Control inspection lot in QM view of material master

Hi
this is regarding the setting for control inspection in QM view of material master.
can anyone give me a prictical example of
1.  'X' An inspection lot for each purchase order item/order item
2. '1' An inspection lot for each material document and material
3. '2' An inspection lot for each material and batch
If my requirement is to create one inspection lot out of several batches made from a production order( eg, 10 batches are created, only 1st one needed for RR and UD), which one should I use?

Hi,
the concept of batch comes when there are some property changes (property in terms of business, that may be quality or something else). if you are confirming production order partially, it means there is something that changes with batches. that's why std sap does not allow to create single lot though all those batches have been created from same production order.
and henceforth, your requirement cannot be fulfilled by any config. you can try for development.
partha

Similar Messages

  • Control Inspection Lot option-QM view

    Hi all,
              We want the system to create only one inspection lot for partial goods reciept from a production order.As an  option i have selected "for each material,batch and storage locaion"option in QM view.Material is batch managed and serial number processed.But still the system creates new inspection lot .Does anyone have a clue.The first inspection lot was only result recorded w/o UD status INSP ...i read that if first inspection lot is credited or already the posting qty is zero then the system will creat new insp lot every time we do GR but here thats not the case as there is still qty to be posted and only RR is done.Pls help .Thanks
    regards,
    Naik

    Hi
    In normal case system will not create inspection lot..
    but you are activating Serial no, means 100% inspection,(and your MIC single RR )
    that is the reason system is creating new inspection lot for each GR
    I don't have real time exp. but i can share some views...
    if your prod.order 100pc and first gr 25pc -- then inspection lot has these 25pc with S.no
    in next GR 25pc- how your existing inspection lot  will update with new S.No ?
    that's why system create new inspection lot but incase without s.no and 100%inspection
    system will check whether inspection lot is created or not and open or completed-- based on that create new lot .
    let us wait for some experts view...
    thanks
    Sami

  • Inspection type's maintained in the material master

    Hello,
    I want to know the transaction code using which I can check the inspection type's maintained in the material master.
    I do not want to go per material put in mass. I know that I can pull the data from tables but i do not want that.
    I want the standard SAP transaction code.
    Regards,
    Narendra Bora

    Well, you could make the argument that using SQVI to create a query and making this report available to select users is not really development.  It is a standard SAP transaction and users can be limited to only running certain queries. Groups of queries can be created and users assigned to groups.  By adding variants that users can't modify and locking certain fields in the variant you can limit the queries to a maximum number of records.  Usually the argument is that a user will create a massive query or set values that return too many values.  Both of these concerns can be addressed.
    I don't think a lot of people understand the full capabilities of SQVI.  You don't have to give users unlimited access to the transaction!
    If there was a "standard" report or transaction for what you want, I think between Sujit, and myself, we would be aware of it.  It is a common requirement during go lives to have to review inspection type setups.  I would hope by now we would have run across it.
    FF

  • Adding fields in costing view of material master

    Hi gurus,
    I need to add 4 fields in costing view of material master. I have followed the steps in SPRO, for configuring customized screen in material master.
    1) Created a function group YMMCO and copied the screen 2904 from program SAPLMGD1.
    2) Added 4 fields in my customized screen.
    3) Created copy of 01 ( Screen reference ) to z1 in OMT3B.
    Since 2904 is not there in the sequence . I changed one 0001 sequence at the end to 2904 . I also assigned my program
    SAPLYMMCO to it. I can see the changed fields in data screen and subscreen.
    4) Then I assigned the SSq to z1 in transaction OMT3E.
    But unfortunately, when I go to MM01 to create a material , I am not able to view the fields I added in costing view.
    I have checked the screen for the previous field, it shows 2904 only.
    Two days back, I did the same thing in basic data view 1 , it was working properly. As per client's suggestion I put it in
    costing view, it is not working . Please give me suitable suggestions.
    Thanks in advance.
    D. Mallick

    Hi,
    I also need to add custom fields to Basic data view. After copying & changing the screen sequence in Config, I could able to see the custom fields in Basic Data view.
    I have appended structure with custom fields to MARA table.
    But the values I enter in the screen is not getting updated to the table MARA.
    Can you please let me know the code, I should have have in PAI (Process After Input) module in the Sub Screen to update the values?
    Thanks,
    Dasa

  • Current period in Accounting 1 view of Material Master

    Dear Experts,
    In Accounting 1 view of Material Master there is a current period, now it is 12 2009.
    Is it possible to make it 11 2009, if yes how to do it.
    Please help if you have solution. it is very crucial for me.
    Thank you for your support.
    Regards,
    Zusen

    Hi,
    Please read the Solution part of  note 487381. There is still a few things need to be carry out before you can proceed
    with the initialization :
    Bear in mind that the initialization of a posting period has the
    following effects concerning the period stocks:
        o  The initialization of the posting period to a previous or to any
           posting period may lead to the loss of the information of the
           inventory balances of the previous periods.The book value of the
           current posting period is taken as the basis also for values of
           the previous period in this case.
           If you want to continue working with this new posting period, in
           addition you should execute report Z_DEL_HIST_ENTRIES attached so
           that history entries greater or equal to the new posting period
           will be deleted.
        o  If you have to briefly reset the posting period by one period
           (for example, postings must still be posted in a certain period)
           just to make a correction (and for a small number of postings),
           you should initialize the posting period back again to the old
           value so that the values of the previous period will not be lost
           (you should forbid postings when carrying out corrections).
           However, afterwards the values of the previous period or the
           history records (as of Release 4.5) of the materials posted in
           this case are inaccurate.
           You should NOT execute report Z_DEL_HIST_ENTRIES in this case.
        o  However, if the posting period is generally reset again to a
           previous posting period and if postings were made during this
           time, all information on the inventory balance of the previous
           periods is lost.
           As of Release 4.5a, you should use the cited correction report
        Z_DEL_HIST_ENTRIES in order to delete history records that are
        more current than the current posting period.Otherwise, it can
        result in deviations (inconsistencies) for the update of the
        history records.
    o  Important! If there are open physical inventory documents that
        have status 'counted' or for which indicator 'Freeze inventory
        balance' has been set, you should reject these if they refer to a
        previous period or have been created in the former previous
        period.The inventory difference to be posted can be determined
        from the current book value of the previous period and the book
        quantity frozen in the physical inventory document (ISEG-BUCHM)
        and does not match the inventory balance of the previous period
        that is currently valid.

  • Problem with *serial no. profile* in work sheduling view of material master

    Hi ! !
    I am here with a problem with serial no. profile in work sheduling view of material master.
    By mistake for some FHMI type ( PRODUCTION RESOURCE TOOLS )materials, serial no profile exist in 'work sheduling' view. Due to that we are facing problem in GRN.
    when I am trying to remove that with MM02. i m getting a message as Serial numbers already assigned to this material
    Please suggest how to remove serial no. profile.
    Thanks in advance,
    Prab

    Hi,
    go to MMBE and check the Current Serial number...for  FHMI type
    and go to IQ02 and close the Serial number range at the Current number range...
    Now you can assign this serial number range to another material type...
    Thx
    Raju

  • View in material master

    Hi Gurus,
    How to delete the view of material master say ex:storage location view for a material
    Regards,
    Subbu

    Hi Subbu,
    Views are dependent on the the material type.
    if u do not want a view for a material type then, u can go to tcode OMS2 and there u can deselect the view in the userdepartment. and save.
    Now that view wont be their for that material type.
    Hope it wud have answered ur question
    Reward if useful
    Shawn

  • PO creation without Purchasing view in material master

    Hi
    i am using 4.6 version
    system is allowing to create PO without purchasing view in material master.
    how it would be possible ?
    Regards
    Rahul

    Hi,
    i have checked with MARA for that material PSTAT value it is showing there "KDALBPCGV"
    please suggest
    regards
    rahul

  • Purpose of maintaining classification view in material master

    Hi gurus
    can anyone explain Purpose of maintaining classification view in material master with example
    Regards
    Vishal...

    Hi
    One of the reason we maintain classification is for batch management where characteristics like shelf life expiry date is being attached to a class & that class is maintained in material master so whenever transactions takes place it will read from the characteristics value.
    the other purpose is with variant configruation, for a configurable material there will be more than one characteristics for ex: in a car it comes with A/C - non a/c, metallic - non metallic, normal steering - power steering all these are mainatained as characteristics & assigned to a class & we use that class in classification for materials.
    there is many more advantages & ways of using classification in material master.
    Regards
    Rang

  • Significance of purchasing view in Material master

    Hi,
    What is the significance of purchasing view in Material master.
    What could be effect if this view is not maintained?
    Like for material type FERT there is no Purchasing view, but we can do procurement for FERT items.
    So what is the significance of purchasing view in Material master?
    Uts

    Hi,
    I cant Agree your statement,because for the Purchasing Activities it is mandatory that you Maintain the Purchasing view of the Material.
    it Gives a error ..material not maintained by Purchasing.
    Material XXXXXX not maintained by Purchasing
    Message no. ME046
    For Inhouse Production through Quota arrangement,it can be optional.
    but for the remaining cases ,it is Mandatory.
    and the Material type your are speaking is FERT.which is standard material type for Finished products.
    if you are having External Procuremnt 100% sure it would be having Purchasing Tab activated .
    if not so that,if it is a inhouse production.
    check it in OMS2 ..for clear information
    Regards
    Anjanna.

  • Sequence of maintaining views in material master

    Hi
    Is it possible to maintain sequence of maintaining different views in material master.
    For example: Basic Data 1 should be maintained first & then Basic Data 2 and then General Plant Data/Storage 1 and then General Plant Data/Storage 2 and so on.
    If the user misses the sequence, it should give a error message.
    Regards
    Pradipta Sahoo

    Hi,
    u r requirment is possible, that u change screen sequence of material master so the apperance will be as per u r requirement. In changes can be done in OMT3B in SPRO.
    Rdg
    Shekhar

  • What is the concept of  view in material master?

    Hello sap gurus
    Some quetions regarding Material Master
    what is  the concept of views in material master ?
    what is determined by specifying industry sector in material master ?
    To sell material which views are material are maintened in Material master?
    Regards
    Amit

    Hi,
    <b>Material master  for finished ggods is related with SD, MM & PP departments</b>. If you carefully go through the various screens in MM record you will realize the importance of the respective fields and the department to which they belong.
    <b>1.Suppose Base unit of measure</b> in Basic data 1 screen. The production people will keep the stock of the item using this UOM.
    <b>2. In Sales:Sales Org.1</b> screen we have sales unit in which we will sell the material.
    <b>3. Then we have the plant</b> data in which we enter the delivering plant. Also the taxes are determined from the plant so we have the settings for taxes also - whether this material is fully taxable/50% tax/Tax exempted.
    <b>4. Then we have purchasing</b> screen in which the data like the purchasing group, variable units,etc are entered. This will effect the purchasing cycle when we are procuring a material from outside. This is related to MM.
    <b>5. The we have MRP</b>, this is related to PP as to how to manufacture the product, the MRP type, the strategy group - whether it is MTO/MTS like that.
    <b>5. Sales:Sales Org.2 screen</b> - Here we mainatin the account assignment group which is very important as far as the generation of the accounting document is concerned. This triggers the system where to post the value in which G/L account. Accounting document is generated when we create the invoice in VF01 & save it.
    <b>6. Work scheduling</b> - Related with the sceduling of the production as to whether underdelivery or overdelivery is allowed, the storage location
    <b>7. Quality</b> - Here you can select for a particular finished item where where it has to be checked for quality during its journey from the raw material stage to the finished goods store as a finished item.
    <b>8. Accounting</b> - Related to accounting, product costing, total value of the stock in hand, etc. Also related with FI & PP
    So all the screens have data which effects one or more modules for the proper functioning of the system to give the optimum results.
    <b>Industry Sector:</b>
    Key that specifies the branch of industry to which the material is assigned.
    <b>Use</b>
    When you create a material master record, the industry sector you specify determines
    1. which screens appear and in what order
    2. which industry-specific fields appear on the individual screens
    <b>Screens for Sales:</b>
    Sales:Sales Org.1, Sales:Sales Org.2. But other screens also have data which is related to sales. You cannot just maintain the sales views and save the master. It has to be properly linked with the other modules also for the proper functioning of the system. That is why the system is called as "Enterprise Resource Planning" You have to paln the resources of your company and these resources are related with all the modules.
    Reward points if solution helps.
    Regards,
    Allabaqsh G. Patil

  • Sales org 2 view in material master

    hi gurus,
    Iam not able to see all fields in sales org 2 view in material master and i would like to know how to configure to restrict end users not to change it . thank you in advance.
    regards,
    Gopio

    Hi naga gopathi
    go to Spro->logistics general ->materials management->  there you select the options of material feilds and select the material type and click on till you reach the sales orgn 2  view , .
    In MMR settigs you can see table  wise so i think it should me MARA table. for sales orgn 2 view
    There you check the feilds wat you want is in display or supress mode 
    Regards
    Srinath

  • Label Data View in Material Master

    Dear Team,
    Despite of performing all below standerd steps, i am not able to view Label Data view in Material Master.
    pls guide
    steps performed.
    1. Check whether the screen sequence SP exists in Customizing for the Material Master under Define Structure of Data Screens for Each Screen Sequence.
    2. Check whether screen 92 has been assigned to screen sequence SP and has the screen type 1 (main screen).
    3. Check under Subscreens whether the subscreens were assigned to screen 92 of the screen sequence SP.
    4. In the Assign Screen Sequences to User/ Material Type/Transaction/Industry Sector IMG activity, set up the users who are allowed to edit the screen sequence and when it appears.
    also I have SAP_ALL Authorization.
    Regards,
    Amol Joshi

    Hello Amol,
    For IMG activity: Define Structure of Data Screens for Each Screen Sequence, for screen sequence 21, with logical screen 92, in subscreen, please see below settings:
    Program: SAPLMGD1 , screen no. is 1002
    Program: SAPLCBGL_LD00 , screen no. is 8020
    Program: SAPLCBGL_LD01, screen no. is 1010
    Regards,
    Niraj

  • Deleting of future price in accouning 1 View from material master.

    Hi,
    During month end process of CKMLCP, we have done the marking activity. so that the system updated the future price for all materails under specified plants. this is valid from 31.03.2008. by this time the system was not released the price automatically even, the valuation area (plant) is activated with automatic release. when doing of production confirmations for the current period, the system is throwing error as "future price and standard price exists". when we deleting the future price manually through MM02 transaction the systm is allowing to do production confirmation.
    Kindly suggest me any transaction code which deletes the future price in accounting 1 view of material master, which is  updated because of marking done through CKMLCP.

    Hi,
    Thanks for your reply,
    We tried to delete the price through CKR1 transaction. after giving of parameters of material and plant blant screen is coming.
    i think CKR1 is useful for deleting of future price updated through costing run i.e., CK40N marking.
    But in this case when we scrutinise, this is updated through CKMLCP transaction.
    after performing of "post closing"  activity through CKMLCP,
    i think SAP has provided another Tab i.e., Mark Material Prices. by this time the system will mark future price at current periodic cost. and at the same time there is a provision to give date either manual date or select the radio button of beginning of following period in parameters tab.there is no provision for giving of valid date upto.
    may be this is useful to update the standared cost estimate with current actual.
    I am also not sure why user have given data as 31.03.2008. usually they are not suppose to do this marking, but, by mistake they have performed.
    Kindly correct me if any mistake and suggest any other way which will delete the future price in accounting 1 view of material master.

Maybe you are looking for

  • [Fixed] eric5 no longer works after -Syu

    Fixed: New eric5 package for Python 3.3 is now available in the repositories.  Works as intended now. Edit 3: filed bug report: https://bugs.archlinux.org/task/32044 Edit2: the exact package name for eric5 in pacman is "eric" Edit: Ok, this is likely

  • Trying to omit duplicate rows in a UNION

    I am trying to omit duplicate rows from my union'ed join of 2 tables but am running into a problem which I am hoping someone can help me with. The following SQL works, but doesn't omit the dups. SELECT service_code, description_txt, effective_date, R

  • How to find what are  the  support-teams map with particular componant type

    hi experts, i am new in solution manager.. My requirement is when creating the support message in crmd_order t-code i have to give the componant type in transaction data after that in fast entry screen i have to assign support team for that componant

  • Regarding printing an circle in smartforms

    Hi,        i want to print an circle in the smartform. i had tried to draw the circle in MSword, word painter, and upload it as bmp file and used it as graphic in the smartform but it is coming distorted. so please help if you know the solution.

  • Where I can find some docs on wwv_flow_utilities?

    It seems this is not officially supported by HTMLDB documentation wise. However, there are many occurences of using it in the API part document, and sample applications. I am wondering where I can find something about it, so I can learn and use it? T