Calculate the postion in the report

hi all
hope all of you in gudd health
i have a report that contains student name, total marks , marsk obtained , percentage.
now i want to assign the postion to the students means the top are first postion and then 2nd postion onwards....
can any 1 plz help
thanx in advance

no its not to add a column sir, its about to calculating the class standing postion of the student
i,e the percentage is calculated runtime and i have to assign the position(class standing) according first secound,third forth onwards

Similar Messages

  • How can i change the postion in the assignment window

    I tried to change the position of an employee, but i dosn't worked. Any suggestion?.
    Thanks

    Question was. How to change the position of an employee?????.I know what the question was. My question back to you was are you sure you have set up the appropriate data structures?

  • Change the position of the text field in the report region

    Hi,
    I am having a report region in whch there are 2 buttons which are in the Region Template position #Create# and a
    text field. I added a text field in the same region. I tried to change the position of the text field near the buttons. I
    tried to change "label-Horizontal/vertical alignment" and "Element horizontal vertical alignment". But the postion of the
    text field is not changing. Plz help,
    Thanks,
    TJ

    Hi Andy,
    Sorry to ask this questions.
    1.Where exactly i need to change the HTML code(By uisng the view source?)
    2.My taskname part html code when viewing the source is given below
    tabindex="999"><img src="/i/e.gif" alt="Edit" class="eLink" />
    </a><tr></td><td nowrap align="left">
    <label for="P1_TASK_NAME" tabindex="999">
    <a class="t16OptionalLabelwithHelp" href="javascript:popupFieldHelp('5853137628393530415','676839962625525')"
    tabindex="999">Task Name</a></label></td>
    <td  colspan="1" rowspan="1" align="left" valign="top"><input type="hidden" name="p_arg_names"
    value="5853137628393530415" /><input type="text" name="p_t06" size="10" maxlength="20" value=""
    id="P1_TASK_NAME"  /><a class="eLink" title="Edit" href="javascript:popupURL('f?
    p=4000:371:676839962625525::::P371_ID,FB_FLOW_ID,FB_FLOW_PAGE_ID:5853137628393530415,107,1');" 
    tabindex="999"><img src="/i/e.gif" alt="Edit" class="eLink" /></a></td></table>
    <table summary="" cellspacing="0" cellpadding="0" border="0" width="100%"><tr><td align="right"><table
    cellpadding="0" cellspacing="0" border="0" summary="" class="t16Button">please suggest what changes i need in this code to change the alignment of the task_name text field,
    Thanks,
    TJ

  • Update table HRP1001. Change the Position and the Org Unit.

    Hi,
    I am new to SAP HR and have been given a work in this area. The requirement is to update the relationship table HRP1001 replacing the old Manager' Position and the Org Unit with the New Manager's Position and the Org. Unit.
    I have some how found out the way to get the Postion and the Org unit of the old manager. Now I am replacing the same with the new details using the Update HRP1001 Command but this is the old and not recommended method acheiving this task.
    Can anyone please suggest me any Function Module OR the BAPI to update the HRP 1001 table with the New MAnager;s Position and the Org Unit.
    Thanks...!!!
    Regards,
    Deepak.

    Hi Kalpesh,
    I am using the FM: 'BAPI_HRMASTER_SAVE_REPL_MULT'but still not updating. I am trying to change the Position and the Org unit but not successful yet.
    I first used the Operator 'I' withi the table BAPIHROBJ-OPERATOR, it failed then I tried 'U' for update it still failed. Can you please let me know how many such operations possible with their charecter values apart from I & U. the domain value set does not exist as it is char1.
    Now I came to know that I have to terminate the old relationship by changing the ENDDA and create a new one with the new BEGDA as tomorrow's date.
    Can you please suggest something.
    Regards,
    Deepak.

  • SSRS Expression to calculate percentage with the denominator being the first value in the same column group in a matrix report

    Hello, Expert,
    Could you please help me with the following problem? Thanks in advance!
    I have designed the matrix report (SSRS 2012) with database table structure looks like below.    
    Week           
    Version
         Count
    Week1
    V1.1
    4000
    Week1
    V1.2
    4000
    Week1
    V1.3
    4000
    Week2
    V1.1
    3000
    Week2
    V1.2
    3000
    Week2
    V1.3
    3000
    Week3
    V1.1
    2000
    Week3
    V1.2
    2000
    Week3
    V1.3
    2000
    Week4
    V1.1
    1000
    Week4
    V1.2
    1000
    Week4
    V1.3
    1000
    The matrix report displays like below. Column grows based on no of Week in the table.   
    Week1
    Week2
    Week3
    Week4
    V1.1
    4000
    3000
    2000
    1000
    V1.2
    4000
    3000
    2000
    1000
    V1.3
    4000
    3000
    2000
    1000
    What I want to do now is: instead of the Count values, I need to calculate the percentage of each week over the
    Count in Week1 so that each cell displays Count(Week2)/Count(Week1), Count(Week3)/Count(Week1), etc. What is the SSRS expression for that? I’m new to SSRS, Please help!

    Heidi,
    Thank you so much for your reply and solution! Now I know how to get the first field in a group. But I can't apply your solution directly just yet because in order to explain my problem I simplified my data structure. My real data structure has a nested
    group like this:
    Week  VersionMajor VersionMinor Count
    Week1  V1           V1.1         2000
    Week2  V1           V1.1         1500
    Week3  V1           V1.1         800
    Week1  V1           V1.2         1000
    Week2  V1           V1.2         500
    Week3  V1           V1.2         200
    Week1  V1           V1.1         2000
    Week2  V1           V1.1         1500
    Week3  V1           V1.1         800
    Week1  V1           V1.2         1000
    Week2  V1           V1.2         500
    Week3  V1           V1.2         200
    Here is the query for the above data:
    SELECT 'Week1' AS Week, 'V1' AS VersionMajor, 'V1.1' AS VersionMinor, 2000 AS Count
    UNION ALL
    SELECT 'Week2' AS Week, 'V1' AS VersionMajor, 'V1.1' AS VersionMinor, 1500 AS Count
    UNION ALL
    SELECT 'Week3' AS Week, 'V1' AS VersionMajor, 'V1.1' AS VersionMinor, 800 AS Count
    UNION ALL
    SELECT 'Week1' AS Week, 'V1' AS VersionMajor, 'V1.2' AS VersionMinor, 1000 AS Count
    UNION ALL
    SELECT 'Week2' AS Week, 'V1' AS VersionMajor, 'V1.2' AS VersionMinor, 500 AS Count
    UNION ALL
    SELECT 'Week3' AS Week, 'V1' AS VersionMajor, 'V1.2' AS VersionMinor, 200 AS Count
    UNION ALL
    SELECT 'Week1' AS Week, 'V1' AS VersionMajor, 'V1.1' AS VersionMinor, 2000 AS Count
    UNION ALL
    SELECT 'Week2' AS Week, 'V1' AS VersionMajor, 'V1.1' AS VersionMinor, 1500 AS Count
    UNION ALL
    SELECT 'Week3' AS Week, 'V1' AS VersionMajor, 'V1.1' AS VersionMinor, 800 AS Count
    UNION ALL
    SELECT 'Week1' AS Week, 'V1' AS VersionMajor, 'V1.2' AS VersionMinor, 1000 AS Count
    UNION ALL
    SELECT 'Week2' AS Week, 'V1' AS VersionMajor, 'V1.2' AS VersionMinor, 500 AS Count
    UNION ALL
    SELECT 'Week3' AS Week, 'V1' AS VersionMajor, 'V1.2' AS VersionMinor, 200 AS Count
    And my matrix table looks like this:
    What I need to do is to calculate the percentage of each week over week1 for
    1) V1 Total
    2) V1.1
    3) V1.2
    I can't use your solution directly because I need to apply Sum function for each cell and the Sum function gives me error when I try to use it on the denominator
    First(Fields!Count.Value,"VersionMinor"). If you could help me further to get to the final solution, I'd really appreciate it!!
    Happy New Year!

  • Average of the column in ALV report

    Hi,
      I am working on an ALV report and for one of the column, i am calculating the average with fieldcatalog property do_sum = 'C'.
    I am sorting the output table for 2 fields and whenever I am expanding/compressing the sorted fields the average of the column is changing. Please let me know how do I get this average calculated constant. It should not change when the user collapses/expands on the sorted field.
    Regards
    Rashmi

    The same question has been asked in this thread:
    Compute average of a report column
    I have offered a solution but as I've said it's not great but it may meet your needs.
    Or another forum user may review and be able to suggest a better solution.
    Does the average need to be part of the report?
    Could you calculate it and display it within a page item below the report instead?

  • Change month of a report by selecting the Year in the EPM context bar

    Hi All,
    I am very new on BPC 10 and actually I am trying to make some report.
    I just try to make a simple thing : display all the month of a year choose by a user (without using the "Editor Report")
    I made a simple report using EPMOlapMember, but when I try to change the year in the EPM context bar in the "Time" dimension, the month displayed does not correspond to the year context and even if I refresh my report.
    What I would like to do is  to allow users to select the year or the month+year in the EPM context bar or by an other way and that the report refresh.
    The finality of this report is to compare the operating cost of a month with the year before, in actual or budget, in periodic or YTD, to calculate variance.
    Below is the structure I would like to have on a single worksheet:
    Scénario : A user choose the month (generally of the month of the current year)
    FIRST (periodic) : Display all the month of the month/year (selected by the user)
    SECOND (periodic) : 1st column : Display the month/year (selected by the user) in actual
                                        2nd column : Display the month/year (selected by the user) in budget
                                        3rd column : Display the month/year-1 (selected by the user) in actual 
                                        4&5th column : Just simple for the delta
    THIRD (year to date) : 1st column : Display the month/year (selected by the user) in actual
                                              2nd column : Display the month/year (selected by the user) in budget
                                              3rd column : Display the month/year-1 (selected by the user) in actual 
                                            4&5th column : Just simple for the delta
    Hope someone could answer !
    Regards,
    Karine

    Hi,
    go through this link
    http://scn.sap.com/community/epm/planning-and-consolidation-for-netweaver/blog/2013/03/01/static-report-in-bpc-nw-10
    Regards,
    Shrikant

  • Report Scheduling. How to syncronize the GMT and the local server timezones

    Hi everybody, I need to schedule reports using the Schedule tab on BIP, but I didn't still understand how the syncronization between my server's timezone and the GMT timezone works.....
    I noticed that when I open the Report Schedules initial page, this is refreshed using the GMT timezone as follows:
    Page Refreshed   Monday, July 26, 2010 7:53 AM GMT
    Actually I'm located in Athens (GMT+3)
    I noticed that if I want to Run once a report, ONLY the GMT is took in consideration.
    For example, I want to run a report at 11.30 (Athens timeone) where the time conditions are the following:
    BIP time (GMT timezone): 08.00 AM GMT
    server timezone: 11.00 AM (Athens time)
    So, if I want to run a report at 11.30 AM (Athens time), I have to write in BIP (Run once) 08.30 AM, instead of 11.30, otherwise if I put 11.30, the report runs 3 hours and 30 minutes later instead of only 30 minutes !!! This is very frustrating....because it means that everytime I need to remember that there is a difference of 3 hours and if I want effectively....
    I also set the Report Formatting Time Zone = GMT+03:00 to fill the gap between the GMT's timezone and Athens's timezone but it didn't work....
    I found that the variable <xsl:param name="_XDOTIMEZONE">GMT</xsl:param> is set into the tmpl.xsl; I tried to change it (GMT+3 or GMT+03:00), I stop and restart the BIP server....but nothing...the BIP timezone is always GMT (as showed by th Page Refreshed date and time).
    At the end my question is this: is there a way to modify the internal BIP timezone in order to fill the gap between this and the server timezone ?
    In other words, I'd like to see the page refreshed with the server timezone (Athens timezone) and not the GMT timezone, in order to schedule reports thinking directly my local server timezone (and not think always to calculate how many hours is the difference).
    This, I think is a common issue for everybody, but....I didn't find nothing in the forum....
    If somebody found a workaround, every help will be appreciated.
    Thanks
    Alex

    Good Morning Vetsrini,
    I know that the "Report Formatting Time Zone" is used to set the timezone properly INSIDE the report...but my attention now is concentrated on the Scheduling...
    As I mentioned before I'd like to find a way to syncronize the BIP timezone (based on GMT) and my local server timezone (Athens, GMT+2), and this I think it's possiblie only if I can modify the BIP timezone (GMT): instead to have GMT, I'd like to have GMT+2 in order to have the same time in both of systems.
    I already tried to change the variable <xsl:param name="_XDOTIMEZONE">GMT</xsl:param> into the tmpl.xsl, but it didn't work....
    I don't understand how all the others millions of BIP users who don't live in UK can use the scheduler keeping in mind always the gap between their local time and the GMT time set in BIP......
    Do you have another hint or workaround ?
    Thanks for your help
    Alex

  • Displaying record based on the condition in Crystal report

    Hi All,
    I want to display certain records in crystal based on some condition.
    For example,
    If I am having 5 student records like,
    Name  Mark1 Mark2 Mark3 Total
    aaa      40       50       60      150
    abc      30       60       40       130
    tcr        25      25        25       75
    Now in table i have only 4 fields (STUNAME, MARK1, MARK2, MARK3).
    I have to calculate the total at runtime and if total is greater than 150, then actual record should display in report.
    For example, I can use formula to calculate total but I can calculate total only after each record prints. But i want to calculate total internally only it should display in report if condition satisfies. I dont want to keep one more field for total in crystal report.
    Please help me on this.

    If the filter is not "pushed" down to the database, then Crystal will pull all of the data into memory and then filter it there.  This is not a big deal if you only have a couple of records, but it can significantly slow down a report that is pulling in more than a few records.
    An alternative, if your report is just linking tables in the Database Expert, would be to create a SQL Expression that adds the three fields together.  Using this in the Select Expert WILL push the condition down to the database.
    If you're using a command instead of linking table, they you would add this to the Where clause of the comment.  If you're using a stored proc instead of tables or a command, you would want to do this filter in the code for the stored proc.
    -Dell
    Message was edited by: Dell Stinnett-Christy

  • "Calculate Average" option for the Activity Usage Profile doesn't work

    I have the same problem as poster 793128 in a comment for a different thread: the "calculate average" profile option doesn't work for units (it works for cost though). I've used this option a lot on previous versions of Primavera but for some reason is not working on our new P6 release 7 (stand alone). As 793128’s post says: nothing happens, nothing changes, the profile keep showing totals, doesn't matter if the "base hours on time period" box is selected or if the divider is input by the user.
    The same option (calculate average / divide by) on the resource usage spreadsheet and on the tabular reports do work as expected so doesn't seem to be that I checked the wrong box for some user or administrator preference set up.
    Thank you for any help or clue. I posted this as a different thread because my original post was in a resource profile thread for a different issue that was already answered.

    *793365,*
    After reading your post I tested an older layout of mine that uses a similar setup and it still operates fine. On the "Resource Usage Profile Options" box under the "Graph" tab, I have "Calculate Average" checked and "24" entered in the "Divide interval totals by:" box.
    This allows my resource profile to display manhours per day for me.
    Some of my background info:
    I run in a multi-users platform and not in a stand alone setup.
    We have different resources loaded into the schedule with multiple calendars.
    I have several "Resource Filter/Group Names" setup for each separate resource on the "Data" tab too.
    Hope this helps,

  • How to display the total at the end of the column in the report.

    Hi all,
    Could any one please intimate, how to display the total at the end of the column. For example, i have a column, "sales" as the Key figure, and it has the data for all the transactions. Now, i would like to display the total at the end of the report, below the same column.
    Similarly, for all the other columns in the report, i need to display the total for all the columns in the report.
    Thanks & Regards,
    A.V.N.Rao

    Hi All,
    Thanks for many suggestions. I tried by providing the "Total" under "Calculate Results as" and also "Counter for all detailed values" under "Calcuate Single Values as", in the  "Calculations" tab of the key figure, but i am unable to get the information. Again, i am providing the requirement below:
    CHAR - A   CHAR - B   TIME CH. - 1 KF -1  KF- 2 KF - 3
    1                     RAM        2012           1         50      50
    2                     SAM         2012          2         100    200
    Result                                               3           150   250
    Assume KF -1 as  "Qty." KF-2  as "Price" KF-3 as "Sales".
    Please intimate the solution.
    Thanks & Regards,
    A.V.N.Rao.

  • Function module for assigning BP Number to the Postion ID in org model

    Hi Experts,
    Is there any function module for assigning BP Number to the Postion ID in organizational model.
    The requirement is:
    1)There are some employees which are reporting to a Manager who has a position ID.
    2) Each of these employees should be assigned to the given position ID.
    This can be done by First Locate the BP Record in SAP via the Vantive Person ID  and retrieve the SAP BP Number.
    <b>Then assign the SAP BP Number found to the Position ID.</b>
    My question is <b>Is there any function module for assigning BP Number to the Postion ID .</b>
    Looking forward for reply.
    Thanks & Regards,
    Renju.

    Hi,
       Org. management uses API classe objects with static methods as APIs. You may be able to achieve this using
    CL_CRM_ORGMAN_SERVICES->MAPPING_ORGUNIT_TO_BP
    Reward if helpful!
    Regards,
    Sudipta.

  • Calculate quantity based on the day

    Hi All,
    I have a requirement to calculate average quantities/day  based on variable entry.
    Date : variable ( range, mandatory)
    Based on the user entry , the report should display quantity
    average quantity on mondays ,
    average quantity on Tuesday ,
    average quantity on Wednesday ,
    average quantity on Thursday ,
    average quantity on Friday ,
    for ex : march 01,2010 - march 15,2010 ( user entry)
    in that date period we have three mondays (1,8,15)
    the report should display average quantity for mondays and so on for otherdays..
    any suggestions on how to proceed...
    srinivas
    Edited by: srinivas reddy on Mar 15, 2010 10:02 AM

    Hi,
    I dont know if others have a better solution, but if I were to suggest something, it would be to create a an infoobject to store the days, include it in your infocube.
    The based on the date, it will populate the day in your infocube. Include this new infoobject into the report, then create restricted key figures using the new day infoobject to restrict.
    Hope you could follow what I suggested and its useful for you.
    regards,
    Gary.

  • How to calculate the measure for the next month using the AGO Function

    Hi,
    I need to calculate the measure for the current month and the next month.
    Can anyone please let me know the syntax to use AGO function for the above requirement.
    Regards,
    Ambika Nanda.

    Hi.
    You can also use Oracle analytic functions LAG and LEAD inside the EVALUATE obiee function. The second one will give you the next measure.
    For example the report is:
    TIMES.CALENDAR_MONTH_DESC
    SALES.AMOUNT_SOLD
    LAG column: EVALUATE('LAG(%1, 1) OVER (ORDER BY %2)' AS DOUBLE, SALES.AMOUNT_SOLD, TIMES.CALENDAR_MONTH_DESC)
    LEAD column: EVALUATE('LEAD(%1, 1) OVER (ORDER BY %2)' AS DOUBLE, SALES.AMOUNT_SOLD, TIMES.CALENDAR_MONTH_DESC)
    And the result is:
    CALENDAR_MONTH_DESC--------AMOUNT_SOLD--------LAG--------------LEAD
    2000-01----------------------------------8025513.84---------------------------8474475.88
    2000-02----------------------------------8474475.88----- 8025513.84-----7439568.24
    2000-03----------------------------------7439568.24------8474475.88-----7062040.48
    2000-04----------------------------------7062040.48------7439568.24-----7497971.40
    Regards
    Goran
    http://108obiee.blogspot.com

  • Not having to refresh the data in the main report but only in the subreport

    Hi SAP,
    I have a report that uses a stored procedure in the main report and uses regular database tables in the subreport.  The data returned from the stored procedure reports information from the month-end database (a cutoff point from the previous month's numbers) while the subreport reports information from the live database.  This report gets run everyday to show the changes in numbers from the live database.  Obviously the numbers from the month-end database remainds static until the next month's cutoff database is created. 
    My problem is that everyday when I run the report, the data needs to refresh from both the stored procedure in the main report and the live database tables in the subreport.  How can I leave the data returned from the stored procedure static or as is without refreshing the stored procedure returned data and just have the subreport data refresh itself?  The stored procedure really puts a strain on the database and I would like to cut-out the time to process the report as well.  Does anyone have any ideas?
    Zack

    Hi Zack,
    Try the following under Report options.
    1. Clear the check box of "Verify Stored Procedures on First Refresh" in the Main report.
    2. Select the check box of "Verify on First Refresh" in  the sub report.
    Hope this helps.

Maybe you are looking for

  • Problem with movie in IE

    Im really lost now... I use Firefox as a browser and the flash code works fine, in preview mode inside flash and also in firefox. Its a menu on my homepage. But when I start it up with internet explorer something very very very annoying happens. The

  • Sale Order Closing

    Hi Gurus, How to short close the Sale Order Right answer will be rewarded Regards

  • Insert and Updateusing Bulk Operations

    Hi, We are on 10g (10.2.0.5.0). We have a batch that will insert/update ~30mm records in each load. The logic is usual if a record exists in target table update it if not insert. Considering the amount of data to be loaded simple For loop will be ver

  • Let us support Steve!

    I apologize that are off topic. We want very much to Steve read our and your wishes for happiness and health. Please let him read this: www.steve.uz Message was edited by: Ruslan-RHD

  • I am running Windows 7 and I cannnot download files from Firefox

    I just got a new PC (Dell Precision M6500) with Windows 7 Ultimate and I have transferred my profile setting over from my old laptop running Windows XP Professional and now I cannot download files in Firefox. How can I fix this?