Change of price control from "s" to "v" in the material master

Dear All,
Due to business requirement, we would like to change the price control for FERT items in the material master from "S-Standard Cost" to "V-Moving Average Price". This change we would like to do only at sales plants (Non-Manufacturing Locations). Very few materilas are having the stock on the date of the price control change
I would like to know is there any SAP Note / Any of you are having such experience? Please arrange the same.
Regards
Anilkumar

Hi,
   i am not sure about any program but through MR21 you can change tthe Price in material master.
If stock is available system will hit to closing stock of the material for price change in case stock is not available it will hit price difference gl account.
Regards,
Sankar

Similar Messages

  • How to change price determination form blank to 2 on the material master?

    Hi expert,
    I had a difficult problem:
    Material ledger is active in our company Normally, in material master data accounting view 1, we always set price determination 2 and price control V. Price determination 2 is set default if creating a material master by entering no price determination.
    Today, my Key user came accross a prblem: In our company, for batch processing of material master, we made a mistake that  price determination were set blank (neither 2 or 3, In MBEW table, field MLAST is blank) when inputting material master. all data were imported without error warnings. But ,acturally, all materials' price determination in accounting view 1 was set Blank! This is a big problem that we can not release standard price or do any other price changing~~~.
    I have used CKMM to try to change price determination. But it failed: it can not identify this situation because old price determination must be set a word rather than blank in CKMM.
    I don't know any other solutions to change price determination from Blank into 2.
    Hope you can help me out. Very thankful!

    Hello,
    I have the same problem with a type material, the material ledger is active but the price determination were set blank.
    I already checked the OMX1 transaction... and all configurations of ML and type material and apparently is ok.
    Has anyone knows the solution?
    (maybe with applying a program or SAP note).
    Please help.
    Regards,
    Eliana

  • Re: Changes in the material master.

    Hi guru's,
    The vendor supplies the material 1 box which consists of 20 pieces, we known that in the material master the unit of measure for alternate UoM is maintained as 10 pieces (in additional data tab). If I make changes as the receipt from vendor as 20 pieces instead of 10 pieces already maintained, what are the consequences I face. its ur pl.
    thanks
    tuljasingh.

    Hi,
    Once you make changes in material master ( from 10 to 20) then when you make the GR then system will make GR for 20 quantities (After makeing changes in MM you have to again change the conversion in PO in quantities tab). 
    So after making GR, quantities & stock value will be updated as per data mentoned in PO conversion.
    If you make any new PO then system will pick bydefaut the conversion in PO from the material master.(i.e. 20 qty for 1 pc)
    Regards,
    Umesh Agrawal
    Edited by: Umesh Agrawal on Dec 8, 2008 10:59 AM

  • Tracking changes in the material master

    Hi All,
    I have a material master 123456.
    In this I have batch_class  023 type. I have a characteristic COLOUR which is assigned to the batch_class.
    For this characteristic there are 2 options RED and BLACK.
    When I created the material master I had assigned RED colour. I did some transaction also.
    After 2 days when I went inside the material master, I found BLACK insteadof RED.
    I want to know who did this changes? I am not able to track this from the mm03--material master changes.
    How do i track the changes?
    Regards,
    Narendra Bora

    in MM04 i think you may not be able to find the classification changes.
    i wouls suggest you to activate change logs on AUSP table a prerequisite of change logs is activating multi object assignments. This entails running program RCCLUKA2 which converts KSSK and AUSP to internal number (more information on the program/procedure can be found in the documentation of the program).
    this can help you to find the change log on the classificaiton values.
    Pravin Mukkawar
    TCS canada

  • Change Special Procurement in the material master?

    Hi,
    How can I change Special Procurement in the material master? Right now Special procurement field is greyed out and would not allow me to change it?
    Sincerely,
    Ketan

    Hi,
    Have you used any MRP profile.
    If so in transaction MMD2 for MRP profile, choose the special procurement type field & change the selection from display mode.
    Now in transaction mm02 the spl procurement field can be entered/changed.
    Regards,
    Senthilkumar SD

  • "Conditions" button at the material master - Change the related condition

    There is "Conditions" button at the material master ("Sales: sales org. 1" tab). We can make condition record of PR00 by this button but at our system the condition for the material price is different (it isZPR0 at our system). How can I change the related condition type as ZPR0 for this button?
    Thanks in advance for the answers....

    Check program LMGMMF0Q and FUNCTION SD_COND_GET_DEFAULT_CONDITION for details.
    It looks it is hard coded, but they also mention that Via a user exit (business transaction event), the
    default KSCHL and KOTABNR can be set.
    Regards,

  • Change Excise Duty Group on the Material Master

    What are the steps to change the excise duty group in the Material Master (MARC- OITAXGRP)? I am getting a message 'Excise duty tax group cannot be changed due to posted stock'.
    We realised some of materials have been setup with incorrect excise duty group at a few plants and there have been a lot material movements posted (101s, 301s). But is the best way to fix this?
    Do we have to reverse all the documents or is it good if we zero the inventory and then it will allow us to change?
    Is a direct table update of the table an option?
    Please advice.
    Thanks in advance
    Srini

    you can't change the excise duty group if there is a stock for the material.
    there is a steps that you need to follow if you inisist to change:
    - zerorize the stock in the current period (all stock types)
    - zerorise the stock in previous period (all stock types)
    - then only you can change the excise duty group.
    these steps can only be carried out when the two posting period are still open, so normally you should do it at month end.

  • Units from the additonal data tab of the material master

    HI Gurus,
    can anybody please tell me how we can pull the units from the units of measure tab of the additonal data data tab of the material master?
    Thanks
    Anusha

    Hello,
    Are you asking about the Table where you can see the entry for UOM in Material Master?
    If this is your question then answer is It is MARA1 & MARM where you can see the UOM.
    regards,
    Prashant Rathore.

  • Availability Check Changed on the Material Master Update Existing Orders

    I need to know if there is a way to update existing orders once changes have been made to the material.  Currently the only way that I know of is to go into individual orders change the plant save then change it back to the original plant on the order then the changes take effect.  How can I achieve this without touching every order individually.  Is there something to mass update existing orders to take a new snapshot of the material master settings for a material.

    Try with t.code VA05 - Open sales order list.
    Execute this list. In the output, sort the data by plant. Then go to menu Edit -> mass change -> new plant. Change the plant for group of sales orders that have similar plants. Then again do the same thing to bring the previous plant in the sales orders.
    This can help reduce the time instead of going one by one.
    Regards,

  • Default Storage location from the Material master

    Can we default the storage location from the material master into the reservation line item in trasaction MB21?

    enter the production storage location in material master MRP2 view.
    Edited by: Jürgen L. on May 7, 2008 6:52 PM

  • RMDATIND program - used for change the Material Master

    Hi Experts,
      Could please confirm whether using RMDATIND program can we change the Material master data?...
    Thanks
    R P R kumaar

    Execute this program and you can find an information icon in the toolbar. press that icon. you will complete documentation regarding this program

  • How to change the base UoM in the material master?

    Hi,
    I want to change the base UoM in the material master for a particular material but I can't change irt with MM02 as system says it has open routings for this material.
    I have set the deletion flag on the routings but still system shows open routings while changing UoM.
    Is there any standard SAP program by which UoM can be changed if open POs, stock etc. are present in the system?
    Thanks,
    Input

    HI
    It is possible to change the Base unit of measure in the following cases:
    1) If there are no stocks of the material in the syatem
    2)If there are no purchase requisitions, purchase orders, or scheduling agreements for the material.
    3)If a purchase order or purchase order item is not being created or changed.
    Procedure for changing is:
    Access the material master record in Change mode.
    Overwrite the old base unit of measure with the new one on any departmental data screen.
    Save the change.
    Thanking you.

  • Change of price control in material master

    Hi, SAP experts,
    We have  business scenario where the procurement type in MRP-2 view of material master gets changed from F to  E that is an externally procured item will be manufactured inhouse.
    In such case in costing view the price control needs to be changed from V to S. If both MAP & std. price  are not identical, system is not allowing to change. Secondly since the item will be manufactured inhouse from now onwards, I have to run the cost estimate & update the master.
    How do I deal with the situation.
    Valuable advice is awaited.
    Regds
    T.S.Shankar

    Hi Shankar,
    When the price control indicator is "V", system will allow changing the Standard price manually through Transaction code MM02.
    Similarly when the price control indicator is "M", system will allow changing the Moving average price manually through Transaction code MM02.
    Hope this clarifies
    Regards,
    Som

  • Change of Price Control indicator.

    Hi,
    Under what conditions a maerial price control indicator can be changed from 'S' to 'V" and vice versa.
    Regards,
    R. Dillibabu.

    Hi,.
    If the material is split valuated you can ONLY change the V to an S on the accounting views that have a valuation type specified.
    You CANNOT under ANY circumstances change the V to an S on the "higher level" accounting view of a split valuation managed material (the higher level accounting view is the one where you do not specify a valuation type.).
    The reason you cannot is due to the fact that each valuation type below this higher level can have a different price and different stock quantities and so the higher level HAS to be an AVERAGE of the lower levels, managed by the system.
    There is no reason why you would ever want to change the higher level view from a V to an S because this view is not used for anything. It simply stores the average price and total value of stock across all valuation types. It is not used in any business transactions.
    Why do you want to change it from a V to an S?
    Steve B

  • Control inspection lot in QM view of material master

    Hi
    this is regarding the setting for control inspection in QM view of material master.
    can anyone give me a prictical example of
    1.  'X' An inspection lot for each purchase order item/order item
    2. '1' An inspection lot for each material document and material
    3. '2' An inspection lot for each material and batch
    If my requirement is to create one inspection lot out of several batches made from a production order( eg, 10 batches are created, only 1st one needed for RR and UD), which one should I use?

    Hi,
    the concept of batch comes when there are some property changes (property in terms of business, that may be quality or something else). if you are confirming production order partially, it means there is something that changes with batches. that's why std sap does not allow to create single lot though all those batches have been created from same production order.
    and henceforth, your requirement cannot be fulfilled by any config. you can try for development.
    partha

Maybe you are looking for

  • DWCS6 - can't edit in Code view {subject edited by moderator}

    In the split view or the design view, I can edit text anywhere on the page but when I click on the code side the text is grey and line number bar turns blue. Is there a way to turn the editing back on in the code view? Working on a PC with a document

  • Jaws.jar location

    Hello I am using SDK1.4.1_02. I thought the jaws.jar was a part of the sdk but when I try to run an app that needs the netscape.javascript package I get the error message that it cannot resolve the symbol. My path setting for Windows XP is: C:\j2sdk1

  • 32 bpc linear workflow -- render different than preview

    Hi, I've been experimenting with a 32 bpc linear workflow and have run into an issue where what I see in the preview window (what I want) looks very different than what is rendered out. The difference seems to be caused by a curves adjustment layer--

  • Reasons to migrate oracle 8.i to 10g

    Hi I'm discussing with a customer which do not want to invest in a migration from 8i to 10g version, because it's application-product end of live is planned for 2010. !! Now I'm looking for positiv or negativ agruments and reasons to migrate from 8i

  • Stopping EEM/TCL script

    How can I stop a pending EEM/TCL script?  I have a Catalyst 4506 version 12.2(40)SG.  The command 'event manager scheduler clear' isn't available.  The output of 'show event manager policy pending' shows: No.  Time of Event             Event Type