CEWB for Rate Routing
Hi..
I have one query reference to CEWB ,is there any selection criteria for selecting task list type R(Rate Routing) in CEWB.
I have checked the same in CEWB found only Routing,Reference operation set,Inspection plan.
I have checked also op77 but it is bydefault Routings for production & not the rate routing one.
Any suggestions to above issue pl.
Tushar
Hi Anupam,
Thanx for reply...
I have checked the settings which you have mentioned & tried with the selection criteria as you said but not possible with desired result as there are only three task list type selection as mentioned above .
I have also checked OP77 ,I tried to create new work area with usage area "R-Repetitive manufacturing" but it is bydefault comes with Routings for production.
Is there any setting which I couldn't incorporate?
Pl. suggest
Tushar
Similar Messages
-
Dear Sir ,
i need sample program of Rate Routing Tcode CA21..Using BAPI or BDC CALL transcation ...........or tell me the BAPI Function module ....
Pls Help to me ....
With Regards ,
Meena ...Hi,
You can check the BAPI: BAPI_ROUTING_CREATE.
Also you could check the following DI/BI steps in LSMW ( Not sure whether these objects work for Rate Routing Creation):
Object 0170 Routing
Method 0001 Batch input
Program name RCPTRA01
Program type B Batch input
Object 0170 Routing
Method 0002 Direct input
Program name RCPTRA02
Program type D Direct input
But following IDOC could be used for loading Rate Routings:
LOIROU02
You can check the documentation in WE60.
Hope thsi helps.
Best Regards, Murugesh -
Hello All,
Please provide me some refrence for rate routing. How to create & use. I don't know any thing about it. So I need to know from begining of rate routing. Is there any refrence from where I can read & test rate routing
Thanks in advance
Mohit GuptaDear,
Please refer this useful link,
http://help.sap.com/saphelp_erp60_sp/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm
You have to proceeds following steps:
1) CA21 - Create Rate routing
First screen = Material on which you have to create a routing
Plant
Second screen = Usage 1 if you create routing for production purpose.
Status 4 release general
Enter
2) Now go on to application tool bar and select operation
Here you have to enter work center, control key and description
For eg. w/c 1 plant pp01 description
w/c 2 plant pp01 description
plant pp99 goods reciepts
3) Now select the component allocation
Select the material here and click on to the new assignemnt for assign the operation seqence on to the material.
4) SAVE
Now routing is create with routing group number
Regards,
R.Brahmankar -
Dear Team,
For creating the rate routing do we have any standard program suggested by SAP for uploading the same.
If so what is the template followed and code for the BDC upload on rate routing transaction code CA21.
Regards,
Deepak GSHi Deepak,
LSMW should work with the transaction. We have done it through LSMW. As per my knowledge no standard BAPI exista for rate routing.
Refer below links for LSMW.
http://www.sd-solutions.com/documents/SDS_LSMW.html
http://www.sd-solutions.com/documents/SDS_LSMW_Batch_Recording.html
LSMW FOR HR
lsmw
LSMW??
Re: lsmw
Regards,
Krishnendu. -
Idoc ROUTING_CREATE01 and rate routing
Hello,
Is it possible to create rate routing with idoc ROUTING_CREATE01, so far I can create only simple routing.
Thanks for your answer.Hi,
For rate routing:
use this BAPI: 'BAPI_ROUTING_CREATE' for creating Rate Routing
Regards,
Kumar(Reward if helpful). -
Defect Recording for operations in rate routing
Dear Masters,
How to record the defects for the operations defined in rate routing of a material once the inspection lot in generated using TCode MFPR in repetative manufacturing?
Thanks & Regards,
Ram KulkarniYou mean to say tan is available in rate routing itself ?
-
Pro & cons for Routings vs Ref Rate Routing
One of our plants uses Reference Rate Routings (CA31, 32, 33). Many colors of vinyls are processed the same way producing many individual material numbers. So one Ref Rate Routing has many Materials assigned to it.
Recently an engineer in other plant found that he can do the same material assignment on Routings (CA01, 02, 03)
What are the pro & cons for Routings vs Ref Rate Routing when doing Material assignments
thank you for any information you can provide
AltheaDear,
Reference routing is usually used for calling the set of operation can be used manr routings so it is reusage.
Suppose a cleaning operation is having 5 operations. This is used in may places. Then create a routing and call this operation set wherever required. Hence you need not repeate defining the operations in each time.
For more details...see below link
http://help.sap.com/saphelp_47x200/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm -
Dear All,
We were trying to carry out mass changes to Rate Routing,
by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
Regards
MithunDear Mithun,
In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
BDC's or LSMW's.
Regards
Mangalraj.S -
Advertise implicit-null label for static routes
Hi, I want to ask if there is any way to change the label or stop adveritise label for an static route. Normally LDP advertises an Implicit Null label for directly connected routes. We want to do similar thing for static routes.
We need to do this is because somehow we need to do rate-limit on the PE interface connecting to the core network instead of the interface connecting to CE. As the incoming packets still got labelled, the rate-limit is skipped. So we want to stop the PE creates label for the static routes or advertises them with implicit null label. Thanks in advance.Calvin,
Bear in mind that if you only enter the "no mpls ldp advertise-label" command, LDP will stop propagating all labels, which might not ba what you want. If you selectively want to propagate certain labels, then you need to also use "mpls advertise label for " as Shivlu suggested.
Regards, -
Problem in automatic rate routing selection
Dear all,
I am using REM and according to that I have maintained REM profile in Material Master, rate routing, line hierarchy, production version, but the time of scheduling of planned order, system is saying " The automatic selection of routing is not possible".
I suppose I am missing some configuration.
As also, I have already done the same scenario in other server.
If u have any suggestion then pl. forward me.
Thanx,
DasDear SAP PP,
1.Check whether have you included the check box for REM allowed indicator in the production version.
2.Also ensure you have assigned the rate routing option for detailed planning and the correct group and
group counter in the production version.
3.Check the valdiity dates of the rate routing,try to create a planned order in some advanced future date
so that your rate routing is valid for the planned order start date.
4.Check the status and the usage of the rate routing.
Regards
Mangalraj.S -
Problem during Rate Routing Upload using BDC.
Dear Sir/Madam,
I am uploading Rate Routings using a BDC program which is working perfectly but having a single problem.
In the initial screen of the transaction CA21(Create Rate Routing), I need to enter only the Material Number and its Plant and all the other fields should be left blank.
But, here the group number field is automatically getting filled with the previous value and it is incrementing the group counter number.
I want the system to allocate different group number for each Routing. I want the group number to be unique.
Thanks,
Ranjan.Dear Ranjan,
While doing recording CA21. you would pass only the material number and plant (i mean you did recording of CA21 based on material number as well as plant not for routing number (group counter))
Routing number (group counter) dynamic (In your case Internal number rage has assigned).
So the Problem is:
1st record of you internal table update smoothly because you program will pass only material and plant
group counter (RC271-PLNNR) field is blank, after update 1st record system will regenerates the
group counter number.
ones the system updates the data it will generates Group counter number and assign to filed :(RC271-PLNNR).
after saving the record system will go loop statement of you program. again program will call the call transaction statement with 2nd record of the internal table. call transaction statement pass the material number and plant field at ca21. but group counter number automatically poulated in the screen field because that time system can't be refresh the initial screen of CA21,
so system will shows previous updated screen ( 1st routing record will show)
Remove your bdc perform and add this code in your BDC perform.
* Start new screen *
FORM BDC_DYNPRO USING PROGRAM DYNPRO.
CLEAR BDCDATA.
BDCDATA-PROGRAM = PROGRAM.
BDCDATA-DYNPRO = DYNPRO.
BDCDATA-DYNBEGIN = 'X'.
APPEND BDCDATA.
ENDFORM.
* Insert field *
FORM BDC_FIELD USING FNAM FVAL.
IF FVAL <> SPACE.
CLEAR BDCDATA.
BDCDATA-FNAM = FNAM.
BDCDATA-FVAL = FVAL.
APPEND BDCDATA.
ENDIF.
* Clearing the Group Counter *
IF FVAL = SPACE.
CLEAR BDCDATA.
BDCDATA-FNAM = FNAM.
BDCDATA-FVAL = FVAL.
APPEND BDCDATA.
ENDIF.
above code: 1st time of call transaction FVAL = space means ( group counter field is blank)
2nd and rest of the time FVAL <> space. means (previous record group number exists for new call transaction ) so system will be by pass with new record.
Check with debugging mode. you will come to whats going in you code.
Even i have go same problem while uploading routing data. i have find out solution after doing my RND.
Regards,
Akshath -
Hi All,
Is there a possibilty to find out the changes made in the Rate Routing of a BOM regarding to Component Allocation over a period of time.
Regards,
R. VijayakumarDear Rajavelu,
Try the standard report CA60,for task list type R - Rate Routing,include the check box for for all the options under Detailed Change
documentation for and execute the report for some date range for any material and plant combination,this will satisfy your
requirement.
Regards
S Mangalraj -
Sequence selection in Rate Routing
hi,
In Normal Routing in sequence overview - extras - new entries we can find the option of creating a Parallel or Alt sequence, but in Rate routing there is no way to select the type of Sequence. It by default shows Parallel sequence.
Pl. let me know the step by step proceduer to create a Alternate sequence in Rate routing.
regardsDear Rishi,
We cant create any alternative sequence for a rate routing.This is one of the difference between routing and rate routing.
Rate routing supports only standard and parallel sequence.
If alternative sequence is present in a routing,then at the time of order creation the system gives a pop to select for alternative
sequence or to skip it and proceed.
For this under OPL8,for plant order type combination the field sequence exchange should be having value 2 - manual selection.
Creating production version or sequence in my understanding depends on the business requirement.
Check and revert
Regards
S Mangalraj -
Rate routing std values not appearing during backflush
Hi ,
Rate routing is defined from REM product. The REM profile has check to post activities.
In MFBF when I try to do assembly backflush the activities are not proposed from rate routing when "Post with correction ".
What could be the reason for this ?
Regards
ShankarRDear Shankar,
Once after selecting the radio button for assembly backflush>post with correction->click on actual activities and check the rate
routing details along with the work center,timings etc.
If you are unable to find the same means,goto KKF6N--->mention the product and plant and click on change mode and click on
cost calculator button for preliminary cost estimate and save the data,then check in MFBF.
Regards
Mangalraj.S -
Standard routing and rate routing
Hi All,
Can someone tell me what tables I should use to get the standard routing and rate routing for the query?
Thanks
Edward.Dear,
Yes you are right.
The main difference between routing and rate routing is you can not create parallel sequence in rate routing CA21 only nothing else.
There are lot of different opinion on this topic but there is no too much difference in them only we use rate routing in REM and normal in Discrete manufacturing.
Also check this thread ,
Difference between routing and rate routing
Hope clear to you.
Regards,
R.Brahmankar
Maybe you are looking for
-
when I start my laptop it loads a third of the way and shuts down automaticallyI've tried to safe boot, repairing discs and clearing RAM but nothing has worked. basically I've come to the final step of having to a erase my hard drive and reinstall mo
-
Transfering data from bsis table to file on application server
Hi Gurus, In my program iam selecting data from bsis table and transferring to file on the application server. Code: Tables: BSIS. data: file type rlgrap-filename. Select * from BSIS into BSIS. Open dataset output in text mode encoding default. Trans
-
Iphone not recognizing charger
My iPhone 5 stopped recognizing the charger about a week ago unless I shook it around or flipped the charger (the part that goes into the phone). I took it to the Apple Store, where an employee removed some lint and claimed it would work. Unfortunate
-
URGENT: Database Difficulties
Hi there No too long ago I purchased Dreamweaver 8 and I am currently designing a website for an organisation but I am having diffculties setting up the Access Database..I have no problem with connecting Dreamweaver 8 to the database. So in order to
-
ORA-00957: duplicate column name for multi-form page
I have read numerous threads on this but I think I am missing something. I have two forms on one page, each based on a separate table. They each have one column in common which is why I believe I am getting this error. However, I do not understand wh