Cost centre and GL A/c is not getting picked up for tax expenses

i have  incoice from vendor for $ 106 and i pay $100 to vendor and $6 in tax
i want to use the GL A/c and cost centre to pay $6 in tax. we want to use the same GL A/c and cost centre related to that PO only for tax expenses. and for another PO  another GL and cost centre related to that PO for tax exp
What configuration i need?

Hi,
your tax expense is a liability a/c which is not supposed to be booked in cost centre.
what is the purpose of bringing it to the cost centre..
Regards,
Divraj

Similar Messages

  • CLASSPATH not getting picked up for MWA

    Hi All,
    Oracle Database 11g R 11.1.0.7.0
    Oracle Applications R 12.1.1
    O/S:Linux
    CLASSPATH not getting picked up for MWA.My classes are lying under $JAVA_TOP/xyz. However my suspicion is that the jvm that deals with MWA is not looking at the classpath above.
    I checked the CLASSPATH from forms using the block $ENVIRONMENT$ and it is looking at:
    /<instance_name>/<instance_name>/apps/tech_st/10.1.2/j2ee/OC4J_BI_Forms/applications/formsapp/formsweb/WEB-INF/lib/frmsrv.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/repository.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/ldapjclnt10.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/debugger.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/ewt3.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/share.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/utj.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/zrclient.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/reports/jlib/rwrun.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/forms/java/frmwebutil.jar
    This clearly does not have $JAVA_TOP/xyz under it.
    Could anyone please let us know what needs to be done and where the classes need to be placed?
    Thanks for your time!
    Regards,

    Hi,
    Did the above steps but still CLASPATH is somehow not getting picked up for MWA.
    $ env|grep CLASSPATH
    REPORTS_CLASSPATH=/<instance_name>/<instance_name>/apps/tech_st/10.1.2/reports/jlib/rwbuilder.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/reports/jlib/rwrun.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/zrclient.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/j2ee/home/oc4j.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/j2ee/home/lib/ojsp.jar
    AF_CLASSPATH=/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/lib/dt.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/lib/tools.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/jre/lib/rt.jar:/<instance_name>/<instance_name>/apps/apps_st/comn/java/lib/appsborg2.zip:/<instance_name>/<instance_name>/apps/apps_st/comn/java/classes
    CLASSPATH=/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/lib/dt.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/lib/tools.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/jre/lib/rt.jar:/<instance_name>/<instance_name>/apps/apps_st/comn/java/lib/appsborg.zip:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/forms/java:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/forms/java/frmall.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/ewt3.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/j2ee/OC4J_BI_Forms/applications/formsapp/formsweb/WEB-INF/lib/frmsrv.jar:/<instance_name>/<instance_name>/apps/apps_st/comn/java/classes:/<instance_name>/<instance_name>/apps/apps_st/comn/java/classes/xxx
    $ echo $CLASSPATH
    /<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/lib/dt.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/lib/tools.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.3/appsutil/jdk/jre/lib/rt.jar:/<instance_name>/<instance_name>/apps/apps_st/comn/java/lib/appsborg.zip:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/forms/java:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/forms/java/frmall.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/jlib/ewt3.jar:/<instance_name>/<instance_name>/apps/tech_st/10.1.2/j2ee/OC4J_BI_Forms/applications/formsapp/formsweb/WEB-INF/lib/frmsrv.jar:/<instance_name>/<instance_name>/apps/apps_st/comn/java/classes:/<instance_name>/<instance_name>/apps/apps_st/comn/java/classes/xxx
    System is expecting file at default $JAVA_TOP/oracle/apps/wms/td/server location
    /<instance_name>/<instance_name>/apps/apps_st/comn/java/classes/oracle/apps/wms/td/server
    $ ls -l XxgilTaskSignonFunction*
    ls: XxgilTaskSignonFunction*: No such file or directory
    where user's have file at $JAVA_TOP/xxx/oracle/apps/wms/td/server location.
    /<instance_name>/<instance_name>/apps/apps_st/comn/java/classes/xxx/oracle/apps/wms/td/server
    $ ls
    XxgilMainPickFListener.class XxgilMainPickPage.class XxgilManifestPickFListener.class XxgilManifestPickPage.class XxgilTaskSignonFunction.class
    Not sure what changes to make to fix this.
    Any suggestions please.
    Thanks,

  • Actual rates (KBK6) is not getting picked up for CPTA (template allocation)

    Hello Experts,
    I am using template allocation for the purpose of overhead calculation. I maintained rate in KP26. It is getting pulled up when I ran standard cost estimate. This is correct
    Now I want to run CPTA (ie. charging overhead at month end) using actual rate. Hence I maintained actual rate in Tcode KBK6. Actual rate is little bit varying with KP26 rates. Hence I want to run CPTA with actual rate.
    When I executed CPTA, I saw that system is picking up KP26 rate and not KBK6 rate. Please help me. How system will pick up KBK6 rate for CPTA.
    --Meena.

    Hi Meena,
    The correct sequence of closing should be:
    1. Template Allocation - CPTA
    This will post activity allocation from CC to your production order at PLAN price.
    2. Calculate Actual Activity Prices - KSII
    This will calculate actual price based on costs posted to CC and activities allocated (try to avoid KBK6 in your testing but rather calculate actual price properly). It will also credit CC but will NOT debit the order.
    3. Revaluate your production order - MFN1
    This will debit the order with the difference between plan and actual activity price.
    Please kindly read SAP Note 156563 - Settlement after activity allocation/revaluation.
    It explains revaluation logic in detail.
    If in your case CPTA generates activity allocation between CC and order (valued at plan price) and KSII calculates new actual activity price, MFN1 has to update the order.
    Regards,
    Szymon

  • Regarding the Release Strategies not getting picked up for PR

    Hi Gurus,
    1 ) I have configured a new Release strategy with Plant,Total Value,AAC and Doc.type as the Characteristics.I have assigned that to a release class and assigned values to the characteristics.
    I have configured 6 release codes and 6 different Value Intervals for 6 release strategies and assigned it accordingly. But whenever i am trying to release the PR, it is picking the first strategy only. its not picking the other strategies even it is of differnet values. Please advice what needs to be done on this.
    with Regards,
    Saakithyan

    1st of all check whether you defined release strategy for Item level or header level.
    If you defined item level check the individual item has all the 6 characteristics you defined.If any characteristic is missing then it will not pick. Provided you defined all the characteristics for classification view or CL20N.
    Thanks & Regards
    Sudhansu

  • File to File (file not getting picked)

    Hi ,
    I am having a file to file scenario. My file is not getting processed from  the source directory. When i check in the communication channel monitoring bith my sender and rcvr communication chanels are wrking fine.
    I have placed the source file with the name mentioned in the sender communciation channel.The processing mode is Archive.
    My file Name is Actual_Labour_Cost.NE*.txt in Sender cc.
    so i placed the file With Actual_Labour_Cost.NE.
    Kindly suggest.
    Regards
    Sai

    Hi,
    If you have using thec orrect file name and extesnsion in the comms channel and still the file is not getting picked up then Could you check the file permission/authorizatios for the XI user you are using in XI to pick up the file from the source directory ?
    The file should at least have the permissions to Read/Write.
    Regards,
    Vishal

  • Pricing procedure is not getting picked

    I have defined a pricing procedure for my service PO and I have created a new PO document type for my service PO. But my pricing procedure is not getting picked up for this PO. please help how to get it resolved.
    Regards,
    Pankaj

    hello pankaj
    After defining Calculation schema, ensure that you have defined schema group for vendor and assignment of the same to Purchase organisation.
    you can also determine calculation schema for standard POs.
    finally goto change vendor and in purchasing Data input schema group in Vendor schema field.
    regards
    Chetan

  • Asset GL accounts not getting picked up in ABST2 run

    Hi,
    There are few asset GL accounts i.e APC and AccDep accounts which are not getting picked up in ABST2 run. What could be the reason? Please advise as to how can we ensure that we get a spool of all the GL accounts post ABST2 run.
    Thanks,
    DP

    Are the missing GL accounts set up as asset reconciliation accounts go to FS03, enter GL account number, and go to control data tab, field recon account for account type should be A for Assets.
    Thanks,
    Tammy

  • Cost centre and Profit centre in one query - Authorisations not working!

    Hiya,
    I have another problem related to Analysis Authorisations.
    I have created an AA with Cost Centre and Profit centre access restricted to a certain node of a hierarchy (type 1 - this node and below). For example, the User can only run a query at Cost Centres level of Country Belgium - the query works fine. Now, the user wants to drill down by the relevant Profit centres. According to the log, the system checks for Profit centres like * and says the user is not authorised. All this, despite the fact that all Profit centres belong to country Belgium and user has been given access to see these profit centres.
    What do I need to do to enable drilldown by Profit centre? I can't make a "*" access to Profit centre as the user will be able to run other queries at global level, which is not what I can allow.
    Any suggestions?

    Hello,
    I don't know if it is relevant, but I had a similar problem when I had two characteristic each with hierarchy restrictions in one authorization object.
    I "solved" it by separting each characteristic into its own authorization object.
    BR
    Ondrej

  • Send cost centre and attendence type not filled automatically

    Hello,
    I am configuring the time recording in ESS. I configured the recording profile and in cats2 it looks good. The send cost centre and attendence type get filled automatically. But when I do the same thing in ESS the values are not populated. Is there something I have to take into account in order to get this done?
    Thanks a lot, Vanessa

    Dear Venessa,
    Please note that in contrast to personal templates, which enable you to prefill the data entry area when you start time recording, the system first displays default values when you create a new account assignment row with one receiver object and at least one working time.The system only proposes default values when you create a new account assignment row. In ESS, this is correct, because it does not make sense to provide default values for the sender cost center and activity type if you are only entering an attendance or absence type.
    Hope this helps,
    Regards,
    Roy

  • How to Capture Multiple Cost centres and Business Unit information in a project?

    Dear Experts,
    With the help of UDA functionality in project super responsibility, I have captured Cost centre and Business unit information and this info will be used/reflected in CC and BU segments of all transactions gets recorded against that project.
    Now, our user wish to have multiple cost centres and business units to be tracked in the same one project. How is this feasible? Below example describes my requirement in a summary, please advise.
    An Indirect project is created when a defect on a machine reported from client's customer and all subsequent activities (purchases, travel to customer site to analyse and troubleshoot, purchases for any in-house analysis etc..involves costs spending internally) in resolving that defect/project involves 6 to 7 different departments (Sales, Tech Support, Quality team etc.,who actually work/travel and spend costs against project until defect resolution). And, each of the above departments will have 1 dedicated owner (project owners) to manage that project and each of these 6 or 7 owners owners will have their own cost centres (eg: 2345 - Sales team) against which they wish to see their transactions (travel, purchases during defect resolution) globally.
    So, all I want to know is how can I make one single project to accommodate multiple cost centresand business unit information to be assigned using UDA? Please let me know if I am not clear.
    Regards
    Venkat

    I think you should use the expenditure organization on the transaction itself to derive the CC/BU. Have AA lookups and define AA rules where you look at a Exp Org to BU or Cost Center to derive accounting.

  • OM - Multiple Cost Centres link with Org Unit/Position not to employee

    Hello gurus,
    In OM there can only be one relationship at a time between an organizational unit and cost centre (A011). For those areas where there is a requirement for the position to have control over more than one cost centre, there are multiple options.
    Option 1 - If only one of the cost centres is used for employee cost incurrence, this should be the main cost centre, and the others controlled through authorizations.
    Option 2 - If more than one cost centre is used for employee cost incurrence, a subordinate organizational unit is created into which those positions are placed.  In this scenario, the  subordinate  organizational units would not have a chief, and the reporting structure would go up to the more senior organizational units.
    Option 3 - Use Cost centre distribution infotype 1018 (A014)
    My question: is there a standard way through which we can show multiple cost centres attached to a position/org unit such that cost incurred by employees goes to master cost centre attached to org unit or positon and other cost centres are just attached to position/orgunit (just to show the org unit/position is managing these other cost centres as well).
    Any thoughts? Anybody has used Enterprise Organization in CO to achieve this?
    Regards,
    Ahmad

    To capture more than 1 cost center, you have to specify them in IT-1018  but employee's cost will be split based on this.
    For data maintanance alone cost distribution is not possible (based on my knowledge).
    May be equivalent custom infotype similar to 1018  @ Postiion / Org Unit level may work.
    along with Master Cost center.

  • IW41 using HR data (cost centre and activity type)

    Hi all,
    Does anyone know the steps required to make IW41 determine the Cost Centre and Activity Type from the HR master?
    We can change the Activity Type by user-exit CONFPM04, but not the Cost Centre.
    Also posted [here|http://www.sapfans.com/forums/viewtopic.php?f=7&t=329923].
    PeteA

    Hi Pete,
    Which cost center field are you using? SKOSTL (sender cost center) should be changeable in export structure AFRUD_EXP. It is this field that is written to the AFRU table (not KOSTL). I did a quick check through debug and it looks possible to set a value in the exit that gets written to AFRU-SKOSTL.
    -Paul

  • Delimiting Cost Centre and Delimiting Company Code

    Hi Team,
    There is a business scenario I want to discuss and get your opinions;
    A Country's Currency is changing from 01012009; I am getting stuck when I reach the cost Centres.
    When i come to Cost Centre, is there a way where I can modify the Currency in the cost Centre and retain the earlier record delimited. If this is not possible then I guess the only other way os to create new cost cnetres with similar master data with new currency getting defaulted from the Company code table and assigning them accordingly. Am I right ?
    A quick response will be highly appreciated.
    Thanks,
    Naveen
    +91 9900350350

    what is your controlling area currency type

  • Link between Cost centre and G/L Account

    Hi All,
    Please provide the Link between Cost centre.
    ie., Please provide me the T.code or Table where we will get link between Cost centre and G/L Account.
    Please let me know.
    Regards,
    Nagaraj S

    Hi,
    Please note that Cost Centers are maintained to capture costs, i.e. P & L items of GLs you have created.  These items would have been created as a Primary Cost element and the costs
    are passed to to the cost center through account assignments.  You can see these GL A/cs created as cost elements -  Cost Center-wise, period wise for which various standard  reports are available.
    Sadashivan

  • Blocking of Cost centre and activity type

    Dear all,
    Please tell me how to block cost centres and activity types which will no longer be used
    best rgds,
    Manoj

    Hi,
    There are two ways .
    If you wish to use the cost center number for any other cost center , then you need to delete the cost center by KS04 & you need to mention the future period for which the same should deleted, normally, starting would be 1st day of next year to 31.12.9999
    Keep in mind, cost center can only be deleted , if no data (Actual/Plan/reversal) is posted in it. You may do it , before starting next year's budget processing.
    If you wish to just block the same , lock Actual primary/Secondary & Plan primary/Secondary in the control tab.
    Regards,
    Deepak Kolwankar

Maybe you are looking for

  • Set up new iMac user accounts & storage locations

    I just made the switch from Windows PC to a new iMac  since it is still in the box I thought I would take some time to think about how I want to set it up before opening it and starting to dump all my files onto the new machine. I'd like to have an e

  • No contacts in address book

    I have iphone4 and have my contacts on it, however on my macbook pro the contacts in address book are no longer there, this happened after i did migration assistance, Can someone tell me how i populate my address book again, I am running SL now 10.6.

  • Can't install Bootcamp on a 4,1 Mac pro

    Greetings ! I'm trying to install bootcamp on my 4,1 Mac pro but i'm experiencing a weird issue.... First of all, here's the summary of the machine : Macpro 4,1 2x2,26ghz quad core xeon, 6gb ram, intel 335 ssd plugged in the optical drive bay, and a

  • I upgraded to 7.0.1 and now my library is gone. . . Please help

    I am using a PC, and updated to iTunes 7.0.1. My music and iTunes are stored on an external hard drive, but I think that the upgrade was written to my regular drive. I still have all the files and library files. Is there a way to restore this with ou

  • How Best to Save Vector Logo as PDF

    Hi, we're creating master logo files for an international corporation that will be used by many different end-users, most of who should be design/production professionals. It will be accompanied by a style guide outlining proper usage, etc. The logos