Blueprint for Project System Projects

Hi All,
Can you please send me some PS Blueprints to my email [email protected] as i have to work on some implementation projects in future.
Thanks
Muzamil

Hi Muzamil,
Please check your email id, i have sent you the documents required.
Regards
Rehman
<b>Reward Your Points If Useful</b>

Similar Messages

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Is it possible to build a project with Labview 2010 on a Windows XP system, that is useful for a system with windows 7 on it?

    Hi there,
    I am planning to use Labview 2010 in a short time.
    But before I'm going to use it I have some questions.
    I know it is possible to run Labview 2010 in an XP environment. But is it also possible to, when running Labview 2010 on a XP system, to build a project to a version that is useful in a Windows 7 environment?
    Or do I have to run Labview 2010, when I want to build a project that is useful on a Windows 7 system, on a system with Windows 7?
    Please give me some information.
    I hope to hear from one of you soon.
    Regards,
    Kenny
    Solved!
    Go to Solution.

    Is it possible to build a project with Labview 2009 on a Windows XP system, that is useful for a system with windows 7 on it?
    Thanks.
    Philippe B.
    Certified Associate Developer / Dépt Moyens d'essais
    www.ingenia-system.com

  • Pricing Schema for Project System

    Dear Sappers,
    I'm configuring Pricing Schema for Project System(PS) module.
    The requirement is, the schema will be in such a way that it supports both excise, CST, VAT and service tax.
    In PS module the user raises a Purchase Order having procurement of material as well as taking service from Vendor.For this in PO he will maintain both material as well as service.
    I'm configuring the Pricing schema in MM - Purchasing - Condition.
    My question is for materials procurement, everything is working fine.But for service respect to activity number I want to maintain service tax and other cess in condition record.
    But to maintain service tax & other cess for activity number, I want the access sequence of sevice to be in Purchasing.I've taken the standard table for Plant, Vendor, Purchase Organinzation and activity number combination from External Service management and making a new access sequence in MM - Purchasing.All fields are coming but for Activity number, it not taking the document structure and showing error.
    How to overcome this??
    Any suggestions will be highly appreciated.
    Warm Regards
    PKB

    Hi Pankaj,
    Thanks for your suggestions.
    As per you reply, the access sequence is already maintain in External Service Management.But I want to bring the same combination Plant, Vendor, Purchase Organizartion and Activity number that is Table 97 to MM - Purchasing - Conditions- Access Sequence.
    I've tried to do it, but when I'm creating in MM - Purchasing, all document structure is copying except activity number.What I analyse the error is due to application area.Activity number is MS (External Service Management) area but i'm trying to do in M(Purchasing)
    Even though when I enter manually MS for the access sequence system is not taking.
    Suggest me.
    Warm Regards
    PKB
    Edited by: Pranaya Barik on Dec 11, 2009 12:09 PM

  • Project Management Question - timelines for Production system deployment

    Hi
    I need an expert advice on setting up timelines for establishing an Oracle Apps Production environment. We are implementing Oracle HR & Payroll at an organization.
    Our system architecture is a 2-node application tier and 2-node DB tier (RAC). RAC is configured by another party and we only have to prepare the application tier (2 nodes)
    We would be installing Oracle Apps R11i (11.5.10) with jserv load balancing on the 2-nodes
    Can anyone suggest how much time this should take to install/configure & patching of the application tier (on 2 nodes)?
    Regards
    Saira

    Duplicate post (check your other thread):
    Project Management Question - timelines for Production system deployment
    Re: Project Management Question - timelines for Production system deployment

  • Planning Profile for Project System

    Dear All,
    In planning Profile (T Code OPSB) for Project System we can find  RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
    Thanks and regards

    Mr. Sridhar,
    Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
    Regards
    Ramesh

  • CHARM activation check failing on "consolidation system for development system SSA-200 in project ZTEST2

    Hello,
    We are implementing Charmlite and want to activate in project landscape.
    We are Solution Manager 7.1 SP11 and testing this scenario in sandbox.
    Steps completed:
    1. in sandbox domain controller, created two virtual systems and made 3 system landscape, where, I can release the transport and see it in QA system (Virtual system buffer)
    2. The LMDB has been updated with Virtual system and in SMSY, the entries of virtual system shows up. The logical components have the client information.
    Issue:
    in /nsolar_project_admin ->System landscape -> change management, When consistency check is performed, we get error message saying
    Virtual RFC is miising (I am guessing, it should be okay)
    The logical component is incosistent (This might be the reason the CHARM is not getting activated.
    "No consolidation system for development system SSA-200 in project ZTEST2
    No track for project ZTEST2 with log. system SSA/200"
    For me, when i look in satellite system, the consolidation system is a virtual system and it should be fine.
    Please advise
    Regards,
    Durga PK Saitana

    Thank you Karthik. Still the problem persists
    I went through the blog earlier. I created l ABAP instance manually in SLD and moved into LMDB and can see the entry in SMSY. (I did not see any option of putting  virtual flag)
    We were trying harmonization of RFC from note 1384598 and since we had virtual systems, went with domain links.
    After domain links, the virtual systems are read. the Dev ABAP system is not able to find the consolidated system. In the satellite system, I can release transport and move the transport.
    Not sure, why this issue is persistent.

  • Business packages for Project systems

    i,
    I wanted to know if there is a business package for Project systems which include transactions like CJ20N, CN33, CN41N, DP81,VA23, VA25. I checked in SDN Portal content portfolio and found there is a BP for Projects 5.3 and BP for Project self service. I checked out the content which is present but not sure whether it suits my requirements.
    Appreciate if any one can point to the right Business package.
    Regards
    PN

    Hi,
    Chk out this link, it points to Project Self Service.
    http://help.sap.com/erp2005_ehp_01/helpdata/en/3f/a197422836c76ae10000000a155106/content.htm
    You can find the prerequisites & the configuration required in the above link.
    For this Business Package you have to install the following software components:
    SAP PSS 600
    BP ERP05 PROJ SELF-SERV 1.0
    Regards,
    Abhishek

  • RPM Upload/Download Project Data u2013 No Selection list for Application system

    When trying to upload from project or download to project from/to application SAP Project System there is no selection list under the drop down field for Application system. As I understand from the RPM guides, this is the logical system. We have defined the logical systems in IMG. Is there some other configuration we are missing?
    We are using SAP RPM 4.5 (CPR Xrpm 450_700: Support package 0009)
    Any help appreciated

    Hi,
    Have you deleted cache and tried it again.
    Pramod

  • BTE's used for project systems master data.

    Hi ,
    Can anyone tell me what are the BTE's used for project systems master data.
    Tcode used are CJ01,  Cj02,  CJ20N,  CJ12,  CNMASS
    When master data is changed or created BTE should trigger.
    Regards
    Subin

    I don't think there are any open_fi BTE available for PS master data.
    you can use classic subs/vals using GGB0 and GGB1 transaction codes.

  • Coustomization Documents required for Project Systems BP

    Hi All,
    We are implementing Project Systems 50.3 Business Package.For customization this Business Package, where we can find the documents.
    We have the PDF Business Package for Projects 50.3. But it doesn’t have the info regarding customization.
    If any one worked on this .. Please help me and send the documents for customization.
    Thanks in advance.
    Regards
    Ravi
    email: [email protected]

    Hi Ravi,
    check the following SAP notes:
    - 446426
    - 660410
    - 602158
    - 604918
    - 642775
    Hth,
    Michael

  • Result Analysis for Project Systems

    Hi all
    Does any1 have any documentation relating to Resut Analysis for Project Systems incl POC calculation and other basic concepts. Any help would be highly appreciated.
    Regards
    Hrishi

    Hi,
    Please follow the link below: it has all the details for the POC methods:
    http://help.sap.com/saphelp_46c/helpdata/en/90/ba6f37446711d189420000e829fbbd/content.htm
    Hope its useful.
    Reward points if found useful.
    thanks..

  • BDC for project system

    Hi all,
    Is it possible to create BDC for PS  for project description, WBS element , activity element?
    Please help me for that
    Ketan
    ABAP consultant.

    hi...
    you can create a recording ( BDC ) for PS for project description, WBS element , activity element if they are associated with some TCODE.....
    ie.. you have to goto Tcode   SHDB   there you have to give transaction for which recording is to be done...after recording generate program....
    but care needs to be taken while doing so...
    regards

  • How to find next number range for project definition in tcode CJ20N

    Hai Experts,
          Please help me 'How to find next number range for project definition in tcode "CJ20N". I was trying in function module NUMBER_GET_NEXT. Is it right function module? If its right what input i need to give for this tcode and for the field project definition?
    Note: I searched in forum before posting, but couldn't find the solution.
    Thanks
    Regards,
    Prabu S.

    Hi,
    For project defination internal number is assigned by system.
    When you saves's project then system allocate one number to project defination, you can view it,
    SE11 >>> table  PROJ >> Click on contents >>> execute,
    here you will get your project defination & number is assigned to project defination.
    kapil

Maybe you are looking for

  • Safari 2.0: javascript can't change title of popup "Untitled"

    With a javascript generated popup window, Safari 2.+ titles the window "Untitled" and will not allow the title to be changed with either html "<title>" tag or with javascript "document.title()" property. Safari 1.+, IE 5.0 and Firefox 1.+ all reset t

  • Detecting Client Disconnect

    I am looking for a way to determine when a client connects and disconnects (especially the latter) from the grid. Two approaches come to mind: 1) Polling for something that appears/disappears when a client connects or disconnects. The most obvious ca

  • Pages being overbearing. Help required

    Having just upgraded from Mountain Lion to Mavericks (10.9.2), I've come across a problem and wonder if anyone else is having the same issue. I'm currently working in Libre Office on one aspect of a project. I opened Pages up for the first time since

  • Matlab script image support?

    Hi there, I'm trying to use the imread function in the matlab script node to translate an 8-bit image into a intensity-value matrix. It works in normal matlab, but not in the node. I can't find the imread function in any of the labview help menus, so

  • Explain Customer Exit (ABAP) Written in CMOD

    Hi Experts, Please explain what this Customer Exit (CMOD) is performing Here var1 is the user entered expiry date and test1 is the newly created customer exit variable. What happens if user enters 01.05.2008 to 31.05.2008 data: yrr1(4) type n, mn(2)