Change R/3 client after EP7 / NW2004s double stack installation (UME settin

Hello everyone,
we have install NW2004s with choosing usage type EP as double stack installation (means ABAP and Java) and using SAP R/3 as user persistence. At the install point, only the client 001 is known / can be used. After the installation (EP test runs without errors) we do a client copy to create a ABAP client (100) for usage as CUA/ User store. Later we patch also the ABAP and Java to SP6. Now the UME settings of the EP ar still pointing  to the client 001. But we want to use the client 100. Question is, where should we change the client -> in the Portal, system administration -> system configuration -> UME configuration -> R/3 or in the visual administrator of the WAS ?? Is there some concerns to change this HUME settings ?? (means JAVA will hangs or.... ?? Have any body some experience with this or tips ??
thanks
mario

Hi Luis,
yes this works with no Problems. Following steps you should take / recomended to do:
1. take your ABAP client Copy from Client 001 to your new Client on which now resident your UME
2. look if all EP related User (J2EE_admin, maybe ADS_user..) and also the User which you have created are copy to the new client
3. Go in the Portal to System Administration, SystemConfiguration, then UME Settings, and Change in the SAP Config the Client 001 to your new Client. Before Save take a connection test
4. Aslo you can do this Change with the visual Admin, but we do this in the EP System Admin iView
5. Restart the Portal / WAS
Tipp: If the connection-test faild later (we had this also) it works nevertheless o.k. as long you had the right settings - maybe thats a bug in the UME settings of SPS6
mario

Similar Messages

  • Display name of shared calendar in Outlook clients after name change on the Exchange Server

    I have changed the name of a conference room resource calendar on the Exchange server but the name change is not being reflected in the end user's Outlook clients. I tested a remove/re-add and that worked but I cannot have everyone in the company do this.
    Is there anyway to force the change down to the Outlook clients?

    I don't know for sure, but if this is the case, then it's highly likely that the GUID is used by the client after its first view of the calendar.  From that point on, it appears it doesn't "revisit" the directory for updated names. 
    We'd need Outlook team feedback for confirmation.

  • Problem Creating New Client in SAP NW2004s ABAP+JAVA LINUX

    Hi,
    I installed successfully NW2004s dual stack on linux vmware (SUSE10 enterprise server). This stack give me two client by default, 000 and 001. System gives me default user sap* and password: sapn4sadm
    I want to implement the process for BW enabling, and I want to create New Client for it. I have been used SCC4 to create a new client by logging on with the Client 000, but the problem start, when I log-on with the new client.
    Client: 002
    User: sap*
    Password: pass
    I have tried system default password of sap* , but that also dosen't help.
    It doesn't work, I also try RZ10 to change the value of login/no_automatic_user_sapstar = 0, but I don't find any profile , when I click on the profile field, i get the message "Profile not found". I am not figuring out where I am doing wrong.
    How can I success to create a new Client in which i could log on with sap* user. Please Help me
    All  yours help would be highly rewarded.
    Obaid.

    In order to edit profiles In RZ10, you must first import them.
    Menu: Utilities --> Import Profiles --> Of Active Servers
    After this you can add your parameter.
    One alternative is to edit the profile directly with vi, restart the system, do all client copy tasks, remove the parameter with vi, restart the system again and then import the active profiles.
    the profiles are located in directory
    /usr/sap/<SID>/SYS/profile
    and the filename is something like this
    <SID>_DVEBMGS<instancenr>_<hostname>

  • In Pages 5.1 how do I change the default spacing after a paragraph? I used to be able to do this with the inspector. I no longer see the option.

    In pages 5.1 I was wondering how to change the line spacing after a paragraph.

    This is from the online Pages Help . You have the option to the Help in your Pages Help menu
    Adjust line spacing
    You can adjust the spacing between lines in a paragraph, and change the amount of space before or after a paragraph.
    Click in the paragraph whose spacing you want to change, or select one or more paragraphs.
    In the Text pane of the Format inspector, click Style.
    Click the disclosure triangle next to Spacing, then choose an option from the pop-up menu:
    Lines: Choose when the distance between ascenders (parts of letters that extend to the top of the line) and descenders (parts of letters that extend below the line) should stay the same. The space between lines is proportional to the font size.
    At least: Choose when the distance between lines should remain fixed (but not to overlap if the text gets large).The distance from one line to the next will never be less than the value you set, but it may be larger for larger fonts to prevent overlapping text lines.
    Exactly: The distance between the baselines.
    Between: The value you set increases the space between the lines, instead of increasing the height of the lines. By contrast, double-spacing doubles the height of each line.
    Click the arrows next to the spacing field to set the amount of space for the option you chose.
    To adjust the amount of space before and after the selected paragraph, click the arrows for Before Paragraph and After Paragraph

  • Behaviour change of synchronous reply after patching to 10.1.3.4

    Hi people ,
    i have a process like this:
    [http://www.jettmedia.com/images/630_syncReply10134Test.jpg]
    Normally in 10.1.3.1 , 10.1.3.3.x ; the process will continue after a partial reply, and any fault uncatched in the process would terminate the flow. And any changes to the outputvariable wont change the process response.
    But after patching to 10.1.3.4 im having a different behaviour on synchronous process replys ,
    The process continues and any uncatched fault AFTER A REPLY its raised to the client, and any change to the outputvariable AFTER A REPLY its changed to the process response .
    The worst thing its that is not clear when the response its really sent to the client , ( if i put a wait activity , after the reply, with 1 minute , works as was expected, like in 10.1.3.3 ... )
    I read this new features list from oracle
    http://www.oracle.com/technology/tech/soa/cab/oraclesoacab-webinar-04-22-08bpel_10_1_3_4_update.pdf
    It says that "Faults in a transient process go to the client" , correcting an old problem of lost instances..
    I cant find any other documentation explaining this new beahaviour but for my organization its a huge problem afecting , many production processes, on the patched servers. Because i raised faults to leave the instances marked as faulted on the console as a normal procedure on the flows , but now , if that throw its close enough after a reply(with a unknow criteria or number of activities) its raised to the client :S
    Thanks for any help , by now the workaround to keep the same behaviour its: WAIT after every reply :S :S !!
    Greetings
    Dam

    Yes its a fire and forget pattern, thanks for the suggestion, il. try it ...
    but its difficult to refactor several flows just for patching , you have any idea if this change after upgrade to 10.1.3.4 its normal ? this is an expected beahaviour ?
    Thank you very much again

  • Change default master client of Portal (ABAP+Java system)

    Hi,
    I change property <b>ume.r3.connection.master.client</b> in Visual Administrator - <Server> - Services – UME Provider from 000 to my own client, then update & save the value & reboot the server. But when I log to Portal the system still use client 001.
    The value is updated with new value when checking Visual Admin again.
    I also restart SAP system but nothing helps.
    I want the portal to use my own client, not 001.
    Any idea to hep?
    Thanks,
    Toan Do

    hi, did you implement this steps?
    Please execute the following steps in the given order.
    Perform a client copy as it is described in the installation guide. Make sure that you use client 001 as source client and profile SAP_UCUS ! Set the parameter "login/system_client" to the new client in the default profile. Check in the target client that all EP users and the j2ee_admin user exist after copy (transaction SU01).
    Change UME master: To do this start either the 'offlinecfgeditor' shell script or logon to the Visual Administrator with the j2ee_admin user and browse to the 'Configuration Adapter' service. Navigate to 'cluster_data -> server -> cfg -> services' and edit Propertysheet "com.sap.security.core.ume.service". Change Property "ume.r3.connection.master.client" to the new client. Save and restart the J2EE Engine.
          Note: Changing the UME master in this way is only possible after a new installation ! For more information please refer to the documentation:
          http://help.sap.com/ -> SAPNetWeaver -> SAPNetWeaver 2004s -> SAP NetWeaver by Key Capability (Administrators's Guide) -> Security -> Identity Management -> User Management Engine -> UME Configuration -> UME Data Sources -> Preconfigured Data Source Combinations -> SAP NetWeaver AS ABAP User Management as Data Source-> Changing the AS for ABAP Backend System .

  • Every time I turn my mac off, the desktop background changes. It always returns to the same picture, which was the second or third thing I changed my desktop to after getting my mac.

    Every time I turn my mac off, the desktop background changes. It always returns to the same picture, which was the second or third thing I changed my desktop to after getting my mac. I have background switching unchecked in my preferences, and I have never selected it as an option. Also, when I go to my preferences, it will show the icon of the picture I changed it to, even though the desktop itself has switched back.

    I would start with some basic troubleshooting.
    REPAIRING DISK PERMISSIONS -
    NOTE: refer to article "About Disk Utility's Repair Disk Permissions feature" found here http://support.apple.com/kb/ht1452 - for the actual apple article on these step. ----
    - click finder in the bottom dock, and in the window that opens, select applications in the left column - scroll through until you see the 'Utilities' folder and double click to open it.  Then double click on 'Disk Utility'
    - When prompted to select a disk volume or image, select the 'Macintosh HD' in the left column
    - ensure the the "first aid" tab is highlighted blue in the middle of the screen
    - click the button at the bottom that says 'Repair Disk Permissions'
    - this process will take a few minutes to run.  It will indicate it's done, by scrolling to the bottom of the "details area" displaying 'Permissions repair complete'
    Dan Frankes has written an excellent article for Macworld on "Permissions" and the need to repair them - see - http://www.macworld.com/article/52220/2006/08/repairpermissions.html.    Another good web site is - http://www.thexlab.com/faqs/durepairfns.html.
    REPAIRING DISK - About OS X Recovery - http://support.apple.com/kb/HT4718.
    - restart your computer hold down command + R keys on the keyboard to boot you into Lion / Mountain Lion Recovery mode
    - select english as your main language then the continue arrow
    - select "Disk Utility" on the resulting screen then 'Disk Utility' ---
    - When prompted to select a disk volume or image, select the 'Macintosh HD' in the left column
    - ensure the the "first aid" tab is highlighted blue in the middle of the screen
    - click the button at the bottom that says 'REPAIR DISK' .......NOT "Repair disk permissions"
    - this process will take a few minutes to run.  It will indicate it's done, by scrolling to the bottom of the "details area" displaying "The Macintosh HD appears OK"
    If you get any other message OTHER than "The Macintosh HD appears OK", like "the Macintosh HD was repaired successfully" run the "Disk Repair" again, until it displays  "The Macintosh HD appears OK".
    Once done, restart the computer as normal

  • How to get client side validation for double range and double field in stru

    Hi,
    I have achieved client side validation by using <html:javascript formName=""/>
    All fields shows client side validation but double field and double range field is not shows client side validation but shows server side validation.
    I am using Liferay jboss server.
    Please tell me a way to achieve client side validation for double field and double range.
    Thanks & Regards,
    Brijesh Baser

    I see in the query component there is a QueryListener and a QueryOperationListener. Have you tried letting Jdeveloper create methods for these in some backing bean, and putting in some debug code to see when these methods run? I would think one of them could very well be used to validate the input, somehow; if the input were bad you could just raise an exception and pass your error message, I bet.
    If not...
    I am pretty sure that there is an appendix in the Fusion Developer's Guide for Forms developers turned to Java...you might look at what it says for post query. I know in the 10.1.3.0 equivalent documentation, they gave reference to a method in the ViewObject which fired for each record after a query was run. You could definitely intercept this query return from there. In fact doing something like this may be something like what Frank N. was intending when he mentioned ViewObjects "validation". Not sure though. I am still learning what new features there are in 11g adf/bc.
    Good luck.

  • Can we change the alternative COA after transaction data posting

    Hi Friends,
    My client has wrongly updated the GL account in alternative Chart of accounts column in Company code segment. They didnt realise and they posted some transaction data as well.
    Today they realised and tried to change the alternative COA and it showed an error message "GL account balance is not zerowised". They tried to clear the GL account balance, but couldnt solve the issue.
    Please let me know is there any other way to change the alternative COA after entering the transaction data.
    Thanks,
    Dwarak

    thnks

  • Changing the source client of a transport request

    Hi!
    I transported few requests from client 300 to client 200 using transaction scc1.
    Now, i want to transport them to another client from 200. But when i try to release those requests the systems prompts "Request <#> (300) belongs to a different client".
    I tried changing the source by double clicking the request, but I'm unable to do so.
    Can u please suggest any way of changing the source client of these requests ?
    Thanks!!
    Regards,
    Muzammil.

    Hi,
    Goto SE01,
    The type transport number
    Display
    Place cursor on the TR
    Click Utilities=>Reorganize=>Change Project.
    Best regards,
    Prashant

  • Changes in one client

    Hi,
    Could you please correct me if I'm wrong.
    we did the changes in one client let us say 100 client in r/3 then if these changes has to reflect into remaining clients. After transporting the request only these changes are going to be reflected into remaining clients correct?

    Hi Harsha,
    Suppose client 100 is ur customizing client. And 200 is your data client.
    Now you activated the datasource in 100 client. It will ask you for a customizing request.
    Create a request for this.
    Now go to client 200 transaction SCC1. Give the request number and execute.
    This will copy the customized changes from Client 100 to 200.
    Regards,
    Mansi

  • I have change e-mail address after first registration and when I logged in it send new password to my old e-mail address. now I can't use my old profile

    I have change e-mail address after first registration and when I logged in it send new password to my old e-mail address. now I can't use my old profile.
    and I can't install my old adobe X anymore
    what to do?
    Mika

    Change Account https://forums.adobe.com/thread/1465499 may help
    -wrong email https://forums.adobe.com/thread/1446019

  • (final cut pro x 10.0.9 )After numerous troubleshooting tips, I am still getting the dreadful your disk have ran out of space, your events have moved or permissions have changed. This happened after I moved some files to another drive. They won't relink?

    (final cut pro x 10.0.9 )After numerous troubleshooting tips, I am still getting the dreadful your disk have ran out of space, your events have moved or permissions have changed. This happened after I moved some files to another drive. They won't relink eventhough the files are there.

    (final cut pro x 10.0.9 )After numerous troubleshooting tips, I am still getting the dreadful your disk have ran out of space, your events have moved or permissions have changed. This happened after I moved some files to another drive. They won't relink eventhough the files are there.

  • Not allowing changes to payment terms after the AR document is released to accounting

    Hi,
    Anyone know the best way to not allow a user to change the payment terms after the AR document has been created in AR? This is affecting aging because users are changing the payment terms without permission. What is the best way to control that?
    Thank you.
    AK

    Hi A K
    Frequent change in payment terms is something business should introspect. Payment term is decided and agreed upon with customer/vendor during the initial stages.
    However from IT perspective, it can be controlled keeping some system controls.
    1. Limit the Customer master change transaction to very limited users or to a manager. There should be internal approvals by management for business to make a change. Bring this into force.
    2. Regularly run the customer master change reports and provide the trend to management to restrict or limit the changes.
    3. Use Change Message control for master data by providing necessary warnings or error messages when master data is changed.
    4. In  the sales order level, there is every possibility to change the payment term. Based on the user authorization get the payment term field greyed out and provide change access to accounting or to a specific user upon approvals. This is a bit complex process but I feel this brings up controls and stops the process from exploitation.
    5. Also activate 'Sensitive fields' KNB1-ZTERM for payment term field in customer master. This brings up another layer of confirmation of change by other users.
    6. Another back route, not recommended in all cases, is to subsititute the required payment term during accounting document posting.
    Hope it helps.
    Thanks,
    Sekhar

  • How to change async to sync after deploying the process.? Thanks

    How to change async to sync after deploying the process.? Thanks

    you'd need to change the base wsdl, the generated one (_Name.wsdl) and the bpel.file .. and remove the generated classes .. (all in domains/you_domain/tmp/your_process dir)
    the wsdl needs to get the output msg to the input msg instead of a callback porttype, the same needs to be in the generated wsdl (don't forget to remove the callback role in plnk session).. and the bpel process needs to have a reply instead of the invoke ..
    this is what you would need to do .. BUT, maybe we can find a better solution for you, if you elaborate on the usecase..
    during design time this is easier :-)
    regards clemens

Maybe you are looking for