Please review the below information regarding cost elements category 90 : Financial Accounting Balance Sheet Accounts                                                                               
Category 90  is automatically assigned when you create cost elements in CO whose   general ledger accounts in FI are asset reconciliation accounts            
(special balance sheet accounts), not income statement accounts. You       
cannot change this category in CO master data maintenance.                                                                               
FI does not require CO account assignments to cost elements of             
category 90. However, if you enter an account assignment, it is only       
recorded statistically for real objects.                                                                               
Category 90 allows you to check order or project budgets for fixed         
asset procurement. To do so, enter the investment order or WBS element     
in the corresponding field in the asset master. The Asset Management       
component ensures that the order or element automatically appears in       
the document when you access the asset procurement.                        
The R/3 System debits the order/WBS element statistically in the           
Controlling component, which you can then monitor with availability        
control.                                                                   
You can treat cost elements of category 90 as activity-independent as      
part of cost center planning. 
Also see note 75980  for further information.  From the note:
  The use of cost element category 90 is only provided in the standard        
  system in the following two cases:                                                                               
1.  As of Release 3.0G, asset acquisitions and down payments which are      
      assigned directly to a fixed asset or asset under construction can      
      be assigned to an account on internal orders or WBS elements            
      statistically. In this manner, for example, an availability check       
      can be triggered on the order or the WBS element for asset posting.                                                                               
2.  As of Release 4.0, cost elements of category 90 can also be created     
      for material stock accounts to display material make-to-order stocks    
      on sales orders or customer projects.                                   
Regards
Javier Reviriego

Similar Messages

  • PCA for Full Balance Sheet Accounting

    Dear SAP Guru,
    We're currently in 4.7. We've implemented PCA for Profit and Loss Accounting. There's business requirement to produce Full Balance Sheet Accounting in PCA, i.e. the one similar to Business Area. Can the standard PCA module (in 4.7) support Full Balance Sheet Accounting? If can, what are the settings and steps that need to be configured in the system? Thanks in advance for your assistance.

    Hello,
    you can get the full balance sheet from PCA.
    The steps are:
    1. You must make sure that you have completed financial statement version (OB58).
    2. Copy this account groups to PCA. (Please check the paths to copy the FSV to your PCA.
    3. See the available reports in KE80. One of the report must suit your requirement.
    4. If they are not suitable to your requirement, create your own balance sheet format (using form and report) - Report painter.
    Hope this helps you.
    Regards,
    Ravi

  • Balance sheet account can be used as a assesment element?

    Dear Gurus ,
    Please let me know wether a balance sheet account can be used as a assesment element.
    Cheers
    Balaji Dhanavel

    Hello,
    You have created two threads. You may please close one of them.
    However, I am giving you the reply here also, because I do not know which thread you observe.
    I do not know in which context you are referring as "assessment element"
    You can create a cost element by using KA06 and create a secondary cost element. However, the system will prevent you if you try to create a cost element which is balance sheet GL Account. You have give a name which is not a GL account. Then only you are able to create the secondary cost element.
    For assessment, you can select the cost element category "42". The cost element can be used for configuration in CO.
    Regards,
    Ravi

  • Balance sheet account as assesment element?

    Dear Gurus ,
    Please let me know wether a balance sheet account can be used as a assesment element.
    Cheers
    Balaji Dhanavel

    Hello,
    I do not know in which context you are referring as "assessment element"
    You can create a cost element by using KA06 and create a secondary cost element. However, the system will prevent you if you try to create a cost element which is balance sheet GL Account. You have give a name which is not a GL account. Then only you are able to create the secondary cost element.
    For assessment, you can select the cost element category "42". The cost element can be used for configuration in CO.
    Regards,
    Ravi

  • Statistical Cost Element for B/S accounts related to inventory - HELP

    Dear Gurus,
    I need to create a CE type 90 for my inventory accounts. In SAP help it says
    "System Response
    Balance sheet accounts cannot be created as cost elements in cost accounting, except for:
    Asset reconciliation accounts
    Material stock accounts for valuated sales order stock for sales orders or projects."
    For assets tcode OAK7 can be used after maintaining relevant accounts in AA -> Integration w/GL -> Assign G/L accounts.
    How do I do the same for material stock accounts (which are B/S as well)?
    Thank you in advance!
    Ciao!
    Max

    Hi,
    In SAP the cost element category is pre set to 90 for all Balance Sheet Accounts.
    Hence you cannot create cost element with category 90 for any Balance Sheet account.
    Award points if found useful.
    Regards,
    Satish Pasumarthi

  • Consumption accounts not created as cost elements - Implications

    Hi
    There are following GL accounts as an Expense GL accounts:
    Cost of Raw Material Consumption
    Cost of Finished Goods Manufactured
    Cost of Finished Goods Sold
    Change in Stock WIP.
    I have not created them as cost elements since its asking me cost center when i do any PGI or issue to sub contract stock, etc.
    So i wanted to know the implications on CO-PA if i do not create cost element. I believe that value will flow to CO-PA on the basis of material code.
    Further my doubt is, if i do not create it as cost element, how it will impact my cost center reports and product costing.
    Please help. I am confused very much.
    Edited by: Meenu_ND on Aug 4, 2011 7:55 PM

    Hi Meenu
    cogs - can not be created as cost elements- GBB-VAX- COSTING BASED COPA- MTS
                Can be created as cost element -GBB-VAY- COSTING BASED COPA- MTO
    always as a cost element GBB-VAY- Accounting based copa
    Thanks
    ram

  • Cost element-balance sheet account

    hi,
      i need to create cost element  for balance sheet account ( other than raw material  account)
    Thanks
    raghavan

    Dear Raghvan,
    Cost elements are not created for balance sheet accounts. It is created from only P&L accounts.
    Even if you try to create a cost element for BS account, system prompts you as 'GL is a balance sheet account'.
    Regards,
    Ajay

  • Cost center empty in general ledger view for balance sheet accounts

    Hi !
    We are implementing ECC6 with new GL functionalities. We activated differents scenarii: cost center, profit center and segment.
    Using FB03 (display document) we noticed that in the entry view, everything is fine: cost center, profit center and segment are filled successfully.
    However, in the New GL view, the cost center is not filled for balance sheet accounts.
    Any solution?
    Regards,
    Julien

    HI,
    Cost center will never be filled for the Balance Sheet account. For Balance sheet account Profit Center is required to be filled.
    Don't be afraid this is the fundamental practice across the globe. Cost centers will be filled in only Expense account.
    Exception to above rule is Asset master will recieve cost center because this will help in determining asset per department.
    Regards,
    Chintan Joshi.

  • Wrong assignment of Balance sheet accounts for Asset Classes...

    dear all,
    there is wrongly assignment of acquisition balance sheet account in asset class in t code is AO85 that is, Acquisition:Acquis. and production costs an Accumulated Depreciation Balance sheet account have been assigned. Also in t code  AO93 for ordinary depreciation same correct accumulated depreciation Balance sheet account have been assigned.
    Now i can say that Acquisition balance sheet account and accumulated depreciation balance sheet account are assigned with same GL (i.e. accumulated depreciation account). 
    The transactions data have been posted for the asset class with different tcodes i.e. 
    ABAVN Enter asset transaction: Asset Retirement
    OASV Enter Transfer Posting
    AIBU   AUC Settlement
    ABUM Enter asset transaction: Transfer in company code
    AB08 Documents from asset
    I wanted to post transaction data with correct acquisition account. What should i do to correct posted transactions..
    Waiting for positive response.
    regards
    saqib usman

    The best way is to create a new asset class and to transfer the existing assets.
    An other option is to change the G/l account in the development system and transport to production. In development it is only possible to this when there are no posting in this asset class. When there are posting you have the option to reset in development asset accounting. Then you can change the G/L account. Have a look to SAP-notes with your error there is a note for.
    When the changes are in production you can make a manual correction with the transaction ABF1 (SAP note 69225).
    With this option you have the problem that the original postings are no longer in line with the asset account assignment. When you want to do a currency conversion in the future you have to make correction posting again in the old fiscal year

  • WBS element on balance sheet accounts?

    Hello everybody
    Is there anyway to assign the WBS element to a balance sheet account?
    I don´t really need it to interact with the PS module, I just need to classify the accounts and receivable payables according to the WBS element.
    I´ve already tried to modify the field status of the G/L accounts and the posting key, it didn´t work.
    I´ll appreciate any ideas you can give me.
    Thanks!
    Rivendelian

    I think you must assign account and /or cost centre in trx. ME21
    A.

  • Check list for creating a cost element?

    Hi,
    Who can provide a check list for creating a cost element?
    Thank you.
    Kind regards,
    Linda

    Hi,
    Cost Elements are broadly of two categories - Primary and Secondary cost elements.
    In case of primary cost element a GL Account should have been created and in case of secondary cost no corresponding GL account should exist. Secondary Cost Elements are used only in Controlling Module. The transaction codes are:
    KA01 - Create Primary Cost Element.
    KA06 - Create Secondary Cost Element.
    KA02 - Change Cost Element
    KA03 - Display Cost Element
    KA04 - Delete Cost Element
    KA05 - Display Changes
    Once transaction data is posted Cost Element cannot be deleted.
    Another point in Cost Elements is defining the Cost Element category. Cost Element category determines which Cost Element category can be used for which Business Purpose. For example cost element category 1 is used for primary costs and 11 is used for revenues.
    In the default account assignment tab, we can define a cost center / internal order and always the postings for that cost element will be posted to that cost object.
    Thanks
    Murali.

  • For financial report requirment can we consider secondary cost element cost

    For financial reporting requirment can we consider secondary cost element cost to profit and loss a/c

    In our senario _ cost is booking cost centers and revenues booking concern profit centers .
    for Financial reporting requirment can I include secondary cost to profit and loss a/c
    what is the impact on the report
    exp: salary booking in primary cost,than Per hour man hour cost computed by costing dept for allocate to concern department
    it is cost center activity price we specify in kp26 at the time of pm order confirm it will confim the activity quandity price will from planning area only,  so for salaries in primary g/ls already captured, if we consider secondary it may double booking
    srinivasa reddy

  • When not to create cost elements for P&L accounts? Implications?

    I noticed some P&L gl accounts are not created as cost elements eg. R&D expense, COGS (posted during SD delivery), sales (posted during SD billing), freight charges, production variance (posted during prod.order settlement), etc.. I'm thinking if cost elements are not created, FI and CO will not reconcile.
    Example of our SD delivery posting :
    Debit   COGS (sales order assignment)
    Credit    Stock
    From above posting, there is amount posted to COGS gl account but no CO assignment except for sales order. Is there supposed to be a follow-up to this posting to reconcile FI with CO ? Or is our setup wrong?
    Fyi we do not use CO-PA.
    Thanks in advance.
    Edited by: Pixel8 ation on Aug 3, 2010 5:16 PM

    Hi,
    Sorry, I probably confused things by mentioning Revenue. Your settings are correct, with Revenue defined as a revenue element (11) rather than a cost element (1).
    With respect to WIP (P&L), I would create it as a cost element, since it represents the absorption of cost centre costs and materials into the production of goods, even though the goods are not yet complete. When the goods are completed they will be credited in CO-OM and debited to stock using a similar entry. The impact of these credits (to WIP or to Stock) is to move costs out of CO-OM into the goods produced (CoGS). In CO-OM, the net result of Costs less credits to WIP/Stock, indicates the efficiency of your cost centres or the accuracy of your standards.
    I would also create the manufacturing variance accounts as Cost Elements and settle them back to your production costs centres (or possibly CO-PA if you used it), since they are also a reflection of the efficiency of your cost centres - i.e. if a Cost Centre manager is not achieving the standards, (s)he should be accountable for the variance, and if you are concerned about reconciling CO-OM and the costs in P&L, you won't reconcile if the variances aren't posted back to CO.
    Regards,
    Marc

  • Two Cost Element for the same GL

    Hi,
    We have 2 Company Codes - 1000 & 2000. We are using same CoA in both the Company Codes. We have a GL, say 12345678 for posting short/excess amount. So during MIRO, the accounting entry would be:
    GR/IR a/c dr.          10,000
    GL 12345678                  2
                       Vendor            10,002
    GL 12345678 would be dr or Cr would depend on short/excess amount.
    We have created Cost Element for this GL 12345678. If I post the MIRO without attaching a Cost Center to this Cost Element system thows an error to attach the Cost Center. I have separate Cost Center for Company Codes 1000 & 2000 however I can only put one Cost Center in this Cost Element.
    Can anyone advice how can I post the above mentioned entry with different Cost Center. This line item (GL 12345678) is generated automatically and the Cost Center field is greyed out hence I don't have option to enter the Cost Center during MIRO. I checked the FSG of this GL, Cost Center field is 'Optional' over there.
    Thanks,
    Sandy

    Solution Option* -You can  assign Differant Cost Centers to Company Code 1000 and Company Code 2000 in OKB9 Transaction Code.Follow the  below process....
    --- Go to OKB9
    --- Select New Entries button
    --- Give the Company Code 1000 in first row and 2000 in 2nd row
    --- Enter the Cost element 12345678 for company code 1000 and 2000
    --- Enter the relevent cost centers  for company code 1000 and 2000
    --- Select Save
    Thanks
    Fit 4 Nothing

  • CO-PA: COGS accounts created as cost elements

    hello,
    I have a question regarding COGS accounts, being created as cost elements. This was not causing problems, because client was using real internal orders for profit analysis. In the next phase of project, during implementation of costing based CO-PA, now I have problem, because of this situation, because I can not delete created cost elements  (only possible at the beginning of the new fiscal year) , and the system asks for cost object assignment during GI creation. I was considering OKB9 assignment, but I think this will cause double values in CO-PA. Maybe temporary solution, by using real internal orders till the end of the year, and then deleting existing cost elements for COGS accounts, could work?
    Please, advise what to do to solve this situation.
    Thanks in advance,
    Dusko

    Hope you are not using account based COPA
    To avoid double values in COPA, you can do one of two things,
    1) after the costs are transferred to the internal order, you can just keep them there without doing settlement, let the users know that there will be under absorption for the internal order.
    2) If the users are not willing to have under absorption in the internal order, you can transfer the costs to a value feild in COPA which is not reflected in the report in KE30 (Remember that you may loose one value feild in COPA this way)
    Both make no effect on KE30 report as data will be transfered to COPA at the time of billing
    Br Naveen

Maybe you are looking for

  • Server returned: 500 Internal Server Error or XMLException

    Runtime Error          UNCAUGHT_EXCEPTION Except.                CX_SOAP_CORE Date and Time          01.05.2008 20:13:24      ShrtText           An exception that could not be caught occurred.      What happened?           The exception 'CX_SOAP_CORE

  • Need help userexit

    Hi Gurus, Need help, in finding user exit which is called once the shipment is saved. I found USER EXIT: V56UCHCO Checking of Shipments for Completeness FUNCTION MODULE: EXIT_SAPLV56U_002 But this doesn't called up and shipment is still in process. I

  • Can't install ASE16 on windows platform

    I did installation on Windows 2008 R2 SP1. It is 64 bit operating system. I have installed Microsoft Visual C++ 2010 x64 Redistributable package. But if I install it error will showed "Error: The installer failed to load sylapij.dll. Please verify yo

  • IPhone 3GS and bluetooth.

    Can someone tell me if i can upgrade my ipphone 3gs via bluetooth? I cant connect my iphone with my pc via usb and i cant do anything to upgrade it. Please help me.

  • Strange effects in borders

    I have two tabbed panes. In the first one, I have 3 JPanels, each one with a JCompound border added by this code: infoPanel.setBorder(BorderFactory.createCompoundBorder(                                      BorderFactory.createTitledBorder("Info"),