Our source system has a RFC problem conection, and when I try to change the parameters I have this meessage
Change to source system not possible
Message no. RSAR743
Diagnosis
The change to RFC parameters is not possible for source systems with manual meta data adjustment and data transfer from files.
Any idea?
thank you

Hi
It looks like, you don't have proper authorisations to change the source system..Please check with authrisations...
Thanks,
Teja

Similar Messages

  • ALE Change Pointers in source system not active

    Hi All,
    I am trying to load 0COSTELMNT using deltas. The initial load is OK and then i use a delta and it fails and i get the error:
    "ALE Change Pointers in source system not active"
    I have carried out the following steps in an attempt to resolve the problem - but it didnt. Anyone have any advice??
    (1) Checked BD61 – to confirm whether the change pointers are active
    (2) Checked BDCP to confirm the number range is maintained
    (3) Checked SALE (Activate change pointers for message types)  to confirm whether the change pointer has been activated for the type we need:
    COCOKA     Control segment CO object/cost element
    COELEM     Cost element master data
    (4) In transaction snum, Selected number ranges and confirmed the intervals are setup
    No. 01
    FROM: 0000000001
    TO: 0000009999
    (5) Activate transfer structure
    (6) Replicate Datasources
    Thanks,

    If you are transferring master data from source system, the BD61 setting on the source system should be checked.
    Why it has been unchecked - not sure (likely someone did it by mistake).
    It shouldn't have any effect on txnl delta. What will be effected though is that you will have lost delta of the ALE based data sources for the period this setting was unchecked.

  • How to change the source system for just a datasource

    Hi,
    Our test/development BI system ( BI 7.0 Unicode ) is connected to our development system and to our test system, 1 BI system connected to 2 R/3 systems.
    During some time, the test system won't be available so all datasources that point to the test system must be connected to the development system. In RSA1 is not possible to change the source system in a datasource: RSDS 057
    'Creation of DataSources for SAP source system D30CLNT007 is not permitted' , same error trying to copy the datasource,.
    Any idea about how to proceed ?
    Regards,
    Joan

    Hi,
    If I try to repliclate metadata in the datasource, message RSAR 051 appears: 'error when opening an RFC connection'. This error is expected because the logical system pointed in the datasource does not exist.
    Is not possible to change the source system in datasource ( in RSA1 ) because the field is always greyed, also if I try to copy the datasource the message RSDS 057 appears.
    Any idea about how to proceed ?
    Regards,
    Joan

  • How to change the Source system from ONE DataSource?

    Hi,
    I'm trying to change a DataSource's source system (active with dtp and transfer rules), but it's not possible to  do it in change mode because the field 'Source Sytem' is not enabled. I know I can use the BDLS transaction but I understand that this is for change all Datasources and I only want to change one of all.
    Thanks for your help

    Hi Marcel,
    As I understand apart from file and web services all other data sources are replicated from underlying source system. BDLS transaction is used to change the source system but in case of system copy activity and it is necessary because the data sources points to old source system.
    In your case as I understand you will have to replicate the current data source directly from underlying source system and then build the rest of the flow. May I know how you have got this single data source for which the source system is different?
    Regards,
    Durgesh.

  • Error Message: Change of update mode not possible due to open V3 update

    Hi Gurus,
    I got error message when i change update mode (LBWE) from V3 to Direct or Queued delta method.
    Error Message: Change of update mode not possible due to open V3 update
    Long text: You are not allowed to change the update mode for application 11 from V3 to another method. This is because there are still V3 update entries for update module MCEX_UPDATE_11 that have not been processed yet.
    Pls anyone give solution for this.
    Thanks
    Muthu

    Hi Sreeni,
    i did check in all the below Tcode as you adviced.
    1. Clear all record at SM13, LBWQ / SMQ1, Setup tables, RSA7 for particular datsasource or application..
    2. For LBWQ provide date range and delete not required records.
    I did not get the 3rd point " Need to clear in CLINTS of R/3 system" of your reply.
    what does that mean?
    I checked all the above tcodes and got the same message as no queue or data exists".
    I went SBIW tcode and activated my data source and try to change the Update mode but still it is throwing error message as "Change of update is not possible due to open V3"
    Please help me out.
    It will be very helpful for me if you could share steps or docs regarding this issue.
    Thanks,
    Shailaja

  • Changing the source system in QA

    Hello All,
    I just wanted a quick opinion from your experience on the following issue:
    We  have a ECC Dev client 20 connected to BI Dev client 20
    Similarly we have ECC QA 120 connected to BI QA 120
    But due to some reason we now want to connect a new ECC QA client 150 to BI QA 120 and take out ECC QA 120 totally(120 is wiped off).
    I already have a lot of development transported to BI QA where the source system is ECC 120. Now if 120 dies and we pull the data from 150, what are the pitfalls to watch for?
    Like all my Master data objects , DSO and Cubes still point to ECC QA client 120 but now the "actual" source system is going to be ECC QA 150.
    Points,
    Gaurav

    You need to replicate all the data sources in BI from QA 150 and change the source system assignment to 150 instead of 120.
    Also, you need to reinitilase delta for delta enabled extractors.
    Two  things to watch out:
    1.  If you dont have source system identifier,  then if you happen to get records with same key, then it will overwrite. This applies to both master and transaction data.
    2. For transaction data that is not delta enables, there may be a possibiltiy with which the records will get duplicated. So, better to delete the old requests before reload the data from QA150.
    Ravi Thothadri

  • Change the source system

    Hello
    In our Quality Box , I need to change the source system connection (from QR1 to QR2). I created the new connection successfully. Now the issue is all the Transfer structure still using OLD connection ( i.e QR1) . I run BDLS and it did not word. How can I re-assign the new source system (QR1)  to all of my Transfer structures in one go. Is there any report ?
    Farooq

    Hello,
    You cant directly convert the existing objects for a source system to the new source system.
    For that you need to do a transport of the objects to the QA box while maintaining the entry in BDLS to convert to the new source system.
    Regards,
    Shashank

  • Change of Source System in OBIA 7.9.6.4

    hi All
    Our Client has decided to change the source system from EBS R11 to EBS R12.So they have completed EBS migration to R12.I have been asigned a job to
    configure the existing bi apps for the source EBS R12 which previosly was using EBS R11. Can any one help me to configure the OBI Apps Financial module.
    Our OBIEE version is 11.1.1.6.9
    OBIA version is 7.9.6.4
    Any help will be appreciated as the Oracle's online doc is also not helping me.
    Thanks & Regards
    Bivin

    Hi Bivin & Srini,
    I am working on this and keep post my updates.please do from your end too.
    Thanks &Regards,
    Raj

  • Change of source system

    Hi all,
    At present we have in our data source the quality source system of (R/3) mapped to the data source in the development of BI. Now i want to change the source system for the data sources in BI to R/3 Qualtiy.
    This mapping is not done for all the application - it is done only for some of the applications like FI etc, and all other applications like the PP,QM etc have the respective R/3 clients mapped to the Data sources.
    Can you kindly tell me the steps that has to be adopted to do this activity.
    Regards,
    M.M

    - In R/3 QA , SE37, run function module RSAP_BIW_DISCONNECT to disconnect you R3 QA connection with BI Dev. ( you can find Log sys names of this connection in RSBASIDOC table in R/3 QA)
    - BDLS has to be run in BI for changing R/3 QA to R/3 dev. Also ensure the changes have been done to SM59 destinations like ip/host, login/password, RFC dest descriptions etc. in both BI dev and R/3 dev.
    - Then RESTORE R/3 dev Source System in BI dev - RSA1 (While performing RESTORE , R3 dev client needs to be opened. After Restore you can close that)
    - Then you will have Replicate all datasources from Context menu of Source sys R/3 dev in RSA1.
    - Then Run program (SE38) - "RS_TRANSTRU_ACTIVATE_ALL"  in BI Dev to activate all transfer structures for R/3 dev source sys
    Hope abovementioned steps help you.
    Rgds,
    Vikram.

  • Error importing *.SCA file into NWDS:  Import (into source SC) not possible

    All,
    When attempting to import an SCA into a new project in NWDS, an "Import (into source SC) not possible: SCA doesn't contain DC sources" occurs.  Any assistance to fix this issue appreciated.
    Thanks,
    Lee

    You can indeed import SCAs into local development configurations in NWDS (Eclipse). You have to have a pre-existing software component of the same name and vendor which may or may not be empty.
    In the Development Infrastructure perspective in NWDS 7.1, just right-click on the software component you want to overwrite with the import and choose "Import".
    To import SCAs into a CMS track in the NWDI, you have to go to http://<NWDI server>:5<nn instance no>00/devinf/ and import the SCAs from the transport inbox directory of the NWDI server. Don't forget to maintain the SLD if necessary.
    Cheers,
    Thorsten

  • Change and transport system not configured

    hi
    Please anybody help me on this. I installed SAP IDES4.7 on Win Xp with Oracle9.2. It is working good except one error. when i click on anymenu item in GUI a popup says " change and transport system not configured'.
    How to fix this?
    i appreciate your help in advance. Thanks
    Madhu

    Hi
    After installing SAP IDES4.7 u have to do post-installation.As a postinstallation u have to configure the STMS(sap transport management system)
    STMS is mainlly used for moving objects from one system to other system
    Regards
    kiran kumar.v

  • Source system not available error

    If the error message is teling as source system not available
    so what can be the reasons for that and tell me the solution also.
    data cllection is incorrect
    so what can i do i have checked trfc connections every thing but every thing is fine
    so any body help me out in this.
    your suggstions will be rewarded.
    Regards.
    Vikram.

    Hi Vikram,
    Try the below mentioned steps:
    1. Check the connections on BW sysetem and R/3 system.
    Use the tcodes: sm58 and sm59. On the context menu of the source system created, check the option for conections. If connections are not fine, contact the basis team
    2. Go to 'source systems' select you source system and right click and select 'Repicate Data Sources' , then try replicating the the infosource for that
    appilication at the top node level as a whole, the try replicating the Data source
    with in your infoarea..
    Hope it would help ..if yes..assign points.
    Regards,
    Manu.

  • Change of Source system in Data Source

    Hi all,
    Our development system is a copy of another BI system. now the development system is connected to different source system. since it is a copy, all data sources are pointing to previous source system.
    How can I change this data source point to new source system.
    With regards,
    Bala

    Hi Bala,
    As u know the DATASOURCE is SOURCE dependent.so the solution when you connect your developement system with another system ,while transporting the datasource you have to change your source system name also according to your BW boxes
    I will give an ex:
    suppose u have 3 system in your BI architecture,
      BW  :    Regression    ---> PREPROD -
    > PROD
    SOURCE  :            S1         --->        S2        -
    > S3
    SO When we transport the BW datasource.....,while transport we have to change the source system accordingly.
    I hope i helped answering your question
    Edited by: SIDHARTHA SATAPATHY on Oct 21, 2011 8:43 PM

  • Change of source system - any mass transaction?

    Hi,
    we have to transfer some programs and stuff from one system to another. Basis people will manually import a transport for this. In target system, I want to change the source system of  the transported objects. Because it is quite a big number, I am looking for a standard reoprt/transaction to accomplish that.
    Any hints?
    TIA,
    Regards,
    Clemens

    Hi
    I believe yuo can create a program to update the table TRDIR, something like this:
    TABLES: TADIR.                         " Catalogo oggetti R/3 Repository
    DATA: COUNT TYPE I.
    PARAMETERS: P_SYST1 LIKE TADIR-SRCSYSTEM, " Source Sys
                P_CLASS LIKE TADIR-DEVCLASS ,
                P_SYST2 LIKE TADIR-SRCSYSTEM. " Target Sys.
    SELECT * FROM TADIR WHERE SRCSYSTEM = P_SYST1
                          AND DEVCLASS  = P_CLASS.
      TADIR-SRCSYSTEM = P_SYST2.
      MODIFY TADIR.
      IF SY-SUBRC = 0.
        COUNT = COUNT + 1.
      ENDIF.
    ENDSELECT.
    IF SY-SUBRC = 0.
       WRITE: Count, 'Objects from', P_SYST1, 'to', P_SYST2.
    ENDIF.
    U can try to use the trx SE03:
    - Run the node: Change Objects Directoty entries
    Here you can change the dev class and source system too, but I don't believe it can change all objects in mass way.
    Max

  • What are the changes to be done on BW end during hardware change of source system?

    Hello Gurus,
    There is some hardware changes happening and I need help in certain things which I need to do from BW point of view.  First of all, I have attached a figure showing my system landscape.  I would kindly request you to go though the fig first.
    For QA, initially we were using AG3 as the source system, now they have made the hardware changes, made a system copy of AG3 into the new system AEQ.  We have connected our BW QA system to this new system AEQ.  Now when I check the system, there are no data in set up tables (I am using SD and MM), but there are data in tables.  But when I replicate data sources from AEQ to BW QA, the existing transformations and DTPs will disappear. So, that left me with 2 options-
    1. Either transport old transformation and DTP from BW DEV to BW QA
    2. Or create new transformation and DTP in BW QA system.
    Can you experts please suggest me what should be the solution?
    Also, please note that, the basis team started the hardware changes with ECC QA system for some reason.  Once ECC QA is fine, they are planning to make the changes in ECC DEV system (from AG2 to AED).  Currently, AG2 is connected to BW DEV and AEQ is connected to BW QA.
    Can you please suggest me whether there will be any issue if we opt to transport transformation and DTP from BW DEV to BW QA when BW DEV is still connected to old source system?  Or, is there any other easy way to sort this out? Please suggest?
    Thanks a lot
    Rakesh

    Hi,
    1. Either transport old transformation and DTP from BW DEV to BW QA?
    Yes, better to transport from bw dev to bw qa
    2. Or create new transformation and DTP in BW QA system?
    at BW Quality, creation may not be possible. Better to transport from bw dev to bwq.
    or use standard abap program to activate transformations and dtp.
    When changes are applying at source then you just need to take care the delta queues
    clear all queues by running related V3 jobs and delta info packs. make them as 0 count.
    once basis team was done changes later try to check your delta loads at bwq .
    Thanks

Maybe you are looking for

  • How do I get a 3rd party WiFi adapter to be recognized as default WiFi?

    I have a really great USB WiFi adapter that unfortunately does function the same as the PCI-e WiFi adapter. Essentially I have to connect to networks with the software that came with the adapter (which is really good) and I cannot use the status bar

  • Goods Receipt not transferred to the Backend System R/3

    We are currently using BBPCRM4.0 & SAP R/3 4.7 (extended scenario) For a particular Purchase Order which has a material number, We cannot transfer GR to the Backend System R/3 successfully.(The shopping cart of unsuccessfully transferred GR is create

  • MacBook Pro will not stay on line

    Hi there, have mac Book Pro, year old. I have two networks in the house, slower DSL and newer and faster cable, both having wireless. I am having a problem with second one. I can connect easily, has no encryption so plain SSID network name, speed and

  • Can't select text in pages to edit

    can't select text in pages to edit

  • Importing From Flat File with Dynamic Columns

    HI I am using ssis 2008,i have folder in which I have Four(4) ".txt" files each file will have 2 columns(ID, NAME). I loaded 4 files in one destination, but today I receive one more ".txt" file here we have 3 columns (ID, NAME, JOB) how can I get a m