Cost Estimate error is coming at the time of billing document release
Dear All,
Hi, I am facing one problem that is whenever i am releasing the billing document system gives the error message.
Error : No standard cost estimate found for this material 164001001.
Here problem is some finished products we have a cost run and other finished materials we don't have a cost run. Other finished materials billing document release time we are facing the above error. There is no costing run for other finished materials. Here we have a CO-PA.
I have mainatined the costing key settings(ke40) in co-pa. In Ke40 t.code i have maintained the below settings.
1. I have selected transfer standard cost estimate radio button under determine material cost estimate.
2. Costing variant is 1010( This is our varaint)
3.Costing version is 01
4. Period indicator : Current standard cost estimate account to entry in material master.
I have maintained the above settings in ke40 t.code. Please suggest if any thing is wrong on above settings.
And also i have maintained costing key to material type assignments in ke4j t.code.
Here i maintained the three point of valuation (PV), One is real valuation, second is manual planning, third is automatic planning.
here i have assigned material type (fert) to costing key in costing key1 filed.
Please suggest if any thing wrong in the above settings. Still i am facing the same error at the time of billing document releasing time. Anybody please help to me. It is a very urgent to me.
Thanks & Regards,
Reddy
Hi,
This is a common error when COPA is activated and when the Costing Key is assigned according to the Material type in KE4J.
When you need Cost estimation for few FGs and dont require for other FG, then you list out the materials for which you require SCE and then assign these list of materials to the costing key in KE4H(Costing key for Products) leaving out those which dont require.
But detail the requirement further to facilitate the solution.
Thanks & Regards,
Ravi Kumar
Similar Messages
-
Error is coming at the time of Installation of SAP Netweaver 04's sp7
Hi All,
An Error is coming at the time of Installation of SAP Netweaver 04's sp7
Error: Unable to create an account for <SystemName> for <SAP Service sid>
can anyone suggest me regarding this.
Regards
PhanikumarHi
Thanks for ur suggestion,
I got the solution to this error.
The main reason is at the time of Intsalling Netweaver on windows 2003 server with Administrator rights, as per the Installtion manual we have to follow the windows password policy must and should and give the same for the Master Password while installing, then we won't get error.
Thanks & Regards
phanikumar -
How we can configure new pricing procedure at the time of billing document
Hi SD Gurus,
Can u plz tell me how we can configure new pricing procedure at the time of billing document level.
Thanks & Regards,
Sreenivas.PHello,
Why?
The sales order confirms the price given to the customer. If you have re-determined a new price/discount then you may consider in VTFL to use pricing type C.
Regards
Waza -
IO assigned with Asset,but not coming at the time of PO creation
Hello
IO assigned with Asset,but not coming at the time of PO creation.
I have made following settings:
1 Depreciation - IFRS (INR) 1 0L
15 Income Tax Act 0
20 Depreciation - Indian GAAP (INR) 3 1L
30 Depreciation - IFRS (USD) 0
31 Depreciation - Indian GAAP (USD) 0
In ACSET-Account assignment:
for dep area-20
CAUFN Internal Order * Generic Trans. Type 02 Depreciation Run
KOSTL Cost Center * Generic Trans. Type 02 Depreciation Run
so currently i am using only dep area-20 only(Indian GAAP)
CAPEX budgeting is through IO. AUC is not doing through IO,its directly from AIAB/AIBU
AS01
KO01
AS02
KO22
KO30
so what is the problem,why i am not getting IO (which is in display mode in PO) when assigned the Asset with category of "A" (asset) in PO.......when i assigned Asset- the GL account come automatically but IO didn't come.
kind regardsHey Ajay
thanks for your reply.....
now i'm getting new error:
Parallel depreciation area 31 is not posted
Message no. AA565
Diagnosis
The asset to be posted does not manage parallel depreciation area 31, or
transaction type that you are using is limited to certain depreciation
areas, and does not contain depreciation area 31. This is incorrect.
System Response
Posting is rejected.
Procedure
Check the asset and the transaction type.
I have checked some configuration but not able to debug it.
regards -
Error in price at the time of creating SHC fro catalogue item
Hi
Cann anyone help me with the following problem.
Error in price at the time of creating SHC fro catalogue item
mentioned below article no. 0452202 then a pallet is to cost 3275,05 (you can only order min. 10 pallets).
The system multiplies up the price by 10 & 10 and at that moment I transfer the shopping trolley it multiplies up again.
The price for 10 pallets was gladly to be 32720,50 - Buttttttttttttt it turns into 3.272.050.
Please help me in providing a solution for this
Best Regards.
sairam.Hi
Please go through this ->
Note 739562 Simplified pricing: Price 0.00 if catalog item.
This is the standard system response as of EBP 3.5 Support Package 05 or Note 569275.
This also depends on how you uploaded the price in the catalogs ->
For price details you should use the following characteristics:-
/ccm/price[1]#/ccm/amount /ccm/price[1]#/ccm/currency_code
Perhaps you have to maintain field pricechangeable in BADi-InterfaceIF_EX_BBP_CATALOG_TRANSFER in method - ENRICH_ITEM_DATA. This will make sure you can edit the price_
Other useful pointers ->
Re: Price determination
Re: free item shopping from catalogue....product with zero price
OSS note 550071 - price for catalog product
How to Upload Price details for a catalog in CCM 2.0
Do let me know.
Regards
- Atul -
Valuation with material cost estimate: error with product
Hi Experts,
Message no. KE350, Valuation with material cost estimate: error with product "2286940000". Please suggest me to resolve this issue.
Points will be provided for good solution.
Regards,
JayHi Jaya
This means that your customization is wrong then...
In KE4J or KEPC you have assigned costing keys to your material types or some other combination... You should have done this config in a way that costing key is not called for in the case of non valuated materials...
In Ke40 you have defined costing key where in you have specified "Issue error msg if no cost estimate found".. This costing key is assigned in KE4J or KEPC in a way that it is getting called even in case of non valuated materials...
Do you have a separate mat type for non valuated material? If yes, remove this mat type from KE4J/KEPC..
If you dont have separate mat type i.e. in the same mat type if you have both valuated and non valuated, then you have a problem.. You would get stuck in that case
Regards
Ajay M -
Valuation with material cost estimate: error with product "117122"
Hi people,
We have the error:
=====================
Valuation with material cost estimate: error with product "117122"
Diagnosis
In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
In order to determine the current plan period, the system needs to read the valuation segment of the material master.
The system has found that the current plan period is not filled forproduct "117122" in plant "UBE1".
We have the follow configuration in trans.: KE40:
. Determine material cost estimate
. Transf. Standard Cost Estimate
. Costing Variant
. Control Data for Standard Cost Estimate
. Period Indicator = "Current Standard Cost Estimate acc. to entry in mat master
. Addiitonal data CO-PC
. Transfer cost estimate in controlling area currency "activated"
We think the reason about our error is because the field above is activated and some configuration more is necessary for this case. For examplo: Trans.: OKYW and this one was not configurated yet.
Do you know what happend?
If we need to configure some transation, or sonly process the cost estimate?
Thanks,
Rosana.Hello Guido
Thank you very much for your return.
It is happenning in a Client that some people are doing the configuration.
Before we didin't have in KE40, the fiel "Transfer cost estimate in controlling area currency" activated.
And now, the people activate that in this new Client and I don't know the impact about that.
I think we have to make the configuration in OKYW.
The other transation you told me, we don't have any information.
Could you tell me some other idea what happend?
Message error is just "Message no. KE350"
Abou claculate the cost:
It was calculated by trans.: CK11N for future planning and the real wasn't not possible to release because this material already have moviments.
Could you tell us is there is some thing more to do?
Thanks,
Rosana. -
Valuation with material cost estimate: error with product " 200038 "
Hi,
I am getting an error:
Valuation with material cost estimate: error with product " 200038 " (Message KE350).
Kindly assist on the same?If this material is mto material go to t.code KE40 and maintain define access to standard cost estimate define cost key with
"Transfer sales orde cost estimatex".
If it is mts material define costing key with Transfer std cost estimate and in costing data
costing variant : ppc1
costing verstion: 1
period indicator: Release std cost estimate matching with goods issue or material costing matching posting date.
This will resolve ur problem. -
Hi Experts,
The user executed standard cost estimate for the month of 6 - 2010 and after that they did enter the price manually in MR21, Now they are getting the error Valuation with material cost estimate: error with product "1200004626" and Message no. KE350... Kindly help me how to fix this issue...
Thanks
YadayyaHi,
I think first you have done standard cost estimate thru CK40N and for next month you might have updated the price through MR21. So system is looking for standard cost estimate and not considering this MR21 price..
So please run standard cost estimate for current month.. this error will be fixed.
Thanks
Fit 4 Nothing -
Batch number coming automatically at the time of Process order release
Hi All,
I want the system generated batch number for header material to come automatically at the time of process order release.
At present ,the batch number is entered manualy dering process order creation.
Can anyone pls guide abt the settings required for the sameDear,
Define the production scheduling profile CORY then
Auto Batch Creation = 2 On release.
Then assign this to your FG or SFG materials in work scheduling view in material msater MM02. Then create new order and check.
Now for automatic generation i have to set internal number asignment for batches.
Batch will create for movement type say 101 SPROLogistics - GeneralBatch mangment--Creation of New Batches --Define Batch Creation for Goods Movements. so it will have same logic in MM for 101 GR against PO will be internal number range but no effect in SD.
Regards,
R.Brahmankar
Edited by: R Brahmankar on Mar 12, 2010 12:40 PM -
Service tax line item not coming at the time of Cash receipts.
Hi Gurus
I have an issue, when i received payment from customer than no line is generated for service tax reversal which i have captured at the time of billing, but it is happining through T code F-28.
any one have some idea of it, please share with me.
Regards
ShivFrom which T code you are posting customer receipt???
-
Document Splitting at the time of Bill of exchange
Dear All,
issue is related to Document Splitting at the time of Bill of exchange
I booked 2 different Customer Sales through FI, but both invoice have different Profit centre.
Entry is like
Customer A/C Dr 1000 Pc 1100
To Sales A/C 1000 PC 1100
Customer A/C Dr 2000 Pc 1200
To Sales A/C 2000 PC 1200
Now from customer we received a single bill of exchange, so that we booked from it from f-36
Now at the time of Discounting through T-code F-33 when we mentioned both the bill with system not able to split the document.
And showing the error Balancing field "Profit Center" in line item 001 not filled.
Regards,
ShyamHi,
Document splitting there in item category 001 check and put profit center is optional.
Regards,
Srikanth.Madani -
Tax posting in cost center and profit center level at time of billing
Hi All,
I need the your inputs for below requirement:
Currently system is updating the Tax amount on profit center level at the time of billing and there is separate condition is maintained in sales order for this tax amount and this Tax amount related with GL account created as cost element category=12 (Sales deductions ).
But now the new requirement to update the same tax amount at profit center level and corresponding cost center level as well.
Can you please help me to know the best way to fulfill this new requirement and what are changes we need to be done for this requirement.
Thanks
RishaThanks...
As per the current setup for cost element category (Tax gl account ) is maintained as =12 (sales deductions ).. whether this cost element category is relavant for my requirement or this cost element category needs to be change -01 before setup in OKb9...
Please confirm.
Thanks
Risha -
Excise invoice is genarated at the time of Billing
Dear Experts,
We are getting Excise invoice is genarated at the time of Billing
Kindly help us to to correct his issue
we have un ticked the Create EI in Basic setting -> Maintain Excise Gourp
any where we have to check let us know
Regards
Sathish JHi Sathish ,
In CIN - basic settings - Maintain excise groups there in that outgoing excise invoice Excise invoice during the billing and Create and post inv in single make the both fields un mark.
Hope this will make you to create invoice and excise invoice separately, or els find if any exit is used earlier.
Check and revert
Regards
Ram -
How to make repricing for specific conditions at the time of billing?
Hello
I'm SD Pricing person. Let me ask here experts below my concern.
In EU countries, there is recycling fee in sales of electronics or Note PC with batteries....to keep our earth clean.
So when customers buy such products, they have to pay more as recycling fee including invoice amount.
My question is... we want to make repricing for recycling conditions when the billing is created.
Based on our configuration, recycling condition is not defined as a kind of tax condition.
So this value is just copied from sales order.
(pricing type in copy control is 'G' which means repricing for tax condition.)
In this situation, we want to make repricing for those conditions during operating system.
Is there any easy way to cover this?
As I think, this is not easy because the system is already operated.
To change condition attribution is really risky. If we dare do, we have to migrate all open orders.
So I want to put this way to the end of my choice.
For this requirement,
1. We have to change condition class or category or calculation type in order to be repriced based on pricing type 'G'.
(ex. Set the condition category as 'I' inter-billing or 'L' always repricing.)
But transaction data are created now and all open orders will be affected.
2. To create new conditions are not easy because these conditions are mapped to the CO-PA value field and the values are posted in FI doc.
3. To change pricing type in copy control is almost impossible because of the impact.
What can I do this in this situation?
What I want to do is just to make repricing for specific conditions at the time of billing in case that pricing type of copy control is 'G'.
Thank you in advance.Let me ask agagin to all experts.
I want to make A condition to be repriced at the time of billing.
For this, I have to set condition category as 'L' (Generally new when copying).
But I do not want to do in that way becauuse I am maintaining big operated system now.
In addition, though I migrate open orders after changing config. as 'L', it is almost impossible for use to migrate because we have more than a thound open orders per a DAY as Globalized system.
That is why I am asking.
Simply I can create new condition but as I mentioned, there are various recycling fee so we already created about 10 conditions. And this recycling conditions are linked to REA package of SAP. So creating another 10 more conditions can not be a way for us.
At last, what I want is not to be shown this condition only in billing doc.
'A' condition should be displayed in both Sales order and Billing doc.
And simultaneously, when the billing is created and if user changed 'A' condition master, then new value which is different from sales order have to be reflected in billing doc.
Thank you in advance.
Maybe you are looking for
-
My lab has about 10 Mac computers. We all access a central hard drive by the way of wifi provided by AirPort. It's just a regular external hard drive (Seagate Desktop Drive) that I turned into our central storage space by plugging it into AirPort (
-
Page will not display properly with inline Frames
I have a html page that will not display properly in Dreamweaver. I have a basic understanding of html and want to be able to edit a website in Dreamweaver that was given to me. It looks fine in a browser, but in Dreamweaver some of the content is mi
-
Reducing app size and using memory
Building with release preference Blank App template will give you a ~200kb .exe, which in running state use ~7mb of memory. It has a huge list of external dependencies. So, is it possible to reduce app size and using memory? Or, how safely unlink fro
-
JSF 2.0 - insert additional content into h:selectOneRadio
Hello, I am trying to convert current pages into JSF and I have difficulties with the following code: <div id=set> <label> <input type="radio" name="inputData" value="default" /> Default </label> (<a href="sample.xml">Download 13 kB
-
Best camera for low light and sports
have the sx200is looking for a newer camera for sports and low light shots