BOM Component Query for MRP during BOM explsion

Hi all,
Bom what I am talking is Revese Logistics BOM(Repair BOM).Here something called attach rate we are using.That means if phone comes for repair then what is the possibility that the particular component will be used.It is usually in decimal places like 0.5,0.7,0.05 etc for components.
ex.
Component A in BOM  we will put as 1.But somewhere we need to use this attache rate as 0.5.
This attach rate is not fixed.Every time it varies based on user entry
Means assume for header qty is 100 MRP run should calculate qty 50 for component A.
Please suggest how to use this attach rate in BOM.
Thanks and Regards
Raghavendra Pai

Hi,
A way of doing what you ask for, is to define the BOM header quantity, for example 100, and the if you define 50 for component A, then you get a 50% rate of usage.
But you need to be careful that quantities for which production orders are created are normally not significantly smaller then the BOM header quantity, becuase then you may get some quantity rounding issues.
These ratios (quantities actually) can be manually changed during the creation of a specific production order, to accommodate a different rate for that specific lot.
Regards,
Mario

Similar Messages

  • How to find component details for the equipment BOM

    Dear All ,
    I have a requirement ..I need to find all the component numbers for the equipment BOM. Can anybody pls help me in finding a table containing this information. I check in tcode IB02,IB03 but I am not able to find the database table containing this information.
    Regards,
    sap_code.

    Hi, Main table for equipment BOM is EQST. You can get the details from STPO (Item) and STKO (Header). You can use the FM CSAI_BOM_READ. Here u need to pass the header details and CSIN-STLTY = E " Equipment BOM.
    Thanks
    Subhankar

  • How to get BOM component dependant demand whitout having BOM header in APO?

    Hello,
    I would like to know if it is possible to get BOM component dependant demand in APO without having BOM header in APO.
    If someone already did that, please thanks to share your experience.
    Thanks a lot and best regards.
    M.Niang

    Hi Niang,
    There is an functionality in APO - DP module called "Forecasting with Bills of Material". You need create DP-BOM (PDS/PPM) from R/3.
    Please refer the SAP help link for details.
    http://help.sap.com/saphelp_scm50/helpdata/en/8f/9d6937089c2556e10000009b38f889/frameset.htm
    Hope this is what you are looking for.
    Regards,
    Nawanit

  • Table for BOM component table for SFG/FERT goods

    Dear All,
      We are creating FRICE to calculate the cost of the product. The input parameter is the fert/sfg goods and the qty consumed to produce the goods and the opening stock and closing stock of the input/raw material of the fert/sfg has to be captured. From which table the same can be captured.
    Regards
    Vasantha.

    Dear All,
      We are creating FRICE to calculate the cost of the product. The input parameter is the fert/sfg goods and the qty consumed to produce the goods and the opening stock and closing stock of the input/raw material of the fert/sfg has to be captured. From which table the same can be captured.
    Regards
    Vasantha.

  • Query for MRP Purchase Requisition

    Hi Gurus,
    Currently system is creating Purchase requisition for BOM Material, which I don't want system should create PR for this material.
    I know MRP type ND but i need someother ways to stop it
    Appricate your response
    Thanks
    Sastry

    Hi,
    You can try the following option-
    1) Tcode - MM02-> MRP1 view - > Plant sp-matl status - 01 ( Blocked for procment/whse)
    2) Tcode - MM02-> MRP2 view - > Procurement type - Blank(No procurement)
    Sudarshan

  • Bdc code to changing purchase group in the BOM component

    Hi We need to change the purchase grroup in the BOM comoponent level for multi level BOM's. Can we use CSAP_BOM_ITEM_MAINTAIN. any body having sample code for this......
    Thanks in advance.

    Hi,
    Did you check standard SAP transaction Mass change BOM CS20 or CEWB for changing the BOM purchasing group.
    Check and Revert,
    Santosh Sarda

  • Copy BOM Component Characteristic value in material PR created by MRP Run

    Dear Gurus,
    My requirement is I have materials like thread to maintain color characteristic i have create class - color- class type is 023 , now i want user should able to maintain characteristic value in BOM component (thread) of semifinish material.  FG , SFG  are not having any characteristic.
    Now in PR and PO we can maintain characteristic value in Material Data --->Configuration tab , Configuration tab will come only when there is tick in material is configurable at material basic data 2 view of thread and in CU41 I have to maintain material for class type 300 - Variant , then in class assignment i have select class type 300 and 023 both and maintain class , both are having same characteristic please make me correct if i am doing wrong process, if i am not maintaining class assignment 300 in CU41, in manual PO system not allowing to enter characteristic value in configuration tab . so i maintain both class assignment 300 and 023.
      Now for manual PR and PO system showing configuration tab and from PO configuration tab characteristic value is coming in MIGO automatically but when i am running MRP for finish material the auto PR generated by system for material thread is not showing configuration tab in Material Data of PR. I have maintain characteristic value in BOM --->Extra--->Batch Classification. Please guide me how to archive this.
    Thanks & Regards
    Akshay.

    Akshay kukde,
    Still i am unable to understand the reason for maintaining a characterstic value for a batch through BOM, I hope you are not changing BOM for every purchase order ?
    can you explain what you expect by maintaing this one value for batch characterstic?
    you can have many other simple option like
    1) Create a material with colour included in it ex, Thread_red, Thread _green etc and use them in BOM
    2) Use text in BOM to hold this discription for colour
    3) Use batch management, class 023 in material master classification , defalut value for colour, purchase order will be created and while doing GR you can change in colur if its different then default you set earlier.
    Akshay kukde wrote:
    if i am creating PR Manually -ME51N , system showing configuration tab , where i can maintain characteristic value , which then reflecting in PO and from PO to MIGO
    The above scenario I have tried by maintaining class type 023 and same characteristic in material Master. but result is same for auto generate PR by MRP- configuration tab is missing.
    My requirement in this case is characteristic value should flow from BOM to PR generated by MRP.
    when you manualy create PR you Thread material is consider to be a configurable material and thats why you are able to input configuration value, otherwise as soon as you put this configurable material inside a BOM of normal materila it loost its configuration feature, if you want you can create your parent material also as configurable material, assign same class to it and create configuration profile and take MRP run this time you will get PR with configuration tab as your thread get configuration derived from parent.
    Hope above details may help you.
    Check and reply, also mark replies helpful if it helps you.
    Thanks
    Ritesh

  • Automatic PR for non-stock BOM component for Subcontract PO

    Dear Guru,
    Can you any master please advice me on below question?
    We have a subcontract PO with the BOM component of non-stock, can i know if there is possible for those non-stock BOM component to generate a Purchase Requisition automatically, any existing configuration that we can do?
    Thank you very much,
    Regards
    Chee Wee

    Hi,
    You can use Material Type "NLAG" for Non-stock materials.
    Non stock materials cannot be stored, right, hence the name non-stock.
    Non-stock material includes materials that are not managed on an inventory basis (for example, small parts such as nails) though physically in stock.
    You can create a BOM which contains an NLAG item or directly use in Production order also.
    item Category "N" So system will create the purchase requisition when there is requirement.
    We receive the non stock material using movement type 101. upon receiving the material will be consumed.
    Please refer link below for better understanding.
    BOM explosion in MRP for non-stock material
    What  is use of  Item Category N(non-stock item) in BOM creation
    Believe this could help your queries. TQ
    rgds,
    nanthakumar

  • Query for BOM Allocations to Master Routes

    I just acquired Query Building permissions and the involved transactions in SAP-PP.  I have access to the sandbox (QAS) to build them before they go into production.  I have a good technical background but never built a query in SAP.  I should be able to catch on fairly quick.
    **I would like to create a query that reports which material numbers have BOM components that are/aren't allocated.  Is this possible where do I start?
    **Are there any threads in this forum that show good query information in regards to production versions, master routes, BOMs, etc. that someone can point me to?

    Hi Lucas,
    Sorry for the late reply. I was travelling yesterday. Was able to create your query in quickviewer.
    Table I used for Joining are as follows:
    Mast: Material to BOM Link
    STPO: BOM Item
    PLMZ: Allocation of BOM to operation
    PLPO: Task List - operation/activity
    Join Condition:
    MAST-STLNR to STPO-SLNR
    STPO-STLTY to PLMZ-STLTY
    STPO-STLNR to PLMZ-STLNR
    STPO-STLKN to PLMZ-ZUONR
    PLMZ-PLNTY to PLPO-PLNTY
    PLMZ-PLNNR to PLPO-PLNNR
    Selection Screen:
    Material Number: MAST-MATNR
    Plant: MAST-WERKS
    List Fields:
    Material Number: MAST-MATNR
    Plant: MAST-WERKS
    BOM Item Number: STPO-POSNR
    BOM Component: STPO-IDNRK
    Component Quantity: STPO-MENGE
    Component Unit: STPO-MEINS
    Operation Assignment: PLPO-VORNR
    I guess this will help you in getting your query set. In case you need to change the field you can do as per your requirement. As told earlier once you are ok with Quickviewer you can convert it to SAP Query from SQ01 transaction.
    Hope this helps you out.
    Best regards,
    Kiran

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • Direct Procurement  for BOM component

    Hi there,
                If we want to use direct  procurement for BOM component then where do we set the indicatior in BOM. I am not able to find the same in BOM.........??
    Please advice me ....
    Regards
    Kaushik

    Hi Kaushik,
    Maintain Direct Procurment is OPPQ-Plant paramaters. Here you specify whether the direct procurement is triggered by the Planning Run or the MRP.
    And also maintain a key for Special procurement Direct Procurement in OPPQ.
    Please assign Special Procurement Key as Direct procurement is MRP-2 view of material master.
    Thanks and regards
    Murugesan

  • To create req for new BOM component

    hello all,
    i confirm the order and now i need to add one more component to the header material for the same order.
    how can i create requirement for new BOM component.
    what i done is i 1st cancel the confirmation. then go for read PP mater data. after that should i run the MRP for header material to create planned order for new BOM component?
    regards

    Dear,
    If you have execute any transaction like GI confirmation then read PP master data will not work.
    Best way you can cancel the confirmation and reveres the good issue by 262 movement type. Then do TECO to the order all reservation get deleted.
    Then update the BOM with new component and run MRP with planning mode-3 delete and recreated. It will create planned order then convert it to production and go ahead.
    Regards,
    R.Brahmankar

  • MFBF can exclude bom component during backflushing ?

    Dears.
    When i confirm repetitive production using MFBF the system consider all the components of the bom.
    One component of this bom have field backflush in mrp2 view of mateial master setted to blank.
    I need that MFBF exclude this component during backflushing.
    But MFBF consider all the components despite backflush field in material master.
    Do you have a solution in order to exclude this bom component during backflushing ?
    Pay attention that i need to plan this bom component , so production relevant flag in bom is filled.
    Thanks in advance.

    Hi,
    In standard SAP, it is not possible to automatic exclusion of BOM component during backflusing in MFBF.
    As suggested by expert Caetano you need to do enhancement using the said BADI.
    Also in REM profile if you remove indicator "Error correction for Backflush" and remove the material from storage location level then your requirement may fulfill. Test and confirm the same.
    Regards,
    Narresh

  • Problem in  BOM or component allocation for the Non- codified Item in a PO.

    Hi All,
    Please advise how to explode a BOM or Assign component in a Purchase order with Item category (L) for a Operation oriented material for which no material code is created from a production order .
    Actually in my scenario, no raw material component will send to the Sub -Contract Vendor. Only Assembled operation material lets say operation 20 from a routing ( which is not having material code ) from an In - house production from a shopfloor has to be sent to the vendor to create a operation 30 material , which is also not having a material code." How to explode a BOM or component allocation for the Non- codified Item in a PO".
    Kindly give me the IMG settings for the above scenario.
    regards,
    YK

    Hi Prasobh,
    Tnx for your suggestion. But, the client external processing routing is not constant activity . Based on the Operation bottlenecks client is sending the operation as external Processing. For Eg., If on first order operation 20 be external , Then in second order operation 20 need not be external. operation 30 may go out for external processing. Client does not want a material code for each operation.
    Give your valuable suggestion.
    regards,
    YK

  • One pricing condition for BOM and other for individual component

    Hello SAP gurus,
    We have two pricing condition types created and assigned in the pricing procedure which has been created with reference to PR00 and condition records are maintained for both the condition types.
    But, we want only one pricing condition type to be triggered in the sales order depending on the usage of material in the sales order. As we are selling the same material individually and as well as a component in a bundle ( BOM).
    i.e, when one pricing condition for BOM component and other for individual component
    What are the configuration steps to be taken care to get this scenario?
    Thanks in advance.
    Regards,
    KB
    Edited by: K.byla on Jan 21, 2010 1:20 PM

    Hi Sagar,
    Thanks for your response.
    Yes, we are maintaining only one material. The same material is used to sell individually and also in a BOM.
    As i have mentioned earlier, whenever the material is sold individually it should pick condition type say 'YR00' and when the same material is sold as a bundle ( BOM) , it should pick condition type " YR01" in same the pricing procedure.
    For both the condition types, the condition records are maintained.
    To give the scenario details,
    A material "X" is sold individually as a single component and the same material is also used for selling bundled with other material "Y" and the bundled material as "Z"
    means, Z=X+Y
    Pricing procedure used is say ZRA000 which contains currently the price cond type YR00.
    Now for the bundle (BOM) involvement i want to use the same pricing pricing proc. and add the new cond YR01 in it so that the system will pick the cond.type YR00 when the material is sold individually and YR01 is taken as the price when the material is sold as a bundle against the item X.
    Need to know the steps for this scenario and do i need to maintain a specific requirement ? please suggest.
    BR,
    KB

Maybe you are looking for

  • Sharing an iTunes Library over WAN?

    Sorry if this question has been asked before but my searching of the forum here has only seemed to turn up questions and anwswers on sharing over a local network. Here is my question. Is it possible to share an iTunes library over the internet? And i

  • Problem with Drag & Drop and multiselection in tables

    Hi, we have a problem concerning drag and drop and multiselection in tables. It is not possible to drag a multiselection of table rows, as the selection event is recognized or handled before the drag event. So before the drag starts, the selection wi

  • Transfer of Video from Windows Movie Maker to PE7

    Hi, I put together my first video using Windows Movie Maker, and the audio tracks are wma files. I just got Premiere Elements 7 and want to transfer the video to it from Movie Maker, but I understand that in PE7 audio files should be either mp3 or wa

  • Automatic Creation of BP Code

    Would like to automatically find the next availble BP code, independent if the BP is a customer/supplier/lead. Current structure and setup for BPs example (no C or S prefixed) 100100 Customer 100101 Supplier 101102 Customer 101103 Customer 101104 Sup

  • Create hidden attribute in OID

    Hello. I want to know how to create a custom attribute in OID which is hidden from certiain users. Is this simple to do? Thanks.