Can we obtain Inspection lots against a Process Order / Production Order

Can we obtain Inspection lots against a Process Order / Production Order  on time basis i.e hourly or day wise against the same order

HI
i think there is no this option.Like Plant maintenance ther is no scheduling tool.
or you have to go with stability studies...
-ashok

Similar Messages

  • Inspection lot number not recorded in production order

    Experts,
    when I release a production order, the inspection lot is created correctly (type 04 - early lot creation) but the inspection lot number is not recorded in the production order. Why not?
    Rgds

    Dear,
    Only 03 type will be recorded in header, not 04. It is normal

  • Inspection Lot number on Process Order

    Hi Experts,
    There's an Inspection Lot field in process order in Assignment Tab, but it doesnt reflect the number of the Inspection Lot of the Material.  What am i missing?
    Thanks,
    Kumar

    hi kumar
    that inspection lot no is assigned to process order when you have maintained inspection type 03 ie inprocess check in material master . when you release process order you can see inspection lot is generated and that inpsection lot no you can on that field.
    Regards
    Pravin

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • External subcontracting processing in production orders

    Hi Everybody, We are facing a following situation...while using external subcontracting processing in production orders..
    Finance wants all costs settled off of production orders with receipts against them at period end to accurately capture costs for the period. This is because of our company’s financial policy i.e. we have to settle the exact costs by every month end instead of using GR/IR postings for partially confirmed quantities.. Any production orders with receipts against them must be able to be settled at period end.  This includes partially received production orders, (it means when the total production order quantity is 10 PCS and if Subcon vendor sends 5pcs in this month end and sends the remaining 5 in the next month).
    Currently we have not been able to settle partially received production orders in our testing.  SAP is requiring the production order to be in TECO (Technically Complete) status before it can be settled.  It is not feasible for PP to have production orders that have not been fully received in TECO status because they loose visibility to them in their reporting and tracking. 
    does any body dealth with this situation? any userexits, functional specs etc..
    Your guidance will be very helpful,,
    srikanth

    Did you try using in order type/settlement profile the radio button which indicates can be settled and the not one which corresponds to 100% settlement. Hope this helps.

  • Differrence Between Process Order & Production Order

    What is differrence between Process Order & Production order apart from that process order is used in process industry & other one in discrete mfg ??

    Hi
    there isn't really any difference. The main difference is in master data: Routing vs. Recipe.
    as you have mentioned, prodn. orders are used for discrete, repetitive & virtual mfg scenarios whereas process orders are used for process industries (chemicals, pharmaceuticals etc.,) where the prodn. is non-stop.
    You can use production order or process order for the same scenario even when you are in a process industry. It is your decision to use either one, but you have to know that process order is more appropriate when you have more machine integrations and interfaces. Process order, as well, requires more master data than production order since you are clubbing both BOM & Routing in the master recipe.
    also Process Order can handle batch management and joint production scenario in a better way in comparison to the production order. Also in process order you can maintain the inprocess instructions and special control paramters for production via the process instruction key and control recipe which is not there in a prodcution order.
    hope it helps
    regards
    Srinivas

  • Inspection lot of cancelled process orders

    Hi Gurus,
    I would like to ask if there is an easier way of knowing if the order of an inspection lot was cancelled. Right now the business is on early lot creation, meaning once the order is created an inspection lot is also created. The problem is when the order is cancelled there is no way of knowing it through QA32 unless you go to the order itself.
    Is there an easier way of knowing what orders are cancelled (TECO without confirmation)?
    Thank you for your help!
    Eva

    Hi,
    But they don't really cancel process orders. They use TECO.
    Thank you.

  • Auto creation of time based inspection points against in process required

    Hi
    We want system to create/generate inspection points automatically when process order is released and inspection lot is created. Currently we have to create inspection point manually using either QE71 or QE11. Previously when scheduling was active in PP, inspection points had been creating automatically for the duration of process order. But now PP scheduling is not required and as a results inspection points are not being created automatically.
    Please assist.
    regards
    Chris

    SAP provides a FM, (QAPP_CUST_IP_CREATE), to be used as a template to create your own FM for automatically creating inspection points.  There is documentation in the FM to explain it.  You then assign this FM in configuration where you define the inspeciton point identifiers.
    FF

  • Regarding Goods Reversal and Goods Issue process for Production orders

    Hi,
    I have a issue regarding <b>Goods Reversal</b> and <b>Goods Issue</b> process for <b>Production orders</b>.
    Actually I am having a Z - Function Module in that i am passing <b>production order number other details</b> to
    make the <b>Goods Reversal</b> happen.
    The code for the above is as below:
                       i_mvtit-material      = wa_mdfa-matnr.
                        i_mvtit-plant         = i_resb-werks.
                        i_mvtit-spec_stock    = 'Q'.          "New
                        i_mvtit-stge_loc      = 'ZWIP'.
                        i_mvtit-stge_type     = i_resb-lgtyp. "New
                        i_mvtit-batch         = i_resb-charg. "New
                        i_mvtit-orderid       = i_resb-aufnr.
                        i_mvtit-spec_stock    = i_resb-sobkz.
                        i_mvtit-entry_qnt     = i_resb-enmng.
                        i_mvtit-entry_uom     = i_resb-erfme.
                        i_mvtit-entry_uom_iso = i_resb-meins. "New
                        i_mvtit-wbs_elem      = v_frwbs.
                        i_mvtit-move_type     = '262'.
                        i_mvtit-xstob         = 'X'.
                        i_mvtit-gr_rcpt       = i_resb-aufnr. "New
                        i_mvtit-reserv_no     = i_resb-rsnum.
                        i_mvtit-res_item      = i_resb-rspos.
                        APPEND i_mvtit.
    * HEADER ELEMENTS
                        k_gmvt_code-gm_code    = '03'.
                        k_gmvt_head-pstng_date = sy-datum.
                        k_gmvt_head-doc_date   = sy-datum.
    * CREATE GOODS MOVEMENTS
                        CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
                          EXPORTING
                            goodsmvt_header = k_gmvt_head
                            goodsmvt_code   = k_gmvt_code
                          TABLES
                            goodsmvt_item   = i_mvtit
                            return          = i_return.
    The Above code does the <b>Goods Reversal</b> but then i will update one Z Table with fields like
    Production Order Number[AUFNR], Number of Reservation[RSNUM], Item Number of Reservation [RSPOS], Material Number [MATNR], Requirement Quantity [BDMNG], WBS element[PSPNR] etc. If Above BAPI runs sucessfully.
    That is happening correctly.
    But Then actual issue is i have do <b>Goods Issue</b> for those Z-Table records.
    There i will give Production order Number's & Storage Location in Selection-Criteria.
    Then i need to do <b>Goods Issue</b> for that order.
    The code i had written as follows.
    * POPULATE VALUES FOR BAPI CALL
            i_mvtit-material      = i_zpsi7603_01-matnr.
            i_mvtit-plant         = i_resb-werks.
            i_mvtit-spec_stock    = 'Q'.                "New
            i_mvtit-stge_loc      = p_sloc.
            i_mvtit-stge_type     = i_resb-lgtyp.       "New
            i_mvtit-batch         = i_resb-charg.
            i_mvtit-orderid       = i_resb-aufnr.
            i_mvtit-spec_stock    = i_resb-sobkz.
            i_mvtit-entry_qnt     = i_resb-enmng.
            i_mvtit-entry_uom     = i_resb-erfme.
            i_mvtit-entry_uom_iso = i_resb-meins.       "New
            i_mvtit-wbs_elem      = v_frwbs.
            i_mvtit-move_type     = c_261.
            i_mvtit-mvt_ind       = 'F'.                "New
            i_mvtit-xstob         = c_x.
            i_mvtit-gr_rcpt       = i_resb-aufnr.       "New
            i_mvtit-reserv_no     = i_resb-rsnum.
            i_mvtit-res_item      = i_resb-rspos.
            APPEND i_mvtit.
    * HEADER ELEMENTS
            k_gmvt_code-gm_code    = c_03.
            k_gmvt_head-pstng_date = sy-datum.
            k_gmvt_head-doc_date   = sy-datum.
    * CREATE GOODS MOVEMENTS
            CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
              EXPORTING
                goodsmvt_header = k_gmvt_head
                goodsmvt_code   = k_gmvt_code
              TABLES
                goodsmvt_item   = i_mvtit
                return          = i_return.
            CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
              EXPORTING
                wait = c_x.
            READ TABLE i_return INDEX 1.
            IF i_return-type EQ c_s.
              DELETE FROM zpsi7603_01 WHERE aufnr = i_resb-aufnr AND
                                            rsnum = i_resb-rsnum AND
                                            rspos = i_resb-rspos.
            ENDIF.
    If i run above code for <b>Goods Issue</b> it is giving error can anybody tell me what changes i need to do to make it work.
    The <b>Error Message</b> i am getting is as below:
    <b>Qty and / or "delivery completed" ind. or final issue ind. are missing</b>
    <b>Error Number for the above is : 264.</b>
    Can anybody solve my issue.
    Any help will be appreciated.
    Thanks in advance.
    Thanks & Regards,
    Rayeez.

    Hi,
    Thanks boss.
    It is working now correctly.
    The issue is the  i_mvtit-XSTOB should be equal space in case of Goods issue while incase of Reversal it should be equal to X.
    Thanks for ur efforts.
    I had awarded you points.
    Thanks a lot.
    Thanks & Regards,
    Rayeez.

  • HOW CAN WE ASSIGN THREE TASK LIST TO THREE DIFF PRODUCTION ORDER

    Respected All
    we have one material which is used for three places FIRST IN MILL1, 2ND IN MILL2 AND THIRD IN TRIMMER MILL.
    the only thing which differentiate this single material is  the production order. we have 3 different production order but one single material. for this we have created 3task list. my problem is when we create batch and confirm it through co15, the lot reflects in QA32. but is not allowing for USAGE DECESION. For that we have to go to QA02, assign the task list and then again go to QA32 and do the usage decesion. is there any method by which we can assign three task list to three production orders so that qa02 step could be avoid.
    pls reply
    thanks
    abhay

    sir
    thank you for the reply could you please tell me in which transaction we find this user exit.
    thanks
    abhay

  • Early Inspection for a Goods Receipt for production order

    Dear Experts,
    This  is with respect  Early Inspection for a Goods Receipt for inspction type 04.( 03 is also active in material master)
    We made partial confirmation  250 qty for production order using t code co11n ( total qty of production order is 1000).
    made the usage decision with an acceptance and posted all open stocks. to unrestricted.
    Now  in second partial confirmation prodn order  of 250 qty was made . This suppose to be rejected .  but sytem will add this 250 qty directly to unrestricted stock .  how to over come this .
    Regards
    Sandeep

    Don't make the UD until all stock has been receipted?
    You basically approved the batch.  So why wouldn't the system put the stock to unrestricted?
    Why would you make a UD when you still have stock to be posted anyway?  You can post stock without without making a UD so why not just post some if you need it, and wait on making the UD?
    Craig

  • System status for IDOC creation and processing for production orders

    All
    I am creating IDOCs for production orders to send requirements to an external WM system for kitting execution.
    I need to know whether there are any system statuses to notify me when an IDOC has been created,failed and processed. If not, how do I go about creating user defined statuses for these statuses.
    Second question, which idocs should I use to confirm, teco and cancel the production orders from an external system?
    Thanks
    Evan

    HI Evan
    u can use the standard program - RBDMOIND scheduled in back ground to update the Idoc staus ,
    this helps to update the IDoc Status from
    '03     Data passed to port OK  '  to
    '12     Dispatch OK'
    status 03 indicates the IDoc is successfully transmitted to Communication Layer and the Status 12 helps to confirm the data dispatch to the receiving port.

  • Process in production order

    What is the process for the Production Order?

    Hi,
    Step 1: Material Master
    Logistics > Production > Master Data > Material Master > Material > Create General > Immediately MM01
    Step 2: BOM creation
    Logistics > Production > Master Data > Bills of Material > Bills of Material > Material BOM > Create CS01
    Step 3: Work Center creation
    Logistics > Production > Master Data > Work Center > ( New Screen ) Work Center > Create CR01
    Step 4: Route creation
    Logistics > Production > Master Data > Routings > Routings > Routing > Create CA01
    Step 5: PIR Generation
    Logistics> Production>production planning>demand management>PIR>Create MD61
    Step 6: MRP Run
    Logistics>Materials Management>Material planning>MRP>MRP>Total Planning>Online MD01 
    or
    Logistics > Production > MRP > MRP > Sng-Item, Multi-Level MD02
    Step 7: Evaluation through MRP list and Stock requirement list
    Logistics>Materials Management>Materials Planning>MRP>Evaluations>MRP List>Individual Display MD05
    Logistics>Materials Management>Materials Planning>MRP>Evaluations>Stock Requirements List MD04
    Step 8: Conversion of Planned order to Production order
    Logistics > Production > Production control > Order > Create > With a planned order CO40
    or
    Logistics >Production > Production control >Order > Create >With material CO01(For creating production order Without planned order)
    Step 9: Order management
    Logistics >Production > Production control >Order > Change >With material CO02
    Step10: Confirmations
    Logistics >Production >Production control >Confirmation >Enter >For order CO15
    or
    Logistics >Production >Production control >Confirmation >Enter >For Operation >For time ticket CO11N
    Step11: Goods issue
    1. Logistics >Production >Production Control >Environment >Goods Movement >Goods Issue
    2. Logistics >Materials Management >Inventory Management >Goods Movement >Goods Issue MB1A--261Movement type
    Step12: Goods receipt
    Logistics > Production > Production Order > Environment > Material Movement > Post Mat to Stock
    or
    Logistics > Materials Management > Inventory Management > Goods Movement > Good Receipt > For Order MB31
    Step13: Techo Or Close Order.
    This can be done from Prd. Order Header menu.
    Regards,
    R.Brahmankar

  • ATP check and Check against planning for a production order

    Hi
        When I create a production order for some orders it is ATP check and for some orders it is showing 2 in type avail check is check against planning in coois screen. Because of this orders are gettign released even though BOM material is out of stock.Can I know in which situations the orders will come under the second scenario. I always want the orders should be in ATP check
    regards,
    PradeepM.

    Hi,
    If you want only ATP check, then in MRP-3 view of the mtl master change the checking group to the same value as the one which you find to be following the ATP check.
    However before making this change do consult your colleagues in other domains, as this will impact all places where Av. check is done.
    Hope it clarifies.
    Regards,
    Vivek

  • Waiver process during Production order

    Hi,
    My client has a requirement whic is called as waiver process, whereby a part could be replaced by another alternative part during production order process, however the whole process need to be integrated with ECM and workflow for seemless communication and approval.
    Has anyone come across manufacturing waiver process and can this process be designed within ECC60 or is it better to look for MES or MII tool to address the business requirement?
    Appreciate any response concerning this topic.
    Thanks and regards,
    Bhaskar

    I resolved this issue by using the process in SAP ME and ECC, using WIP processing in MES.

Maybe you are looking for

  • Possible to re-install XP on boot camp partition in 10.7

    Hello, I'm new to this forum and found it very useful in the past. Now I wanted to know; I am currently running 10.6 (Snow Leopard) and installed Windows XP Home Edition (32bit) using Boot Camp. If i updated to 10.7 (Lion) I know I will more than lik

  • Warcraft IIIx busted after update to 10.5.5

    After installing the update to 10.5.5 Warcraft III is unplayable. The mouse cursor slows to a crawl (graphics still move at full speed). IN windowed mode you can see how slow the cursor moves relative to how it moves in the OS. Has anyone encountered

  • Applications crash upon opening in Lion 10.7.3

    Hi, A number of my applications are crashing in Lion 10.7.3 upon startup. Microsoft Office 2011 is returning the following error: Exception Type:  EXC_BAD_ACCESS (SIGSEGV) Exception Codes: KERN_INVALID_ADDRESS at 0x00000000e4fa0366 Google Earth is re

  • Automizing error message with Fault Message Type

    (Request F6)  (Request F6) System - > XI - >        SAP (Doesn't have F6)           <-- XI <--       SAP (Doesn't have F6)    (Respons: error)    (Respons. error) (Problem) When the request message doesn't content sufficient information that is requi

  • Picture Slide Show

    I am making a website at the moment and would like to include a Flash style custom slideshow on the homepage. I don't have a good backround in AS at all and don't know where to even start. I will start by showing you what I would like to achieve and