Automatic TO Creation and Confirm for the 321 Mvt type
Hello Experts,
Like to know the customisation invovlved for automatic TO creation and confirmation for the 321 movement type in which QM is activated.
I have already activated in OMKZ as below
1.Automatic TO for 321 mvt ytpe
2.TO item to be confirmed immediately
3.Propose confirmation
Table T333 -AUTTA
T333-SQUIT &
T333-VQUIT is activated.
Please let me know any other settings to be performed
Regards
Krishna
Hello Experts,
I am trying to create the Automatic TO and TO confirmation for the mvt type 321.
I made the below settings
I have activated in OMKZ as below
1.Automatic TO for 321 mvt ytpe -"A"
2.TO item to be confirmed immediately - tick mark
3.Propose confirmation - tick mark
Table T333 -AUTTA
T333-SQUIT &
T333-VQUIT is activated.
I have activated in OMKX as below
Table T321-TBFKZ Immediate TO Creation with "A"
T321-TAFKZ TR creation with "X"
After doing the settings i am not able to see the Posting change number in the Material document created for the mvt type 321.
Please let me know how to create the Posting chnage notice for the material document and how to convert the Posting change notice to automatic TO and confirmation.
Thanks & Regards
Krishna
Edited by: Hariharan krishna on May 25, 2011 8:01 AM
Similar Messages
-
Automatic TO creation and confirmation for a Material document
Hi Dear All,
i am new to MM andWM.
I have to customization for auto transfer orders and confirmations for material documents what ever created with 101 movement type in Inventory Management. I have down configuration like below.
SPRO->Logistics Execution->Warehouse Management->Activities->Transfers-> Set Up Autom. TO Creation for TRs / Posting Change Notices
Double click on control data tab
Hear for my warehouse I given input like Auto TO = 1,
AddId = select check box.
And in Assign control tab for 101 movement type I have given input like below.
Automatic TO = 1.
TO item can be confirmed immed. = tick checkbox
Propose Confirmation = tick checkbox.
Foreground/Backgrnd = D.
After creating of Material document I am executing report RLAUTA10 in SE38.When I execute this report system showing message like TO processing finished: TR total: 17, TO created: 0, Errors: 17.
If I check header details of transfer requirements in LB03, i am not seeing Tick Mark in Auto TO Creation field.
Can any one tell me what the mistake i have down or if i need to do any further configuration. Please help me regarding this concern?
Thanks in Advance..Dear Steve,
Thanks a lot for giving reply with what I need to do, but I am unable to see result.
I have down configuration like below even though system not processing Auto TO creation. Can you explain me if I have down any mistake below.
Click on Assign button,
Press on New entries
WhN = 900
Reference Movement Type = 101
Movement indicator = B
Movement type for Whse Mgmt = 101
TR create Transfer Requirement = X
Immed.TO Creation
Mail confirmation for background processing = 01.
GR date = 2 -
Auomatic TO creation and confirmation from PCN with 321 MVT type
Dear Friends,
I am facing following WM issue, Kindly go through it and reply me with your valuable solution.
In my plant QM is active, so while receiving goods against any Purchase Order (MVT TYPE 101), all my stock goes to quality. After UD check, 99% material move to unrestrictd stock (321 mvt.type) and 1% used for quality (331 mvt. type).
For an example if I have received 1000 kg material (which initially goes to quality), after UD 995 kg material come to unrestricted stock and 5 kg used for quality check.
In my existing system for material document with mvt. type 321, one PCN is generated in the background, and using LT05 we make TO from PCN and confirm it.
But is it posible to create the TO and confirm from the PCN (Mvt. 321) in the backgroung itself, i mean to say that while my QM user is doing UD, material document with mvt 321, one PCN and TO will be generated and TO will be confirmd in the background itself.
I don't want to use LT05 separetely to make TO from PCN.
Please reply me soon.You need to make the config settings here in ur system.
SPRO > Logistics execution > WM > Interfaces > Inventory Management > Activate Automatic TO Creation
Assign the relevent setting to movement types...
Hope thsi helps
Thanks & regards
AHP -
Automatic Creation and Confirmation of Warehouse Task in EWM 5.1
Hello,
We want an automatic creation and confirmation of the warehouse task in EWM 5.1 on the based of a delivery type and warehouse number.
The scenario goes in this way... As soon as the inbound delivery is created/replicated in EWM, the creation and confimartion of warehouse request, warehouse task and warehouse order (all the transactions) should be called automatically. And the goods receipt should be posted.
Can someone throw more light on the customizing/BADI/enhancements etc required??
Thanks and Regards..Hi koen,
I tried with the FM that you suggested...
But somehow with the process type 'stock removal' gives an error...
Is that that this FM will help to create a pick task for a particular outbound delivery--Tcode:/SCWM/TODLV_TO.
how will this FM take the outbound delivery as an input?or it will be on the corresponding sales order number and item number as input?
Being new EWM i require help on this..about how to go about creating the pick task for an outbound delivery which wil be equal to the warehouse request.
Thanks in advance,
Rashmi. -
Stop Automatic creation and confirmation of Transafer Order for a doc type
Hello All,
There is a requirement that I need to stop Automatic creation and confirmation of Transafer Order for a particular document type.
The issue is that sometimes the cycle goes upto creation of Invoice automatically but sometimes this does not happen. More over the user wants that the transafer order needs to be confirmed manually.
Can u please provide the .steps involved for thie case.
Thanks
ChandrashekharDear Steve,
Thanks a lot for giving reply with what I need to do, but I am unable to see result.
I have down configuration like below even though system not processing Auto TO creation. Can you explain me if I have down any mistake below.
Click on Assign button,
Press on New entries
WhN = 900
Reference Movement Type = 101
Movement indicator = B
Movement type for Whse Mgmt = 101
TR create Transfer Requirement = X
Immed.TO Creation
Mail confirmation for background processing = 01.
GR date = 2 -
Automatic bookmark creation and sorting
I have to make 4 quality manuals in PDF (each around 300 pages) from loose word files. They are organized like this
folder 1
chapter 1.doc
chapter 1.1.doc
chapter 1.2.doc
attachment 1.1.doc
folder 2
chapter 2.doc
chapter 2.1.doc
chapter 2.2.doc
attachement 2.1.doc
attachment 2.2.xlc
etc...
Converting them to a single pdf can be easily done by combine files, but the bookmarks are not correctly sorted. The bookmarks are used for easy navigation. Is there a better work around to do such an exercise?Hello Experts,
I am trying to create the Automatic TO and TO confirmation for the mvt type 321.
I made the below settings
I have activated in OMKZ as below
1.Automatic TO for 321 mvt ytpe -"A"
2.TO item to be confirmed immediately - tick mark
3.Propose confirmation - tick mark
Table T333 -AUTTA
T333-SQUIT &
T333-VQUIT is activated.
I have activated in OMKX as below
Table T321-TBFKZ Immediate TO Creation with "A"
T321-TAFKZ TR creation with "X"
After doing the settings i am not able to see the Posting change number in the Material document created for the mvt type 321.
Please let me know how to create the Posting chnage notice for the material document and how to convert the Posting change notice to automatic TO and confirmation.
Thanks & Regards
Krishna
Edited by: Hariharan krishna on May 25, 2011 8:01 AM -
While installing Acrobat XI Pro, the installation automatically rolls back and I get the message "The wizard was interrupted before Adobe Acrobat XI Pro (11.0.07) could be completely installed. Your system has not been modified. To complete installation at another time, please run setup again." How to resolve it.
How do I modify the system.Hi Rgardezi,
The only reason why Acrobat installation fails and throw this error message is when there are some services running in the background causing the installer not to complete the installation. My take is try the following steps and suggest if you were able to install the products or not :
1) Navigate to control panel and confirm that there is no line Item that talks about Acrobat. If you see Acrobat XI listed there, please remove them.
2) Perform a selective Start up using the steps mentioned in this link.
Please suggest if the above mentioned steps were able to resolve the query for you or not.
Cheers,
Kartikay Sharma -
Inspection Lot creation for the 103 movement type
<<Don't ask for or offer points>>
Dear Experts,
we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
Kindly let us know what settings need to be done in order to achieve the same.
Full points will be awarded for the reply
Regards.
Edited by: Matt on Sep 18, 2011 4:44 PMHi,
If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
This check box is available in the inspection type set up in the Material master.
Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
Regards
Hari -
Immediate TO creation and confirmation during MB1B
Hi
In one of our client scenario , we need to create a immediate TO creation and confirmation with respect to PCN created during stock transfer from one storage location to another storage location with in a same plant .
I have done the neccesay setting in Tcode OMLR , but the system is not been able to create the immidiate TO perhaps system doesn't know from which storage type it sohuld select the material.
Can anybody hleps me how to configure this . Do i need to customise storage location control .if yes then what are steps in details ?
Thanks
RAJK
Edited by: RAJ K on May 3, 2010 10:37 PMPlease refer the following thread: -
TO not created from TR
Thanks
Swagat -
b.stats.paypal.com : server does not support RFC 5746, see CVE-2009-3555
This appears on my error page everytime I try to use my credit card through paypal. I enter all of my info (billing, etc..) and after hitting the "review and confirm" button the same page reappears and has erased my cc number and leaving my name and billing info. What can I do to finish my transaction?The message about CVE-2009-3555 is meant for webmasters to make them aware that they need to fix their servers.<br />
Firefox 3.6 versions can detect such a misconfiguration and displays a warning in the "Tools > Error Console".<br />
* http://wiki.mozilla.org/Security:Renegotiation
You may have a problem with the PayPal cookies.
* "Remove the Cookies" from sites causing problems: Tools > Options > Privacy > Cookies: "Show Cookies"
See also:
* http://kb.mozillazine.org/Cookies#Removing_cookies
* [[Cookies]]
* [[Enabling and disabling cookies]] -
I have two hard drives on my mac 10.5.8 power pc and hear the clickking sounds of the first hard drive and think that it may be dying, can I install everything on the other hard drive also and wait for the first drive to die before i use the other drives? Or, what is the best way to handle this?
I do not know what you are waiting for.
I'd make a backup of your important stuff before cloning the entire disk.
Carbon Copy Cloner will copy your startup drive to an external firewire drive. You can boot from the external drive to verify that you have a good clone. When you upgrade your existing startup drive, you can at any time boot from your external drive and go back to your existing system.
http://www.bombich.com/software/ccc.html
SuperDuper is the wildly acclaimed program that makes recovery painless, because it makes creating a fully bootable backup painless. Its incredibly clear, friendly interface is understandable, easy to use, and SuperDuper's built-in scheduler makes it trivial to back up automatically. And it runs beautifully on both Intel and Power PC Macs! -
When I start iTunes on my home computer (Not a MAC), it automatically shuts down, and gives me the message that the Data Execution Prevention security feature has shut it down...what to do?
For general advice see Troubleshooting issues with iTunes for Windows updates.
The steps in the second box are a guide to removing everything related to iTunes and then rebuilding it, which is often a good starting point unless the symptoms indicate a more specific approach. Review the other boxes and the list of support documents further down page in case one of them applies.
Your library should be unaffected by these steps but there is backup and recovery advice elsewhere in the user tip.
tt2 -
For the Attribute Movement type(BWA) we use Value " 201" and not "101" why?
Hello Experts,
We are in SRM 7.0 classic scenario,
For the Attribute Movement type(BWA) we use Value " 201" and not "101" and provide the Source syst(backend R/3)
Can you all plz help me understand what is the difference if use value "101" for the Attribute Movement type(BWA)
Also,can you all plz help me understand if we shd use value "101" or "201" for the Attribute Movement type(BWA) and under what scenario.
Any pointers will be highly appreciated.
Thanks & Regards,
RKSHi,
Movment type " 201 maintained for the Classic scenario only.
It is necessary to maintain the attribute if the default material group for a given user (or) sit is set to a backend logical system. The EBP system knows that if the user is set for backend procurement ,that there might be a possibility for a reservation to be generated therefore it checks to see that a value for this attribute is maintained. The BWA value should be defined for the as 201 preceeded by the logical system and a backslash.
101 should not be used. This isfor the Good receipt.
In the extended classic scenario when you do the confirmations in SRM the movement type 101 will be created in the
backend system (R/3 or ECC6.0)
Regards
Ganesh Kumar .G -
Quotation Creation and Billing for Service Orders--node details needed
Hi ,
I need to work on node "Quotation Creation and Billing for Service Orders" ....I see lot of integration with SD and FICO . Can any one give details about integrations required and what is done in this node ....
Regards
NPBThere are different steps to be done for that.
1. Create DIP Profile in ODP1 & check the consistency in ODP2 - DIP will be used to bill the customer based on resource (labor & material) usage. Creation of DIP profile has been discussed many times in this forum. Please check.
2. Assign the Quotation document type & Billing type used in DIP profile to your sales area - Your document type should be assigned to your sales organisation, distribution channel & division combination. -
Configure the tcode SCOT and SMTP for the SPM module in the R/3
Hello,
I want to know if I have to configure the tcode SCOT and SMTP for the SPM module (SAP GRC AC 5.3 SP5) in the R/3 if I want to send information toe the owner & controller.
Best Regards.
Pablo Mortera.Pablo,
This would normally be a basis function. Be very careful as this is not specific to GRC.
This will impact any external notifications using email / fax etc.
It will also depend on your version and infrastructure.
If you have web application servers, you will be able to do a lot more than if you have standard (older) application servers.
You need to create a node under the INT and assign the appropriate tcp / ip rfc connection to direct it to your email server.
You will then need to define the types of communications to be sent via that method and any appropriate email domain settings.
You also need to create and set the appropriate send jobs to run periodically which will then automatically call the rfcs to process the waiting documents.
Simon
Maybe you are looking for
-
Unit of measure for stock , Goods issue , Purchase.
Dear All Experts, How we can maintain different unit of measure for Stock, Goods Issue, Purchase? Regards, Sandeep.
-
How to read data from buffer while validating in sm30
Hi all. I am doing validations in sm30 by using events.The user is entering the data thru sm30 (multiple records at a time) Before the data gets saved into database table it might be storing in some buffer. Can you pls tell me where this data is
-
How can I get CS3 to open on new iMac with 10.6.4?
Just bought a new iMac and am trying to get everything moved over to it. I use Dreamweaver, Fireworks & Contribute from CS3. When I try to open any of them (newly installed from the Adobe downloads) I get this error message: file://localhost/Users/
-
SAP username in Crystal Report
Hey, i want to display the sap username in a crystal report. I'am using SAP BI 7.0, Crystal Reports 2008 and the Integration Kit. It's possible? Greetz Tim
-
Earmarked Funds and Funds Transfers Workflow WS50000016
Hi all, I'm trying to activate the Earmarked Funds and Funds Transfers Workflow with no success. On the Funds Management IMG I've found some info about it with some steps to activate this workflow. But the template WS50000016 in that info is not in t