Can the routing create FM CP_BD_DIRECT_INPUT_PLAN   for multilevel BOM

Dear Friends ,
Need help for the implementation of function module CP_BD_DIRECT_INPUT_PLAN  .
The function module works fine when BOM is single level but in case of multi level BOM it does not create the routing documents .
& gives the following errors
No entry in field PLMZD-STLKN although entry is required
When we pass the node number then we still get this error .
No valid material component found .
Wanted to make sute that can above FM module can be used for multilevel BOM or we have to use the  BAPI  BAPI_ROUTING_CREATE.
Thanks ,
Anurag .

You must pass the PLMZ_DI-VORKN parameter.
Edited by: albert liu on Sep 23, 2008 11:50 AM

Similar Messages

  • When I change the time zone of the clock, the "Date created" time information for my documents and image files in the Finder window (and in Get Info) is changed. Can I make the time info in "Date created" remain fixed regardless of the clock's timezone?

    When I change the time zone of the clock, the "Date created" time information for my documents and image files in the Finder window (and in Get Info) is changed. Can I make the time info in "Date created" remain fixed regardless of the clock's timezone?

    When I change the time zone of the clock, the "Date created" time information for my documents and image files in the Finder window (and in Get Info) is changed. Can I make the time info in "Date created" remain fixed regardless of the clock's timezone?

  • Routing for Multilevel BOM

    Hai Techies,
    I have a question here with respect to routing. In case of Multilevel BOM how will the routing should be done.
    For Eg in my top level material if i have few semifinished materials which in turn have BOM for them. Then should we need to have each routing for each semifinished materials and one for the finished good.
    Could you please advice how it should be or how it can be?
    Regards,
    Kris.S

    Hi Gurus,
    My company does not allow Engineer to construct BOM in SAP. MFE Engineers only perform ECO to change BOM in PLM systems. Upon approve and release in PLM, this information will be transfer to SAP as BOM.
    Having pre-defined BOM in SAP and un-editable. we will only able to create routing on existing SAP BOM which is a multilevel. BOM A consisted of BOM B and BOM C which BOM B is a make part (in house manufacturing) and BOM C is a Purchase part. BOM B explored to BOM G and H where BOM G is also a MAKE part and BOM H is a make part. Under BOM G and H are all purchase material.
    A - B - G
            - H
        - C
    So does it need to create routing for A, B, and G only?
    Regards...

  • After updating my iPad 2 to iOS 6, I cannot connect to my router.  I have turned the router off, left off for a considerable time, turned the iPad off and on, reset the network settings, nothing works.  Any other suggestions?

    After updating my iPad 2 to iOS 6, I cannot connect to my router.  I have turned the router off, left off for a considerable time, turned the iPad off and on, reset the network settings, nothing works.  Any other suggestions?  It is obvious many others are having similar problems, so the iOS 6 looks like a loser.

    I have just upgraded from a 3 to a 4S and now I can't connect to my wifi. I've tried everything, resetting network settings, switching to boot, renewing lease, rebooting, turning off cellular data etc etc. nothing works!! Very frustrating!

  • What is the second, third, etc. next-hop address in the route-map set command for?

    What is the second, third, etc. next-hop address in the route-map set command for?
    route-map TEST_PBR permit 10 match
    match ip address 101
    router(config-route-map)#set ip next-hop 1.1.1.1 ?
    A.B.C.D IP address of next hop

    Hi,
    You may get your answer in below link
    http://www.groupstudy.com/archives/ccielab/200812/msg00999.html
    First next-hop will be used unless until that is not unreachable. If first is unreachable, then next one will be used. Since these next-hops are directly connected, router can easily come to know whether they are active or not. In case you want to set some loopback ip as next-hop then you need to use keyword recursive "set ip next-hop recursive"
    --Pls dont forget to rate helpful posts--
    Regards,
    Akash

  • Replace the link "Create Bookmark Link" for "Download"

    When I execute a report from interactive columns in principal report ( published in the dashboard), I don't download for default, because this link not exist. Is it possible to replace the link “Create Bookmark Link” for “Download” (excel)?, Can I add additional link "Download" or "Export" to Excel?
    Thank.

    I don't understand what you want. Do you want a link that will download a Dashboard to Excel? Why do you want to replace the "Create Bookmark..." link? What's that got to do with your requirement?

  • Error message at the time create new Hierarchy for Cost Centers (OKEON)

    Dear Experts,
    we have create new company code with reference to old company code. at the time  create new Hierarchy for Cost Center with t code OKEON system given the error message "Overlapping intervals or identical values have occurred".
    we have already checked the duplicate entry but not found the same.
    Please help.
    Regards
    BK GAIKWAD

    the long text to the message is:
    Diagnosis
    You want to use cost center together with activity type . For this combination, however, no master data record was created in fiscal year . The record is defined in CCA during activity type planning.
    System Response
    Procedure
    1.Create the master data record.
    Activity type planning
    1.Or, check your entries.
    I think you should discuss it with your functional consultant

  • Can the forms created in Forms Central be copied and pasted into Muse?

    Can the forms created in Forms Central be copied and pasted into Muse?

    Hi,
    The form that you create via FormsCentral can be embedded in your Muse site (in Muse you can select Object/Insert HTML and then paste the embed code that you get via FormsCentral by clicking "Distribute" Tab / Embed button.)
    See http://forums.adobe.com/message/5252743#5252743 on how to get the embed code via FormsCentral.
    See https://my.adobeconnect.com/p73yae8df5r/?launcher=false&fcsContent=true&pbMode=normal on how to paste it on Muse.
    Thanks,
    Lucia

  • On Apple TV. Can the USB port be used for a keyboard and mouse interface

    On Apple TV. Can the USB port be used for a keyboard and mouse interface

    A bluetooth keyboard can be used with the Apple TV.
    There is no need for a mouse with an ATV.

  • Can the H-Squared Air Mount for AirPort Extreme be mounted horizontally on a wall withOUT the Horizontal Adapter?

    Can the H-Squared Air Mount for the Airport Extreme Base Stataion (5th Generation) be mounted horizontally on a wall withOUT also having to buy the Horizontal Adapter (which costs another $14.95)?
    Are there mounting holes in the Air Mount to allow for that?

    Can the H-Squared Air Mount for the Airport Extreme Base Stataion (5th Generation) be mounted horizontally on a wall withOUT also having to buy the Horizontal Adapter (which costs another $14.95)?
    Yes, if you wanted to use a couple of L brackets, you could do this. The chances of the pre-drilled holes in the L brakets  lining up with the pre-drilled holes in the Air Mount are open to question, though. So, you may need to some drilling.
    I suppose you could design your own horizonatal adapter out of wood, but once you did that, you might as well use another piece of wood for the top shelf. Then, you don't need the Air Mount at all.
    Are there mounting holes in the Air Mount to allow for that?
    The Air Mount has a dozen, maybe more pre-drilled holes. As you might imagine, the Horizontal Adapter mates perfectly with the Air Mount.  The picture in the link below will give you a good idea.
    http://h-sq.com/products/airmount/index.html

  • BAPI to create Purchase Requisition for selective BOM Material

    Dear Experts,
    I need ur help, Actually I am developing a module Pool prg to create Purchase Requisition for selective Bom Material .
    Actually, standard T.Code (ME21N) create PR for a multiple BOM Materia lwhich are used to create a prepared material. But my requirement is PR should be generate for selective BOM material .
    Multiple BOM Material is used to prepared a complete Material .
    I have checked a particular BOM Material, for this matrial Purchase Requisition should be genrate.
    Please suggest me the related code and Bapi which helps me .
    Thanks & Regards,
    Swapnika

    Hi
    you can Use BAPI   BAPI_REQUISITION_CREATE
    Hope Its  help You.
    Regards
    Ajit

  • Availability check for multilevel BOM

    Hi friends,
    is a Availability check for multilevel BOM in SAP-ERP possible
    regards
    Markus Streif

    Hi Markus,
    Please check the given link also.
    how availability check works in case of  multilevel product
    Multilevel ATP
    Availability check for components
    Hope this helps.
    Regards,
    MT

  • How to create production version for multiple BOM & Routing ?

    If I have 3 BOMs ( A, B & C ) and 2 Routing ( 1 & 2 ) for material XYZ then how then production version will be created ? I feel that there will be 6 PVs.
    combination of A1, A2, B1, B2, C1 & C2. but some one told me that  I have to create duplicate routing of 1 & 2
    with number 3 & 4 and use it for bom B, and another duplicate Routing with number 5&6 and use it for BOM C.
    in this case my PV data will be like this A1, A2, B3, B4, C5, C6.
    Please guide me which way is correct. I feel that the first way is right, because in that case I have 2 routing in system, and in second way I have total 6 routings for that product. please guide me.

    Hi Archana
      If you are doing component allocation with routing ,
    routing for material 1  counter 1 you are choosing alternate Bom  1 or 2 for material.
    similarly for Material 1 counter 2 you are choosing alternate Bom 1 0r 2 according to your choice
    like this   3 routing groups will get created with each have 2 counters
    if you allocate similar kind of material in one group in material allocation tab & you are going for component allocation it will assign one material bom.
    second material bom will not get assigned to the operation.
    if you are not going assign the component at the routing level than you can follow first process.
    if you are planning to allocate components at routing level than you have to follow second process.
    If have any more doubt kindly revert back with your query.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Can using query create aging report for GL Account

    Hi all expert,
    I have a challenge scenario which customer request print out aging report for the following GL Account.
    This is not a business partner account. However, customer want display like aging report.
    30 days aging report for the following GL accounts by projects:-
         i)     WIP (Work In Progress) account
         ii)     Accrued Revenue account
         iii)     Accrued Cost account
    Examples:
                            Current Balance       30 day   60 day  90 day   120 day
    Account  WIP         10000               2000        3000      5000     0
    Any idea or example given? If yes, can you provide a query here?
    Regards,
    Eric Tan

    Hi Eric
    In standard SAP Business One this is difficult as the reports are 2 dimensional. To achieve this you will need to write multiple select statements into a temporary table and then select the final result from the temp table. Here is a sample for you to test:
    USE [*DATABASE_NAME*]
    GO
    /****** Object:  StoredProcedure [dbo].[REPORT_NAME]    Script Date: 04/24/2009 13:17:21 ******/
    SET ANSI_NULLS ON
    GO
    SET QUOTED_IDENTIFIER ON
    GO
    CREATE proc [dbo].[*REPORT_NAME*]
    as
    set nocount on
    begin
    DECLARE @Day_no varchar(2)
    DECLARE @Month_no varchar(2)
    DECLARE @Year_no varchar(4)
    DECLARE @Start_Date Datetime
    SET @Day_no = DAY(GetDate())
    SET @Month_no = MONTH(GetDate())
    SET @Year_no = YEAR(GetDate())
    SET @Start_Date = @Year_No + '/' + @Month_no + '/' + @Day_no --  + '/' + @Year_No
    IF OBJECT_ID(N'tempdb..#CRDAGEING', N'U') IS NOT NULL
    drop table #CRDAGEING
    SELECT T0.[CardCode] AS [CardCode], T0.[CardName] AS [CardName], -T0.[Balance] AS [Balance], CAST(0 AS MONEY) AS [Current], CAST(0 AS MONEY) AS [1Week], CAST(0 AS MONEY) AS [2Weeks], CAST(0 AS MONEY) AS [3Weeks], CAST(0 AS MONEY) AS [4Weeks], CAST(0 AS MONEY) AS [5Weeks], CAST(0 AS MONEY) AS [6Weeks], CAST(0 AS MONEY) AS [Over6Weeks], CAST(0 AS MONEY) AS [Avg3Months], CAST (0 AS MONEY) AS [Onhand] INTO #CRDAGEING FROM OCRD T0 WHERE T0.[CardType] = 'S' -- and T0.[CardCode] <> '' --and T0.[DocDate] >= @FromDate AND T0.[DocDate] <= @ToDate
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] <= @Start_Date GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] >= DATEADD(DAY,1,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,8,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,8,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,15,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,15,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,22,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,22,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,29,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,29,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,36,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,36,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,43,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,43,@Start_Date)  GROUP BY T1.[ShortName]
    SELECT SR.[CardCode], MAX(SR.[CardName]), SUM(SR.[Balance]) AS [BalanceOwing], SUM(SR.[Current]) AS [Current], SUM(SR.[1Week]) AS [1Week], SUM(SR.[2Weeks]) AS [2Weeks], SUM(SR.[3Weeks]) AS [3Weeks], SUM(SR.[4Weeks]) AS [4Weeks], SUM(SR.[5Weeks]) AS [5Weeks], SUM(SR.[6Weeks]) AS [6Weeks], SUM(SR.[Over6Weeks]) AS [Over6Weeks] FROM dbo.#CRDAGEING SR GROUP BY SR.[CardCode] ORDER BY SR.[CardCode]
    END
    Go to Microsoft SQL Studio manager and select your company database. Then expand the list and select Programmability > Stored Procedures. Right click on Stored Procedures and select New Stored Procedure. Copy the above code over the code in the edit window and change the database name as well as report name. Then select Execute to create the stored procedure. If you make changes, remember to change the word CREATE to ALTER (with other words CREATE for the first execute, and ALTER thereafter). Then in SAP Business One create a new query and leave everything blank. Click on execute and select the pencil to change to edit mode. Remove the words SELECT and type in EXEC REPORT_NAME (change the REPORT_NAME to the name you used in SQL). Then execute again and the results will be displayed in SAP Business One.
    Let me know if you get stuck. Remember the above is an example and will need to be changed to use your tables and fields as required. The basic idea is to move across by one column with each select statement. So for example the first select statement does the CURRENT column, the second one the 30DAYS column, and so on.
    Kind regards
    Peter Juby

  • Why can't I create property nodes for item in STRICT typedef cluster?

    I've tried this in LV7.0/WIN2k and LV 7.1/OSX - both versions work the same.
    I have a TYPEDEF consisting of a cluster of items A, B, and C.
    I have a front-panel instance of this typedef.
    Under certain conditions, I want to disable and gray Item C, because it's not applicable.
    So I need a property node connected to item C.
    If the typedef is STRICT, then I cannot create such a property node - the menu item to create anything is just not there.
    If I change to NON-STRICT, then I can create the property node.
    I can change it back to STRICT, and the property node works just fine.
    The question is, if the nodes WORK normally, why can I not CREATE one?
    If there's some sense behind this, someone please point it out to me...
    Steve Bird
    Culverson Software - Elegant software that is a pleasure to use.
    Culverson.com
    Blog for (mostly LabVIEW) programmers: Tips And Tricks

    I agree with you, It would be nice to be able to keep the non strict typedef auto-update and extend it to properities which effect the look of a control. I am not sure why you can change the properities on a strict typedef. A strict typedef should have private properities (can only be changed from within the definition and no public other vi scope for writing these values. I have in the past used a custom control for presentation purposes and contained the structure of the data to be displayed within the typedef cluster. This is not all that automatic since we need vi's to convert between the definition and control. Seperating data structure from presentation is much like XML where the file only contains data structure and a reference to a style for presentation. It would be a very nice option to allow nonstrict typedefs to have an additional auto-update properities which could be toggled on and off. I would be curious to here others opinions on how to keep data structure and presentation consistant across an application without being tied down to a strict typedef (allowing the optional change of teh presentation at runtime).
    Paul
    Paul Falkenstein
    Coleman Technologies Inc.
    CLA, CPI, AIA-Vision
    Labview 4.0- 2013, RT, Vision, FPGA

Maybe you are looking for

  • OWB runtime user/owner installation error

    While installing OWB 9i, the following error has come: oracle.wh.util.DebugUtility: java.sql.SQLException: ORA-29540: class oracle/aurora/rdbms/security/PolicyTableManager does not exist oracle.wh.util.DebugUtility: ORA-06512: at "SYS.DBMS_JAVA", lin

  • 5200 : Error in executing  query -- Hyperion Financial Reporting

    Problem in accessing the Hyperion Financial Reports.User is having full access and able to access all the folders except one folder(Legal Folder reports). We are getting 5200: Error Executing the query error. Recently we have upgraded Hyperion to 11.

  • I'm new to Mac and Adobe, I installed PSE 11 from disk on iMac but it will not open, any help would

    I'm new to Mac and Adobe (probably sounds lame :( , but anyway I installed PSE 11 from a disk and it won't open on iMac ? Any help would be appreciated.

  • "Get info" on video files freezes iTunes for minutes.

    When I right click a video file and select "get info", iTunes always freezes for at least 60 seconds. Then it shows the normal tag info. If I change anything and press ok it freezes again, then it works as it should (with the edited info saved proper

  • Ipod NOT SHowing Up!

    Yes. Ive tried to do that stuff in "hardware" and what not. Ive tried to restart comp. Ive tried uninstalling and reinstalling and repairing. Ive tried the updates, ive tried to put in disk mode. Nothing works. This use to happen with my shuffle, but