CIF of SA is not consistent for Validity End Date

Hello gurus,
Our company is quite new in using SNC, and we bumped into this problem (see description below), and hopefully this forum can help us.
<Description>:
When the Scheduling Agreement is CIFed from R/3 (ECC) to SNC, the Validity End Date does not get updated each time.
It gets updated sometimes, but not always. It is inconsistent behaviour.
<Example>:
Scheduling Agreement A
Validity End Date: 31.12.2012 Changed to 30.11.2012 in R/3.
Performed CIF using Transaction Codes CFM1 and CFM2.
Correctly updated the Validity End Date in SNC.
For the same Scheduling Agreement A updated Validity End Date to 31.01.2013 in R/3.
Performed CIF using Transaction Codes CFM1 and CFM2.
The Validity End Date was not updated in SNC & remained as 30.11.2012.
For the same Scheduling Agreement A updated Validity End Date to 15.10.2012 in R/3.
Performed CIF using Transaction Codes CFM1 and CFM2.
The Validity End Date was not updated in SNC & remained as 30.11.2012.
Thanks guys
Tuffy

Hi Tuffy,
1 - I am just wondering if after the Delete the existing External Procurement Relationship in SNC, and CFM1 and CFM2 the SA (i.e. changed my validity end date value) to the SNC, will the problem of the SNC side not able receive the changed SA??
When there is a change in the SA, integration model would create the same in SNC if it does not exist. But the transfer from ERP does not happen just like that. First, make sure that the message type (CIFSRC) has been checked in BD50 and then schedule a job to periodically transfer the SAs.
2 - What does the tcode the person in the SNC side have to double check to ensure the SA is transmitted there??
The t-code is /SAPAPO/MTI2 - External Procurement Relationship.
3 - Someone in our company advise BASIS team to check the transactions BD50 and BD52. What exactly does it mean and does it help?
This is correct. I mean guys who are responsible for Integration model need to set-up BD50, BD52 so that changes to SAs are transferred periodically.
Regards,
Sandeep

Similar Messages

  • Could not create a valid GL date rejection for PA transactions to GL

    Hi All,
    PRC: Interface Labor Costs to General Ledger has the Rejection "Could not create a valid GL date".
    I have verified all Periods are Opened. Still there is a a rejection.
    Thanks,
    Praveen

    Praveen Bharadwaj wrote:
    Hi All,
    PRC: Interface Labor Costs to General Ledger has the Rejection "Could not create a valid GL date".
    I have verified all Periods are Opened. Still there is a a rejection.
    Thanks,
    PraveenPlease see these docs.
    PAGGLT, PASGLT gives 'Could Not Create A Valid GLDate', even when GL data is re-open. [ID 330874.1]
    PRC: Interface Labor Costs to GL (PALDLC) Will Not Interface, CDL.Batch_Name Is Null [ID 437301.1]
    PALDLC and PASDUC Error - Could Not Create A Valid GL Date For Provider [ID 338330.1]
    Distribute Labor Cost Exception-Could Not Create A Valid GL Date [ID 418675.1]
    PAXACCPB - PRC: Create Accounting Gets Error 95325 Gl Date Not An Open Or Future Enterable Period [ID 951452.1]
    Thanks,
    Hussein

  • JPF Resources not defined for Validator

    Hi,
    I am developing portlet using Java Page Flow. I saw this error, however it's still validating:
    ERROR [ExecuteThread: '10' for queue: 'weblogic.kernel.Default'] (ValidatorForm.java:154) - Resources not defined for Validator
    How can I fix it? Thanks

    Hi Abhishek / Durgesh ,
    Thank you for your valuable suggestions
    We checked back for all points that you guys suggested
    1:  I coudn't find planning method attribute at plan options >> main tab
    2: Parent item is not a buy item and all the components are active.
    3: For Components: WIP supply Type is not Phantom
    4: Sourcing Tab for the parent Item is as expected (i.e. Source organization is populated with appropriate value)
    5: Actually, We have re-tested a different scenario where Work Order was not created through custom program. We created a new sales order and ran collections+Plan. Still no Planned Orders for components

  • Validity end date is not getting copied from inquiry to quotation.

    Hi Friends,
    While creating quotation the validity end date is not getting copied from inquiry to quotation.
    What setting needs to be done, pl suggest.
    Regards,
    Hari.

    Sreehari,
    i dont find any logic of having Same validity date for Quotation and Inquiry....
    the simple reason is explained by example: Say you have created Inquiry on 1st november and end date is 15th novembr. Customer comes to you on 14th november and asked for Quotation, and if you refer quotation on that day that means its only applicable for one day, which generally wont be the case.
    There is no option for copying the validity dates from Inquiry to Quotation as per standard. If you want, create routine, place it in copy control.
    Thanks,
    raja

  • Position 1000001 not available for the start date of the infotype record

    Dear Experts/Gurus,
    I am getting the following error message "Position 1000001 not available for the start date of the infotype record" while trying to upload employees HR Master data in PA40.
    I know the reason why because the position is created on 01.05.2009 & employee DOJ is 01.02.2006 both are mismatch & the position date has to be changed earlier date than DOJ but i don't know how to do.
    Please let me know how to sort out this issue asap.
    Rgds,
    Vikrant

    Dear Friend,
    Use  PP02, select the position no, select infotype 1000 (Object), select planning status & validity(date) and then use the copy function to change the start date.
    Regards,
    Aks

  • Table for Valid To date field in C203 Tcode

    Let me know the table name for "Valid To Date" field in C203 transaction.
    Thanks,
    Angavai.E

    Hi Angavai,
    Check with table PLMW.
    Regards,
    Raghu

  • Lock NOT set for: Archiving the data from a data target

    Dear Expert,
    I try to archive one of my info cube, when i start to write the Archive file the Free Space in the Archive folder not enough and it make the process error.
    Then i try to changes the Archive folder to another path with enough free space. But when i start to write the archive file with new variant this error message came up :
    ==============================================================
    An archiving run locks InfoProvider ZICCPS810 (archivation object BWCZICCP~0)
    Lock NOT set for: Archiving the data from a data target             
    InfoProvider ZICCPS810 could not be locked for an archiving session 
    Job cancelled after system exception ERROR_MESSAGE                  
    ==============================================================
    Please Help Me.
    Wawan S

    Hi Wawan,
    If the earlier archive session resulted in error, please try to invalidate the earlier session in archive management and try running archive job again.
    Hope this helps,
    Naveen

  • ODI 11g 11.1.1.7 with Win64 bit OS : Starange problem : Right click does not work for Create new data server in Topology.

    ODI 11g 11.1.1.7 with Win64 bit OS : Strange problem : Right click does not work for Create new data server in Topology.
    On right click nothing happens at all. I have  reinstall the ODI multiple times with right installer. issue persist.
    Please help.

    Hi,
    Did you use the generic installer or the win32 one ? You should use the former with Win64.
    You can also check that your version of Java is supported in the certification matrix.
    Regards,
    JeromeFr

  • Please add XSD Schema for validating TLF data in TLF 3.0

    It would be very beneficial to have a XSD schema for validating TLF data.  Please add this to TLF 3.0.  There are a couple of posts where others have already asked for this...
    http://forums.adobe.com/message/2795099#2795099
    http://forums.adobe.com/message/2223205
    Thanks!

    Sure Gang!
    We could use the XML schema to validate the TLF markup that we are generating from our publishing system.  We generate XML files which include the TLF markup and a XML schema would be very beneficial to validate that markup to make sure we are doing everything right.

  • DTP error: Lock NOT set for: Loading master data attributes

    Hi,
    I have a custom datasource from ECC which loads into 0CUST_SALES.  I'm using DTP & transformation which has worked for loading data in the past for this infoobject.  The infopackage loads with a green status but when i try to load data, the DTP fails with an error message at "Updating attributes for InfoObject 0CUST_SALES Processing Terminated" & the job log says: "Lock NOT set for: Loading master data attributes".  I've tried reactivating everything but it didn't help. Does anyone know what this error means? We're on SP7.   Thanks in advance!

    Hello Catherine
    I have had this problem in the past (3.0B) --> the reason is that our system was too slow and could not crunch the data fast enough, therefore packets where loacking each other.
    The fix: load the data into the PSA only, and then send it in background from the PSA to the info object. By doing this, only a background process will run, therefore locks cannot happen.
    Fix#2: by a faster server (by faster, I mean more CPU power)
    Now, maybe you have another issue with NW2004s, this was only my 2 cents quick thought
    Good luck!
    Ioan

  • Change validity end date on activity type

    Is there a way to change the validity end date of an activity typre. Currently it is 9999 we would like to change it to 2011.
    We would like to use a particular activity to cost current standards but dont want to use it for planned estimates that we will create for 2011. I am assuming if the validity ends in 2011 it will resolve the problem. I know we could create alternate routings and different production version but I am trying to avoid that and see if we can find a short cut.
    Your help in this regard will be much appreciated

    Hey Greta,
    I executed the report but it says ,"The deletion could not be carried out, plan records still exict on cost center for activity type." I have deleted every thing from kp26 for that particular combination of activity type and Cost center.
    Any ideas as to what is happening!!
    Regards,

  • Validity end date tab is suppressed in scheduling agreement

    Hi ,
    In scheduling agreement , Validity end date tab is suppressed ,
    There is no layout is assigned to the doc type & standart transaction varient is acitve , but while doing ME31L above field is not coming ( it is in suppressed / hide mode )
    Please let me how to get that validity date tab in scheduling agreement.
    Thanks,
    Pradeep

    Hi,
    Go to SPRO > IMG > MM > Purchasing > Purchase Order > Define Screen Layout > NBF > Administrative data, header > make the fiels Validity Period field optional / Required.
    Hope this will help you.
    Regards,
    Manish Jain

  • Validity start and Validity End date in PO

    HI  gurus
       can you plz tell me how to activate  validity start and Validity End date in PO
    Neha

    Hi,
    It is applicable for PO done for Frame work oder with Doc type - FO(Frame work order)as its an agreement of supply of stock only between specified period.For this kind of Doc type system makes it mandatory to enter the valisity start and end date.
    Thanks

  • Comparing dates (Start date should not be later than End date etc ...)

    Hello All,
      I have a table (5 rows) with 7 columns. Of which the first to columns are the start date and the end date. Can someone kindly advise on how I can go about to ensure that there is some validation mechanism in place such that the start date is not later than the end date and vice versa ? Thank you very much.
    from
    Kwok Wei

    Hi
      Use calculated attributes as Pran suggested. It should work. Where are you getting the data from. Is it from R/3. The node bound to the table ui element is it a model node. Anyway Here is the link on how to use the calculated attribute.
    http://help.sap.com/saphelp_nw04/helpdata/en/7f/a0384162316532e10000000a1550b0/frameset.htm
    regards
    ravi

  • Query  on extension of validity end date of Qualification - PD

    Hi All,
    I want to extend the validity end date of a qualification.
    I tried T-code OOQA however the validity dates are greyed out .
    Can anyone please help me with this?
    Best Regards,
    Kanika

    It can be done using Tcode-  RE_RHGRENZ4.
    Thanks all...
    Kanika

Maybe you are looking for

  • Vectors and JTable

    There is 2 things I am having problems with. I have 2 vectors I need to combine. I am not sure how to combine vectors. Also I am trying to enter the information in the vectors into a JTable. I have the column names in the JTable. Here is some of the

  • Convert date to number

    Hello. I want to convert date field to number. I used TIMESTAMPDIFF(SQL_TSI_DAY, "Invoice date (invoice header)".Date, CURRENT_DATE ) to get number of days from invoice date to current day but this number is treated as date format and I'm not able to

  • Get content from html page

    Hey guys, Im looking at accessing a webpage, downloading the content then stripping out the parts i want. http://sunsolve.sun.com/search/document.do?assetkey=1-34-9-1 For example, I would like to be left with just the patches and their information, n

  • An irrecoverable stack overflow  on RedHat7.1 Linux WLS6.1 SP2

    Does somebody knows this type of problem,please ? We have 2 processor Linux machine Hardware: VALinux Dual CPU 550Mhz with 1GB Ram, 8GB SCSI HDD. Server type and Kernel build: Linux Linda 2.4.5-beta4va3.15smp-piii #1 SMP Fri Jun 15 04:29:19 PDT 2001

  • Need some help with MDX formula

    Hello, I am not finding any good documentation on MDX formulas, there is a specific one that I need some help with....could someone please elaborate what exactly does this formula mean? thanks. (MEASURES.[SIGNEDDATA], CLOSINGPERIOD([%TIMEDIM%]. [%TIM