we can ensure that Purchase Orders does not contain items from sales orders. e.g. if there are multiple sales order then one PO should be generated for each sales order.
    At the time of Requisition Import, we can specify the parameters like
    1.     Buyer
    2.     Category
    3.     Item+
    4.     Location
    5.     Vendor
    There is no parameter like Sales Order , so we’ll end up creating PR from multiple sales orders and then PO would be created from PRs.
    Let me know if we can achieve the functionality of create unique PO for each Sales Order.
    Thanks,

    If you have different vendors for items on a sales order, you will have to create different POs.
    Assuming all items go to the same vendor, you can consider a simple customization as follows
    Write a before-insert trigger on the po_requisition_lines_interface and make the requisition_number or group_code same for all items on a given Sales order.
    That will make the Requisition Import program put all such lines on one requisition.
    Hope this helps,
    Sandeep Gandhi

  • Restricted automatic creation of PO in sales order

    Hi Experts
    When we create a sales order (VA01), we had customized the automatic creation of a Production order (CO01); but our client is asking us to limit this automatic creation to a certain characteristics of the material.
    For example, we have to choose the colours (number and values), and for one colour, the production order donu2019t need to be created automatically.
    Please can anyone help me to find any solution for this matter?
    Thank you in advance
    Hachim EL ALAMI

    Dear Hachim,
    if there is only one material for which you don't want production order to be created you can restrict that particular material by using material exclusion from Logistics screen - Sales and Distribution - Master Data - Products - Listing/Exclusion
    and select condition type B001 for Exclusion  and now if you try to enter this material in the sales order system will give you an error
    OR
    you can use listing condition type A001 in order to include only those materials for which you want production order to be created for them
    Hope this will solve you purpose
    Regards,
    Sagar

  • Auto creation of PRs from Sales order

    Hello all,
    I am working on drop shipments. i understood that based on the item category TAS in the sales order the system will automatically create Purchase requisitions.
    My question is apart from the Item category does the system take any configuration into consideration while creating the Purchase requisitions automatically. does the system need information such as account assignment data, release strategy and valuation price and other settings to create the PR automatically.
    Pl. advise.
    Thanks,
    Maxx

    Maxx,
    Please see the docs I posted to your other Drop Ship question.
    Rgds,
    DB49

  • Automatic Service purchase requisiton from sales order

    Gurus,
    We have a business scenario where , service purchase requsition needs to be created automatically from a sales order.
    Could you please let us know whether anybody has worked on this scenario ?
    Kindly also suggest if any workaround can make this scenario possible ?
    Thanks & regards,
    Aditya
    For useful answers - Do not worry about reward points.

    You can enable it from schedule line category. In the configuration of Schedule line category fill the PR document type in the Order type field and click the P.req.del.sched checkbox on. Then , when  you create sales order, a PR will be automatically created.
    Reward if this helps.

  • Deactivate the automatic Creation of Delivery after Sales Order is Posted

    SD gurus,
    When I am creating a Sales Order, after posting it I want to create the delivery for the same manually.
    But the configuraion is so made that the delivery is automatically generated.
    How do i go for it ?
    Kindly help

    Hi Mohanty,
    I think the Immediate Delivery under Shipping for that order type may have value A or X, Clear that value.
    1) Goto VOV8 tansaction.
    2) Select the Sales order type (For eg: OR for standard order) and double click on that
    3) Under Shipping tab, Set Immediate Delivery with Blank value
    Plz reward points if it is helpful
    Thanks,
    Vinay

  • Auto creation of PO from Sales Order

    Hi All,
    In third party process, i want a PO while saving the Sales Order.
    In Genearll practice a PR gets generated while saving the sales Order. Here in this case i want a PO must be created in background while saving the Sales Order.
    Its very Urgent, as i have to give the solution to client.
    Waiting for all valuable response.
    Regards
    Sangram

    Maxx,
    Please see the docs I posted to your other Drop Ship question.
    Rgds,
    DB49

  • Creation of Invoice from Sales Order

    Hello Gurus
    I have to create Invoice against the Sales Order.  I do not want the delivery document. I just want to save the Sales Order and raise the Invoice against the Sales Order.  What are the necessary configuration steps to achieve this?
    I really appreciate any kind of help.
    Thanks
    Rajesh

    Hi Rajesh,
    Order Related billing is when we bill directly as per the order no delivery needed or involved
    Eg; Service's items here there is no delivery involved hence
    after order directly billing is done
    In order related billing, the Invoice will be generated with reference to the order. Example... For service relevent scenario we will be doing the order related billing because there is no physical goods movement happens. (doing some repair).
    Try with below :
    In vov7 for the item cat---billng relevance maintain order related billing. In vovg against the order type mention the order related billing type. Maintain the copy controls.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Restrict Automatic creation of Notification from an Order

    Hi,
    In one of my client, During creation of order a notification is created automatically in the background.
    Now they dont want to create notification in the background.
    How to stop this ?
    Thanks

    Hi
    SPRO-Plant Maintenance and Customer Service---Maintenance and Service ProcessingFunctions and Settings for Order Types--Define Notification and Order Integration
    please follow the path and uncheck the notification option for perticular order type .
    Shail

  • Automatically creation of Asset from Internal Order(IO) when Released

    Dear experts,
    In my scenario, we are using IOs (not WBS). When I budget and release the Internal order, it should automatically create the Asset/Asset class(Not AUC)( as in WBS,if we assign Investment Profile).Could this possible?coz' I have not seen the Investment profile as such in IO.
    guide me.
    Thanks,.
    Sanju.

    You have to define investment profile and assign the same to you Internal order the same you can achieve Txn OITA . ( viaSPRO->IM>IO&IM>Masterdata--> Define Investment profile )
    After you have to assign the same to your order .
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/2a/f9f588493111d182b70000e829fbfe/frameset.htm
    Regards
    Nitin

  • Creation of automatic PO from sales order in 3rd party scenario

    hi ,
    we know, as per standard SAP ,  creation of PR from Sales order happens when we save SO. how to create PO automatically from sales order? and where where to put document type for  that PO ? ( in schedule line category we can set document type for PR)

    Hello
    In addition to what Kapil suggested,
    3 - The Outline Agreement or Purchasing Info Record shall be maintained which will allow the automatic copying of unit price and other conditions into PO and
    4 - The Source List shall be maintained for the nominated vendor which was shown in either the Outline Agreement or Purchasing Info Record.
    By activating those config you can automatic create PO from PR.
    For that use TCode ME59 to automatically convert the current PR into PO.
    But, you can not automatically generate PO from sales order similar to that of PR.
    Thanks & Regards
    JP

Maybe you are looking for

  • Acrobate X pdf printer

    I am running Mac os 10.5.8 and just installed Adobe CS5.5. I was running CS 4 with Acrobat pro 9, and I could print to pdf using adobe pdf 9.0. After I pdf'ed and opened in Illustrator and works fine. Now when I tell it to print it shows it saving bu

  • Need help with re-registering a 2nd nano

    Need help! I'm a new nano owner. I have 2 nanos (the 2nd is my boyfriend's). We have one computer. I unknowingly registered both under the same usename. How do I reinstall the 2nd under a new username so as to distinguish into 2 separate music librar

  • BitmapData.draw() and embedded MovieClip

    I can't capture the content of an embedded MovieClip, the following code creates a Bitmap that shows only the results of the changes methods of Graphics, although the clip is correctly embedded. Have you tackled similar problems? Thanks. [Embed(sourc

  • Image resolution in InDesign CS4 js

    Hi, is it possible to find out image resolution directly from InDesign, or do I have to open the file in Photoshop to do it. Thank you. Yulia

  • If I bought an Ipad 1 from the US would I be able to use it in the United Kingdom?

    If I bought an iPad 1 from eBay US site...Would it work in the UnitedKingom?