Charm in implementation project

Hi All,
Iam currently configuring charm in implementation project. We do not have QA and PRD systems build yet.
I have created transport routes DEV>VQA>VPR ie with QA and PRD as virtual systems.
Now how do I add this as virtual systems in logical component. If I create entry in SMSY manually, tomorrow when my QA and PRD systems are available, how do I change it?
Regards,
S

Hi,
For demo system you can create three additional clients say 100>dev, 100> QA, 300> PRD and 500> solution manager ( that will be your original client).
you can create logical component for the same in SMSY and also you need to set up the transport route accordingly.
you can test the entire charm functionality this way.
When you would be having your actual systems you can create another logical component and project for the real scenario in solution manager and adjust the transport routes and you can still keep the demo system active alongwith real system scenario in case you want that.
Regards,
Sarita

Similar Messages

  • ChaRM on implementation Projects

    Hello
    I have a conceptual question regarding the use of ChaRM on Implementation projects.
    We are using ChaRM and have ensured that CTS is driven from Solution Manager i.e transport requests can only be created from corrections (SDMI). To date all SDMI's have been created as follow on documents to Change Transactions (SDCR). Going forward we would like to differentiate genuine changes (Changes to scope after blueprint sign off)  from implementation activities driven from blueprinted requirements.
    Whilst we see benefit from approval workflows for genuine changes, it is quite a chore to create SDCR's for all regular implementation work which is implicitly approved by signed off blueprint.
    It is also difficult for us to then differentiate Changes from Implementation SDCR's.
    Can anyone see a problem with all implementation tasks being generated directly as SDMI's with no preceding SDCR whilst leaving genuine changes as SDCR generated corrections?
    The only one I can think of so far is that there is workflow that sets the status on an SDCR when the SDMI has been through it's lifecycle although I'm not sure how the system would behave if there is no SDCR.
    Thanks
    Mark

    Hello,
    for the first please use SDMJ. SDMI is old.
    You can create SDMJ directly without SDCR and his approval workflow. There is no problem.
    It is not really clear how to work with Implementation projects and "changes".
    There are two known scenarios:
    Implementation project (phase of the application management life cycle is "Implementation"):
    If you have an really Implementation project for an Implementation of for example an new SAP product you should use an "Implementation project". It is not a change request!
    Here you work with the known IMG-projects, blueprint, project phases.....
    The transport process is realized via bc-sets. It means you create all you "changes" in bc-sets.
    Implementation project (phase of the application management life cycle is "Optimization"):
    Here you can use also the "Implementation project"
    You can create SDMJ directly without SDCR and his approval workflow. There is no problem.
    The transport process is realized via transport requests.
    I guess the different between this two scenarios is the transport process.
    Hope this is helpful.
    Best regards
    Thomas

  • ChaRM and test management in implementation projects

    Hi
    I am doing implementation projects in solution manager. i have activated charm in the project so as to transport all the changes related to the project with the project lifecycle.
    I have got confusions regarding CHarm and Test MAnagement.. when we activated CHaRM the tester can logon to the system and perform testing and pass the Change Document to the next phase.
    What is the standard flow when both CHaRM and TEst Management for a project exists??
    Thanks

    Please can someone tell me how to use TEST MANAGEMENT and ChaRM for Implementation Project together??
    Edited by: Hasan Sidra on Jan 2, 2012 11:11 AM
    Edited by: Hasan Sidra on Jan 2, 2012 11:11 AM

  • Use Change management in implementation project

    Hello SolMan Experts,
    I have a requirement that I need to do an implementation through solution manager. I want to develop objects in my R/3 systems using solution manager. I have seen a thread where someone told that Change request is not possible in implementation but we have an option to create a change request with development(Implementation).
    Should I create a change request development(Implementation) for each development happening for the project?
    Please help.
    Thanks in advance
    Farzan

    Hi Farzan,
    While I am not able to give you further technical know-how on your specific question, I would like to share a word of caution though.
    In my experience, activating ChaRM within an active Implementation Project poses problems if you have to change the 'System Landscape' of the project midway.
    For instance, if you had 3 Logical Components listed in the tab Sys. Landscape of the Implementation Project, activated ChaRM, and later, you decide to add one more Logical Component, it does reset the CTS counters to '0' and you have to do a few steps manually, to restore it to what it should be.
    I am not sure if this is due to a bug or if this is a known constraint. I for one, can't foresee any Implementation Project which can effectively freeze the Sys. Landscape scope by end of Blueprint phase. In long projects, due to afterthoughts and various pressures, one may end up tampering with a few Logical Components well into Realisation phase.
    You may like to check with SAP over OSS and ask them for recommended approach.
    As a recap, yes it is possible to activate ChaRM in Implementation project technically. However, if it is indeed a recommended approach, I am not so sure.
    Regards,
    Srini

  • Linking solution manager projects with CHARM implementation project

    Hi Guys,
    Currently i am working in CHARM implementation project, i have created one CHARM implementation project with urgent correction and i am able to create the Transport request and release the transport request succesfully and i am able to move it to quality system successfully. But my customer is asking to link the solution manager project to CHARM implementation project.
    Earlier before implementing CHARM they have implemented project managent in solution manager, during that project they have created so many projects which are currently running, now they want those projects to be linked CHARM implementation project.
    When ever they create a transport request through CHARM they want the TP to be saved under a respective project which they are using currently. but according to my knowledge the TP can be saved under CHARM implementation project only.
    Now i want to know whether the projects created in SOLAR_PROJECT_ADMIN can be linked to CHARM implementation project. Pls give ur valuable inputs as it is very urgent.
    Thanks&Regards
    Raju

    Hello,
    We have implemented this with two systems landscape where in we have in place a Solution Manager Dev system and Solution manager Production system both are SOLMAN 4.0 with SP12. So the path for us to move the changes is from Development Systems to Production system.
    We have ChaRM between the Dev and production. We reapplied the satellite system concept. For us the Solution manager Prod is a satellite systems all the changes that we move from Development system to Production systems is tracked with necessary documentation in the ChaRM process.
    Yes, I agree with you that this is not any big magic. Working with two SOLMAN implementation, I strongly feel that SAP needs to have well rounded ChaRm processes. We have robust Change Management Process, but when we moved to ChaRM we were limited functionality of the ChaRM processes.
    I had approached and did some research on how other companies are implementing the same process. Most of them have almost the same process for tracking SOLMAN changes. I am still look out for improved process to manage SOLMA changes.
    Hope this helps!!! Thanks
    Vish

  • Link between implementation project configuration (SOLAR02) and ChaRM?

    Dears;
    We want to benefit from listing all IMG Objects and developments in an implementation project (SOLAR02) to control our transports as we have ChaRM activated on the affected systems.
    But there seems to be no link/control which has several consequences:
    *Status of "changes" in ChaRM and related developments in the implementation project have to be tracked seperately
    *There is no link between the development in the project (SOLAR02) and the created TR.
    *There is no limitation/control in the content of the TR if it concerns items not listed in your project => how to check if the project is up-to-date?
    Are my assumptions correct? Or am I forgetting something?
    What is the experience in maintaining changes (transports) for implementation project? On what level? Linked with the structure in Solar02 or completely independant?
    I have done quite some reading around the topics but documentation around project management via SolMan and ChaRM via SolMan seems never to be really connected? (only the overall status of the project and the activation of charm via SOLAR_PROJECT_ADMIN)

    >
    Jett Jiang wrote:
    > 1. Active Change Request Management. the inter-connect is in SOLAR_PROJECT_ADMIN.
    > 2. Use normal correction to control the TRs and updates the documents at the same time.
    Thank you for the reply. Concerning these points:
    1) This is done... No questions there
    2) The "and" in your sentence means that I myself have to do both things? So there is no link?
    So this does mean that (what my understanding was) I have to create a normal change via ChaRM but under the project for example a certain business scenario. That developers work on all topics related and should "remember" that if they put something under that transport they should verify if this is documented in the SOLAR02?
    If then the change is put to testing they should manually update the status of everything related to this transport in the SOLAR02...

  • ChaRM activation in implementation project??

    HI
    I am quite new to solution manager , i want to ask that if we have created an Implementation Project in Solution Manager What is the pupose of activating ChaRM in it?? when i can do configuration directly from "Configuration" in Solution Manager itself and directly transport it to landscape by the transport option in "SPLAR_PROJECT_ADMIN"??
    Please guide
    Thanks

    Hi Sindra,
    When we have a normal correction we would normally use the Transport of Copies function to move developments into the QA system so we can check that we get the desired result.  If we need to change our development we can change the development and assign the changed development to a new task in the Transport Order. When we want to transfer the development we can then release the task, create a new TOC and import the TOC.  This can be completed as many times as required, the important point to remember is that we never release the Transport Order until we have completed the development.
    If during the project cycle we need to perform a correction to the development when we are in the test phase we can use Test Messages (SDTM) to control the creation of a new transport and the import process.
    If during the correction process you are finding that the status of the document is changing to a previous status then there could be a problem and you should have a warning or error message displayed in the ticket.
    Hope this helps,
    Rich Labib

  • Charms Process in Implementation Project

    Hello Gurus,
    I am part of an implementation project for where we are implementing various functionalities of Solution manager.
    Here we are in the process of implementing CHARMS in the Implementation Phase.
    So I have created a project of type 'Implementation' and has already activated Charms.
    Here the task list is already created and active
    Following are the issues which i am facing while creating a change request.
    1: If I create a change request of type 'SDCR' and authorize the change request, a normal correction of type 'SDMI' gets created automatically. But system throws an error 'No Maintenance cycle is open for the current system'
    I believe for a project of type 'Implementation' ,maintenance cycle doesnt get created, instead an implementation cycle gets created.
    So Let me know if  i have missed out any configuration. or if possible can u suggest me if there is any workaround for this?
    Regards,
    Anubhav

    Hi Raquel,
    Thanks for the reply.
    I have only activated BC Set 'SOLMAN40_CHARM_BASICFUNC_001' prior to activating CHARMS.
    After Activation Charms A project cycle of type 'SDDV' also got created along with the task list.
    But when I try to create a change request of type 'SDCR', it is automatically creating Correction of type 'SDMI'
    Also I had selected the correct Subject option 'Development (Implementation)' in Transaction SDCR
    Am I suppose to activate any other BC set?
    But why is it giving me error related to Maintenance cycle?
    Regards,
    Anubhav

  • Implementation Project with ChaRM

    Hello,
    I'm on Solution Manager 7 EHP1 SP 6 and  all configuration work for ChaRM has been completed.  I've been following the DEMOs from SDN and SOLMAN-RKT and with some exceptions (some steps/screens are either no longer required or assumed); which leads me to believe that up to this point everything is working as is it should.
    I'm still a little fuzzy when it comes to Implementation Projects.  I have the following questions:
    1. How are Non-IMG changes (Workbench) assigned to a project.
         a.  solar_project_admin -> System Landscape -> IMG only create a Customizing Request
    2. In the Normal Corrections Demo, corrections are initiated through CRMD_ORDER, is this so during an Implementation Project?
    3. In the DEMO there appears to be a Workflow notification process between task, is this active by default?
    I know that's a lot all at once, but I finally got some momentum behind this and I want to keep it going.  Thanks in advance for any information you can provide; points will be awarded.
    Jose

    Hi Jose,
    1. How are Non-IMG changes (Workbench) assigned to a project.
    a. solar_project_admin -> System Landscape -> IMG only create a Customizing Request
    Once you have created a Change Request transaction (SDCR), you will be able to select the follow up change document, Normal correction (SDMJ) or U'gent Correction (SDHF) for example. Then you will create a transport request under this change document. This transport request will be available in the development system where you will perform your changes. For new objects the system will ask the transport request when you are creating the object, for changes in an existing object the system will ask for the transport request when save the change.
    2. In the Normal Corrections Demo, corrections are initiated through CRMD_ORDER, is this so during an Implementation Project?
    Yes, you can use CRMD_ORDER to create new change requests (SDCR) and select the Normal correction (SDMJ) in the subject field. Once this change request has been approved the Normal Correction will be created automatically. However you can create a new change request from a support message (SLFN) for example.
    3. In the DEMO there appears to be a Workflow notification process between task, is this active by default?
    I'm not sure if I have understood this last question, by default ChaRM doesn't have notifications. But you can setup this in the same way of support notification. Please take a look at the following link:
    Sending E-Mail from Support Message
    /people/dolores.correa/blog/2007/09/18/sending-e-mail-from-support-message
    Best regards,
    Fernando

  • ChaRM: switch back project implementation phase

    Dear All,
    is it possible for an implementation project to switch back the phase (for example from test to development or from golive to Emergency Correction)? Which are the contraindications?
    Regards,
    Bob

    Hi Bob,
    - technically nothing is blocking you from that
    - functionally: you should just pay attention to what have been done in last phase before switching. As long as transport requests sequence is respected during import (meaning you use ChaRM for imports) there should nt be any contraindication
    be aware that by checking table /tmwflow/tpphmac for phase model 'devrl' (that corresponds to implementation project) you ll know what is exactely allowed in each phase of your project type.
    SAP Would not recommend changing values in this table though
    Regards
    Khalil
    Edited by: Khalil SERRHINI on Sep 7, 2010 11:01 AM

  • ChaRM Maintenance Project & Implementation Project - How to select ?

    Hi,
    I am having an Interesting issue.
    I have defined two ChaRM Projects, One is Maintenance Project (ZCHARMIDES) & One is Implementation project (ZCHARM_NC).
    Implementation project (ZCHARM_NC) I defined today itself & Maintenance Project I am using for last 2 months.
    In both the projects I have same logical component.
    Now When I am creating a Change Request & authorizing it, it is generating Normal correction based on subject. But by default its taking Task list M000000001 which belongs to Maintenance Cycle, But I want to select Implementation Project, how to select this.
    My issue is why system is not asking me to select project ( Maintenance & Implementation) even though the logical component is same.
    I want to select Implementation Project  - I000000114 for checking Normal Corretion.
    Regards
    Praveen Khot(PK)

    Hi PK,
    It depends on the subject which you are selecting. A normal correction type in the subject field is related to the maintenance project. And hence, when you have only one maintenance project with that landscape, it automatically gets assigned to that maintenance project.
    In order to select the implementation project, your subject would look like Development (Implementation) (unless customized) and only then the follow on correction type would be the normal correction in the implementation project.
    Per the standard functionality of ChaRM, you will not be able to see the pop up to choose amongst one of the project types for a CR.
    Regards,
    Sneha Vyas.

  • ChaRM: Implementation project vs. Maintenance project

    Hi!
    What is the difference between an Implementation and Maintenance proejct in ChaRM?
    For both of them I can create CR's. Is not?
    Thank you very much much!
    regards
    Thom

    Hi, Thom
    I think the normal corrections in both cases are the same,
    and the project workflow's look's similar.
    from Sap Library:
    [Workflow for Maintenance Cycles|http://help.sap.com/saphelp_sm40/helpdata/en/06/172e4208d06869e10000000a1550b0/frameset.htm]  vs [Workflow for Implementation Projects|http://help.sap.com/saphelp_sm40/helpdata/en/1a/c39742042fc86ae10000000a155106/frameset.htm]
    In my opinion, we use each project type for concrete task's (Implementation Project for business process implementation, Maintenance project - for solution maintenance).
    Regards,
    Oleg.

  • CHARM- No task list found for implementation project

    Hi All,
    I created an implementation project, and created a task list for the implementation project.
    But when i create a change request with normal correction, The Task list is not getting displayed.
    I am facing a conflict also, When i directly create a correction document without creating a change request. I am getting the task list for implementation project.
    Why is it am getting the task list for Implementation project in correction document and not in change request.
    When i tried to explore. found that in change request it is getting the list of maintenance cycles(Maintenance projects) and not the tasklist for other type of projects.
    Our customized flows are all dependent on the change request. So Is there any configuration i can do to get the task list of implementation project also in the list.
    Kindly guide on this issue.
    Thanks in advance.
    Regards,
    Subhashini.

    Hi Xavier,
    I  was also checking that one only.
    For the standard transaction type SDCR, it is working perfectly as you toldh when i select development(Implementation).
    But the problem is, here we have customized SDCR to ZDCR with our follow up documents.
    When i try to include the Code group of implementation(Implmntn), Nothing is happening.
    The subject is getting included in the list. but iam getting only the list of maintenance project only.
    I have made the changes in copy nsontrol also. but i dont see any difference.
    I could not able to trace where exactly i need to do the customizing to bring the list of implementation projects in my change request(ZDCR) when i select the subject( Project-implementation(SDMI))
    Kindly advice.
    Regards,
    Subhashini.

  • Change Request Management in Implementation projects or not?

    Hello guys,
    We are starting a Change Request Management project at a customer.  We discuss  in the blueprint phase whether we should be using it only for maintenance activities, and not for implementation projects.  We have some people that can be working both in maintenance and also in projects at the same time.
    We want to understand whether that scenario is possible and also whether is advisable.  We want to have control over the process, and therefore we should be restricting the creation of Transport Orders through SE01 so that we know that transport requests are created only by change document action.
    What are the drawback, difficulties, considerations you may consider in making that decision?  Is it logic to work that way or is it better just to implement it for the whole installation, including implementation projects?
    Esteban Hartzstein
    Edited by: Esteban Hartzstein on Jan 20, 2010 3:37 PM
    Edited by: Esteban Hartzstein on Jan 20, 2010 3:39 PM

    We want to have control over the process, and therefore we should be restricting the creation of Transport Orders through SE01 so that we know that transport requests are created only by change document action.
    this you can do either via SE03 / Display/Change Request Attributes  / SAP_TMWFLOW     Request created using Change Manager          X          X / Defaul for all client = Mandatory
    or
    you can achieve this by just activating the CHaRM in SolMan ( solar_project_admin / system landscape / CHARM)
    Nesimi

  • CTS Mgmt in SolMan for an Implementation Project?

    Hi,
    In an Implementation Project, if we need to use Solution Manager for CTS, is there any pre-requisites?
    To be more clear, the project is still in the development stage and has not gone-live. The SolMan project type will be "Implementation" project(not a maintenance project). In this scenario, how the development/customization request will be moved across the landscape?
    What are the steps to be followed?
    Any inputs in this regard will be greatly appreciated.
    Thanks a lot in advance.
    best regds,
    Alagammai.

    Hi Avinash,
    Again thanks a lot for your timely help.
    So, all transports relating to an implementation project can be moved using the CHARM feature of SolMan. Nice )
    (ii) Whenever I create Implementation or Maintenace project in my SolMan system, I am not finding this "Change Request" tab under "System Landscape" tab. What could be the problem? Is that becos CHARM is not configured in my system?
    (iii) As you told while we create the transport route in the satellite systems, do we do it in the regular way? Or is there any modifications need to be done as we have to use it with CHARM? (sorry, might seem to be a silly question... but, as I am not aware of it...)
    (iv) Also, you have listed a number of steps to be done. Are these steps to be done in the SolMan system?
    (v) Is there any link or document describing this process? Do you have any document of your own? If so, can you pls send the same to my email id [email protected]?
    Thanks & Best regds,
    Alagammai.

Maybe you are looking for

  • Can't send texts to other iphones

    I have an iPhone 5 that has been updated to ios7.  All of a sudden I am unable to send texts to other iPhone users.  When I type my text and hit send it say's "sending" but never sends.  Now, I have to tap on my message and an option comes up that sa

  • Displaying multiple midi regions in piano roll

    I have overdubbed some midi tracks and would like to view and edit them in one window of the piano roll. The manual says "Ensure that View > Show Selected Regions Only is switched off." Well for the life of me, I cannot find any option in either view

  • For Migration: Staffing of existing Roles with Distribution

    Hi, As a part of Migration, we are trying to use a Report for Uploading Staffing data. The roles are having Distribution. We are trying to use BUS2177staffingadd BAPI which works only if Start and End dates are same as that of Role. We are planning t

  • Installing Adobe Flash Player 11.7 silently

    I've tried different things that I found online, including the -install at the end of the command line but I still get prompted to walk through the installation process.  I need it to install silently.  Mozilla Firefox has a real simple switch you ad

  • Show itemcode on production order lookup and BOM lookup

    When looking up a Production Order or Bill of Material, the ItemCode is not available in the lookup window. Even when you "Product No." in the case of the Production Order or "Parent Item" for BOMs you get the Item description rather than the ItemCod