Create background job triggered by another job

Hi experts,
I want to run FCHU in background everytime I finished run F110.
I'm thinking to use background job creation SM36 - triggered by job. But the problem is, job created from F110 the job name is not fixed.
Please anyone can give better idea ??
Thanks,
Melissa

Hi melissa,
The suggestion given by Prem is perfectly Ok.
I would suggest you to create an event  by sm62 and then create an event triggered  background job which will run the FCHU in Back ground.
So you need to get an enhancement point in F110 and put the code of triggering the event .
If there is no enhancement  then you can create a program which will call the Transaction F110 by using CALL TRANSACTION statement and after F110 processing the control will get back to your program and you can write a code for triggering the event by using the FM SWE_EVENT_CREATE.
I hope this will help you

Similar Messages

  • SQL SERVER AGENT job dependent on another job

    Hi
    I have 2 Sql Server Agent jobs that run on a daily basis.
    One which is run first but is dependant on another job completing.
    The secone runs every 30 mins between 9:00am to 7:00pm.
    If my first Job hasn't run but the 2nd job does start running the 2nd job will fail.
    Is there away with SQL servent agent where if my first Job hasn't run  then don't run the 2nd job?
    Regards

    Hi aivoryuk,
    According to your description, if you set one job is dependent on another job, when the first job does not run or execute failed, then the second job will not run. I recommend you use two steps to instead of this two jobs. In step Advanced page, we can set
    that the first job execute successfully then go to the next step. Or else, it will quit the job and report a failure.
    The other way is that we create new job with the same schedule as the second job , in this job , we can check the first job status with the sp_help_job stored procedure, then you can use sp_start_job to Start
     the second job. For more information, you can review the following post.
    http://social.technet.microsoft.com/Forums/en-US/d5cb4004-02fb-4b41-a321-5197f8105941/sql-server-agent-making-1-job-dependent-on-another?forum=sqltools
    Regards,
    Sofiya Li
    Sofiya Li
    TechNet Community Support

  • Redwood - Schedule a job dependant on another jobs completion?

    Hoping someone can help as documentation on Redwood seems to be very limited.
    We are currently running Redwood for the "Standard Jobs" without an issue, however we now have a requirement to start testing our batch schedule through Redwood and can't seem to figure out how to create jobs with dependencies on other job completions?
    Can anyone point us in the right direction?
    The other issue we have, is that we are unable to find an option to release a job based on an event trigger?
    Thanks a lot

    Hi Matthew,
    Jobs can be made dependant in two ways.
    1.     Using Job chains where you will be able to have multiple scripts (each script executes a step in multi step job) dependant on one other. (Documentation for the same is available in Redwood help with key word – ‘What is a job-chain’). In this case you will have one job chain with multiple scripts getting executed in a parallel or sequential way. Also it is possible to embed job chains in other job chain. You can take different actions based on output / processing state (completed, cancelled etc.) of previous script in Job chain.
    2.     Raising events by predecessor script which in turn triggers next script.
    First solution is more appropriate and used one.
    If you are talking about events in Redwood they can be raised and sensed by scripts and can be defined in script properties under node –wait Events & Raise events.
    Hope this helps.
    Regards
    Vithal

  • How to set a job ran after another job finished?

    Dear Experts,
    Our requirement is to have 2 JOBs defined in SAP:
    JobA and JobB
    The requirement is JobA will firstly ran and finished everyday.
    Then JobB will start to run upon JobA finished everyday also.
    Then what i did is set 2 jobs, and set JobB ran after with JobA. I set JobA's name in 'After Job' for JobB.
    Right now, the issue is:
    JobB will run after JobA, but only could run one day..
    The next day after JobA finished, JobB will not run...
    Please kindly help what issue here??
    Thank you very much.

    Dear Hoo,
    It is possible to follow one job after another.
    For this set up please go to transaction "SM36"
    fill your details and then press "Start condition" a new screen opens where you can see several tabs,
    and there is one tab with "After Job" , please enter the name of Job e.g jobA.
    here you can set all the conditions to start a new job.
    I hope this solves your problem.
    Regards,
    Paresh

  • How to trigger a job from the another job?

    Dear Pals,
    Im new to Business objects data integrator 11.7.2.3. 
    Requirement :
    I have two jobs JOB1 and JOB2. JOB2 to be executed only after completion of JOB1.Please do let me know how to meet this requirement.
    Thanks in advance.
    Regards,
    Diras

    export the execution command for both the jobs from the web admin batch job history page
    this will export the job launch command to a .bat or .sh file depending on OS to %LINK_DIR%/log directory
    you can call these jobs in another script in sequence
    or if you are looking for lanuching Job2 only if Job1 is successful, then in the Job1 you can add a script at the end and call the script (to which the execution command is exported) for Job2 by using the exec function

  • Can a dbms_job.run execute a job that execute another dbms_job.run?

    Hi,
    I'm using Oracle9iR2 database.
    I create a package procedure that loop through a list of jobs from user_jobs table and run it using dbms_job.run(jobid).
    Then I schedule this package procedure as a job (say JobA) itself to execute the above procedure every 15 minutes.
    However, it always fail. When I execute JobA manually from sqlplus, I get the folllowing error. Any idea what's wrong?
    SQL> exec dbms_job.run(55805);
    BEGIN dbms_job.run(55805); END;
    ERROR at line 1:
    ORA-12011: execution of 1 jobs failed
    ORA-06512: at "SYS.DBMS_IJOB", line 406
    ORA-06512: at "SYS.DBMS_JOB", line 272
    ORA-06512: at line 1
    Please advise.
    Thank you.
    Message was edited by:
    bchurn

    Hi,
    I am bchurn's colleague who is currently also looking into this problem. The code that we have is similiar to yours except there's a cursor looping through all the failed jobs and executing them.
    I am not sure what is the actual difference but it is actually a job running a procedure instead of through SQL Plus.
    However, we found out that a job cannot run another job. But it seems to be alright with your settings :-/
    What we have is actually a job created for every email to be sent out to our users (jobA). But many a times, the emails were not sent out because of unknown problems (during that time - I think it's the ORA-00600 error).
    The last time we created the second job (jobB) for the purpose of re-executing failed jobA jobs. The errors are that a job cannot execute another job.
    Then, we worked around to change jobB to re-adjust the execution time for all the jobA jobs instead of directly reexecuting them. While some failed jobA jobs are executed successfully because of it, some still remains. We found out that the errors from failed execution of jobA jobs as following:
    ORA-00600: internal error code, arguments: [kgassg_2], [], [], [], [], [], [], []
    ORA-29279: SMTP permanent error: 555 5.5.4 <fieldNameHere> parameter unrecognized
    The second error very seldom. First one most common. The jobs eventually being executed successfully after many re-execution (sometimes about 3 to 4 times, some over 20 or 60 times). Anyone can give suggestions or inputs on the first error? The error log file and its trace files do not give much information on the errors with something like the following:
    Error log file:
    Errors in file /opt/app/oracle/products/920/admin/testapp/bdump/somefilename.trc:
    ORA-00600: internal error code, arguments: [kgassg_2], [], [], [], [], [], [], []
    And when I go and search for the somefilename.trc, it does not exist.
    Any idea on how to solve this or identifying the actual problem?
    Thank you in advance.

  • Create Background jobs

    How can i create background jobs and link them to the Event so that they will be triggered? I have no clue on this, can anyone explain in a detailed manner with the Transaction codes for each.
    Thanks in advance.

    Hi laitha,
    JOB is a program which starts to a determined point of time and executes some standard programs in the system. JOBs can be planed to a determined point of time on the regular basis (every night, for example) or to some discret time moments. So, the JOB can be planed and then will be started automatically without the manual start.
    Realtime programs are understood in the most cases as actual program execution which is started by somebody to the actual moment of time.
    Typically per JOBs some special processes will be started that should be executed automatically and regularly: for example, IDOC application, some correction reports, statistic updates etc.
    Standard jobs are those background jobs that should be run regularly in a production SAP System These jobs are usually jobs that clean up parts of the system, such as by deleting old spool requests.
    Use
    As of Release 4.6C, the Job Definition transaction ( sm36 ) provides a list of important standard jobs, which you can schedule, monitor, and edit.
    Standard jobs are those background jobs that should be run regularly in a production SAP System. These jobs are usually jobs that clean up parts of the system, such as by deleting old spool requests.
    for more information you can go thru the following thread:
    http://help.sap.com/saphelp_nw70/helpdata/en/24/b884388b81ea55e10000009b38f842/frameset.htm
    About Events:
    Events have meaning only in the background processing system. You can use events only to start background jobs.
    Triggering an event notifies the background processing system that a named condition has been reached. The background processing system reacts by starting any jobs that were waiting for the event.
    Types of Events:
    There are two types of events:
    1.)System events are defined by SAP. These events are triggered automatically when such system changes as the activation of a new operation mode take place.
    2.)User events are events that you define yourself. You must trigger these events yourself from ABAP or from external programs. You could, for example, signal the arrival of external data to be read into the SAP system by using an external program to trigger a background processing event.The event scheduler processes an event if the event is defined in the system.
    For example, if a system (System 1) receives an event from another system (System 2), the event scheduler of System 1 processes the event only if it is defined in System 1. That event does not need to be defined in System 2 (the sending system).
    You define an event by assigning a name (EVENTID) to it. When defining an event, you do not define the event arguments.
    for more information you can go thru the following thread:
    http://help.sap.com/saphelp_nw04s/helpdata/en/fa/096e2a543b11d1898e0000e8322d00/frameset.htm
    When you schedule the process chain or infopackages the jobs associated with it run in the background mode. In case you want to create a job for a specific activity you can do so in SM36. You would be creating jobs that would get executed in any one of the options:
    1. Immediate
    2. Date & Time
    3. After event.
    4. After job.
    5. At Operation mode.
    In case you want to view the job logs go to sm37.
    _List of Background Jobs_
    BIREQU - Load of a Request/Reconstruction of a request
    BI_AGGR4 - Aggregates activation
    BI_BTCH - Any batch job like ABAP program run in background
    BI_DELR - Deletion of request
    BI_HIER - Hierarchy loading/activation
    BI_ODSA - ODS activation
    BI_PROCESS_ABAP - ABAP program in process chain
    BI_PROCESS_LOADING - Data Loading in process chain using nfopackage
    BI_PROCESS_ODSACTIVAT - ODS actiavation in Process chain
    BI_PROCESS_TRIGGER - Trigger job for process chain
    BI_PSAD - probably PSA deletion
    BI_STAT - Building statistics
    BI_STRU - Change run job
    BI_WRITE_PROT_TO_APPLLOG - Application log job
    RANATL_ACCT_CACHE_WARMUP
    Use tcode SM62 to create User events.
    Use tcode SM64 to trigger the event.
    Wizards for Event Creation :pls chk this link
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/f7/d1c20a02d511d3a6550060087a79ea/frameset.htm
    *pls assign points,if info is useful**
    Regards
    CSM reddy

  • How to create Background job for Dialog program

    Hi Experts,
    I have copied Standard tcode to Z-tcode (CS12 tcode).
    Now my requirement is to create background job for this program (but program is not a 'E' type its 'I').
    How we can schedule Dialog program to Background.
    Pls suggest me.
    Regards
    SK

    Hi do as below :
    Reefer below :
    Bakcground Job Creation
    You will have to submit your report using Submit statement ,
    then inside the submitted report write open_job.
    Regards,
    Uma

  • Create background job

    Hi,
    is it possible to create background job of a program with POO, i had a look on class, i found CL_BP_ABAP_JOB or CL_BP_JOB but i don't use them.
    Otherwise i will use 'JOB_OPEN' but i like POO
    Can you help me ?

    I answer myself...
    The class to use is cl_bp_abap_job.

  • Periodic Background Jobs after another Job finishes

    Hi
    I have to schedule a job 'B' to run after job 'A' finishes.
    When i schedule job 'B' to run after job A , it runs only once , while i need the job B to run periodically after job A finishes.
    1) I cannt make job B as step 2 of job A , because job A is not scheduled by me and i cannt change that.
    Can anyone tell me how to i trigger the job B periodicaly after job A finishes .
    Any solution or hint would be appreciated.
    Looking forward to some helpful replies from the gurus of SAP.
    Regards
    Purva

    Dear Team,
    Job ES_RPTMC_CREATE_CHANGEPOINT_AUTH  ran only once where as SEC:INDX_UPDATE_FOR_STRUCT_AUTHS ran daily.
    CAUSE:
    “The start condition "Start after job" is internally mapped by means of "Start after event SAP_END_OF_JOB with the parameter <Jobname><Jobcount> of the predecessor". The pair <Jobname><Jobcount> is the unique key for a job.
    If a job is executed periodically, the SAP_END_OF_JOB event is always triggered with different parameters.
    The successor in turn waits for SAP_END_OF_JOB with just one particular parameter (this is the parameter with <Jobname><Jobcount> from the first predecessor). When the successor is rescheduled, the key fields from the next predecessor must therefore always be known in advance, something which is not always technically possible.”
    SOLUTION:
    This task can be completed with the new ABAP program Program  BTC_EVENT_RAISE.
    The program is delivered by Support Package for Basis Releases 640 and 700, and is included in the standard system in all subsequent releases.
    The program is used to trigger a batch event. Existing programs do not therefore have to be changed. The BTC_EVENT_RAISE program has several parameters in the selection screen, including the event (and parameters) that is to be triggered.
    PROCESS:
     Go To SM64
     Click on Create
     Create two events.
    Our Case:
    We created Z_ES_CP_AUTH and Z_SEC_AUTHS
     Go to SE38
     Give the event name as BTC_EVENT_RAISE
     Select Variants and click on Display
     Give the variant name as the one you created.
    Our Case:
    Z_ES_CP_AUTH
     Click on Create
     Give in the details for variants
     Click on attributes and give the details for attributes
     Go to the job which needs to be run first
    • Select the job in released status
    • Job->Change
    • Step
    • Add BTC_EVENT_RAISE as the last step of the job with the parameter as the variant created
    Our Case:
    Step: BTC_EVENT_RAISE, Parameter: Z_ES_CP_AUTH
     Go to the job which needs to be run next
    • Select the job in released status
    • Job->Change
    • Start Condition -> After Event.
    • Give the BTC_EVENT_RAISE parameter of the first job as the event of the second job.
    Our Case:
    After Event: Z_ES_CP_AUTH
     Save the changes.
     The jobs will start running one after the other with the given frequency.
    Thanks
    Joginadham U

  • Job triggered by event created with BP_EVENT_RAISE

    Hello,
    in the exit for sales orders we trigger one event to call one program using FM BP_EVENT_RAISE. We have one job that starts after this event is created and looking with SM37 the job is still released under this condition (as is also in table BTCEVTJOB). The event is created correctly and the process has been working fine until a couple of days ago. I create new sales orders and see that this FM is still called, but the job does not start.
    I am trying to track the created events with transaction SWEL, but it does not work. How can I check that the event is being created and processed? any other transactions or programs to check this?
    Thanks.

    hi,
    as per my experience, in some user-exit you cannot call the BP_RAISE_EVENT ( or the method of the static class CL_BATCH_EVENT->RAISE ) . Even if the event is define correctly and the job is scheduled correctly the bapi call has no effect on event rasing and job is still in released status. 
    You can try to create a job having the needed steps and directly executed .( JOB_OPEN, submit 'your_program',  JOB_CLOSED ).... .. so i suggest to create a custom FM that execute this work .( JOB_OPEN, submit 'your_program',  JOB_CLOSED )  and call it into the user exit..
    Hope this can be a good input for you.
    Best regards luigi.
    Edited by: luigi la motta on Jun 14, 2010 4:14 PM

  • Unable to remove a host from VMM - Error (2606) Unable to perform the job because one or more of the selected objects are locked by another job.

    I am unable to remove a host from my Virtual Machine Manager 2012 R2. I receive the following error:
    Error (2606)
    Unable to perform the job because one or more of the selected objects are locked by another job.
    Recommended Action
    To find out which job is locking the object, in the Jobs view, group by Status, and find the running or canceling job for the object. When the job is complete, try again.
    I have already tried running the following command in SQL Server Management Studio
    SELECT * FROM [VirtualManagerDB].[dbo].[tbl_VMM_Lock] where TaskID='Task_GUID'
    I received this error back:
    Msg 8169, Level 16, State 2, Line 1
    Conversion failed when converting from a character string to uniqueidentifier.
    I have also tried rebooting both the host and the Virtual Machine Manager Server.  After rebooting them both, I still receive the same error when trying to remove the host.
    Here are my server details
    VMM Server OS = Windows 2012 Standard
    VMM Version = 2012 R2 3.2.7510.0
    Host OS = Windows 2012 R2 Datacenter
    Host Agent Version = 3.2.75.10.0
    SQL Server OS = Windows 2012 Datacenter
    SQL Version = 2012 SP 1 (11.0.3000.0)

    Hi there,
    How many hosts are you managing with your VMM server?
    The locking job might be the background host refresher job. Did you see any jobs in the jobs view, when the host removal job failed?
    If there is no active jobs in the jobs view when this host removal job fails, can you please turn on the VMM tracing, retry the host removal, and paste back the traces for the failed job (search for exception and paste the whole stack)?
    Thanks!
    Cheng

  • Background Processing? how schedule job for "System Error" Message .

    Hello everyone,
    in sap help i have read.
    http://help.sap.com/saphelp_nw04/helpdata/en/5a/f72040599a8f5ce10000000a155106/frameset.htm
    PCK> Monitoring>Message Monitoring-->Background Processing
    you can schedule jobs for various background processing:
    ●     Archiving of messages processed successfully
    ●     Deletion of messages that are not to be archived
    ●     Restarting of messages with errors
    ●     Rescheduling of lost messages
    can anyone understand this docu?
    give me some introduction, how can i define and schedule these jobs ?
    thx in advance!!
    best regards
    Yaning

    Background Processing
    Prerequisites
    You have started the message monitor on the initial screen of the PCK and are in Background Processing.
    Features
    Archiving
    You require two archiving sessions to archive messages:
    ●     One session to write the messages to the archive
    ●     One session to delete the persisted messages that have been archived
    To do this, you schedule an archiving job, which implicitly schedules the sessions to write to the archive and delete the archived messages.
    You can define one or more rules for each archiving job; these rules contain conditions that a message must meet in order to be archived by the job. At least one of the defined rules must be met for archiving to take place.
    All information that is displayed for a message in message monitoring is archived, in addition to the audit log for each message.
    Deleting
    A standard delete job is created automatically. It runs once a day. You can schedule additional delete jobs; however, you cannot define rules for them.
    Restarting
    Instead of restarting messages with errors manually with message monitoring, you can schedule a job to automatically restart these messages. This is possible for all messages for which the number of defined restart attempts has been exceeded (messages with the system error status).
    You can define one or more rules for each job to restart messages; these rules contain conditions that a message must meet in order to be restarted by the job. At least one of the defined rules must be met for archiving to take place.
    Rescheduling
    A standard job to reschedule messages is created automatically. The job runs once a day and ensures that messages lost as a result of database failure, for example, are rescheduled. You can schedule additional rescheduling jobs; however, you cannot define rules for them.
    Thx Aamir.
    But I mean the messages with errors in Adapter Engine , not in Intergrations Engine.
    the situation is like Naveen Pandrangi's WebLog
    II. Errors in Adapter Engine [XI :  How to Re-Process failed XI Messages Automatically|XI :  How to Re-Process failed XI Messages Automatically]
    I
    Till now we have seen how to resubmit/restart message that failed in Integration Engine.  One a message makes it from Integration Engine to Adapter Engine, the message is flagged as checked in Integration Engine. The status of the message in Adapter engine does not effect the processed state in Integration Engine. Now if this message was asynchronous, XI will by default try to restart the message 3 times at intervals of 5 minutes before the status of the message is changed from Waiting to System Error .
    *how can i schedule a job to automatically restart these messages with errors?
    best regards
    Yaning
    Edited by: Yaning Liu on Aug 18, 2008 1:43 PM

  • Trigger a job based on a job that will be created during runtime

    I searched sdn and I did not find any threads addressing my issue(Trigger JOB B after a JOB A which will not be available untill runtime).
    My Req:
    I have a where in, a JOB 'A' will trigger to execute a BDC session in program A using a SUBMIT ...RETURN statement.
    I will have to trigger a different job 'B' using program B, the moment the 1st job runs completed.
    I thought this would be possible, by handling the events and trigger the FM in program A after the SUBMIT statement. But the problem is SUBMIT statement would just create the job and return the control back to the program A and immediately call the FM to raise the EVENT. In this case, my job B will trigger and even complete before JOB A could complete successfully.
    I tried using AFTER JOB option in SM36 instead of AFTER EVENT. The problem with this option is, JOB A will be available ONLY during runtime and hence cannot schedule program B with the option AFTER JOB.
    Any thoughts are highly appreciated.
    Thanks for your help.
    Best Regards,
    Kiran

    Hi Thomas,
    I programmed the way you mentioned and this triggers both the jobs at the same time.
    DATA: number  TYPE tbtcjob-jobcount,
          jobname LIKE tbtcjob-jobname.
    jobname  = 'JOB1'.
    CALL FUNCTION 'JOB_OPEN'
      EXPORTING
        jobname          = jobname
      IMPORTING
        jobcount         = number
      EXCEPTIONS
        cant_create_job  = 1
        invalid_job_data = 2
        jobname_missing  = 3
        OTHERS           = 4.
    IF sy-subrc <> 0.
      MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
              WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    ELSE.
      SUBMIT zhbn_life_premium_summary_rpt
      VIA JOB    jobname
          NUMBER number
          AND    RETURN.
      IF sy-subrc EQ 0.
        CLEAR: jobname.
        jobname = 'JOB2'.
        CALL FUNCTION 'JOB_OPEN'
          EXPORTING
            jobname          = jobname
          IMPORTING
            jobcount         = number
          EXCEPTIONS
            cant_create_job  = 1
            invalid_job_data = 2
            jobname_missing  = 3
            OTHERS           = 4.
        IF sy-subrc <> 0.
          MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
                  WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
        ELSE.
          SUBMIT zhbn_life_premium_summary_rpt
          VIA JOB    jobname
              NUMBER number
              AND    RETURN.
          IF sy-subrc EQ 0.
            WRITE: 'job 2 success'.
            jobname = 'JOB2'.
            CALL FUNCTION 'JOB_CLOSE'
              EXPORTING
                jobcount             = number
                jobname              = jobname
                strtimmed            = 'X'
              EXCEPTIONS
                cant_start_immediate = 1
                invalid_startdate    = 2
                jobname_missing      = 3
                job_close_failed     = 4
                job_nosteps          = 5
                job_notex            = 6
                lock_failed          = 7
                invalid_target       = 8
                OTHERS               = 9.
            IF sy-subrc <> 0.
              MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
                      WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
            ENDIF.
          ENDIF.
        ENDIF.
      ENDIF.
      jobname = 'JOB1'.
      CALL FUNCTION 'JOB_CLOSE'
        EXPORTING
          jobcount             = number
          jobname              = jobname
          strtimmed            = 'X'
        EXCEPTIONS
          cant_start_immediate = 1
          invalid_startdate    = 2
          jobname_missing      = 3
          job_close_failed     = 4
          job_nosteps          = 5
          job_notex            = 6
          lock_failed          = 7
          invalid_target       = 8
          OTHERS               = 9.
      IF sy-subrc <> 0.
        MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
                WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
      ENDIF.
    ENDIF.
    Am I missing anything?
    Thanks
    Kiran

  • Schedule job with dependencies in another job

    Hi All,
             I Have a job in sm36 schedule but I want to create a new job and will be started after my first job,
       for exemple : I have a job Test1 started in 30 and 30 minutes and I create a new job test2 that this job has to executable after the job test1, I can to do this but my slave job only executable one time, I need that this job stay continued always after job test1 and don't finish.
    Thank for Help.
    Regards,
    Osvaldo Antonio dos Santos

    Hi,
    I am afraid your reqmt may not be possible.
    You can very well run one job after another job by maintaining the After event parameters in SM36. However you cannot enable a job run for ever. Once there is no input meeting the selection criteria, teh job will finish.
    Instead of thinking of enabling the job for ever, you can maintain the jobtest2 as after event of jobtest1.
    After that you can create jobtest3 using the same variant of jobtest2 and schedule it to run once in 15 min or 30min or so.
    Hope this helps you
    Pls reward if it is of some help to you