Coverage profile and fx lot size.

Dear All
I have a material with coverage profile (MRP2 view)
I have an issue during MRP run in MD03 with this material.
IN material there are folowing parameters
MRP type : PD
Lot size : FX
Fixed lot size : 24
So, In MD03 I get the following:
Per./segmt     PldIndReqs     Requirements      Receipts     Avail. quantity      ATP quantity      Actl cov.     Stat. cov.     Daily reqs      Trget cvge      MaxCv     Min.covge      Target stck Minimum stock     Maximum stock
30.10.2011     0     -10,421      0     120,457      0      14     11,6     10,421      17      20     9      177,157     93,789     208,42
31.10.2011     0     -10,421      0     110,036      0      13     10,6     10,421      17      20     9      177,157     93,789     208,42
01.11.2011     0     -8,445      0     101,591      0      12     12,4     8,164      17      20     9      138,788     73,476     163,28
02.11.2011     0     -8,445      0     93,146      0      11     11,4     8,164      17      20     9      138,788     73,476     163,28
03.11.2011     0     -8,445      0     84,701      0      10     10,4     8,164      17      20     9      138,788     73,476     163,28
04.11.2011     0     -8,445      72     148,256      0      18,6     18,2     8,164      17      20     9      138,788     73,476     163,28
05.11.2011     0     -8,445      0     139,811      0      17,6     17,1     8,164      17      20     9      138,788     73,476     163,28
06.11.2011     0     -8,445      0     131,366      0      16,6     16,1     8,164      17      20     9      138,788     73,476     163,28
07.11.2011     0     -8,445      0     122,921      0      15,6     15,1     8,164      17      20     9      138,788     73,476     163,28
08.11.2011     0     -8,445      0     114,476      0      14,6     14     8,164      17      20     9      138,788     73,476     163,28
Link: [imageshack.us/photo/my-images/33/35632293.jpg]
<a href="http://imageshack.us/photo/my-images/33/35632293.jpg/">[IMG]http://img33.imageshack.us/img33/7832/35632293.jpg[/IMG]</a>
MD03 generated purchase requisition on 04.11.2011 for 72 pcs.
As you can see the available quantity of material on 04.04.11 will be 84,701 - 8,445 = 76,256. That is more than Minimum stock( 73,476)
Can you suggest why system creates purchase requisitions on 04.11.2011 but not on 05.11.2011
I can only assume that it's a one more feature of MRP. It calculates dates and quantitys to be procured as lot size EX was set in material master record and doesn't take into account increasing of stock due to FX lot size.
P.S. When I clear coverage profile in material master , SAP generates pur.requisitions correctly.

OK, now it is more clear.
First you should know that only target is doing a real impact. Min and Max are just for display.
Since you have period as month, looking at it on daily resolution is not relevant, you should look at months. You can also see on your daily display that target stock level will only change at month turn.
Hope that it makes it now easier for you to understand the system's calculation.

Similar Messages

  • Report for Reorder point, safety stock, current stock and fixed lot size

    Hi,
    Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
    They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
    Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
    Thanks in Advance.
    Regards,
    Shankar Goud.

    Hi,
    There is no standard report because this is meant to be managed by the MRP run.
    The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
    Are you using MRP?
    If so then please use the standard functions in MRP to get this.
    If not, then WHY NOT?
    Steve B

  • Rounding Value,Minimum Lot Size and Maximum Lot Siz parameters

    Hello Gurus,
           Please explain me the what is the use of the parameter Rounding Value
    ,Minimum Lot Size and Maximum Lot Size parameters in the product master and how does it in impact during the Heuristic Run?
    Thanks.

    Rounding value is the incremental quantities in which the order can be produced/procured. Eg. if orders are possible with quantities 40,60, 80, 100 etc..then rounding value is 20.
    Min lot size is the minimum quanity in which order can be produced eg. 40 in above example
    Max lot size is the maximum quanitity in which the order can be produced/procured. eg. 100 in our example
    Impact on Heuristic run: heuristics takes all the above parameter to plan supply order. eg. if requirement is 55, it will supply plan for 60. If requirement is 120, it will produce two orders - one for 100 and the other for 20. if the reuqirement is 10, the order size will be 40.
    Hope this helps.

  • Rounding value and Minimum lot size

    Hi all,
    Finish material is X and Raw material is Y.
    Bom- For Preparing Xu2019s 1 Qty, 1 Qty of Y is required 
    In Material Master of Y - Rounding value and minimum lot size is 10,
    Project needs 5Qty of X.
    When MD51 for Project execute u2026 PR of Y must be of 10 as per rounding value and minimum lot size, but it is creating PR of 5 qty.
    Above scenario working properly if I take MRP run with MD02 for material X for 10qty, after MRP PR of Y will be created for 10qty.
    With Regards,
    Ashish

    Dear,
    By default, the lot size works as lot-for-lot quantity in the make-to-order and project scenario.
    Go to OMI4 select your Lot size and define Lot Size: SOP  1 or 2Lot-for-lot with rounding. Better create new Lot size as ZX with these setting.
    If you always want lots to be created for the multiple of the rounding value, you must specify a minimum a multiple of the rounding value.
    Example: minimum lot size: 10 and rounding 10.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Coverage profile and Forecast profile together

    Dear all,
    Can we use coverage profile and forecast profile together.What are the requirements for the same.
    We are using coverage profile with following details
    No. of periods=20
    Type of period per length=1
    Range of coverage in first period= 10
    The forecast profile is set for
    Historical periods=12
    Initialisation period=2(Automatic,X)
    Periods /season=12
    Forecast periods=12
    with different weighting groups.
    But whenever forecasting is executed with some historical data for the 3 profiles it is giving same forecast values for all 3 profiles with different weighting groups.
    Also the MRP type used here is a copy of the PD MRP type and not VV or VS.
    Where can the problem lie?
    Regards
    Manisha

    Dear
    Coverage Profile and Forecast profile are two different subject  !
    If it is range of coverage profile , then The range of coverage profile contains the parameters for calculating the dynamic safety stock. This is a statistical calculation on the basis of average daily requirements.With the dynamic safety stock, you can determine a safety stock based on requirements and range of coverage. The dynamic safety stock adapts automatically to the changed requirements and is fully available for planning purposes. You can limit the quantities used in the calculation of the dynamic safety stock by defining maximum and minimum ranges of coverage. You can also limit the period of time by defining different time periods in which the range of coverage is valid.
    I hope you are asking about saferty caverage profile,,here basicalli we are setting the system to see how the safety stock is to be covered and calculated.See the help link below and come back if required
    http://help.sap.com/saphelp_47x200/helpdata/en/f3/dbbb16b36111d1a6770000e83235d4/frameset.htm
    https://wiki.sdn.sap.com/wiki/display/ERPLO/Dynamicsafetystock+calculation
    Where as Forecasting Profile , please refer the below :
    Profiles
    One more query : Also the MRP type used here is a copy of the PD MRP type and not VV or VS.
    I think you should use Forecast Base MRP type like VV  rather PD.PD does not carry out any Forcasting Functionality .Please check wether you replicate PD from VV , then it is possible to execute Forecast specially Total Consumption set up in MRP type .
    Hope this will be useful
    Regards
    JH

  • Configure Coverage Profile and other

    I have question regarding coverage profile configuration.
    - To configure coverage profile for safety stock, can I put it in decimal e.g. 1.5 days to cover safety stock level as it would impact the rest of production planning process?
    Thank you very much.

    Dear
    Coverage Profile and Forecast profile are two different subject  !
    If it is range of coverage profile , then The range of coverage profile contains the parameters for calculating the dynamic safety stock. This is a statistical calculation on the basis of average daily requirements.With the dynamic safety stock, you can determine a safety stock based on requirements and range of coverage. The dynamic safety stock adapts automatically to the changed requirements and is fully available for planning purposes. You can limit the quantities used in the calculation of the dynamic safety stock by defining maximum and minimum ranges of coverage. You can also limit the period of time by defining different time periods in which the range of coverage is valid.
    I hope you are asking about saferty caverage profile,,here basicalli we are setting the system to see how the safety stock is to be covered and calculated.See the help link below and come back if required
    http://help.sap.com/saphelp_47x200/helpdata/en/f3/dbbb16b36111d1a6770000e83235d4/frameset.htm
    https://wiki.sdn.sap.com/wiki/display/ERPLO/Dynamicsafetystock+calculation
    Where as Forecasting Profile , please refer the below :
    Profiles
    One more query : Also the MRP type used here is a copy of the PD MRP type and not VV or VS.
    I think you should use Forecast Base MRP type like VV  rather PD.PD does not carry out any Forcasting Functionality .Please check wether you replicate PD from VV , then it is possible to execute Forecast specially Total Consumption set up in MRP type .
    Hope this will be useful
    Regards
    JH

  • Minimum and max lot size

    Hai All,
               Can anyone please tell exactly from which table we can get the data "Minimum and max lot size".
    Is it "MAST" or "PLKO" or "MARC"?

    Hi Kavitha,
    check with the table MARC and the fileds BSTMI (Minimum lot size ) BSTMA  ( Maximum lot size )
    for more info
    Re: Table for Lot size.......
    hope it helps you.
    Thanks!
    Edited by: Prasanth on Mar 7, 2009 7:26 PM

  • Coverage profile and Stime period profile in MRP

    Can anyone explain what is the importance of coverage profile and safety time period profile in MRP2 view and what is their implication in MRP and SOP ?

    Hi,
    Coverage profile is used in Material Requirements Planning for calculation of dynamic safety stock. This dynamic safety stock is calculated by using formula: Average daily req*range of coverage.
    Average daily req is calculated by considering requirements in specific periods and no of days for the total period length.
    You can find all the setting in
    MRP--> Planning-> MRP Calculation---->Define range of coverage profile.
    e.g.
    You have maintained in coverage profile:
    Period indicator: W(week)
    Number of periods to be considered for ADR: 2
    Period length: Standard days (5 days)
    Range of coverage: 5 days
    Req for 1st week: 1000
    Req for 2nd week: 1000
    then Ave daily req.= (1000+1000)/(5 period length*2 no. of periods)=200
    then Dynamic safety stock= 200 (ADR)*  5(range of coverage)=1000
    Hope you got it.
    Sachin

  • Combination of Fixed Lot size and Period lot size

    Dear all
    I have scenario as follows:
    1. My supplier's standard packing size of a raw material is 1000 EA.
    2. I want to follow period based lot size to optimise my order and inventory cost. But I don't want to use dynamic lot size which will propose dynamic quantity.
    So my requirement is like I want to fix lot size as 1000 at material master and Period is Week. My proposal quantity must be 5000 EA for the following demand pattern:
    Week 1:1200
    Week 2: 1000
    Week 3: 1100
    Week 4: 1000
    System must consider period as well as fixed quantity.
    Kindly throw some light on this.
    Advance thanks.

    Hi
    1.As you are looking for Weekly demand demand quanityt , you have to assign Weekly Lot Size : WB.
    2. Goto OWD1   and Create a Rounding Profile which will rounds into Weekly Demand quantity for that plant and simulate .
    3.Assign this rounding profile in MMR in MRP1
    3.DO NOT assing  rounding valu as 1000 .Rather keep it blank
    Hope this will solve the problem
    Regards
    JH

  • Relation between PO Qty and Minimum Lot size of material master

    I have maintained "100" in minimum lot size ( MRP1 View, table MARC and field BSTM) for the material.
    I am also succssed to create the Purchase order for 2.5 Qty for the same material. '
    I wanted to know, how system is allowig to create the PO with lesser qty or is this view is maintained only for sales?
    Please give your expert comments on the same.
    Thanks,
    Vikas
    99301 03991

    Used for claculate the procurement qty during MRP and depends on the lot size procedure you select. quota arrangement also uses this lot size.
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d26ad44af11d182b40000e829fbfe/content.htm]
    Edited by: Karthik on Jul 8, 2011 9:47 PM

  • Issuance (pack size) Qty and Minimum Lot Size

    Hi Experts,
    I have a problem, I have to maintain Minimum Lot Size and issuance (pack size) in the material master. Suppose Minimum Lot size of one material is 2000 and Pack size vendor provides is 400.
    Means, when we place order, minimum order can be made for 2000 Nos and when we issue the material to WIP from Main Store the minimum issue quantity should be 400.
    How can we map in the system.
    Please help me.
    GR

    Dear,
    I would like to suggest as :
    Maintain the Base unit of measurement for material as PAK/CARTON/EA.
    In additional data, unit of measurement mention 400pc = 1 ea/carton.
    Whenever issue the material from stores, the quantity should be 1 ea (i.e 400 pcs) basing on base unit of measurement.
    Now comes to minimum order quantity should be 2000 pcs.
    Maintain ORDER UNIT in purchase tab of material master as PC.
    To restrict the order quantity must be 2000 pcs, In that vendor master
    Order optimisation restrictions u2013 quantity. This is useful while ordering the vendor.
    For example if the quantity to shipped from this vendor you enter as 2000 pcs. When creating purchase order, if quantity is less than 2000 the system will give message.
    Try this in quality with a full cycle of documents.
    Regards,
    Syed Hussain.

  • Fixed lot size and Minimum lot size

    Dear senior,
    My client has the following scenario. His supplier provides the item in a fixed lot size of 100. The minimum lot size to be ordered is 300.
    The supplier is a fixed vendor.
    I tried to maintain this information in the Material Master MRP views. Lot size  - FX, Fixed lot size - 100, Minimum lot size - 300.
    However, everytime, the minimum lot size will get reset.
    Is there any way , I can maintain this scenario via configuration or any other method?
    Thank you.

    Hi,
    Fixed lot size - 100 means for every 100 quantity system will create one purchase document.
    If you selected Lot size - FX - Fixed order quantity , then no need to maintain Minimum lot size & Maximum lot size fields.
    Then you have to maintain Fixed lot size filed only.
    Ex: 
    Lot size = FX
    Fixed lot size = 100
    There is a requirement of 300. Then system will create 3 PO's with quantity of 100 each.
    If Lot size is Ex - Lot-for-lot order quantity, then only need to maintain Minimum lot size & Maximum lot size fields in the MRP 1 view.
    Ex: Lot size = EX
    Minimum lot size = 60
    Maximum lot size = 100
    There is a requirement of 250. Then system will create 3 purchase documents, two documents with the quantity of 100 and third one with the quantity of 60.
    That's why, in your case system is reseting Minimum lot size every time.
    If you want to maintain Minimum lot size, then maintain
    Lot size as EX
    Minimum lot size = 100
    Max lot size = 300
    It will solve your problem.
    Regards
    KRK

  • Weekly lot size calculation with scheduling lines

    Hi,
    We are using WB = weekly lot size calcultaion for purcahsed material.
    We are also using Scheduling agreement and MRP is creating schedule lines automatically, but it does not take into account the weekly lot size.
    If we have three different requirements coming from different end products for same week, but different date and then we run the MRP, SAP will create three different schedule lines for the same date. Is it possible to configure system so, that it will create one schedule line in that case?
    Regards,
    jaana

    Hi,
    We are using rounding profile and minimun lot size from the Quota arrangement. Roundings seems to work fine.
    Which plant parameters you mean, I have check the MRP plant parameters, bur is there some point which will effect for the gouping?
    Thanks and regards,
    jaana

  • MRP run with lot size as per prod. version and capacity levelling

    Dear PP experts,
    Hi, We are working with strategy 10. For SFG and FG produced inhouse we have created BOM and recipe with production version.
    For example:
    I have a production version with batch size as 100 Kg.
    I load PIR for 500 Kg in MD61.
    I have maintained lot size as EX in the material master but I have not defined mini. and max. lot size.
    Is it possible during the MRP to consider the production version batch size if the mini. and max. lot size is not maintained in the system and create 5 Planned Order of 100 Kg each.
    I know, how it can be done by using lot size in material master or by maintaining schedule lines in MD61 or by maintaining quota. But if nothing is maintained is it possible for the system to create 5 Planned orders as per the production version batch size.
    Pl. check if this is possible and revert back.
    Regards,
    Prashant

    Hi
    No, system will not consider the size that maintained in the production version  for the creation of planned order while the mrp run .
    This lost size is used to validate the bom/ routing combiation for the particular  pv of the material

  • Reg: lot size and replenishment lead time

    1. please explain about lot size and replenishment lead time.
    2. please also explain about consumption based planing and in steps explain how to perform manual and automatic reorder point(transc code please)

    You use the lot-sizing procedure to determine how the system is to calculate the reorder quantity in the planning run.                                                                               
    A lot size defining the lot-sizing procedure is assigned to every material master record applicable to materials planning.                                                                               
    The lot size is defined in Customizing by the combination of the lot-sizing procedure and the lot-sizing indicator.                                                                               
    Three procedures for lot sizing are available:                                           
    o  static lot-sizing procedures                                                          
    o  period lot-sizing procedures                                                          
    o  optimizing lot-sizing procedures                                                                               
    You use the lot-size indicator to define the procedure.                                                                               
    The following parameters are also available for controlling the lot-sizing procedure:                                                                    
    o  Short-term and long-term lot size                                                     
       You can split the lot-sizing procedure into a short-term and a long-term period. This means that you can select one lot-sizing procedure in the near future and a different one in the distant future.                                                                               
    You define the periods in the section of the screen entitled "End of the short-term period/start of the long-term period".                                 
       The valid from date of the long-term lot size area is defined via:                    
       -  a periodicity                                                                      
       -  a number of periods                                                                
       The beginning of the long-term period is calculated by taking today's date and adding the number of periods in the future; the long-term planning period then starts on the next complete period.                              
       Note                                                                               
    For materials that are planned using the short and long-term lot size,                
       it is recommended that you define a maximum MRP period. Defining the                  
       MRP period has the effect that materials after a certain period are                   
       included in planning even if no changes relevant to the planning run                  
       have occurred. This avoids a situation where order proposals created                  
       with the long-term lot size move into the short-term period because no                
       changes relevant to MRP have occurred for the material.                               
       You define the maximum MRP period in the step, "Define maximum MRP                    
       period". A material that is planned on a regular basis should also be                 
       provided with an MRP type that contains the indicator for regular MRP.                
    o  Scheduling indicator                                                                  
       For period lot sizes, you can use the indicator for scheduling to                     
       determine whether the availability date;                                              
    o  is to be set to the first requirements date in the period                             
    o  or is to be set to the beginning of the period                                        
    o  is to be set to the end of the period                                                 
    o  or whether the period start represents the beginning of the planned                   
       order and the period end represents the availability date (repetitive                                                                               
    manufacturing)                                                        
      Interpretation of the delivery times                                  
      For the lot-sizing procedure, you can also define whether the period  
      start is to be interpreted as the delivery date or as the availability
      date using the indicator, "interpretation of the calendar times".     
      NOTE                                                                  
      The indicators, Scheduling and Interpr.deliv.times are mutually       
      exclusive.                                                            
      Indicator for the splitting quota                                     
      For the quota arrangements, you can determine whether the requirements
      quantities are to be distributed to several items, that is, whether   
      they are to be split. With the splitting quota arrangement,           
      requirement quantities are not simply allocated to the smallest quota 
      rating. Instead, they are distributed among various sources using the 
      following formula:                                                    
      Quantity for source of supply X = Quota of source X * reqmts quantity                                                                               
    Sum of all quotas          
      Overlapping indicator                                                 
      The overlapping indicator along with the cycle time in the material   
      master record are used to split the planned orders into several       
      partial quantities whereby the in-house production time overlaps by   
      the cycle time.                                                       
      Lot-sizing procedure for make-to-order production                     
      In make-to-order production, you can use the indicator, Lot size for  
      make-to-order production to determine whether,                        
      the order quantity is to be calculated using the exact lot size       
      the order quantity is to be calculated using the exact lot size and   
      the system is also to take the rounding quantity or the minimum and   
      maximum lot size into account                                         
      the order quantity is to be calculated using the lot-sizing procedure 
      defined for the short-term area                                       
      Maximum stock level variant                                           
      The system only displays the Maximum stock level variant field in the 
      lot-sizing procedure, Replenishing to maximum stock level. The        
      indicator only has an effect in connection with reorder point planning
      taking external requirements into account and in connection with      
      material requirements planning and controls how the system calculates 
      lot sizes.

Maybe you are looking for

  • [SOLVED]Swapping from xf86-video-ati driver to catalyst

    Hey everyone, So as the title implies, I need some help on this.  I tried doing a pacman -R xf86-video-ati, then setting my xorg over to vesa as the driver prior to installing the catalyst driver.  That part went fine.  Installed catalyst which updat

  • Why won't my iPad load games

    IVe downloaded a game it try's to load then just takes me bk to my main screen y, I've tried it with different games but it's doin the same, can someone help.

  • ID for ADE

    it ry to make an id for ADE it dont works

  • Two problems : navigating the timeline and know where your shot matching originates

    Hello, - I wonder how you can navigate the timeline freely (I'm on PC in direct link mode) to be able to use, for example, the C shortcut easily when you edit a one hour film. In a word, I can't find how I can zoom on the secondary playhead instead o

  • New toy and I'm lovin' it.

    I had decided to get back to doing some personal still photography and proceed for a bit recently untill I hit a major hurdle. Printing exhibition quality "art photos" (esp. B/W) from digital source was a stumbling block .. Very expensive and no cont