CF MX and Daylight Savings Time Change

Next year 2007, the Daylight Saving day (chaning the clocks
for spring and fall) will be changing. The Spring date will be a
month earlier and the fall date a month later then it has been for
years.
How will the Cold Fusion Server for MX 7+ handle this? Will
it use the server time or use the internal CF Server clock?
Thanks.

My problem is that now CFMX 6.1 thinks that it is 8 hours
later in the day
than it really is (it is stuck on GMT now) and I am unable to
get CFMX to
acknowledge the operating systems clock. :-(
"GregK" <[email protected]> wrote in message
news:eord35$5mq$[email protected]..
The technote for this issue:
http://www.adobe.com/cfusion/knowledgebase/index.cfm?id=d2ab4470
has
another
link to a technote which addresses null pointer exceptions
after upgrading
the
JVM on CFMX 6.1 systems:
http://www.adobe.com/cfusion/knowledgebase/index.cfm?id=kb400232
The hotfix
described in that technote gives a fix for CFLDAP and
CFSERVLET tags after
the
new JVM is installed.
The important thing to note is that Adobe feels that
daylight savings time
will indeed present a problem for ColdFusion applications.
Unfortunately,
the
problems are not explained in any detail. I can guess that
functions like
DateDiff( ) may calculate incorrect values when spanning the
changed weeks
of
daylight savings time. As others have suggested; however,
simply retrieving
the system time, i.e. Now( ) function may not be affected as
long as the
operating system clock is set correctly.
Hope that helps.

Similar Messages

  • E-Load/e-ME and Daylight Savings Time Change

    If you are using e-TEST suite versions 8.10 or older, please see the following knowledge base article on updating your JRE for e-Load and e-Manager Enterprise.
    http://qazone.empirix.com/entry.jspa?externalID=201&categoryID=15
    (you must be logged into QAZone to view this link)
    It is recommended that e-Load and e-Manager Enterprise customers update the JRE on their e-Load and e-ME server machines using the SUN JRE patch referenced in the article.
    e-TEST suite version 8.20 which is releasing this week does not require any update.
    Message was edited by: jfernandes

    My problem is that now CFMX 6.1 thinks that it is 8 hours
    later in the day
    than it really is (it is stuck on GMT now) and I am unable to
    get CFMX to
    acknowledge the operating systems clock. :-(
    "GregK" <[email protected]> wrote in message
    news:eord35$5mq$[email protected]..
    The technote for this issue:
    http://www.adobe.com/cfusion/knowledgebase/index.cfm?id=d2ab4470
    has
    another
    link to a technote which addresses null pointer exceptions
    after upgrading
    the
    JVM on CFMX 6.1 systems:
    http://www.adobe.com/cfusion/knowledgebase/index.cfm?id=kb400232
    The hotfix
    described in that technote gives a fix for CFLDAP and
    CFSERVLET tags after
    the
    new JVM is installed.
    The important thing to note is that Adobe feels that
    daylight savings time
    will indeed present a problem for ColdFusion applications.
    Unfortunately,
    the
    problems are not explained in any detail. I can guess that
    functions like
    DateDiff( ) may calculate incorrect values when spanning the
    changed weeks
    of
    daylight savings time. As others have suggested; however,
    simply retrieving
    the system time, i.e. Now( ) function may not be affected as
    long as the
    operating system clock is set correctly.
    Hope that helps.

  • ICal and iCloud Calendar Appointments Problems Following Daylight Savings Time Change

    This morning following the daylight savings time change, I noticed that some but not all of my appointments had shifted forward an hour. Strangely enough, some are correct on the iCloud calendar but are still not correct in iCal. Is anyone else experiencing this problem? Here's another anomaly: the info panel is showing the correct time while the calendar view is not! I have turned off time zone support in both iCal and the iCloud calendar. It's so frustrating when you rely on these tools--especially for appointments--and you find that you can't trust them to be accurate!

    samdale67,
    Have you had any luck fixing this problem yet?
    I just noticed today that my iCloud calendar is consistently one hour behind my iPhone4s calendar. It's as if my iCloud calendar never got the Daylight Savings Time Spring Forward message. The iPhone, on the other hand, updated to DST right on schedule. It's annoying because I'm starting to use my iCloud calendar and would like the time change to be applied.
    DaveStump 

  • Multiple instances spawned after daylight savings time change

    This is a known issue and there is an SAP Knowledge Base Article created on this issue:
    1448881 - Multiple instances spawned after daylight savings time change
    Below is the information from the SAP Knowledge Base Article:
    Symptom
    Scheduled reports that are supposed to run once a day, run multiple times.
    Duplicate instances are being created.
    Environment
    BusinessObjects Enterprise XIR2 SP5
    BusinessObjects Enterprise XIR2 SP5 + FP5.x
    Reproducing the Issue
    A report is scheduled to be run on a daily basis - this is a Recurring schedule.
    Normally the report runs once a day, at a particular time.
    After Daylight Savings Time change, the report runs at the specified time, but immediately after the successful instance, another instance is spawned.
    Many more instances spawn after each instance completes.
    Cause
    This is a known issue: ADAPT01318487. This issue is because of DST and how our code handles this change.
    Resolution
    There is currently no known fix for this issue. There is however a script that can quickly resolve the problem.
    The issue it seems is related to Daily recurring schedules.
    What this script will do:
    it will run a query to display all your DAILY Recurring jobs
    you will have the option to choose your jobs and reschedule them by 1 hour
    you will then highlight the same job and change them back by 1 hour
    by modifying the schedule times, you are modifying the schedule itself and this will keep the issue of duplicate instances from occurring.
    Exact Steps to Complete:
    Stop the Job Servers.
    Double click on the .hta file.
    Change the System Name to that of your CMS name.
    Add the Administrator's password.
    Click Logon.
    Click List All Recurring Instances.
    Select All.
    Make note of what it says in: Schedule Selected Recurring Instances: Should be 1 hr earlier.
    Click Reschedule Selected Recurring Instances.
    Choose All instances again and change Schedule Selected Recurring Instances to 1 hour Later.
    Click Reschedule Selected Recurring Instances.
    Now start your Job Servers.
    The issue should not occur again.
    The Script is attached here, but please review the SAP Knowledge Base article 1448881 as well

    Hi Nicola,
    - The multiple spawned instances issue ONLY affects XI3 SP3+ only.  For XI3 SP1 and SP2 all Fix Pack levels this is not an issue as it was introduced as a problem in SP3.
    - 1568239 notes the Java version and can apply to all O/S environments and is updated to reflect that.
    If you are located in Europe you can also apply the patches in advance of the DST change to avoid the problem.  If you are in Americas at this point utilizing the clean up scripts for this year is the approach needed to clean up the spawned instances and reschedule the existing schedules.
    Thanks,
    Chris

  • HOw do I fix the fact that ical jumped (almost) all my events post daylight savings time change an hour ahead?

    A few weeks ago I noticed that everything past 3/8 was an hour ahead, and I assumed once daylight savings time changed it would all jump back. It hasn't, and I don't know how to continue scheduling events or if I should change them all.  I read that (a few years ago) the suggestion was give it 24 hours to adjust??

    I think this problem is more complex. Background - UK clocks went back at the end of October; the USA went back one week later. I am in the UK and my Outlook calendar contains appointments created in the USA.
    Someone in the USA created a recurring appointment before any clocks went back. In Outlook everything is correct. The meeting times are the same each week except for the one week between the two clock changes when, quite correctly, the meeting shows up one hour earlier. When I sync with my iPhone, the meeting shows at the same time every week regardless - this is incorrect.
    Someone in the USA created a recurring appointment in the week after the UK clocks went back but before the USA clocks did. Outlook correctly shows the first occurrence as one hour earlier than all the following occurrences. Unfortunately - and this is the really nasty bit - the iPhone shows ALL the appointments one hour earlier than they should be. The only one that is correct is the first one.
    This is a nasty bug and something that Apple needs to fix.

  • How to determine if daylight savings time change will occur automatically

    Can any one assist me in determining if a daylight savings time change will occur automatically, or if it will require manual intervention

    Your operating system controls your "clock" and any running application only "uses" what it is told.
    Not a QuickTime issue. It's up to the user to set the clock.

  • JRE Update regarding Daylight Savings Time changes

    Hi,
    Is there a JRE Update to be released anytime soon dealing with the US Daylight Savings Time changes?
    A similar update was released for the DST changes in Australia (JRE 1.5.0 Update 6). The link to information page is:
    http://java.sun.com/developer/technicalArticles/Intl/AusTimeZone/
    If there is an update coming for US, when would it be?
    Thanks,
    Vinay.

    If you had read through the bugs related to the one
    whose link was in the post just before yours, you
    would have seen this one:
    http://bugs.sun.com/bugdatabase/view_bug.do?bug_id=639
    1777
    which appears to answer your question.If I read the bug report right, a fix was made to JDK 1.3.1 to handle the Australia situation. Are you pointing me to the workaround or a potential fix for the US timezone issue?
    The bug report says: "This fix is based on tzdata2006a." Does this tzdata file include an entry for the March 2007 onwards change in the US?
    -Raj

  • 2007 Daylight Savings Time Changes

    What, if any, effects will the 2007 changes to US daylight savings time have on the operation of the LabVIEW 7 Express development environment and deployed applications created with it?

    I believe the answer depends on the OS the application runs under.
    If MS has there act together and the machine in question has recieved updates, there should be no issue.
    If you are running Unix (or a variation o such), a patch must be applied (at least that was the story my wife gave for working all night Saturday night).
    I can not answer this Q for Mac or LV-RT running under Pharlap.
    Ben
    Message Edited by Ben on 02-27-2007 10:24 AM
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • CF MX and Daylight Savings Time

    Hi. We have ColdFusion MX Version 6,1,0,83762 installed on
    our Windows 2003 server. Will we have any issues with the product
    and the Daylight Savings Time coming up on March 11? Is there a
    required patch for this change? Thank you.

    This has been discussed at length in
    http://www.adobe.com/cfusion/webforums/forum/messageview.cfm?forumid=1&catid=7&threadid=12 44419&highlight_key=y&keyword1=dst

  • CUE timezone and daylight savings time

    Hi,
    Having issue where CUEs don't seem to be adjusting for daylight savings time. Timezone is set correct to EST but is a hour off because its daylight savings time now. The router and CUE are configured to use same NTP server and router has summertime setting and adjusts for DST fine and has correct time but CUE is a hour behind, like it is not doing DST.
    Were on version 2.2(2) of CUE software.
    This is also in indiana where the laws changed recently so maybe that has something to do with this.
    Any ideas?

    Very likely due to the change in Indiana. A workaround would be to change the timezone to an EST zone that observes DST such as America/Louisville (Eastern Time - Kentucky - Louisville Area).
    Hope this helps.
    Brandon

  • COREid and Daylight Savings Time for 2007

    Do COREid or any of its components require any special fix in order to comply or function properly with the new Daylight Savings Time for 2007?
    Background:
    In August of 2005 the United States Congress passed the Energy Policy Act,
    which changes the dates of both the start and end of daylight saving time
    (DST). When this law goes into effect in 2007, DST will start three weeks
    earlier (2:00 A.M. on the second Sunday in March) and will end one week later
    (2:00 A.M. on the first Sunday in November) than what had traditionally
    occurred.
    Thanks,
    Craig
    Message was edited by:
    user557097

    We have experienced many problems with DST and COREid in the past; most of them resulting in hung Access server and unavailability. I don't know if it's because we have components distributed across multiple time zones or what. Our plan is to have someone available at the time change to cycle the services (and maybe the server as a whole) and do a health check after the fact. I hope this helps.
    --Aaron                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

  • All-day calendar entries and daylight savings time

    Since changing to daylight savings time, whenever I change the date on an all-day calendar entry, my iPad (but not my iPhone) changes the one-day calendar entry to a two-da calendar entry. How do I correct this?

    Dates are represented internally with a long that represents the number of milliseconds past some fixed point. Timezones do not affect this.
    I'm assuming you're getting your dates as java.sql.Date
    You should then build a Calendar (see GregorianCalendar) and call setTimeZone() with your timezone without daylight savings

  • Cron job and daylight savings time

    What is the behaviour of cron when the time changes from daylight savings time to standard time and vice versa ?

    This has been discussed at length in
    http://www.adobe.com/cfusion/webforums/forum/messageview.cfm?forumid=1&catid=7&threadid=12 44419&highlight_key=y&keyword1=dst

  • Having problems setting alarm time since daylight savings time change today

    Since the change to Daylight Savings time this morning, I am unable to set my alarm correctly.  I set it to 2:40 a.m. but the time on the alarm shows 3:40 a.m.  I have all the proper settings correctly done.  I have powered down the phone numerous times, and still the same result. Any assistance would be greatly appreciated.

    I've cleared the clock cache, powered off the phone and the problem remains the same. I have the Automatic date & time checked, and the same for Automatic time zone (GMT-5:00, Eastern Daylight Time).  I have even unchecked both and still get the same result.
    What is weird, I can set the alarm for any other time, but unable to set it at 2:40 a.m. When I do this, it sets to 3:40 a.m.  Any time that I set from 2:00 a.m. to 2:59 a.m. goes to that time setting in the 3 a.m. time.

  • Has anyone had problems in v5.0a of Iplanet calendar installed on a Sun box with creating events and daylight savings time?

    Events created around 4/6/2002 at 8pm get created with the wrong time (9pm) and there are several other creation and display problems tied to Daylight Savings in April and October. Version 5.1 of the software seems to fix that but we are looking for a fix until we can upgrade. We have been using Windows systems to access the calendar.
    Thanks.

    We have not seen exactly this, but many users appointments are lining up in the wrong time slots. Also, when scheduling, the time display is off by an hour. We have found what looks like a temporary fix.
    We noticed that the problem only affects users who have the start of the week set to Sunday (when daylight savings time started). Setting the week to start on Monday fixed our display problems (you can do it in the users, options section).
    I am placing a support call w/SUN.

Maybe you are looking for

  • PackageMaker Metapackages Command Line

    Hi everyone, I'm trying to create a .pkg via PackageMaker command-line. I'm using 3.0.4 PackageMaker on SnowLeopard. My goal is to create a sort of an "online installer" via command line (since it will be an automatically generated installer). I have

  • Bill due date

    Can I choose my own billing due date?!

  • IPhoto Titles in iDVD

    If I add titles in an iPhoto slide show, they appear in the upper left hand corner of each slide. When I send the slide show to iDVD, the titles are outside of the TV-safe area and do not show on the DVD when played on a TV. Any suggestions as to how

  • Using an 11" for development work

    I was wondering about the usability of the 11" for development work (I'd go the 1.6 with 4gig) I will generally work with a monitor, but I'm wondering about the performance given the slower CPU. Has anyone tried Eclipse? When a browser, etc, is runni

  • Is anyone else having problems with multiple displays?

    I have to set my display arrangement on every reboot every since Mountain Lion (clean install). I have 3 24" Apple Cinemea Displays connected to 3 Nvidia GT120s. I have a friend with a Mac Pro as well and 3 displays having the same problem. It doesn'