CEWB for Rate Routing

Hi..
I have one query reference to CEWB ,is there any selection criteria for selecting task list type R(Rate Routing) in CEWB.
I have checked the same in CEWB found only Routing,Reference operation set,Inspection plan.
I have checked also op77 but it is bydefault Routings for production & not the rate routing one.
Any suggestions to above issue pl.
Tushar

Hi Anupam,
Thanx for reply...
I have checked the settings which you have mentioned & tried with the selection criteria as you said but not possible  with desired result as there are only three task list type selection as mentioned above .
I have also checked OP77 ,I tried to create new work area with usage area "R-Repetitive manufacturing" but it is bydefault comes with Routings for production.
Is there any setting  which I couldn't incorporate?
Pl. suggest
Tushar

Similar Messages

  • Rate  Routing

    Dear Sir ,
                   i need sample program of Rate Routing Tcode CA21..Using BAPI or BDC CALL transcation ...........or tell me the BAPI Function module ....
    Pls Help to me ....
    With Regards ,
    Meena ...

    Hi,
    You can check the BAPI: BAPI_ROUTING_CREATE.
    Also you could check the following DI/BI steps in LSMW ( Not sure whether these objects work for Rate Routing Creation):
    Object               0170   Routing   
    Method               0001   Batch input
    Program name         RCPTRA01         
    Program type         B   Batch input  
    Object               0170   Routing     
    Method               0002   Direct input
    Program name         RCPTRA02           
    Program type         D   Direct input  
    But following IDOC could be used for loading Rate Routings:
    LOIROU02
    You can check the documentation in WE60.
    Hope thsi helps.
    Best Regards, Murugesh

  • What is Rate Routing ?

    Hello All,
                   Please provide me some refrence for rate routing. How to create & use. I don't know any thing about it. So I need to know from begining of rate routing. Is there any refrence from where I can read & test rate routing
    Thanks in advance
    Mohit Gupta

    Dear,
    Please refer this useful link,
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm
    You have to proceeds following steps:
    1) CA21 - Create Rate routing 
         First screen =  Material on which you have to create a routing
                               Plant
         Second screen =  Usage 1 if you create routing for production purpose.
                                   Status 4 release general 
                                   Enter
    2) Now go on to application tool bar and select operation 
         Here you have to enter work center, control key and description
         For eg.      w/c 1    plant    pp01      description
                         w/c 2    plant    pp01      description
                                     plant    pp99      goods reciepts
    3) Now select the component allocation
         Select the material here and click on to the new assignemnt for assign the operation seqence on to the material.
    4)  SAVE
    Now routing is create with routing group number
    Regards,
    R.Brahmankar

  • CA21 Rate Routing

    Dear Team,
    For creating the rate routing do we have any standard program suggested by SAP for uploading the same.
    If so what is the template followed and code for the BDC upload on rate routing transaction code CA21.
    Regards,
    Deepak GS

    Hi Deepak,
    LSMW should work with the transaction. We have done it through LSMW. As per my knowledge no standard BAPI exista for rate routing.
    Refer below links for LSMW.
    http://www.sd-solutions.com/documents/SDS_LSMW.html
    http://www.sd-solutions.com/documents/SDS_LSMW_Batch_Recording.html
    LSMW FOR HR
    lsmw
    LSMW??
    Re: lsmw
    Regards,
    Krishnendu.

  • Idoc ROUTING_CREATE01 and rate routing

    Hello,
    Is it possible to create rate routing with idoc ROUTING_CREATE01, so far I can create only simple routing.
    Thanks for your answer.

    Hi,
    For rate routing:
    use this BAPI: 'BAPI_ROUTING_CREATE' for creating Rate Routing
    Regards,
    Kumar(Reward if helpful).

  • Defect Recording for operations in rate routing

    Dear Masters,
    How to record the defects for the operations defined in rate routing of a material once the inspection lot in generated using TCode MFPR in repetative manufacturing?
    Thanks & Regards,
    Ram Kulkarni

    You mean to say tan is available in rate routing itself ?

  • Pro & cons for Routings vs Ref Rate Routing

    One of our plants uses Reference Rate Routings (CA31, 32, 33). Many colors of vinyls are processed the same way producing many individual material numbers. So one Ref Rate Routing has many Materials assigned to it.
    Recently an engineer in other plant found that he can do the same material assignment on Routings (CA01, 02, 03)
    What are the pro & cons for Routings vs Ref Rate Routing when doing Material assignments
    thank you for any information you can provide
    Althea

    Dear,
    Reference routing is usually used for calling the set of operation can be used manr routings so it is reusage.
    Suppose a cleaning  operation is having 5 operations. This is used in may places. Then create a routing and call this operation set wherever required. Hence you need not repeate defining the operations in each time.
    For more details...see below link
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm

  • Mass Changes to Rate Routing

    Dear All,
    We were trying to carry out mass changes to Rate Routing,
    by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
    Regards
    Mithun

    Dear Mithun,
    In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
    BDC's or LSMW's.
    Regards
    Mangalraj.S

  • Advertise implicit-null label for static routes

    Hi, I want to ask if there is any way to change the label or stop adveritise label for an static route. Normally LDP advertises an Implicit Null label for directly connected routes. We want to do similar thing for static routes.
    We need to do this is because somehow we need to do rate-limit on the PE interface connecting to the core network instead of the interface connecting to CE. As the incoming packets still got labelled, the rate-limit is skipped. So we want to stop the PE creates label for the static routes or advertises them with implicit null label. Thanks in advance.

    Calvin,
    Bear in mind that if you only enter the "no mpls ldp advertise-label" command, LDP will stop propagating all labels, which might not ba what you want. If you selectively want to propagate certain labels, then you need to also use "mpls advertise label for " as Shivlu suggested.
    Regards,

  • Problem in automatic rate routing selection

    Dear all,
    I am using REM and according to that I have maintained REM profile in Material Master, rate routing, line hierarchy, production version, but the time of scheduling of planned order, system is saying " The automatic selection of routing is not possible".
    I suppose I am missing some configuration.
    As also, I have already done the same scenario in other server.
    If u have any suggestion then pl. forward me.
    Thanx,
    Das

    Dear SAP PP,
    1.Check whether have you included the check box for REM allowed indicator in the production version.
    2.Also ensure you have assigned the rate routing option for detailed planning and the correct group and
    group counter in the production version.
    3.Check the valdiity dates of the rate routing,try to create a planned order in some advanced future date
    so that your rate routing is valid for the planned order start date.
    4.Check the status and the usage of the rate routing.
    Regards
    Mangalraj.S

  • Problem during Rate Routing Upload using BDC.

    Dear Sir/Madam,
    I am uploading Rate Routings using a BDC program which is working perfectly but having a single problem.
    In the initial screen of the transaction CA21(Create Rate Routing), I need to enter only the Material Number and its Plant and all the other fields should be left blank.
    But, here the group number field is automatically getting filled with the previous value and it is incrementing the group counter number. 
    I want the system to allocate different group number for  each Routing. I want the group number to be unique.
    Thanks,
    Ranjan.

    Dear Ranjan,
    While doing recording CA21. you would pass only the material number and plant (i mean you did recording of CA21 based on material number as well as plant not for routing number (group counter))
    Routing number (group counter) dynamic (In your case Internal number rage has assigned).
    So the Problem is:
    1st record of you internal table update smoothly because you program will pass only material and plant
    group counter (RC271-PLNNR) field is blank, after update 1st record system will regenerates the
    group counter number.
    ones the system updates the data it will generates Group counter number and assign to filed :(RC271-PLNNR).
    after saving the record system will go loop statement of you program. again program will call the call transaction statement with 2nd record of the internal table. call transaction statement pass the material number and plant field at ca21. but group counter number automatically poulated in the screen field because that time system can't be refresh the initial screen of CA21,
    so system will shows previous updated screen ( 1st routing record will show)
    Remove your bdc perform and add this code in your BDC perform.
    *        Start new screen                                              *
    FORM BDC_DYNPRO USING PROGRAM DYNPRO.
       CLEAR BDCDATA.
       BDCDATA-PROGRAM  = PROGRAM.
       BDCDATA-DYNPRO   = DYNPRO.
       BDCDATA-DYNBEGIN = 'X'.
       APPEND BDCDATA.
    ENDFORM.
    *        Insert field                                                  *
    FORM BDC_FIELD USING FNAM FVAL.
       IF FVAL <> SPACE.
         CLEAR BDCDATA.
         BDCDATA-FNAM = FNAM.
         BDCDATA-FVAL = FVAL.
         APPEND BDCDATA.
       ENDIF.
    *                Clearing the Group Counter                                *
       IF FVAL = SPACE.
         CLEAR BDCDATA.
         BDCDATA-FNAM = FNAM.
         BDCDATA-FVAL = FVAL.
         APPEND BDCDATA.
       ENDIF.
    above code: 1st time of call transaction FVAL = space means ( group counter field is blank)
    2nd and rest of the time FVAL <> space. means (previous record group number exists for new call transaction ) so system will be by pass with new record.
    Check with debugging mode. you will come to whats going in you code.
    Even i have go same problem while uploading routing data. i have find out solution after doing my RND.
    Regards,
    Akshath

  • Rate Routing Changes

    Hi All,
    Is there a possibilty to find out the changes made in the Rate Routing of a BOM regarding to Component Allocation over a period of time.
    Regards,
    R. Vijayakumar

    Dear Rajavelu,
    Try the standard report CA60,for task list type R - Rate Routing,include the check box for for all the options under Detailed Change
    documentation for and execute the report for some date range for any material and plant combination,this will satisfy your
    requirement.
    Regards
    S Mangalraj

  • Sequence selection in Rate Routing

    hi,
    In Normal Routing in sequence overview  - extras - new entries we can find the option of creating a Parallel or Alt sequence, but in Rate routing there is no way to select the type of Sequence. It by default shows Parallel sequence.
    Pl. let me know the step by step proceduer to create a Alternate sequence in Rate routing.
    regards

    Dear Rishi,
    We cant create any alternative sequence for a rate routing.This is one of the difference between routing and rate routing.
    Rate routing supports only standard and parallel sequence.
    If alternative sequence is present in a routing,then at the time of order creation the system gives a pop to select for alternative
    sequence or to skip it and proceed.
    For this under OPL8,for plant order type combination the field sequence exchange should be having value 2 - manual selection.
    Creating production version or sequence in my understanding depends on the business requirement.
    Check and revert
    Regards
    S Mangalraj

  • Rate routing std values not appearing during backflush

    Hi ,
    Rate routing is defined from REM product. The REM profile has check to post activities.
    In MFBF when I try to do assembly backflush the activities are not proposed from rate routing when "Post with correction ".
    What could be the reason for this ?
    Regards
    ShankarR

    Dear Shankar,
    Once after selecting the radio button for assembly backflush>post with correction->click on actual activities and check the rate
    routing details along with the work center,timings etc.
    If you are unable to find the same means,goto KKF6N--->mention the product and plant and click on change mode and click on
    cost calculator button for preliminary cost estimate and save the data,then check in MFBF.
    Regards
    Mangalraj.S

  • Standard routing and rate routing

    Hi All,
    Can someone tell me what tables I should use to get the standard routing and rate routing for the query?
    Thanks
    Edward.

    Dear,
    Yes you are right.
    The main difference between routing and rate routing is you can not create parallel sequence in rate routing CA21 only nothing else.
    There are lot of different opinion on this topic but there is no too much difference in them only we use rate routing in REM and normal in Discrete manufacturing.
    Also check this thread ,
    Difference between routing and rate routing
    Hope clear to you.
    Regards,
    R.Brahmankar