Batch Determination in Production Order Component Overview Screen on the basis of FIFO, Thickness, Grade, width etc.

I am facing a difficult scenario. Pl. help me out. In my Business Process I am assigning Batches in Production Order Component Overview Screen. Here I am assigning relevant batches to BOM Components manually, My Management want SAP to suggest batches automatically on FIFO basis, thickness, grade, width & first batches should automatically assign to Production order.  Can you pl. tell me how to configure this scenario.
Or can I pull stock overview screen at Production Order Component screen to assign relevant batch to BOM Components
Once batches assigned in Production Order component screen cannot be changed. It can be changes by specific persons only.

Hi,
Automatic Batch Determination for production order components is possible by configuration.
You can also refer below discussions to map your scenario.
Batch determination in production order | SCN
Automatic Batch Determination in Production order
Regards,
Naresh

Similar Messages

  • Production Order Component Overview

    Hi All ,
    Could you please guide to understand the following will be grateful.
    In the production order component overview screen-MENU BAR is having following list
    Order, Functions, Edit, Goto, u201CCOMPONENTu201D, Environment, System, Help.
    In the above, if you left click the COMPONENT option there will be drill down option, in that there you have u201CCharacteristic Value Assignmentu201D
    u2022 What is the functionality of this option (u201CCharacteristic Value Assignmentu201D) ?
    u2022 If I select the BOM component in the component overview and I left click the COMPONENT option in the menu bar and select the u201CCharacteristic Value Assignmentu201D what will happenu2026.
    Thanks in Advance....

    Hi ,
    This is for the Component selection according to the Characteristic Value it will take you to Class to which Characteristics are
    assigned , say if your component selection based on the characteristics value say if your Hardness of the Raw material is
    99% based on that your Yield would vary for the Finished Product .
    You have created MIC 's with Hardness with characteristic value 95% , 96% , 97% and 98% etc....
    Your Quality lab has given test value for this component as 99% so your component selection will be this characteristic value
    as master data .
    Assign Characterisctics to Class , Assign class to class type 023 / 022
    Regards,
    Jayavimal

  • Automatic Batch Determination   in Production order

    Dear All,
    We are using automatic batch determination is based on FIFO (first Mfg first out) for components..After releasing the order.
    I have maintained Batch Class in all the materials which are used as a all material special Characteristic LOBM_HSDAT as a one of the class characteristic. as we want batch determination  on GR date for few material and for few material LOBM_VFDAT for self life material and its class.
    Then create Sort Rule CU70 mainatained the same LOBM_HSDAT in it. and one with LOBM_VFDAT.
    Then create Batch serch Strategy (USE T.Code COB1- search strategy CO01the respective sort rule and selection critoria.for All ROH HALB and Finish material.
    In Material Master of all component in MRP 2 view select value 3 (Automatic Batch Determination) for BATCH ENTRY. All ROH HALB and Finish material
    After mainting above all prerequisite I should able to do the Automatic Batch Determination as per my selection Rule.
    But Automatic Batch Determination  in Production order after release is not working.
    Please need your help.
    Regards,
    Manish
    Edited by: manish gurnule on Dec 30, 2008 5:26 AM

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    Madhu

  • Query on Batch Determination in Production Order

    Dear Gurus
    I have one query on batch determination in production order against the scenario given below, which need your help .
    We know that it is possible to allocate the same component batch to two concurrent production orders at the same time in SAP.  But as per the business requirement its not possible physically. So business want to update the batch selection logic to exclude the already allocated batch to any open production order.
    In my understanding it cant be done without any enhancement, but require your expert opinion before coming to any conclusion.
    If you have any idea to achieve the solution kindly let me know.
    Thanks

    Dear
    I am not sure whether you can change the Batch SELECTION logic  for concurrent production order .As far as I know batch selection is done on Batch search strategy /sort Rule
    Explore SAP Help : http://help.sap.com/printdocu/corePrint46c/en/data/pdf/LOBM/LOBM.pdf
    Refer this useful thead from expert :Userexit in Batch determination and external number ranges for batches
    Regards
    JH

  • Filter for batch determination of production order

    Filter for batch determination of production order
    Dear guru ,
    We trigger batch determination manually for every production order using CO02.
    How can I understand whose are the production orders arenu2019t taking place batch determination?
    Checking all the production orders is too heavy ?
    Does exist a massive transaction (coois or others)  where I can select the production orders with components not assigned to the batch ?
    Thanks in advance

    Hi
    In COOIS > In the initial screen select  Documented Goods movement  in the list Field along with and other selection criteria and run the Report
    In the list of orders > Expand corresponding order to view Documented goods movements list with the components with and w/o batch numbers
    Regards
    Brahmaji

  • Issue regarding Batch determination in Production order as per Expiry date.

    Dear all,
                    first of all  happy Navratri.
    I have issue regarding batch determination in production order.
    I have to compare P.O header materialu2019s expiry date and issuing components expiry date at the time of batch determination.
    lets take example,  Material having self life is u201CXu201D years and batch determination against PO is based on FEFO with the help of self life we can determine Expiry date of manufacturing material  suppose it is u201CYu201D  I have to introduce restriction at the time of good issue if expiry date of issuing components u201CZu201D is less than expiry date u201CYu201D.
    Please give your valuable suggestions either standard or through SAP enhancements.
    thanks & Regards
    SIVA

    Dear
    Thanks for your reply, i am layman about batch derivation can u elaborate it.
    Thanks & Regard

  • Production Order Component Overview (SAPLCOMK - screen 120)

    PP Experts,
    Have a requirement to add column to the component overview screen within production order create, change and display (CO01,CO02 & CO03).  In particular the column is the material master field - old material number (MARA-BISMT).
    Any suggestions how to approach this requirement?
    Thanks,
    Barry

    only ABAP can help u.
    i dont it will be big job for an abper.
    but since you are asking standard screen change..then it may ask for acess key or something...not sure.
    Pravin M.

  • Production Order - Component Overview - Storage location

    Hi,
    While i create Production orders, i do not see the storage locations for the components,listed in the component overview screen. I have maintained storage location & storage bins through MMSC transaction.
    Am i missing any config setting, so that the storage location will be visible in the Production Order.
    regards,
    K.Kumar.

    Hi
    You have to maintain the production storage location in the Material master (or) in BOM.
    In Material master MRP2 View, if you maintain the production storage location it is applicable where ever you use that material.
    In BOM-->Select the component >Go to item details> select the "Status/Lng text tab"--> here you can maintain the Production storage location. If you maintain here it is specific to this BOM only.
    Please check and revert.
    Regards
    Bala

  • Adding new column in production order component overview

    Hi Experts,
    Please let me know any enhancement or badi available to add a new column to production order component list. There is a business requirement to display the fixed bin in component list.
    THanks
    RIjil

    Sudhakar,
    Check the MRP parameter 'Individual/Coll' in MRP4 view for the components. This should be set as 2 for collective planning. If this flag is left blank then planning will be based on the parent material (If the parent material is planned for special stock then the components will also be planned for special stock)
    Let me know if this helps.
    Thanks,
    Jaison

  • Batch determination in production order for a component

    Hi All,
    Is there any FM or BAPI which can determine batch for a component in production order and save it. I don't want to use call transaction method for CO02 as this determines batches for all components in production order during saving process

    Hi,
    Look at BAPI 'BAPI_MATERIAL_GETBATCHES'. This might help you.....
    Here ia sample code:
    CALL FUNCTION 'BAPI_MATERIAL_GETBATCHES'
    EXPORTING
    material = MATERIAL
    BATCHNUMBER =
    plant = PLANT
    expirydatefrom = DATE
    EXPIRYDATETO = 99991231
    AVAILABLEDATEFROM =
    AVAILABLEDATETO = 99991231
    IMPORTING
    RETURN =
    TABLES
    batches = it_batches.
    Regards,
    Raj.

  • Batch determination in production order automatically for component

    Hi Experts
    Please understand the scenario and conclude the results
    Few of RM is having Batch management where Stock are lying into different production shop floor location XXXX and those RM is used into one production order of Finished Goods where System will not picking batch into production order , that we are putting by checking availability and than putting correct Shop floor Storage location and correct Batch in which stock is lying.
    now the above activity i want to perform through automatic batch determination which will system pick by default in which stock is exist in shop floor location. please suggest me step by step procedures for the same. few idea i have but i need clear guidelines....
    Thanks in advance..
    Pankaj Agarwal

    Pankaj,
    You can define the production storage location in BOM component details under Status/Lng Text or in MRP2  production storage location so that system will do the reservation by default for this production storage location and also good issue will be from same storage location.
    Against this reservation you can transfer the stock from stores to shopfloor.
    Check below SAP note for more information
      137225 - Prod. order: Issuing storage location for component
    Br
    KK

  • Reset Batch Determination in Production Order

    Dear PP experts,
    I've done the batch determination for component in production order successfully.
    My question is if it's possible to reset this batch determination ?
    Can anybody tell me how to do it??
    Thanks,
    Helly

    Hi,
    In Pord order - comp overview , when you select the component and trigger batch determination , it will lead to the Batch determination screen - there you select Batch determination - Original situation .
    This will reset the batch determination.
    pls try.
    Regards,
    Sheik

  • Batch determination in Production orders

    I am doing batch determination for one of the components in the Production order. We have 2 storage locations where the component is stored SLOC 1 and SLOC 2. When I do a batch determination on this component I want it to show batches from SLOC 1 first and then SLOC2. Currently it shows batches only from SLOC1 which is the issue location on the component screen in Production order.
    thanks a bunch

    Hello John,
    You can maintain the withdrawel sequence (stock determination group) in customizing and same can be assigned to the material in the material master.
    1) You can create stock determination group to plant in customizing.
    2) Assign the stock determination rule to the order type in the customizing and also check batch determination check box. Also select operation for stcok determination rule to be cheked at batch determination (number 5)...Transaction OPJ2.
    3) And assign the group to the material in the material master.
    Acoording to the sequence defined your batched from the storage location will be displayed in the production order screen.
    regards
    TAJUDDIN

  • Special stock indicator in Production Order Component overview

    Hi  Team,
    I have one finished product , for which i have created BOM . It has only one component in it .
    Now i am creating a Sales order , based on the definition and requirement set , system is creating a production order in background.
    When i go to production order and see components overview screen , there is one field special stock . This is getting filled with '1'  - Individual customer stock always. 
    Even though we have stock in storage location , it is expecting components to be in Sales order stock . 
    If i create a stand alone production order for same materials , there is no special stock indicator set in components .
    Can any body let me know how is this special stock field getting populated and what settings has to be reviewed in order to supress the same.
    Thanks,
    sudhakar

    Sudhakar,
    Check the MRP parameter 'Individual/Coll' in MRP4 view for the components. This should be set as 2 for collective planning. If this flag is left blank then planning will be based on the parent material (If the parent material is planned for special stock then the components will also be planned for special stock)
    Let me know if this helps.
    Thanks,
    Jaison

  • Batch Determination for  production orders

    Hi Experts,
    How do we set up batch determination strategy for production order.My requirement is" Batch Determination at the time of releasing the orders using : - the FIFO strategy on finished product , - the LIFO strategy on components (raw material)".
    Please help me to setup this requirement.
    Thanks,
    Ravi.M

    Just some simple hints:
    You must create a batch class to classify the materials with a characteristcs for the expiration date.
    There exist std characteristic for this.
    In the material master you have a setting to trigger batch determination at release.
    You must create sort rules sorting this characteristic ascending for FIFO and descendign for LIFO. (CU70)
    For component in production/processs order:
    You have to create a search strategy with of a type included in the search procedure defined in production/process ordeer dependent parametersy og your choice. Tc COB1
    In this you use the sort rule and the batch class as selection class.
    Your finished goods goes to a sales order so you have to craete a strategy there as well.
    It follows similar procedure as above but relates to sales order types and other search procedure.
    Good luck!
    Regards,
    Tor Holter

Maybe you are looking for

  • How do I create an object with code?

    I have a flash cs3 file in which I have created a simple movieclip (square) by drawing a rectangle on the stage of that movieclip.  When I drag that into another movieclip (clip) I am able to set properties for it such as x and y position by adding a

  • Can't drag and drop photos into Photoshop CS6

    I'm having this problem since the last time I formatted my computer, and it is really annoying. Basically, when I try to drag an image into photoshop, the cursors changes into a circle with a slash in it (unavailable). I can open files by right click

  • How to Capture the parameter?

    Hi All, I am doing Level based reports which displays table in each level with link to url in specific column.  Ex:  1st level -  say business unit as link to url.  clicking on this will open a 2nd level explorer  window which displays table related

  • How to Show floders and documents as a tree structure from path only

    sir, I am doing system side project using Java.. so i want to know how to show folders and documents as tree structure format.. plz give your idea regarding this?

  • Program error in class sapmssy1 method : uncaught_exception

    Hi Friends, I am executing Balance sheet report in portal while displaying the out put I am getting the below error message u201CError Brain (068): Characteristic value 18 of characteristic 0GL_ACCOUNT is not ALPHA-converted Program error in class sa