Billing Social Service Entitlement Items using PA2640
Wondering if anyone can help with this.
We are using Posting Area 2640 in Social Billing to bill NCD entitlement items. Our implementation of the PSSCB_BILL_CREATE BAdI populates the PA2640_POS_ID* fields on the billing document items, which is then mapped to main / sub transactions by SAP standard code.
One of the keys to determine the main/ sub transaction is the benefit product ID (BENEFIT_ID_EXT field in PSSCD_NCDitem table). This is carried through from the SSP / GED / GPD and originally sourced from the PRODUCT_ID field in the COMM_PRODUCT master data table, which has a 40 character length. However the TFK033D table key fields used in Posting Area 2640 are defined as length 12, which is too short to hold the potential maximum product ID length.
Our options to make this work are:
Modify the SAP standard TFK033D table and associated structures (which we would like to avoid if possible because other posting areas use this table as well and allowing 40 character data to be entered could cause unintended truncations)
Limit our product IDs to 12 characters (which is not feasible due to the way they have been designed)
Stop using Posting Area 2640 to do the mapping and implement our own custom mapping configuration table to go from benefit product to do main / sub transaction (however we would like to use as much SAP standard functionality as possible)
Any suggestions? How risky is it to modify the TFK033D table field length?
The release is R12.1.3
-Seth
Similar Messages
-
Standard text entry for Service line items using BDC
Hi,
I want to enter standard texts for service line items of RFQ created using BDC, if it is a line item i can pass RFQ_number+line_item number as TDNAME in SAVE_TEXT function module, but for Service line item what value we need to pass in TDNAME.
Is there anyway we can capture the package number in BDC of ME41?
Regards
Bala Krishna.
-
How to remove a service line item from a service related PO
Guys,
I am doing a report thro' which a user can upload the details for a Service related PO. If the PO contains more Service Line Item than the upload file, then I want to remove those Service Line Items. I used BAPI_PO_CHANGE to upload the details. But I am trying to remove those additional Service Line Items using BDC in ME22 transaction. But it is not working correctly. Is there any program(s) thro' which I can remove those Service Line Items? Any expert thoughts....
Advance Thanks
RameshI did it through BDC.
-
Hi Gurus,
I have a situation.
we use service line items using the unplanned service function within SAP. On PO line items, we assign an overall limit and expected value.
Ok, now a bit of a background regarding one of the system changes we made in SAP. About 2 years ago, we noticed that some users were changing the PO price after the GR was complete. This obviously causes issues with GR postings, so we changed the logic to disallow price changes after a GR has been completed.
The logic we applied around price changes has worked fine, with one exception--Service line items using the unplanned services function. For example, if we create a PO with an overall value of $3,000, and only use $500 of that $3000, we want to be able to adjust the value to show what was actually done. In other words, we would like to be able to change the PO value down to $500, closing out any open value on the PO. With the price change logic, the system will not allow us to change the price because a GR/Service entry sheet has already been completed.
So here is what my business is asking for
1. The logic around price changes to be modified when it comes to services. would like the ability to modify the overall limit and expected value, but only be able to modify it to a point where it is equal to, or greater than the actual value. And should not be able to drop the overall limit and expected value to anything below the actual value.
Is there a way to do this.
Please let me know.
Thanks,
SrikanthSInce you are working with enhancement check with ABAPer for logic and modify the program for Service PO's
-
Rating a List Item using jquery with out using User profile service
Hi,
I dont have access to Central admin and i was not not able to enable USer profile service.
can i rate a list item in Sharepoint 2010 using any jquery plugin
i got the link
http://blogs.msdn.com/b/carloshm/archive/2009/08/24/jquery-rating-in-sharepoint-lists.aspx
But i am not able to find any plugin in it.
Please advice.
Thnaks,
PallaviHi,
According to your post, my understanding is that you wanted to rate a list item using JQuery in SharePoint 2010.
The link you had posted above is for SharePoint 2007.
You can refer to the following articles which about using the JQuery to call the rating service.
http://blog.dennus.net/2011/08/09/using-spservices-and-jquery-to-include-social-rating-control-on-_layouts-page/
https://www.habaneroconsulting.com/insights/Calling-the-Rating-Service-using-jQuery-in-SharePoint-2010-Part-1-of-2#.UxbQxvmSz6k
You can also use the tool of the CodePlex to achieve it.
http://sptoolbasket.codeplex.com/
Thanks & Regards,
Jason
Jason Guo
TechNet Community Support -
How to change Service Item using BAPI_ENTRYSHEET_CREATE.
Hi All,
There's a requirement for me to upload/ Create Entry Sheet using BAPI_ENTRYSHEET_CREATE from the source file.
The Header was given to me but the Service Item, they would like the flexibility to change the existing lines that was adopted from ML81N.
Eg of the file.
Header given:-
PO NO
Po Item
Short Text
Ext Entry Sheet No
Service Location
Period Start
Period End ....n so on
Service Item given:-
Service Line (Extrow)
Service Order Qty (Memge)
Ext Service No (EXTSRVNO)
The objective of this file is
1) Create Service Entry Sheet (using Header)
2) Adopt the Service Item
3) Change Service Item (using Service Item)
Could anyone guide me how to do it? If Using BAPI_ENTRYSHEET_CREATE...is actually creating it with full details of the upload file. but given to me, t requrement is they would like to create n change the item.
Appreciates your help.
Thank you.
Regards,
Sheena WeeHi ,
If you are trying to test the FM through TCode SE37 then it will not give you the desired output.Do one thing create a test program and there you call the FM with your data.I hope in this way you can solve the issue.
Regards,
Sarbajit. -
Error whil creating Service Line item in ME51N using BAPI_PR_CREATE
Hi Experts,
Am able to create PR number using BAPI_PR_CREATE, but when am trying to create Service line item am getting acc assignment error please check my code and solve my issue. ..its very adj please help me .
DATA : t_bapimereqitemimp TYPE TABLE OF bapimereqitemimp ,
t_bapimereqaccount TYPE TABLE OF bapimereqaccount,
t_bapimereqaccountx TYPE TABLE OF bapimereqaccountx,
t_pritemx TYPE TABLE OF bapimereqitemx,
wa_bapimereqitemimp TYPE bapimereqitemimp,
pr_number TYPE bapimereqheader-preq_no,
wa_prheader TYPE bapimereqheader,
wa_prheaderx TYPE bapimereqheaderx,
wa_pritemx TYPE bapimereqitemx,
wa_bapimereqaccountx TYPE bapimereqaccountx,
wa_bapimereqaccount TYPE bapimereqaccount,
t_return TYPE TABLE OF bapiret2,
wa_return TYPE bapiret2.
DATA : t_bapi_srv_limit_data TYPE TABLE OF bapi_srv_limit_data,
wa_bapi_srv_limit_data TYPE bapi_srv_limit_data.
DATA servicelimitx TYPE TABLE OF bapi_srv_limit_datax.
DATA w_servicelimitx TYPE bapi_srv_limit_datax.
DATA : t_servicelines TYPE TABLE OF bapi_srv_service_line,
w_servicelines TYPE bapi_srv_service_line,
t_servicelinesx TYPE TABLE OF bapi_srv_service_linex,
w_servicelinesx TYPE bapi_srv_service_linex,
t_bapi_srv_acc_data TYPE TABLE OF bapi_srv_acc_data,
w_bapi_srv_acc_data TYPE bapi_srv_acc_data,
t_bapi_srv_acc_datax TYPE TABLE OF bapi_srv_acc_datax,
w_bapi_srv_acc_datax TYPE bapi_srv_acc_datax.
DATA : t_bapimereqitem TYPE TABLE OF bapimereqitem,
w_bapimereqitem TYPE bapimereqitem.
DATA : t_bapimereqitemx TYPE TABLE OF bapimereqitemx,
w_bapimereqitemx TYPE bapimereqitemx.
wa_prheader-pr_type = 'RV'."lv_doc_type.
wa_prheaderx-pr_type = 'X'.
wa_bapimereqitemimp-preq_item = '1'."wa_eban-item.
wa_bapimereqitemimp-pur_group = '100'."wa_eban-ekgrp.
wa_bapimereqitemimp-preq_name = 'E.R. TITTO'."wa_eban-afnam.
wa_bapimereqitemimp-short_text = 'AC Fitting'."wa_eban-txz01.
wa_bapimereqitemimp-material = ' '."wa_eban-matnr.
wa_bapimereqitemimp-plant = '1000'."wa_eban-werks.
wa_bapimereqitemimp-store_loc = 'ST00'."wa_eban-lgort.
wa_bapimereqitemimp-matl_group = 'Z13'."wa_eban-matkl.
wa_bapimereqitemimp-quantity = '1'."wa_eban-menge.
wa_bapimereqitemimp-unit = 'AU'."wa_eban-meins.
wa_bapimereqitemimp-deliv_date = '20140604'."wa_eban-lfdat.
wa_bapimereqitemimp-preq_price = '100'."wa_eban-preis.
wa_bapimereqitemimp-item_cat = 'D'."wa_eban-pstyp.
wa_bapimereqitemimp-acctasscat = 'K'."wa_eban-knttp.
wa_bapimereqitemimp-fixed_vend = ' '."wa_eban-flief.
wa_bapimereqitemimp-purch_org = '1000'."wa_eban-ekorg.
wa_bapimereqitemimp-currency = 'INR'."wa_eban-waers.
wa_bapimereqitemimp-pckg_no = '00000001'.
wa_bapimereqaccount-preq_item = '1'."wa_eban-item.
*wa_bapimereqaccount-serial_no = '01'.
wa_bapimereqaccount-gl_account = '0000002244'."wa_eban-sakto.
wa_bapimereqaccount-costcenter = 'OPSD'."wa_eban-kostl.
APPEND wa_bapimereqitemimp TO t_bapimereqitemimp.
APPEND wa_bapimereqaccount TO t_bapimereqaccount.
wa_pritemx-preq_item = '1'."wa_eban-item.
wa_pritemx-pur_group = 'X'.
wa_pritemx-preq_name = 'X'.
wa_pritemx-short_text = 'X'.
wa_pritemx-material = 'X'.
wa_pritemx-plant = 'X'.
wa_pritemx-store_loc = 'X'.
wa_pritemx-matl_group = 'X'.
wa_pritemx-quantity = 'X'.
wa_pritemx-unit = 'X'.
wa_pritemx-deliv_date = 'X'.
wa_pritemx-preq_price = 'X'.
wa_pritemx-item_cat = 'X'.
wa_pritemx-acctasscat = 'X'.
wa_pritemx-fixed_vend = 'X'.
wa_pritemx-purch_org = 'X'.
wa_pritemx-currency = 'X'.
wa_pritemx-pckg_no = 'X'.
wa_bapimereqaccountx-preq_item = '1'."wa_eban-item.
*wa_bapimereqaccountx-serial_no = '01'.
wa_bapimereqaccountx-preq_itemx = 'X'.
wa_bapimereqaccountx-serial_nox = 'X'.
wa_bapimereqaccountx-gl_account = 'X'.
wa_bapimereqaccountx-costcenter = 'X'.
APPEND wa_pritemx TO t_pritemx.
APPEND wa_bapimereqaccountx TO t_bapimereqaccountx.
**Service item limit
*wa_bapi_srv_limit_data-doc_item = '10'.
wa_bapi_srv_limit_data-overall_limit = '1000'.
wa_bapi_srv_limit_data-exp_value = '800'.
APPEND wa_bapi_srv_limit_data TO t_bapi_srv_limit_data.
*w_servicelimitx-doc_item = '10'.
w_servicelimitx-overall_limit = 'X'.
w_servicelimitx-exp_value = 'X'.
APPEND w_servicelimitx TO servicelimitx.
w_bapimereqitem-preq_item = '10'.
***w_bapimereqitem-preq_name = 'E.R. TITTO'.
***w_bapimereqitem-plant = '1000'.
***w_bapimereqitem-store_loc = 'ST00'.
***w_bapimereqitem-matl_group = 'Z03'.
***w_bapimereqitem-quantity = '1'.
***w_bapimereqitem-unit = 'AU'.
w_bapimereqitem-item_cat = 'D'.
w_bapimereqitem-deliv_time = '20140604'.
w_bapimereqitem-acctasscat = 'K'.
**w_bapimereqitem-consumpt = 'U'.
APPEND w_bapimereqitem TO t_bapimereqitem.
**w_bapi_srv_acc_data-doc_item = '1'.
**w_bapi_srv_acc_data-outline = '0000000001'.
*w_bapi_srv_acc_data-srv_line = '20'.
w_bapi_srv_acc_data-serial_no = '10'.
w_bapi_srv_acc_data-serial_no_item = 'D'.
*w_bapi_srv_acc_data-quantity = '1'.
*APPEND w_bapi_srv_acc_data TO t_bapi_srv_acc_data.
**w_bapi_srv_acc_datax-doc_item = '1'.
**w_bapi_srv_acc_datax-outline = '0000000001'.
*w_bapi_srv_acc_datax-srv_line = '20'.
**w_bapi_srv_acc_datax-serial_no = '01'.
**w_bapi_srv_acc_datax-serial_no_item = '01'.
*w_bapi_srv_acc_datax-quantity = '1'.
*APPEND w_bapi_srv_acc_datax TO t_bapi_srv_acc_datax.
w_servicelines-service = '00000001'.
APPEND w_servicelines TO t_servicelines.
w_servicelinesx-service = 'X'.
APPEND w_servicelinesx TO t_servicelinesx.
CALL FUNCTION 'BAPI_PR_CREATE'
EXPORTING
prheader = wa_prheader
prheaderx = wa_prheaderx
IMPORTING
number = pr_number
TABLES
return = t_return
pritem = t_bapimereqitemimp
pritemx = t_pritemx
pritemexp = t_bapimereqitem
praccount = t_bapimereqaccount
praccountx = t_bapimereqaccountx
servicelimit = t_bapi_srv_limit_data
servicelimitx = servicelimitx
servicelines = t_servicelines
servicelinesx = t_servicelinesx
serviceaccount = t_bapi_srv_acc_data
serviceaccountx = t_bapi_srv_acc_datax.Hi,
Check this Thread , Thread1 . It might help you to resolve the issue.
Thanks
KH -
Date Error on the Service Order while using service product
Hi PM experts,
I am working on the scenario resource-related billing, using service product in the service order created from a service notification linked to a contract with service product as the line item. service product is the material of DIEN material type.
when i was trying to save the service order created using transaction code-IW31, i am getting the Error Message:
" *SYS:Date 00.00.0000 not expected*".
This error started only yesterday, and it was not there before. Basis team has confirmed that they have not done any new
updates to the system.
Had anyone encounered this problem before, if yes kindly let me know the solution and the steps to resolve it.
thanks for the help.
regards,
rajaramanHi,
Here is the error description with message number,
SYST: Date 00.00.0000 not expected.
Message no. FGV004
As an update to this thread, while searching for the reasons for the problem, i found that the characteristics used in the
warranty class were carrying default date value as 00.00.0000. can this be a reason for getting this error as the service
product number which is a DIEN material type is linked to the master warranty which is in turn assigned to the equipment.
Hope this information helps.
regards,
rajaraman -
Mile stone billing for service contract
Hi gurus,
can you help me for the following:
i want to configure mile stone billing for service contract in my client business process,
can any one send me the complete configuration process steps for mile stone billing.
I'll reward you full marks,
Thanks in advance
nitchelHiya...
Billing Plan for Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing
dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of
the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a
billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and
cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :-
1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1. Item -> Schedule lines.
2. Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order Item Turbine 100,000
Billing Plan
Billing date Description % Value Billing Block Milestone Billing Status
01-10-94 Contract 10 10,000 - x x
01-03-95 Assembly 30 30,000 x x
01-04-95 Maintenance 30 30,000 x x
01-05-95 Acceptance 30 30,000 x x
01-06-95 Final invoice .. .. x
Network/Activities
Milestone Estimate Actual
Assembly 01-03-95 01-03-95
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
2. always updated with the actual date of the milestone
3. updated with the actual date of the milestone, if the date is earlier than the
planned billing date for the date
Keep Sapping
Regards -
Resource related billing and service quotation
Dear gurus,
can anyone explain the process of resource related billing and service quotation in step by step.
if possible mail me the screen shots also in this email-id
[email protected]hi,
Maintaining Profiles for Sales Order and Billing Request
Use
The Dynamic Item Processor (DIP) profile defines and controls resource-related quotation and billing for service orders and sales documents. It may be maintained in either the Customer Service or the Sales and Distribution section of the IMG. The DIP profile allows flexible determination and translation of actual labor, material and other costs into sales materials for appropriate pricing and billing.
DIP profiles BC10 is used exclusively in the value chain for time and material project.
Integration
The DIP profile functionality is closely integrated with the controlling module for the processing of cost objects into sales materials.
Prerequisites
Relevant sales document types, condition records, sales materials have been created.
Procedure
Access the activity using one of the following navigation options:
IMG Menu Project System ® Revenues and Earnings ® Integration with SD documents ® Creating Quotations and Project Billing ® Maintain Profiles for Quotations and Billing
Transaction Code ODP12.
Activities:
In the configuration item Profiles for Sales Order, Billing, Results Analysis, choose profiles BC12.
The DIP profile can be used for processing resource-related billing and results analysis, as well as for generating resource-related quotations. To do so, sales document types must be defined for each usage. Access the Usage section of the profile and maintain the following entries:
DI Usage SD Ty BC12
1 Billing & Results Analysis Z2TC
all other fields leave blank
Access the characteristics section of each profile. The characteristics are the objects which the system will take into consideration when processing and displaying resource-related billing. For both billing and order usages, set the characteristics as follows (note that other settings are automatically defaulted in by the system):
Characteristic Charact
Relevant Material Determ NoSummarizat. Structuring Sequence
Z2TC
Accounting Indicator X
Activity Type X X X
Object number X
Period X
Transaction Currency X X
Unit of Measure X X
all other fields leave blank
The sources section determines what type of costs will be selected by the DIP profile for each usage. More detailed selection criteria are available, but not maintained in this setting. Access the sources section of each profile and maintain the following entries:
Line Source Percentage
1 0001 Actual Cost - Line 100
Access the material determination and criteria sections of the profile. Material determination defines the sales materials that costs will be converted into. The criteria defines cost element groups (cost elements are determined from the labor activity type or the component account assignment) that correspond to each material. For both billing and quotation usages, define material determination as follows:
Material/Service Material Determination:
Transfer Quantity/Costs Material Determination:
Conversion Quantity Criteria:
Activity Type
Z2TC
I00342 X (Transfer Cost & Qty) Checked
I00984 X Checked
all other fields leave blank
To confirm that all entries and settings in the DIP profiles are consistent, go to the configuration item check profile settings. Enter the DIP profile and execute. Green traffic lights should be displayed next to all items for both usages. Otherwise, determine the inconsistency and make the necessary correction.
Go through t.code DP90
1.U will get "resource related billing request initial screen.
2.U enter ur "Srevice order", then select "Expences" button.
3.u get " Billing request for resource related billing document" Here the columns for "Open amt" and "Amt. to billed" equal the transactions that have posted to the project and have not been billed. To continue, press the "Billing request " button. The system will ask you if you really want to do this -- say "yes"
Then u will get the overview screen.
Link service order to a quotation thru transaction DP90. The quotation will be created with reference to the service order. The business scenario is that you are creating a quotation for the job to be done. The line items in the quotation are based on resources and materials planned in service order.
CHAN
Message was edited by:
CHAN HARI -
Resource Related Billing for Service
The service order was billed and accounting document created. I created another accounting documnent for the same order in DP90 and it only picks up the parts and bills at a negative 1. Can anyone explain why this is happening? It seems to bill the labor just fine. I simply trying to re-bill the service order using DP90 transaction.
What can I check?Charlie,
Is this for all orders, or only one?
It may be that someone has partially billed the spare part item on the first DMR, and the second DMR is picking up the remaining costs.
Try deleting the first DMR via VA02 (assuming there is no billing document) and re-running DP90.
PeteA -
Web Request in Social Services(Public Sector)
Hi ,
Has any one worked on Web request in social services. If any one has any tutorials related to how to create a web page using this technology please let me know.
In SPRO it comes under Public sector->Social Service->Web Request
I have developed web applicatons using CRM Web UI(BSP_WD_CMPWB). How is web request different from Web UI developement.
Thanks
AnsariThe context for each main item is close to what is given below:
Public Sector --> Industry sector
Social Service --> Like Government Services for the benefit of the society
Web Request --> A "simple" service request for use through a web application like ICSS
The Web Request in this context is NOT technology related. It is a transaction type and a kind of simplified Service Request . Likewise, Social Services should not be confused with "Web Services" in any sense.
Hope this, in some way, answers your questions or at least help you understand their "real" meaning. -
Reading list items using JQeury
Hi All,
I am new to JQuery. Please help me on reading the ListItems(for eg., title, name, location etc.,) using JQeury & wanted to display this data in a site page.
Let me know if you have any queries.
Thanks,
Kumar.check this article on using REST and Jquery to get list items
http://www.plusconsulting.com/blog/2013/05/crud-on-list-items-using-rest-services-jquery/
you can use JSOM as well
http://social.msdn.microsoft.com/Forums/sharepoint/en-US/8dda0580-c632-4c1b-92f0-59e1a3f29e5b/jquery-fetch-data-from-sharepoint-list-in-a-webpart
My Blog- http://www.sharepoint-journey.com|
If a post answers your question, please click Mark As Answer on that post and Vote as Helpful -
Issue with PO change output - Service line items
Hi All,
This is issue with PO change output. We have PO with line item 10, 20 and item 10 has 4 service line items. PO is approved and initial print out is taken.
Some one goes and makes changes to 1st service line items of PO line item 10.
A change output gets triggered. When this output is printed, it prints line item 10 details. This is standard functionality as this item is changed. But its printing all the service line items for this PO line item. Consider a case where there are 3000 service lines for a PO item. If I add 1 service item to this PO line item, the change form prints 3001 services for that line item. There were no changes done to first 3000 service line items.
Currently PO change form takes care of changes at PO line item but it does not take care of changes at service line item level.
Is there any setting that needs to be done for this so that it only considers the changes at Service line item level also.
Regards,
ShahuIf you're using a standard form, send a message to SAP. Otherwise make a change in the form.
-
BAPI_PR_CREATE for Service line items only
Hi All,
We are unable to create the Purchase Requistion Order using the BAPI_PR_CREATE for Service line items.
The Error Message 436(06) " In case of account assignment, please enter acc. assignment data for item" is always received with respect to Account Assignment.
We are currently using ECC 6.0 EHP 4. SAP instance to create the Purchase requisition order.
We already did this analysis and came to this include previously for the Error Message 436(06) and could find thatt the accounting tables are not filled.
Also, the accounting items table is refreshed and deleted in 3 places in the code.
We did put debug on that u2026 but during debug, the control does not go to these places.
I suppose there is some other major functionality related to Service PR is missing in the BAPI_PR_CREATE.
Also we are unable to find the detailed documentation.
Thanks and Regards,
Shivakumar K.Hi Shivakumar,
Hi Shivakumar,
in most of the cases this error - 06 436 - happens due to wrongly filled BAPI structures.
Please check the entries in the x-structures in first line, for example:
PRACCOUNT structure
PREQ_ITEM 00010
SERIAL_NO 01
GL_ACCOUNT 2222222
COSTCENTER SAP-DUMMY
PRACCOUNTX structure
PREQ_ITEM 00010
SERIAL_NO 01 <<<<
GL_ACCOUNT X
COSTCENTER X
SERVICEACCOUNT structure
Line 1:
DOC_ITEM 00010
OUTLINE 0000000001
SRV_LINE 0000000010
SERIAL_NO 01
SERIAL_NO_ITEM 01
SERVICEACCOUNTX structure
Line 1:
DOC_ITEM 00010
OUTLINE 0000000001
SRV_LINE 0000000010
SERIAL_NO 01 <<<<
SERIAL_NO_ITEM X <<<
Regards,
Edit
Maybe you are looking for
-
Bootmgr is missing message after stopping recovery disk
I have an HP G72 series laptop with Windows 7. I took the laptop in for service and was told the hard drive was bad. They replaced the hard drive and gave me the information to order the recovery disk from HP. I put in disk 1 and it started out OK. I
-
Srvctl on 11.2.0.3 does not stop and start listeners
I recently installed the Grid software under the "grid" user on RH5. Clusterware and ASM run under GRID_HOME, the single instance database runs under ORACLE_HOME. I have created 2 listeners on non-default ports (manually using entried in listener.ora
-
Error in SCCL on ECC 6.0 system
Hi, I am trying to copy client 350 from 000. BD54 and SCC4 completed, the test run shows the below error , Error: Table FMATGRED30000001 error in DDIC - Check table with SE14 The data object could not be created: The type FMA TGRED30000001 does not e
-
Map Builder - Fenced Center Line
Hi everyone In order to depict depressed contours using Map Builder (ver 11.1.1.0.0), I would like to use a fenced center line with a pattern similar to this: ___|___|___|___|___ . However, Map Builder seems not to be able to create a fenced line wit
-
Internet Help W/ Service Provider
So i have IO Digital Cable As My Internet & Cable provider. The internet was installed into my home pc desktop but i frequently used to switch the Ethernet Jack and plug it into my Mac Book Pro to use internet on my laptop. Now as of late i've not be