Hi Experts,
Can anybody say how to change the Scheduling agreement and Info Record using Bapi.
I use BAPI_AGREEMENT_MAINTAIN to change Scheduling Agreement .
But it does not changing Scheduling lines.

Hi,
Please find the below link check the setting are correct or not
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/a02cb00a-bfb4-2c10-98aa-e33e7f64ba28?quicklink=index&overridelayout=true
Reagrds,
Pramod

Similar Messages

  • BAPI/FM to change scheduling agreement's delivery status.

    Hi All,
    I have to check  "Delivery completed" indicator of scheduling agreement.
    I tried using BAPI_PO_CHANGE but it returns the message below:
    "Not possible to process a scheduling agreement using this function"
    Is there any other BAPI or FM to change the agreement.
    I do not want to use batch-input. But if there is no other option I will.
    Note:  I am using system 4.6C
    Thanks
    Mandeep

    hii
    try using BAPI_AGREEMENT_MAINTAIN FM.
    one another FM BAPI_SCHEDULE_MAINTAIN is used to create or change scheduling agreement delivery schedule lines.i hope any FM can help you.
    regards
    twinkal

  • How to Change Scheduling Agreement Schedule line data thru BAPI ??

    Hii
           I want to change the shedule line data for a scheduling agreement .
    I used BAPI_PO_CHANGE but as this BAPI is used for PO only this gives a
    Error Message for Scheduling agreement .
    Please suggest me BAPI or FM to update the Scheduling agreement Schedule line.
    Regards
    Ajitabh Pradhhan

    as BAPI_AGREEMENT_MAINTAIN is not available in 4.6c
    Please help me out on hwo to maintain Scheduling Agreements .
    Regards
    Gaurav

  • Contract , scheduling agreement and service order

    Hi all,
          Can anybody tell me about the contract scheduling  agreement and when we can suggest our client to go for schedule or contract agreement ?
    Pls tell me elaborately .
    Also Pls explain me about service order and when can i go for service order . whether it is restricted to AMC ?
    Pls explain me elaborately.
    pls explain me steps for creating contract or scheduling agreement and service order..........................
    points to be rewarded.
    Regards,
    Girish.

    Hi,
    Contract is outline purchasing agreement where you have a contract with the vendor,may be a for a predetermined quantity or predefined value. So everytime you need the matl,  you need to make PO ref the contract asking for the delivery of the matl. In such instance when PO is ref with contract its called contract release orders or call off orders. So Process are ME01, ME11, ME31K with aggnrement type, ME51,ME21 & MIGO,
    Scheduling agreement is a long term purchase agreement, where you will keep issuing the delivery schedules whenever there is a change in requirement or at predetermined time intervals. The delivery schedule can be on hour/daily/weekly/monthly basis. SA is also an agreement with the vendor for the supply of matl, may be a quanity or value. The delivery dates will be maintained in ME38 ref the SA which are called delivery schedules.So you can maintain the delivery schedule and communicate the vendor on Forecase basis or JIT basis. And when you need some more matl then will only create SA deliveries using ME38. SA could be of 2 types:- without release documentation-system will transmit the delivery info to the vendor once you save the document.
    With release documentation- after creating the delivery schedules you need to create SA release using ME84.So Process are ME01, ME11, ME31K with aggnrement type, ME38 & MIGO,
    Service order or service PO is created with item Category "D" and an account assignment category as per ur requirement. U can not enter ur material here only u have to maintain short text of material. Example: You want to clean the boiler and u given contract to your Vendor. Vendor sends quotation mentioning that Rs.100/hr/Man head. Now how you will measure the cleaning activities of furnace? You can pay to contractor based on the hourly basis/ man head spent in cleaning activities. So in this case create the Purchase Order mentioning "Cleaning" in the short text in Item overview(Acc assignment ' K' or “C” or “P” and Item category 'D) and item details " Man Head" Service No , Gross price - Rs.100.00 and unit - hour ( or pick from Service master) and Quantity-number of hours spent by all man head.
    The steps to create Service PO are:
    1) Maintain Item Category as D & account assignment such as cost center “K”or slaes order”C”
    2) Keep material code field blank.
    3) Enter description of service & other fields in the PO Item Overview level. Press Enter.
    4) System will prompt you to maintain services at Item Level. Maintain your service master number / service description & other fields (quantity / rate /)
    5) Save the PO.
    For more follow the links;
    For more follow the link;
    http://esoadocu.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/render.asp?packageid=DBBB6D8AA3B382F191E0000F20F64781&id=EB65A89F1AFD4C46AB61C6161BAF
    http://www.sap-img.com/sap-sd/sap-sd-scheduling-agreement-vs-contract.htm
    http://www.copacustomhelp.state.pa.us/infopak/nav/procurement/contracting/file1499/index.htm
    http://www.sap-img.com/materials/what-is-outline-and-scheduling-agreement.htm
    Regards,
    Biju K

  • SCHEDULING AGREEMENT AND SCHEDULING LINE CREATION

    Hello Guys,
    I trying creating a scheduling agreement(SA) for vendor & material combination.
    I have created a Scheduling agreement in ME31L then maintained in ME38.
    In ME38 i have also mentioned the delivery date. when i am checking EKKO for Purchasing document , its created with the delivery date specified.
    My question is how to create a schedule line ? Do we need to maintain a source list of that material, plant and vendor.
    If we have the source list maintained, then what is the next step after SA is created and maintained.
    Do we need to do MIGO? because i tested by creating one SA in ME31L and maintained in ME38. I mentioned the delivery date as today and when i checked EKKO table the Purchasing document is created.
    Do i need to create a Purchase Order?
    If no then do i need to do MIGO? If i need to do MIGO, for what reference do i need to do MIGO???
    My client never maintained a Scheduling agreement, they want the scheduled lines to be created and sent to vendor and we need to receive  the goods on specified delivery date.
    Help will be appreciated.
    Thanks.

    Hi,
    You need to make a distinction between the scheduling agreement (ME31L/ME32L) and the delivery schedule creation (ME38/ME84)
    With ME31L you create the scheduling agreement. In the scheduling agreement which is created for a vendor you maintain the parts that you will order at this vendor, the target quantity that you will order over a certain period and the price.
    In ME38 you use the scheduling agreement number that is created with ME31L to create schedule lines (manually). These schedule lines consist of a date and an quantity. This is the data that needs to be transmitted to the vendor and against which the vendor is shipping the ordered materials.
    Once the vendor ships the materials you post the goods receipt in Migo against the scheduling agreement number.
    That is the basic working of the scheduling agreement and the delivery schedule.
    Now some remarks.
    You need to set-up the required output conditions for transmitting the data to the vendor either via print, fax, email or EDI.
    You can do this manually in each scheduling agreement and each release but typically you maintain the output condition records.
    For scheduling agreement contract (ME31L) you use transaction MN07.
    For the delivery schedule (ME38/ME84) you use transaction MN10.
    In order for you to be able to post the goods receipt the delivery schedule needs to have been transmitted otherwise you will get a message that not requirement are found when trying to post goods receipt.
    Also the goods receipt can only be posted if the requirements are valid on the day that you are performing MIGO. This means if you would post GR today then the open requirements in the scheduling agreement need to be for today or already from previous dates. The system will not allow you to post GR for quantities that are only due tomorrow (if this is required a user exit needs to be set-up).
    If you want schedule lines created via MRP then you need to set-up a source list using ME01. You have to make sure that the MRP key is set to 2 in orer for the system to generate schedule lines and you also have to make sure that you have the correct MRP parameters set-up.
    You can use ME84 to transmit the delivery schedule lines generated by MRP if no changes are required. With the ME84 you can transmit multiple releases at once, however this transaction can not be used to make manual changes to the MRP proposal.
    The scheduling agreement offers lot's more possibilities but the above should get you going with the basics.
    Hope this will help you on your way.

  • Reg. Scheduling agreements and contracts

    Hi Dears
    Please explain in greate details "what is schedule agreements" , "contracting", "How to use Scales in standard PO" and what is scales.
    I couln't find the proper explanation in our Forums.
    Bye
    Rajkumar

    Hi
    (1) - Schedule agreements allow you to have 2 different sets of schedule lines (VBEP-ABART).  Standard SAP you should have two sets of tabs - of schedule lines. One Forecast & the other JIT.  Forecast forwards the schedule lines to planning (seen in MD04) and JIT passes them to shipping (VL10). They can be identical or different. Typically these are used for component supplier customers (namely Automotive). The customer will provide you 4-10 weekly buckets (usually a
    Monday date) of future forecast qtys. Also send you 1-2 weeks of individual FIRM ship dates - which are entered on the JIT. It comes down to the customer not knowing exactly what they need next week, but they don't want to suprise you with a large order qty, where your lead times are 5+ days. The forecasted qtys they sent last week should account for this.
    (2) Cumulative Quantities are tracked and influence how the schedule agreement passes requirements to both forecasting and shipping. These qtys are sometimes requested by the customer on ASNs. Cumulative qtys reset at year end unless you've got a customer calendar or you've modified standard SAP user exits to not reset.
    Schedule agreements are very nice when the customer sends EDI data (830s = forecast or 862s = JITs). Outside of that they can really cause trouble regarding daily maintenance, missing requirements, *** qty corrections, year end processing, etc.
    One alternative would be to use customer independent requirements - entering the weekly, monthly forecasting qtys and entering standard sales orders (with or without multiple schedule lines) to represent the true firm qtys.
    Refer below
    http://www.sap-basis-abap.com/mm/gr-creation-for-schedule-agreement.htm
    You can fix a price in the info record for a say qty from 1-100 price RS150 & if the order qty is 101- 500- the prices is 140 . Scales cannot be used directly in PO but can be pulled into the PO from various master data like info record,  quota arrangement.
    For further details refer sdn thread below
    Contracts
    scheduling agreements
    Message was edited by:
            SHESAGIRI.G

  • Upload Purchase info Records using LSMW

    Hi,
      Im uploading purchase info records using LSMW - direct method
    Object               0060   Purchasing info rec.
    Method               0000
    Program Name         RM06IBI0
    i need step by step process for this. any one have done this using this program help me out.
    Regards,
    Vimal

    Hello Jürgen
    and thank you!
    One additional question: When I import info records using LSMW, one condition record (PB00) is created automatically. Is it possible to change the validity of that condition record using LSMW, too? Or can I only create new condition records?
    Thanks again
    Alicia

  • Material Master,Vedor Master and Info record

    Hi
    When we create all these record, some of the fields are populated from one an other, so if we change these common field in one record, will it be changed itself in other record?like purchasing value key in MM and Info record are common so if we change this one in info record,the change in MM will be done itself or not and if not why?

    Hi,
    Let me take one example of reminder days only.
    Now material master's reminder days are specific and limited to that material only. for ex for material "007" reminder days are 3,6 and 9. that is in general.
    but when that material is provided by X vendor than reminder should be 4,7 and 11..than what?
    that should be maintained in info record. so info record is one level up for data maintenance. so if there is no info record, reminder days will be take from material master that is first level. but if you have maintained info record , means you want some specific data for that material when it is provided by any specific vendor..than reminder should be taken from info record.
    when data is adopted , first system checks info record than material master/vendor master.
    so when you create info record, some data are taken from master data ( material master/vendor master) but you can overwrite it base upon your need.
    than that data is fixed for that material n vendor..it doesnt change if you change master data...
    hope this solves your query..
    reward if useful.and revert if any doubt
    regards

  • Validity date of condition records (creation of info records using LSMW)

    Hello gurus,
    we would like to create info records using LSMW with one condition record (PB00). This works fine, we just are not able to influence the validity of the condition record, it's always "creation date until 31.12.9999".
    We tried to maintain the fields BKONP-DATAB and BKONP-DATBI, but that did not change anything.
    Any ideas on this?
    Thanks
    Alicia

    Hello Jürgen
    and thank you!
    One additional question: When I import info records using LSMW, one condition record (PB00) is created automatically. Is it possible to change the validity of that condition record using LSMW, too? Or can I only create new condition records?
    Thanks again
    Alicia

  • Same BO is getting invoked for Pur. Order, Schedule Agreement and Contract

    Hi All,
    My Scenario is like this:
    For Purchase order, Scheduling Agreement and for Contract the Release Statergy are same. For these three scenarios i have created 3 different workflow templates.
    My Purchase order workflow is working fine.
    My problem is :
    When i create a Schedule agreement or a contract, my PO business object is getting invoked and it goes to error.
    I have a doubt:
    For all the three scenario's they are using same number range, will this may be one of reason for the above problem???
    Kindly help me to resolve the issue.
    Thanks and Regards
    Balaji E.

    Hi,
    You can check this link:-
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/abap/workflow+scenario (based on PO change)
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/crm/action%252bprofiles%252bin%252bsap-crm(reason for more than 1 WF trigger)
    More than 1 WF trigger, could be that there would be a triggering condition that triggers more than 1 WF. Since further the conditions are not satisfied, this could lead the WF in error state.
    Let me know if u still face any issues..!!
    Regards,
    Kanika

  • Changes in plant specific info record...Urgent!!!

    Hi All,
    I changed the order unit in one of the plant specific info record and it resulted in a change in the generic info record (without any plant) for the same material & vendor.
    Can anyone let me know why its happening as I am making the changes to a plant specific info record?
    Kindly help me ASAP...
    Thanks,
    Swati.

    Hi Swathi,
    Please check the purchase organisation used in the Info record is assigned to Plant or Company code.
    If the Purchase Organization used while creating Info record is assigned to plant. Than you are doing plant specific info record change. If the Purchase Org used while creating the info record is assigned to Company code. Than it affetcts all the plants which are assigned to that company code.
    Hope this answer helps.
    Please check.
    Thanks
    Giri

  • Scheduling Agreements and relevant schedule lines configuration !

    Dear Sapients,
    I request you all to help me in providing the configuration steps for Scheduling Agreements and relevant Schedule lines configuration.
    Its urgent please help me !!
    Regards,
    Sreedhar.
    kodalisreedhar----
    com

    Hi Sreedhar,
    Scheduling Agreement with Delivery Schedules
    Definition
    An outline agreement that is created for one or more materials and outlines the overall expected quantity of the material(s) to be delivered to the customer over a specific period of time.
    Use
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Structure
    The structure of scheduling agreements with delivery schedules resemble that of other sales documents in the R/3 System, in particular the standard scheduling agreement.
    Data that applies to the entire document appears in the header; data about materials appears at item level; and delivery dates and quantities appear in the schedule lines within the delivery schedule. Additionally, the system maintains a history that permits you to compare and contrast various generations of delivery schedules.
    Integration
    Data in scheduling agreements comes from three sources:
    The customer sends in requested quantities and dates, normally by Electronic Data Interchange (EDI)
    The component supplier enters data manually
    The system automatically copies data into the scheduling agreement from master records
    Please go through the below link for further information
    http://help.sap.com/saphelp_47x200/helpdata/en/93/7439fb546011d1a7020000e829fd11/frameset.htm.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Exit for role determination via exit for scheduling agreement and contract?

    Hi..
    I have a requirement to fetch the agents in run-time for PO,PR,SCHEDULE AGREEMENT, CONTRACT..
    For PO i am using EXIT : - M06E0005
    For PR release i am using EXIT :- M06B0001
    By using above 2 exits i am getting the agents at run-time...
    Same way i need the EXIT for SCHEDULE AGREEMENT and CONTRACT..
    if there is any EXIT for this please share with me..
    Regards,
    Imtiaz Khan

    Hi Imtiaz,
    Ideally you should have your agent determination logic in workflow itself instead of determinining them in EXIT.
    Can you tell me why you are determining agents in exit and how you are making use of it ?
    Also let us know how your workflows are getting trigger for all these documents.
    Regards,
    Ibrahim

  • Creation Profile in Scheduling Agreement and Schedule LIne

    Dear Experts,
    Currently I'm working on Scheduling Agreement and Schedule Line.In standard SAP gives the provision of creation profile.I've gone through the SAP help documentation but I'm not clear on that.I've few doubts on creation profile.
    1. I've created a profile say XXXX for 14 days JIT and 6 months Forecast.And I maintain the same on Scheduling Agreement additional data.
    2.I'm creating delivery schedule respect ot Scheduling agrrement.
    3. I maintain the aggregation horiozon in creation profile as 10 days daily aggregation for JIT and 120 days for monthly aggregation for forecast.
    4.I run MRP for the header material and I maintain the necessary SA number in Source list.
    5. After MRP run I'm not getting the respective schedule lines for JIT and Forecast.
    6. What is the use of creation profile in Scheduling Agrrement and schedule line and is it determine ant schedule lines after MRP run.
    Please clarify me on creaion profile.
    Thanks in advance
    PKB

    Dear Experts,
    I'm not getting any response regarding Creation profile which I posted last week.
    Can anybody explain me the use of Creation profile in Schedule line?
    From Standard SAP help documentation I'm not convince.
    Best Regards
    PKB

  • How to create a partner and header record using CRM_ORDER_MAINTAIN?

    Hi any one knows how to create a partner and header record using the function module CRM_ORDER_MAINTAIN??
    I tried to  create a record, but i only managed to create a header record and the partner record is not reflected in the transaction.  Why is that so? is there any indicator that i need to include?
    Thanks..
    Jen

    Hi Jen!
    I use this FM and it works perfectly.
    Use this to create a partner:
      gs_partner-ref_handle    = '0000000001'.
      gs_partner-ref_kind      = 'A'.
      gs_partner-ref_partner_handle = '0001'.
      gs_partner-partner_fct   = '00000001'.
      gs_partner-partner_no    = NO_PARTNER. "number of the partner, bu_partner
      gs_partner-display_type  = 'BP'.
      gs_partner-no_type       = 'BP'.
      gs_partner-kind_of_entry = 'C'.
    *  ls_partner_l-ref_handle    = '1'.
      gs_partner-ref_guid      = '00000000000000000000000000000000'.
      APPEND gs_partner  TO gT_partner .
      ls_input_field-ref_kind  = 'A'.
      ls_input_field-logical_key   = '0001'.
      ls_input_field-objectname  = 'PARTNER'.
      ls_input_field-ref_handle  = '0000000001'.
      ls_input_field_names-fieldname = 'DISPLAY_TYPE'.
      INSERT ls_input_field_names INTO TABLE ls_input_field-field_names.
      ls_input_field_names-fieldname = 'KIND_OF_ENTRY'.
      INSERT ls_input_field_names INTO TABLE ls_input_field-field_names.
      ls_input_field_names-fieldname = 'NO_TYPE'.
      INSERT ls_input_field_names INTO TABLE ls_input_field-field_names.
      ls_input_field_names-fieldname = 'PARTNER_FCT'.
      INSERT ls_input_field_names INTO TABLE ls_input_field-field_names.
      ls_input_field_names-fieldname = 'PARTNER_NO'.
      INSERT ls_input_field_names INTO TABLE ls_input_field-field_names.
      INSERT ls_input_field  INTO TABLE  gt_input_fields.
      clear ls_input_field-field_names[].
      CALL FUNCTION 'CRM_ORDER_MAINTAIN'
      EXPORTING
    *    it_schedlin_i   = gt_schedlin_i_com
        it_partner      = gt_partner
    *    it_sales        = gt_sales
    *      it_orgman       = gt_orgman
    *      it_appointment  = gt_appointment
    *      it_ordprp_i     = gt_ordprp_i
    *   it_product_i    = gt_product_i
    *      it_activity_i   = gt_activity_i
    *      it_pridoc       = gt_pridoc_com
      CHANGING
        ct_orderadm_h   = gt_orderadm_h
    *   ct_orderadm_i   = gt_orderadm_i
        ct_input_fields = gt_input_fields.
    *      ct_doc_flow     = gt_doc_flow
    *      cv_log_handle   = gv_log_handle.
    Hope it helps u,
    Regards,
    Mon.

Maybe you are looking for

  • Outlook Add-On in SAP Business One 8.8

    Hi Experts I recently Upgraded to SAP Business One 8.8 I installed Outlook Add-On (I installed Outlook server, outlook .ard file and Outlook stanalone) when I start the add-on its is connected and it gives a message Initialization Failed. So I cannot

  • Safari quits unexpectedly everytime I try to open. Please help!!!!

    Safari quits everytime I try to open it. I need help in ways of fixing this. Below is a copy of the crash report............. Process:     Safari [4694] Path:        /Applications/Safari.app/Contents/MacOS/Safari Identifier:  com.apple.Safari Version

  • Error while posting parked docs

    Hi, When we post parked  (FBV0) doc. At the time of postingsystem prompt me particular message on the screen. Field BSEG-SKFBT. does not exist in the screen SAPMF05A 0301. Message no. 00349 Diagnosis The specified field does not exist on the screen.

  • I am unable to re-enable bonjour services to view my shared library on my PC from my Mac

    I am unable to view my shared music library from my Mac on my PC (running Windows 7).  When I check in the sharing preferences, it says "The Bonjour services has been disable.  Bonjour is required to share music with others.  Please re-enable the ser

  • Auto Email on event - EEM script for NxOS

    I generated EEM script for Duplicate IP address detection, but i do not know how to trigger email in NxOS. event manager environment emailto "[email protected]" event manager applet Duplicate_IP   description "Detect Duplicate IP and Send Trap"   eve