Best Way to Change Source System Client

We initially had a ECC source client for BI as 35.  But over time, we suffered with good test data because the ECC team use client 15 and not 35.  We want to change BI 7 to use client 15.  I have created a new source system in RSA1 for Client 15 but when I try to delete client 35 and /or change the source client on a datasource, all the data mappings are deleted!
I would really appreciate any advice or information on the best way to change the source R3 client for Bi without losing data mappings.  Point awarded and much respect
Warm regards
Lee Lewis

Hi,
Yes. There is a way to change the source system without deleting the old system. Please use the T.code BDLS and for more information refer the below link
Re: Changing a Source System.
OSS note 886102 will also give more information about this.
Hope it helps.
Thanks.

Similar Messages

  • Change Source System client for BI datasources

    Friends,
    We have created/migrated datasources in QA system using existing SAP Source System, for example,  ECC Client 320. Now we want to change the SAP Source System to the different client, for example, ECC Client 330. 
    All datasources are already created when connected to old Source System (ECC Client 320). The new requirement is to  extract the data from new client, from ECC Client 330. We like to change this seamlessly without impacting the data loads, full as well as delta.
    Any ideas as to how to accomplish this please?
    Regards,
    Upender Kadire

    Hi,
    The client mentioned while creating source system in BW is to be changed.
    Go to the RFC Destination created for R/3 system in BW and change the client.
    Now regarding the delta, the delta has to work fine, as BW system is Client independent. It looks for the Source and bring data.The delta queue is maintained in R/3.if you change the client, the delta will be picked from the new client.
    Happy Tony
    Happy Tony

  • New source system for HR extractors - easy way to change source system?

    Hi
    Our HR module is going to be seperated from the ECC module and thereby placed on a new server and have its own source system.
    In BI we have to handle this as well so that all 7.0 transformations and 3.5 transferrules etc. have to be mapped to the new HR source system. It there a smart way to do that and how would you do it?
    Thanks and kind regards,
    Torben

    Hi Dhanjayan
    Thanks for your reply.
    That would be an option to collect all source system dependent objects in a transport, however by doing that we will also collect objects for all the other areas than HR and it will therefore be a huge task to remove non HR related objects.

  • Change source system from A to B

    Hello,
    We have a lot of infosources which have a connection to datasources from source system A. Some of that infosources contain formulas. Now we have to change to source system B with the same datasources and even  the same content. What´s the best way to change without losing or filling in again the formulas and is there a way to do it not seperately for each infosource but for all infosources together, so simultaneously?
    Kind regards,
    Jos

    Hello Jos!
    Have a look at this document:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/uuid/0e38e10f-0401-0010-2ea1-f6fad5969c47
    It contains recommended scenarios for client copies and such. I think it will be useful to you.
    Kind Regards
    Andreas

  • Best way to handle source files

    Hi there,
    After some pretty general advise please.
    The company I work for looks after a lot of websites, and one
    of the
    headaches we have is the best way to handle source files. By
    source files I'm
    referring to Photoshop files, Flash .fla files and also other
    none Adobe
    files that relate to a site, not the .html, .asp, .aspx,
    .css, .js etc type
    files.
    Now I'm NOT after a version control system, just a simple way
    to store the
    source files in a location that is separate from the website
    but still to be
    able to have a smooth workflow between the Dreamweaver site
    and it's source
    files.
    At the moment, and I know this is unwise, we have a
    subdirectory within the
    site where we store the source files, and use WebDAV to
    transfer both site
    and source files to and from the server. But I really want to
    separate the
    site from source but still maintain a link between site and
    source...... if
    you see what I mean. I think the upshot is I would like to be
    able to open a
    site within Dreamweaver and instantly be able to access that
    sites source
    files if needed. This method needs to be shared across a
    small team spread
    round the UK.
    I looked at the Repository Subversion version control, but
    like I said I'm
    not after a source control system, plus it appeared to
    conflict with WebDAV
    and Contribute, that some of our clients use to maintain
    content on their
    sites. I also looked at Version Cue which looked promising,
    but can't see a
    clear workflow between Dreamweaver and Version Cue which
    separates site from
    source. I might be missing something.... part of my brain
    perhaps. :)
    Would be grateful for any advice please.
    Cheers,
    @ndyB

    Take a deep breath. Relax. All is fine.
    iDVD does not look at the size of your video file, it looks at the length. iDVD can accomodate up to 2 hours of movie
    iDVD gives you different options depending on the length of your movie. Although I won't agree with your friend about reducing the length of your movie to 15 minutes, if you could trim out a few minutes to get it under an hour that setting in iDVD (Best Performance though the new version may have renamed it) gives you the best quality. Still, any iDVD setting will give you good quality even at 64 minutes
    In FCE export as Quicktime Movie NOT any flavour of Quicktime Conversion. Select chapter markers if you have them. If everything is on one system unchecked the Make Movie Self Contained button. Drop the QT file into iDVD

  • Does not allow to change source system in Variant

    Hi Gurus,
    I am creating a variant for the program RSIMPCUST, but it does not allow me to change source system name. It is showing me gray color. Do you how to fix this issue ?.
    Thanks
    Liza

    Hello Liza,
    Did you try my solution?
    [Re: Change source system name in variant in BWQ]
    There are solutions to change variants properties, but that particular program has the logsys parameter not able to change, so you cannot change the value of that variant (only with debug).
    It's best to go for that solution I already provided to you...
    Diogo.

  • Change source system name in variant in BWQ

    Hi Gurus,
    I created a process chain for global seetings for unit of measurement and fiscal year variants and transported to BWQ.
    In BWQ, I found the source system name in variant is showing ERD source system name, but I need to change it to ERQ source system name. Any advice how to change source system name in variant in BWQ I would appreciate it.
    Thanks
    Liza

    Hello Again Liza...
    I had the same problem but I didn't need to include in process chain...
    So to execute periodically you can change it in debug mode, not the best solution...
    But since you need to use it in a process chain, you should copy that program to one of yours Z.
    Do this:
    Go to transaction se38 and insert the program name "RSIMPCUST".
    Click on the button of "Copy" (Ctrl+F5).
    Change the source program name to ZRSIMPCUST (or whatever you want)
    Click Enter
    Click the button to mark everything (F8)
    Click Enter
    On the next window of the name of the include click enter (leave it blank)
    Click on the button Change of your Source Code
    In line number 54 you'll find this in Selection Screen part:
    PARAMETERS:  logsys  TYPE rsa_logsys MODIF ID p01.
    PARAMETERS: logsysnm LIKE tbdlst-stext MODIF ID p02.
    Delete those two lines and insert this ones:
    PARAMETERS:  logsys  TYPE rsa_logsys.
    PARAMETERS: logsysnm LIKE tbdlst-stext.
    Now click on Activate button (Ctrl+F3)
    Now you have a new program just like the old one but you can change the source system to whatever you want!
    Please assign points,
    Diogo.

  • Best way to change fund posted in an EBS document

    What is the best way to change the fund in one line item in a document produced when the electronic bank statment is processed? The bank charges fees that come through the statement and should post to a different fund then any other item such as checks, etc.
    I am trying a substitution but coming across the error Field COBL-KOSTL. does not exist in the screen SAPLKACB 0002.

    The error message that I was receiving...Field COBL-KOSTL. does not exist in the screen SAPLKACB 0002, was coming from function module EXIT_RFEBBU10_001 and include ZXF01U01. The programming code was attempting to default a cost center when the external transaction code = 661. The coding was removed and the default acct assignment cost center was added to the cost element master data. The substitution also worked correctly as it should.

  • Newbie Quesion: Best way to change colour of a movie

    Hi,
    Could someone tell me the best way to change the colour of
    one element of a
    movieclip in AS2?
    Say for example I had a filled white circle in the middle of
    a black square,
    how can I change just the colour of the circle?
    I have tried this.myColor.setRGB( color ); but that sets the
    entire clip to
    be of one colour. Do I need ( as I suspect ) one clip on top
    of another or
    is there any way of keeping details of the clip being
    changed?
    TIA
    Wil

    Cheers jdh,
    This is one method I'd considered.
    I'll give it a bash.
    Wil
    "jdh239" <[email protected]> wrote in
    message
    news:ens1vd$ahn$[email protected]..
    > Don't know if this will help, but this code changes the
    color of my
    > "LOADING"
    > text while it is loading. Should have the essential code
    to do what you
    > are
    > looking for.
    >
    > Make the white circle a movie clip and pick the
    following code apart to
    > get it
    > to change colors:
    >
    >
    >
    > stop();
    > loading.gotoAndPlay(1);
    > import flash.geom.ColorTransform;
    > import flash.geom.Transform;
    > var colorTrans:ColorTransform = new ColorTransform();
    > var trans:Transform = new Transform(loading);
    > trans.colorTransform = colorTrans;
    > loadI = setInterval(loadF, 100);
    > function loadF() {
    > percent =
    Math.floor(_root.getBytesLoaded()/_root.getBytesTotal()*100);
    > if (percent<=39) {
    > colorTrans.rgb = 0x0000FF;
    > // blue
    > trans.colorTransform = colorTrans;
    > } else if ((percent>39) && (percent<60)) {
    > colorTrans.rgb = 0x00FF00;
    > // green
    > trans.colorTransform = colorTrans;
    > } else if ((percent>60) && (percent<80)) {
    > colorTrans.rgb = 0xFF8000;
    > // orange
    > trans.colorTransform = colorTrans;
    > } else if ((percent>80) && (percent<99)) {
    > colorTrans.rgb = 0xFF0000;
    > // red
    > trans.colorTransform = colorTrans;
    > } else if (percent>=99) {
    > clearInterval(loadI);
    > _root.gotoAndPlay(16);
    > } else {
    > loading.gotoAndPlay(1)
    > }
    > }
    >

  • Best way to change partition key on existing table

    Hi,
    Using Oracle 11.20.3 on AIX.
    We have a table about 800 million rows and 120gb in size.
    Want to try copies oif this table to evalaute different partitiong strategies.
    What is the quickest way to do this?
    Would have liked say datapump table 1 tro disk and datapumo import the data to new table but do the tables need to be of the same format.
    Thanks

    >
    Using Oracle 11.20.3 on AIX.
    We have a table about 800 million rows and 120gb in size.
    Want to try copies oif this table to evalaute different partitiong strategies.
    What is the quickest way to do this?
    Would have liked say datapump table 1 tro disk and datapumo import the data to new table but do the tables need to be of the same format.
    >
    First your subject asks a different question that the text you posted: Best way to change partition key on existing table. The answer to that question is YOU CAN'T. All data has to be moved to change the partition key since each partition/subpartition is in its own segment. You either create a new table or use DBMS_REDEFINITION to redefine the table online.
    Why do you want to export all data to a file first? That just adds to the time and cost of doing the op.
    What problem are you trying to use partitioning to solve? Performance? Data maintenance? For performance the appropriate partitioning key and whether to use subpartitions depends on the types of queries and the query predicates you typically use as well as the columns that may be suitable for partition keys.
    For maintenance a common method is to partition on a date by year/month/day so you can more easily load new daily/weekly/monthly data into its own partition or drop old data that no longer needs to be kept online.
    You should use a small subset of the data when testing your partitionings strategies.
    Can you do the partitioning offline in an outage window? If not then using the DBMS_REDEFINITION is your only option.
    Without knowing what you are trying to accomplish only general advice can be given. You even mentioned that you might want to use a different set of columns than the curren table has.
    A standard heap table uses ONE segment for its data (ignoring possible LOB segments). A partitioned/subpartitioned table uses ONE segment for each partition/subpartition. This means that ALL data must be moved to partition the table (unless you are only creating one partition).
    This means that every partitioning scheme that uses a different partition key requires ALL data to be moved again for that test.
    Provide some information about what problem you are trying to solve.
    >
    Is this quicker than datapump?
    >
    Yes - exporting the data simplying moves it all an additional time. Ok to export if you need a backup before you start.
    >
    Found artcle which talks about using merge option on datapump import to convert partitioned table to non-partitioned table.
    >
    How would that apply to you? That isn't what you said you wanted to do.

  • Best way to change config then change it back after a while.

    I spent some time today trying a couple approaches to this, but they all seemed a little klunky.
    I'm looking for the best way to change the BGP prefixes which are advertised out to an ISP, based on some check.  I want to set a timeout so the router won't attempt to send the route again for say 30 minutes after it is triggered, but then will start advertising it again, and monitor to see if the trigger condition returns.  If the trigger condition returns then again withdrawl the route for 30 minutes and so on.
    I'm using a prefix-list already to limit outbound route advertisments, so it seems simplest to just make a config change to remove one line in the prefix-list, then a few minutes later put it back.
    I tried just using the "cli command wait", but if I set the wait period too long, the applet seemed to die, and never ran the later cli commands to put the prefix-list line back.  There is also a exit-time clause for the event, but I couldn't figure out how to put the line back after the exit-time expired.  Lastly I tried doing an event with a watchdog timer, but also couldn't get that to work either.  Before I spend too much time working on differant options, I wanted to see if anyone had any recommendations.
    I've done some TCL scripting on Cisco routers, but that seemed to be overkill for this, and I wanted to keep the config easy to manage for peers who might not be as proficient in TCL scripting.
    This is intended for ASR-1002X routers if it matters.
    Any suggestions would be much appreciated.
    Thanks
    Derek

    Thanks for all your help Joe. 
    Ok, so here is my current script, which seems to be working pretty well (changing to entry-type "value" fixed the variability in detection times).  For testing in the script below, I'm using a 30 second timeout for when the line gets put back, and a 60 second timeout for when monitoring should resume after the event is triggered. The script checks the value of the OID every 5 seconds.
    The only other thing I would like to do with it that I can't figure out, is how to use an environment variable for the exit-time.  Ideally, I would just add a value, like 10 seconds, to the ATimeout variable.  However I can't figure out the syntax to just use a var for the exit-time.  Anyone know the secret (or if it is possible?)
    event manager environment ATimeout 30
    event manager environment q "
    no event manager applet DDOS_RESPONSE01
    event manager applet DDOS_RESPONSE01
    event snmp oid 1.3.6.1.4.1.9.9.166.1.17.1.1.21.80.65538 get-type exact entry-op gt entry-val "0" entry-type value exit-time 60 poll-interval 5
    trigger
    action 001 cli command "enable"
    action 002 cli command "config term"
    action 003 cli command "no ip prefix-list PUBLIC_NETWORKS seq 140 permit 10.4.1.0/24 le 32"
    action 004 syslog msg "DDoS Attack Detected. Removing Web Srvr Subnet from PUBLIC_NETWORKS for ($ATimeout) seconds."
    action 005 cli command "event manager applet RESTORE_PREFIX"
    action 006 cli command "event timer countdown time $ATimeout "
    action 007 cli command "action 101 cli command $q enable $q"
    action 008 cli command "action 102 cli command $q config term $q"
    action 009 cli command "action 103 cli command $q no event manager applet RESTORE_PREFIX $q"
    action 010 cli command "action 104 cli command $q ip prefix-list PUBLIC_NETWORKS seq 140 permit 10.4.1.0/24 le 32$q"
    action 011 cli command "action 105 syslog msg $q DDoS Attack Timeout ($ATimeout) reached. Re-adding Web Srvr Subnet to PUBLIC_NETWORKS. $q "
    action 012 cli command "action 106 cli command $q no event manager applet RESTORE_PREFIX $q"
    exit
    event manager environment ATimeout 30
    event manager environment q "
    event manager applet DDOS_RESPONSE01
    event snmp oid 1.3.6.1.4.1.9.9.166.1.17.1.1.21.80.65538 get-type exact entry-op gt entry-val "0" entry-type value exit-time 60 poll-interval 5
    trigger
    action 001 cli command "enable"
    action 002 cli command "config term"
    action 003 cli command "no ip prefix-list PUBLIC_NETWORKS seq 140 permit 10.4.1.0/24 le 32"
    action 004 syslog msg "DDoS Attack Detected. Removing Web Srvr Subnet from PUBLIC_NETWORKS for ($ATimeout) seconds."
    action 005 cli command "event manager applet RESTORE_PREFIX"
    action 006 cli command "event timer countdown time $ATimeout "
    action 007 cli command "action 101 cli command $q enable $q"
    action 008 cli command "action 102 cli command $q config term $q"
    action 009 cli command "action 103 cli command $q no event manager applet RESTORE_PREFIX $q"
    action 010 cli command "action 104 cli command $q ip prefix-list PUBLIC_NETWORKS seq 140 permit 10.4.1.0/24 le 32$q"
    action 011 cli command "action 105 syslog msg $q DDoS Attack Timeout ($ATimeout) reached. Re-adding Web Srvr Subnet to PUBLIC_NETWORKS. $q "
    action 012 cli command "action 106 cli command $q no event manager applet RESTORE_PREFIX $q"
    exit

  • Best way to change workstation

    What is the best way to change the workstation name and import it into
    edirectory.
    We constantly have user change computer name. Most of the time when we
    change the computer name it takes day to reflect on the edirectory. When
    rename the workstation object, we cannot even remote to the workstation.
    I have problem remote to through user name, I keep getting user does login
    when in fact the user is login. We have netware 6.5 with the latest
    service pack.

    Sang,
    It appears that in the past few days you have not received a response to your
    posting. That concerns us, and has triggered this automated reply.
    Has your problem been resolved? If not, you might try one of the following options:
    - Do a search of our knowledgebase at http://support.novell.com/search/kb_index.jsp
    - Check all of the other support tools and options available at
    http://support.novell.com.
    - You could also try posting your message again. Make sure it is posted in the
    correct newsgroup. (http://support.novell.com/forums)
    Be sure to read the forum FAQ about what to expect in the way of responses:
    http://support.novell.com/forums/faq_general.html
    If this is a reply to a duplicate posting, please ignore and accept our apologies
    and rest assured we will issue a stern reprimand to our posting bot.
    Good luck!
    Your Novell Product Support Forums Team
    http://support.novell.com/forums/

  • Best way to change TreeMap value?

    Hello,
    I am wondering what is the best way to change a value in a TreeMap? I have retrieved a value by .get on the key i.e.
    String aString = (TreeMap) aTreeMap.get(aKey);but would now like to change aString and ?.put? it back into the map?
    How would I do this?
    Thank you,
    Poot.

    but would now like to change aString and ?.put? it
    back into the map?Do I just have to keep a note on the (key,value) - especially key - change the value and then .put(key,value) back in? Though I'll need to remove the initial pairing if I do this since TreeMap won't allow duplicate keys!
    There must be an easier way as this.
    Thank you for your reply,
    Regards,
    Poot.

  • Change Source system Tech.Name

    Production :   PRE -
    >  PRB
    PRE-Production    :   PPE -
    > PRE
    We make a copy of our production BI to Preproduction BI (PPB) we follow note # 886102. We want to connect this system to our pre production ERP (PPE).We already run BDLS change the logical system name we created new RFC created which is pointed to new R3 system .Problem is when we are going to run Tcode RSA1 in source system it shows old Tech name PRE600. We are unable to activate the source system.
    We can create new source system (PPE),but All our BI objects mapped with old source System (PRE600). I am afraid to change thousands of BI objects ( change source system from PRE600 to PPE600).
    Is there any work around we can change the Logical Source system Tech.Name? or some batch job which change the source system name for all BI objects.
    Appreciate your earliest reply.
    Nawab

    Hi
    Can you please check the Tcode BDLS
    Check the document it will be helpful
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bff13df2-0c01-0010-6ba7-bc50346a6fd8
    Regards

  • Best way to change the speed of a sequence of linked short clips?

    I have a sequenced project of about 150 short 1 second clips linked together via a crossfade transition... I would like to make the timelapse faster. What is the best way to change the speed of the sequence or the clips themselves? I would rather change the sequence for it would be less labor intensive I would imagine!!
    Thanks
    RD

    Or...select all the clips in the timeline, control-click (or right-click) on them and select 'Duration'. Change the duration to whatever will fit/fill the timespan you need, then hit OK.
    If you're needing to change the dissolve as well, you should remove all but one of them first, then drag the remaining transition into the browser. Dbl-click it into the viewer, set the duration of what you want, then use the hand icon at top right and drag it back into the browser. Rename it relevent to it's new duration, then control-click on it and select "Make Default".
    Now, set an inpoint at the first frame of your clips in the timeline, then drag all the shortened clips from the timeline into the canvas and release where it says 'Overwrite with Transition'.
    That's another way to accomplish this.
    K

Maybe you are looking for