Constraint capacity planning for Un-Routed items in ASCP

Hi All,
Is there any possibility to create constraint capacity planning for items which do not have routings in ASCP?
I tried by setting Bill of Resources (BOR) in Aggregatin tabbed region in Plan option. But i could not get an expected result. Kindly help me out in this.
regards,
Murlai R
Edited by: user10942922 on Mar 27, 2009 9:30 AM

Dear ,
To answer the question for Capacity requirement planning on sales order I would say that MRP does  only materials planning based on demand and reciept  but never does Capacity Requirement Plannig .MRP generates Planned Order  and susequently , production order can be genreted and farther you can carry out capacity requirement planning based on the work cente available capacity , requirement and load for those MTO orders .
But there are SAP business suit like APO-SNP APO PPDS which carriy our details scheduleing and caapcity check based on the demand situation : Sales Order ,Independent Order  and does capcaity vaialbality chek for those demands while planning .
Now , here is the answer of your question :
1) Can Capacities are Scheduled as per priority given in SO automatically. : Not possible  through  SAP MRP but in APO-PPDS, APO-SNP-CTM , Herustic model .
2) Can revised availability dates will be reflected in SO. : It can be reflected as per the ATP chekc , Replishmenet Lead  Time and re-scheduling horizon maintained in OPPQ-Carry all overall plant parametres.
3) Which reports will be useful for understanding consolidated availability date of material for given sales order/s. : You can check through MD04/MD05 or in sales order -Availaibility check -Schedule Line -Availaibility date .
Hope your are clear about the requirememt .
Regards
JH
Edited by: Jiaul Haque on Jun 5, 2010 1:59 PM
Edited by: Jiaul Haque on Jun 5, 2010 1:59 PM

Similar Messages

  • Capacity Planning for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • Capacity Planning for Workflow Manager

    Some information is available regarding highly available Workflow Manager implementations but I cannot find any information regarding when or how you should perform capacity planning for the workflow manager.
    A few questions are jumping out at me.
    When would we want/need a dedicated Workflow Manager server? (I can understand if this was shared between multiple farms this may be a benefit but what about from a pure capacity perspective).
    Are there any case studies or documentation that we can use as a baseline estimation for capacity for the workflow manager?
    Generally speaking for a small/medium farm deployment is it expected that this service also run on the application server?
    certifications MCITP, MCTS, MCPD | blog
    http://corypeters.net | twitter
    @cory_peters

    That would really depend on what kind of workflows are being run and the traffic being generated by the users. If you have long and complex workflows, you will need multiple nodes in the farm to handle.
    Our tests with very simple workflows on a 16-core 16GB machine with SQL Server on a diff machine showed that it could handle 400 incoming messages per second and 65 workflow executed per second. Now if you have complex workflows, it may slow down further.
    If you have one msg per user per second - it may mean 400 users handled per second. But I wouldn't make that conclusion - u must test your farms against your scale needs and accordingly plan your farm capacity
    Hope this helps
    Ravi Sekhar

  • Capacity planning for DB, pctfree pctuser

    What is segment, pctfree, pctused ? want to clear my concepts...
    Secondly how we can do capacity planning for Database growth?

    The simplest and most accurate approach is
    - Create the schema
    - Load it with a representative amount of data (i.e. 1-2% of the expected data volume)
    - Measure the amount of disk required
    - Multiply by an appropriate factor to determine the eventual size
    You can also do back of the envelope calculations, taking the average row size of your larger tables, multiplying by the expected number of rows, then adding an appropriate multiplier. Probably in the neighborhood of 2 to account for indexes, empty space in the table, etc., but this is very application specific.
    Justin

  • Capacity Planning for OBIEE

    Hi,
    I am looking for some information on how to do capacity planning for obiee imlpementation. Any pointers would be much appreciated.
    -Thanks

    Check out this document:
    http://www.peakindicators.com/media_pi/BI+EE+Architectures+and+Sizing.pdf
    regards
    John
    http://obiee101.blogspot.com/

  • Capacity Planning for Hyper-V individual host and Cluster

    Hi Experts
    I need to know some basic idea about Capacity planning for Hyper-V which requires Capacity Planning for Hyper-V individual host and Cluster.
    I got attached info on websites but still not clear. Can someone link me to an effective website or help me to calculate the required sizing. W
    Regards Suman B. Singh

    Hi,
    You might want to check out these websites:
    http://www.microsoft.com/en-us/download/details.aspx?id=39057
    http://technet.microsoft.com/en-us/library/dd277865(v=office.12).aspx
    http://technet.microsoft.com/en-us/solutionaccelerators/dd537570.aspx
    Cheers
    Andrew

  • Error in MIR7 - Different Material Vendor  planned for del. costs item in PO

    Dear All,
    We getting error during MIR7.
    We add two freight condtion ZFRO and ZFRT in purchase order  as below :
    ZFRO = we have add Rs. 350 against freight to Vendor(MATERIAL VENDOR)
    ZFRT =  We have add Rs. 100 for local freight which is paid to FREIGHT VENDOR directly (cash payment) i.e. paid for Transporter's Godown to our factory.
    Now during MIGO, store department has enter  as :
    1. ZFRT (Freight Vendor - FREIGHT VENDOR)
    2. ZFRO (Freight Vendor - MATERIAL VENDOR)
    Now during MIR7 we are getting following error :
    Different Material Vendor 300255 planned for del. costs item in PO 4500028018
    (300255 is FREIGHT VENDOR which is at Number 1 in freight tab of MIGO)
    Thanks and Regards,
    Nirav

    For good and service,
    In MIR7, select the option Goods/Service Item
    First do only for Good/Service item...
    After that, in MIR7 select only Planned Delivery cost and give the same PO number..
    Then you will receive a pop-up message to choose vendor..
    Here select one vendor and press continue..
    Then save you invoice..
    And again do the same and just select the other vendor..
    You can see 3 invoice number in PO history..
    One for goods charges and another two for freight charges..

  • Can anybody give me the formula for Database capacity planning for 10gR2?

    Hi ,
    I want to learn how to make database capacity planning for production in 10gR2. Here i need any formula to plan the capacity.
    Can anybody help me?
    Regards
    Rajesh

    hi,
    There is no perfect world. There is no perfect application. If I am permitted to say, there is no perfect CAPACITY PLANNING. In this world, we strive hard to achieve near PERFECTION
    DISK SPACE ESTIMATED FOR THE DATABASE(RDBMS) ONLY
    ESTIMATES ARE BASED ON ASSUMPTIONS, SAMPLING, STATISTICS
    ESTIMATES CAN NOT QUANTIFY DISK SPACE REQUIREMENTS IN REAL TIME
    ACTUALS ALWAYS VARY FROM ESTIMATES.
    so ther is no particular formula to plan capacity planning.
    or post your rquirements for the DB and wait for some reply
    regards,
    Deepak

  • Transaction to maintina Billing Plan for Sales order item

    Hi All,
    Is there any transaction other than VA01/VA02 to maintian Billing plan for Sales order item.
    Thanks & Regards,
    Rajanidhi Rajasekeran.

    It is possible to maintain Billing Plan in Sales Document Type (VOV8), as well as Item Category level (VOV7). As you want it at Item level, maintain the same in Item Category Configuration at Item level & it will by default be captured in Sales Order at Item level.
    Step 1: Sales Document Type
    IMG > Sales and Distribution > Sales > Sales Documents >
    Sales Document Header:
    1. Sales Document Type:The sales document types represent the different business transactions, such as Inquiry, Quotation, Sales Order, etc. To create new sales order type, always copy as with reference to similar sales order. If possible use standard sales order.
    2. Define Number Ranges For Sales Documents: Maintain number range with discussion with core team.
    3. Assign Sales Area To Sales Document Types:
    A. Combine sales organizations / Combine distribution channels / Combine divisions: Ensure to maintain these, else Sales Order creation will give error.
    B. Assign sales order types permitted for sales areas: Assign only required Sales Order Types to required Sales Area. This will minimize selection of Sales Order Type as per sales area.
    Sales Document Item:
    1. Define Item Categories: If possible use Standard Item Category. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Item Categories: If possible, use standard. Formula for deriving item category: Sales Document Type + Item Category Group + Usage + Higher Level Item Category = Item Category
    Regards,
    Rajesh Banka

  • Bandwith Capacity Planning for 100 user SSL VPN Facility

    What are things we should conisde while doing the  bandwidth capacity planning for SSL VPN Facility for 100 users  ?       

    Hi Surya,
    This is not an easy question, since there are so many things to consider that I may miss some of them.
    1- In case you are planning to use an ASA, check this to find the ideal throughput for you:
             Compare Models
    2- What type of traffic? TCP or UDP?
         If TCP
              Make sure you avoid fragmentation, adjust the MSS value if necessary.
         If UDP
              If fragmentation must happen, then set the DF bit to clear to allow it.
    3- Make sure the clients always negotiate DTLS (which is by default).
    As mentioned in the document above:
    "Maximum throughput measured under ideal test conditions.
    VPN throughput and sessions count depend on the ASA device configuration and VPN traffic patterns. These elements should be taken into consideration as part of your capacity planning."
    Thanks.
    Portu.
    Please rate any post you find useful.

  • Capacity planning for multiple orders

    Hi All,
    I am sure this is a common situation but I am struggling to map it so can I get some guidance.
    We have a number of work centers where the capacity is based on the area of the part going into it against the shelf space. For example - we use an oven in our manufacturing process. It has 3 shelves with 3 m2 space in total. We would put different sized parts in until it is full. How can I map this capacity constraint in PP??
    Kind regards
    Ben

    Hi,
       You can determine the quantity of a material that can be accomodated in the oven with the mentioned space and the amount of time required to process the oven with that quantity. So mention this quantity in routing and do the Capacity planning as with the standard Processing formula in the Work center or use the formula [Formula for furnace|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c03921439a11d189410000e829fbbd/content.htm]
      But, in real time, as we process different types of products, the confirmation qty of that Production order determines the qty processsed. Hence it is not possible to do capacity planning with the combination of different products.
      Hope this gives you an idea..
    -Thaila Shree

  • Capacity Plan for Partially Confirmed Order

    Hi Guys
    Can any one please guide me on Capacity Planning (CM29) how to:
    1. Plan to plan a partial order. Or in other terms: how to plan a part order in wk1 and rest in wk2
    2. If the process order is partially confirmed, then how should supervisor re-schedule it again for later date!
    3. Ideally what should be followed:
      a. Schedule the Planned Order on CM29 and then Convert them to Process Order , OR
      b. Convert the Planned Order and then Schedule the Process Order on the CM29 screen
    Thanks in advance
    -Rahul

    Hi Mehdi,
    Once order status is PCNF you cannot create lot with inspection type as 03. You need to reverse all the confirmations/Goods issue and activate 03 inspection type in material master, maintain MIC related data in routing and do Read Master data. Then system will create inspection lot.
    For 03 inspection type manually inspection lot cannot be created. Once order is released inspection lot will be automatically created by system.
    Thanks & Regards,
    Ramagiri

  • How to go about capacity planning for storage ?

    Hi Experts,
    How to go about Capacity Planning? For  instance if clients wants to upgrade to new server and new storage and asks us how much additional storage do you need for next 5 years, how can calculate the amount of storage.
    I don't have any baseline info about the server of past years. Where can I start and any scripts you guys use for doing capacity planning?
    Appreciate your help.
    Thank you.
    Sam

    Please see this link:
    SQLAuthority News – Storage and SQL Server Capacity Planning and configuration...
    T-SQL Articles
    T-SQL e-book by TechNet Wiki Community
    T-SQL blog

  • Activate Integrated Planning for Cost Line Items posting

    Hi all,
    Based on this SAP Help link, there are two ways to create plan line items:
    1) By adding the business transaction "Plan line items" to the user status of the WBS Element.
    2) By activating Planning Integration a.k.a. Integrated Planning for version and WBS Element/Project Profile.
    Option 1 works fine for me.
    However, option 2 does not seem to be working when I activate it, contradicting the state from the link:
    If planning integration is active in the fiscal-year-dependent parameters of the relevant planning versions, the system writes cost element planning line items for plan-integrated WBS elements, regardless of user status.
    So far what I have customized is:
    -In transaction OKEV, select the version, click on "Settings for Each Fiscal Year" and double click for the year. Then I mark both "Integrated Planning" and "Integrated planning with cost center/bus. processes" checkboxes.
    -Activate "Integrated Planning" at Project Profile level: go to transaction OPSA, select Project Profile, go to tab "Controlling" and mark "Integrated Planning".
    Nevertheless, when I post plan costs from transaction CJR2 using the customizing above (based on second option), I see no cost lines when running CJI4.
    I wonder if there is something missing in customizing that allows me to see posted cost line items in CJI4. I would appreciate very much your help.
    Many thanks and best regards,
    Pablo

    Hi Gokul,
    Many thanks for the link to that threat, Rachel Tang's reply on that discussion is very complete and included the answer to my question.
    She comments that three points must be checked to activate Integration Planning:
    1) Mark "Integrated Planning" at CO Version/Year level (SPRO > Controlling > General Controlling > Organization > Maintain versions).
    2) Mark "Integrated Planning with costs centers/bus. processes" at CO Version/Year level (same transaction).
    3) Ensure WBS Element has Integration Planning marked (PRPS-PLINT = X). [It looks like this is done automatically by marking Project Integration at Project Profile level BEFORE project is created]
    In my case, I had first and second steps correct. However, even though I had marked Integration Planning at Project Profile level, it seems that already created Project Definitions are not updated with new Integrated Planning value after it is changed at Project Profile level.
    Maybe it is possible to modify WBS Element's Integration Planning flag manually (though SAP OSS Note 301917 states that this is impossible), otherwise I could never achieve Integration Planning for already created projects.
    In my case it would be more suitable to use the alternative of adding Business Transaction "Write plan line items" to User Status.
    Many thanks to Sanjeev and Gokul for your help.
    Best regards,
    Pablo

  • Capacity planning for a 2 million hits / day site

    Hi,
    I am doing a feasibility study for a 2 million hits per day
    e-commerce site.
    We are looking at various vendors but would prefer an
    Oracle solution.
    One option I am looking
    at is a three-tier server architecture with instances of
    Oracle Application server running on one set
    of machines and instances of Oracle 8/8i running on a second
    set of machines.
    Macromedia generated HTML would be auto-translated to PL/SQL
    cartridges to generate the relevant WRBXs.
    Has anyone any experience of the performance issues /
    robustness of this type of large-scale
    development.
    In particular, I am looking for some hard numbers / capacity
    planning model on:
    Number of instances of Application Server;
    Number / type of Application Server boxes - SpecInt / Flt and
    memory;
    Number of instances of RDBMS / parallel Oracle;
    Number / type of RDBMS boxes - SpecInt / Flt and memory; and
    External communications bandwidth.
    Any advice, personal anecdotes, recommended sites, or
    literature references much appreciated.
    Regards,
    Ajit Jaokar
    null

    Hi,
    1. Do cross forest authentication Go through Global Catalog?
    Yes, cross-forest authentication relies on Global Catalogs of both forests.
    2.  Do Global catalogue cache ad object info if they are in different Forest. If not, how does the authentication request flow across the forest?
    GC doesn’t cache information for objects from another forest. However, once a user has been authenticated and authorized, its service ticket remains (on the local machine) for a while before it logs off. The authentication request
    is first received by the local DC, then GC, when GC couldn’t find a match in its own forest, it checks its database for trust information, if there is a name suffix matched, the authentication request is passed to the corresponding forest.
    3. Is this calculation still the same when considering cross forest trusts?
    Yes, establishing forest trust doesn’t consume much more space, because GC doesn’t store information of another forest.
    4. Do we need to consider any other memory requirements in a cross forest trust environment?
    Not really, as I mentioned above.
    More information for you:
    Accessing resources across forests
    http://technet.microsoft.com/en-us/library/cc772808(v=WS.10).aspx
    Best Regards,
    Amy

Maybe you are looking for

  • Error in Mail Sender Adapter

    Hi all, without any obvious reason i'm suddenly getting an error in the runtime workbench at the Communication Channel Monitoring: exception caught during processing mail message; java.io.IOException: unexpected greeting response; read * BYE Connecti

  • PDF forms in Preview

    Someone emailed me a pdf document to fill in, which I did in Preview.  But when I emailed it back, the recipient got back the blank form.  Am I missing a step somewhere?  When I go back and open the PDF, I still see my edits and additions.

  • Getting error in Migo_gr

    Hi EveryOne , I m getting error in Migo_gr that : "  Field Bus. Area is a required field for G/L account DMRC 141004 " . The bus arear is not visible in Migo_gr . thanks

  • How to download a web page intact as one file, which can be easily done with Safari

    On Safari all I do with a complex web page is 'Save As (whatever I wish, or its existing description. That shows as a complete webpage in a single file. Firefox saves it as a file PLUS a folder of elements. Takes up twice my desktop real estate, and

  • How do I see thumbnails of the .NEF files I'm importing?

    Windows Vista 64-bit Ultimate.  Lightroom 2.6. When I go to import .NEF files off my card, sometimes I just want to import one or two that I need NOW.  The rest can wait.  But LR onlyshows me filenames and sizes, and occasionally the date (I've seen