Created by date is identical on ALL projects!!

Whyyyyyyyy is the created by date the same on ALL projects??!!!!

USB Device: nanoKONTROL, 0x0944, 0x010f, 0xfa423000
Hi there,
have you installed the NanoKontrol plug-in for Garageband/Logic from Korg?
If yes,here's how to uninstall it:
Run LP 9.0.2
*Logic Pro/Express*
From the Logic pro/Express menu, select “Logic Pro/Express” - “Preferences” - “Control
Surfaces” - “Setup...” , and open the control surfaces setup window. Click and select
nanoKONTROL icon, push [delete] key on keyboard to delete nanoKONTROL
information.
After deleting the nanoKONTROL information, quit Logic Pro/Express and delete the
following file and folder.
/Applications/KORG/nanoKONTROL Control Surface plug-in
/Library/Application Support/MIDI Device Plug-ins/nanoKONTROL.bundle
A
Message was edited by: immo

Similar Messages

  • Sort by date on all projects

    Hello all,
    I just switched to Aperture, so forgive me if I'm missing something obvious.
    I prefer to sort all projects, events, everything by date, DESCENDING rather than the default ascending.  Is there some way to set a preference for all projects or new imports?  Is there some way to change the sorting on all of my projects at once?  I just imported my iPhoto library, and now I have hundreds of projects to go through and change.  Daunting, and a waste of time.
    Never understood why people would want to sort ascending anyway.  You have to open a project and then scroll down to the most recent stuff every time....
    Any suggestions or tips would be greatly appreciated.
    Thanks,
    Bryan

    Hi,
    I'm afraid that the sort functionality is not provided, you may download the result in excel, and sort by PO date
    in excel file.
    Thanks and regards,
    Polly

  • Idoc type provided by ECC to hold all project data

    Hi All,
    Please provide me the Basic Idoc type and message type provided by ECC which hold all project data like WBS Elements Info, Network & Activity info.
    Thanks,
    Suresh

    Hello,
    Please check if Basic Type PROJECT01and Message Type PROJECT suits your requirement.
    BR/Yogesh

  • How to update all projects data (checkout-edit-save&publish-checkin)?

    Hi every one,
    we have more that 400 projects in pwa and it will take too much time to update status date for all of them one by one mounthly
    so I'm looking for a solution (probably VBA) for opening all projects and set the status date to a specified value and save & publish then check-in all of them.
    is there any way to get it done?
    thanks for any help

    You can build a user form in VBA
    I made one that has 12 text boxes with project names. It is used to open and close and republish projects to current date as status date but you could just as easily set that date to something specific.
    Dim controlplanname
    If TextBox1.TextLength <> 0 Then
        controlplanname = "<>\" & Trim(TextBox1.Text)
        FileOpenEx Name:=controlplanname, ReadOnly:=False
        Macro Name:="AfterAcceptControlPlanUpdates_Close"
    End If
    Sub abAfterAcceptControlPlanUpdates_Close()
    ' this is a first attempt at a one button macro
    ' after countless control plans are opened from the web
        'DisplayAlerts = False
        Alerts False
            Call WriteProjectDeadlineToFinalMilestone
            LevelingClear All:=True
            UpdateProject All:=True, UpdateDate:=Now, Action:=2
            Application.RepublishAssignments False, pjPublishScopeAll, False, True, True, ""
            fnWait (2)
            UpdateProjectToWeb EmbedProjectFile:=True
            'MailSendProjectMail MessageType:="TeamPublishAll", Subject:="Publish New and Changed Assignments", Body:="Below are the latest schedule changes. Contact your project manager if there are any problems with the changes.",
    ShowDialog:=False, PublishScope:=1
        Alerts True
        fnWait (2)
       'DisplayAlerts = True
        FileClose pjSave
    End Sub
    So you could build a looping construct that finds out the status date of projects and if it is below a certain threshold then call the Sub.
    It is important to also be aware that this sub will overwrite and not process the updates the resources have submitted.
    My use case is accept all updates from PWA, All those projects open themselves. Then I apply the Sub. Then I have a list of Projects that have not been modified recently. And call the Sub separately on those via the custom form, and just let it run.

  • To create such script which will fetch all this data in form of create command

    Whenever I do a restore I always forget to reapply some database roles or application roles in post restore steps.We have one database of very different db roles,Grant permissions,Login and User permissions and they changes also frequently.
    What dmv's I required to create  such script which will fetch all this data in form of create command and after restore I just have to run those create commands and all the rights should visible as before .
    Thanks

    The context of your question is not entirely clear, but I assume that you restore a copy from one type of environment (for instance QA) to another (for instance development).
    To get group membership, you use the catalog views sys.database_principals and sys.database_role_members. Querying these is straightforward.
    To get permissions you would query sys.database_permissions. This view is more difficult to query, but you can take shortcuts depending on what is in use at your site.
    Erland Sommarskog, SQL Server MVP, [email protected]

  • Query to showed all level of BOM details, sort by create/update date

    Hi expert,
    I need a query to display all the level of BOM and can be sort by create / update date.
    The display of query should be as below:
    A (1st level) Parent BOM
    B (2nd level) Child BOM 1
    B (2nd level) Child BOM 2
    C (3rd level)  Child BOM 2 - 1
    C (3rd level)  Child BOM 2 - 2
    B (2nd level) Child BOM 3
    B (2nd level) Child BOM 4
    Below is the BOM  query that can only display up to 2nd level and cannot sort by date.
    Can someone please help to modify or there is a better query?
    Thanks
    Declare @BOMDetails table(TreeType Nvarchar(MAX),PItem NVARCHAR(Max),PName NVARCHAR(MAX),CItem  NVARCHAR(Max),CName NVARCHAR(MAX),[Quantity] Numeric(18,2),[UoM] NVARCHAR(MAX),[WareHouse] NVARCHAR(MAX),[IssuMethod] NVARCHAR(MAX),[PriceList] NVARCHAR(MAX))
    INSERT Into @BOMDetails
    SELECT T1.TreeType ,T0.Father AS [Parent Code], T2.ItemName AS [Parent Description], T0.Code AS [Child Code],
    T1.ItemName AS [Child Description], T0.Quantity ,T0.Uom ,T0.Warehouse ,T0.IssueMthd,T0.PriceList  
    FROM ITT1 T0 INNER JOIN OITM T1 ON T0.Code = T1.ItemCode
                 INNER JOIN OITM T2 ON T0.Father = T2.ItemCode
    Union All
    SELECT ' ',T0.Father as [Parent Code], T2.ItemName AS [Parent Description], ' ', ' ', 0, ' ',' ',' ' , 0 FROM ITT1 T0 INNER JOIN OITM T1
    ON T0.Code = T1.ItemCode INNER JOIN OITM T2 ON T0.Father = T2.ItemCode
    Group By T0.Father,T2.ItemName
    ORDER BY T0.Father,t0.Code
    update @BOMDetails set PItem='' ,PName='' where TreeType='N' or TreeType='P'
    Select PItem as[Parent Code] ,PName as [Parent Description],CItem as [Child Code],CName as [Child Description],Quantity,UoM,IssuMethod ,PriceList    from @BOMDetails

    Hi,
    Try this query and modify as per your requirement:
    SELECT
    T0.[Father] as
    'Assembly',T0.[code] as 'Component1', t10.[ItemName]
    'Description1',T1.[Code] as 'Component2', t11.[ItemName]
    'Description2', T2.[Code] as 'Component3', t12.[ItemName]
    'Description3', T3.[Code] as 'Component4', t13.[ItemName]
    'Description4',T4.[Code] as 'Component5', t14.[ItemName]
    'Description5', T5.[Code] as 'Component6', t15.[ItemName]
    'Description6'
    FROM
    ITT1 T0 LEFT OUTER
    JOIN ITT1 T1 on T0.Code = T1.Father LEFT OUTER JOIN ITT1 T2 on
    T1.Code = T2.Father LEFT OUTER JOIN ITT1 T3 on T2.Code = T3.Father
    LEFT OUTER JOIN ITT1 T4 on T3.Code = T4.Father LEFT OUTER JOIN ITT1
    T5 on T4.Code = T5.Father LEFT OUTER JOIN ITT1 T6 on T5.Code =
    T6.Father left outer join oitm t20 on t0.father = t20.itemcode left
    outer join oitm t10 on t0.code = t10.itemcode left outer join oitm
    t11 on t1.code = t11.itemcode left outer join oitm t12 on t2.code =
    t12.itemcode left outer join oitm t13 on t3.code = t13.itemcode left
    outer join oitm t14 on t4.code = t14.itemcode left outer join oitm
    t15 on t5.code = t15.itemcode
    Thanks & Regards,
    Nagarajan

  • How to create a data load file from Excel !!!

    Hi All,
    I'm new to HFM and would like to load data into an HFM application. As I have an Excel file with all the data. When I'm directly loading the data it throws an error saying "No section has been specified to determine if this is data, description or line item detail". How can I convert this excel file into proper format (.dat) file understandable by HFM ?

    There are several ways to get this data into HFM.
    1) FDM - best option if you have it
    2) Webforms/Data Grids
    3) HsSetValue formulas in Excel
    4) DAT file loads
    5) JVs, etc
    If you wish to use DAT files created via Excel, you will likely want to use Excel VBA macros to create your DAT file to load. We do this on occasion for special projects and it works quite well. What you can do is set up an Excel file with your data inputs to look however you want, then link your POV members and amounts to another tab (we commonly call this the Export tab and it is set up in an HFM-friendly format).
    Create a macro to write a DAT file to a specified location using data from the Export tab. The DAT file will need to be formatted as below. For a specific sample, you can extract data from your HFM app and see the format.
    !Data
    Scenario;Year;Period;View;Entity;Value;Account;ICP;Custom1;Custom2;Custom3;Custom4;Amount
    Scenario;Year;Period;View;Entity;Value;Account;ICP;Custom1;Custom2;Custom3;Custom4;Amount
    Scenario;Year;Period;View;Entity;Value;Account;ICP;Custom1;Custom2;Custom3;Custom4;Amount
    Scenario;Year;Period;View;Entity;Value;Account;ICP;Custom1;Custom2;Custom3;Custom4;Amount
    Scenario;Year;Period;View;Entity;Value;Account;ICP;Custom1;Custom2;Custom3;Custom4;Amount
    Brush up on Replace, Merge, or Accumulate load options in the HFM Admin and User Guides, then upload your new DAT file.

  • How can I create a data file?

    I'm back. I found the CFA & PEF files and I am getting ready to go to work and delete all these on all my drives.
    What I need to know now is how to create a data only file on a DVD for back up.  I have successfully burnt a DVD in Encore, but I do not want to use that as a back up
    I feel like it would be degraded somewhat. Besides it is an Encore file.
    What I want is a Premiere file from CS4. This way I can always go back to it and make any changes or edits in the original time-line.
    If I can do this I was planning on using a DVD-RW so I could make changes later on.
    I also want to make a transfer DVD to install my projects on another computer. This will be a Video only computer with no internet connection to mess with my OS and slow things down.
    Thanks Again

    For the Projects, the trick will be the Asset files. If they will fit onto DVD DL discs, you're OK. If they are too large (DV-AVI is ~ 13GB per hour), then you'll need some type of backup, or spanning software, that will write files across multiple discs. A better choice, IMO, would be a 1 - 2 TB external, where you can use Project Manager, or just Windows Explorer and Copy, to do the entire Project folder with Assets. I'd recommend against a USB and go at least for FW-400. FW-800 would be better, but you'll need FW-800 connections on your computer. eSATA would be the best, but then you'll need eSATA connectors.
    Good luck,
    Hunt

  • Is there a way to manually custom-edit the "Date created" and "Date modified" attributes of files in Mac OS 10.6?

    In "List View" in a Finder window, among the many column options are "Date created" and "Date modified." In "View Options" (command-J) for any folder, one can add these columns, along with the standard ones "Size," "Kind," "Label," etc.
    A user can alter a file's name, and a file's "label" (i.e. its color). On the other hand, a user can NOT arbitrarily edit/alter a file's official "size" -- other than by physically altering the contents of the file itself, obviously.
    But what about a file's "Date created" and "Date modified"? Can either of those be manually edited/changed, just as a file's name can be changed -- or is a file's creation-date an immutable attribute beyond the editorial reach of the user, just as a file's "size" is?
    And yes, a person can "alter" a file's "Date modified" by simply modifying the file, which would change its "Date modified" to be the moment it was last altered (i.e. right now). But (and here's the key question) can a user somehow get inside a file's defining attributes and arbitrarily change a file's modification date to be at any desired point in the past that's AFTER its creation date and BEFORE the present moment? Or will so doing cause the operating system to blow a gasket?
    If it is possible to arbitrarily manually alter a file's creation date or modification date, how would it be done (in 10.6)? And if it is NOT possible, then why not?

    sanjempet --
    Whew, that's a relief!
    But as for your workaround solution: All it will achieve is altering the created and modified dates to RIGHT NOW. What I'm looking to do is to alter the modification/creation dates to some point in the past.
    I'm not doing this for any nefarious reason. I just like to organize my work files chronologically according to when each project was initiated, but sometimes I forget to gather the disparate documents all into one folder right at the beginning, and as a result, sometimes after I finish a job, I will create a new folder to permanently house all the files in an old project, and when that folder is places in a bigger "completed projects" folder and then is organized by "Date created" or "Date modified" in list view, it is out-of-order chronologically because the creation and modification dates of that particular project folder reflect when the folder was created (i.e. today), and not when the files inside the folder were created (i.e. weeks or months ago).
    The simplest solution would simply to be able to back-date the folder's creation or modification date to match the date that the project actually started!

  • How to create a data connection with dynamic XML file?

    Thanks for all reply first!
    I have formatted the submitted data into an XML file on the server side,this file can be import to PDF form correctly.
    I try to send this XML file to the user to let him can review what he has submitted.
    I guess that I should create a data connection to the XML file so that it can be reviewed by the user.
    But the question is that the XML file is dynamic generated.
    How can i do?
    give me some clus or examples,please.
    thanks,
    Jasper.

    Hi Jasper,
    To show user back the result, you can use PDF instead of XML. You can store the PDF template in server and you can merge XML data with PDF template by Livecycle Form Data Integration service.
    We, as KGC, can generate huge number of Adobe Livecycle forms in small periods. Also we give consultancy on Adobe Livecycle ES products and Adobe Livecyle Designer. In case of any need, do not hesitate to contact us.
    Asiye Günaydın
    Project Consultant
    KGC Consulting Co.
    www.kgc.com.tr

  • Problem in creating a user in Identity management

    hi all
    i work on portal 7.0 and am involved in the branding of the portal.
    when i try to create an user in Identity mgt the following error message is displayed..
    ..current user has user creation permissions in th UME , but cannot create users in the backend systems(datasource).Original and possibly untranslated message was "no active writeable datasource found for usr craetion,check your permissions configuration".
    kindly help
    thanks in advance
    krishna chaitanya.

    Hi Chaitanya,
    I think you are using a LDAP or SAP system to store users. The problem is when you are defining the datasource configuration file. This might be in *read only * mode.
    You can check this by System Admin -> System Configuration -> UME Configuration ->Data Sources tab..
    You check wether you data source config file is in read only mode or not. If this file is in read only mode you cannot create users from the front end
    You need to create users from LDAP or SAP system what ever may be your back end.
    Thanks,
    Raju Bonagiri

  • Create report in orde to display all pending orders on basis of  "CODE"

    Hi ,
    I need to create report in orde to display all pending orders on basis of  "CODE" ( e.g RC , VP ext)  given on selection screen.
    This "Code" field is on  tcode Me23n inside tab "Release strategy".What is table and relation to fetch ebeln on basis of CODE(e.g RC)
    Regards.

    Hello,
    In SQL Server Reporting Services (SSRS), by default, the chart will only display axis labels for data points in the dataset that contain valid values. Also, if we have values of 1, 2, and 6 on the category axis, we can specify the chart to use a scalar axis
    to maintain the scale of category values. It is add numeric or date/time values to the axis where no data grouping values exist.
    You can refer to the steps below:
    1. Right-click X-Axis, select Horizontal Axis Properties.
    2. Select “Scale(Number/Dates)” below “Axis type:”. Configure “Axis range and interval” as you require.
    You can refer to the screen shots below:
    Preview the report:
    There is an article about Formatting Axis Labels on a Chart, you can refer to it.
    http://technet.microsoft.com/en-us/library/dd239363.aspx
    Regards,
    Alisa Tang
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Share Data Source between multiple report projects in Microsoft SQL Server 2012 Reporting Services

    I have a reports solution in 2012 which contains multiple report projects one each for target deployment folder and we use TFS 2012 for report deployment.
    We have a template project which has a bunch of template reports and all the datasources used in different reports.
    When I develop a report, I cannot "Preview" in TFS but, for deploy this used to work fine util the reports solution was in TFS 2010 & Visual Studio 2008 R2. Since we moved to TFS 2012 & SSRS 2012 not being able to deploy till I create all
    the necessary datasources for each project and now all the developers complaining that they cannot develop reports in TFS itself as they cannot preview (this problem was existing previously) and now not being able to deploy as it errors for each report "Could
    not find specified rds file". I tried messing around with the .rptproj file DataSources tag that did not help either by modifying it like below.
    <DataSources>
    <ProjectItem>
    <Name>DB.rds</Name>
    <FullPath>Template\Data Source\DB.rds</FullPath>
    </ProjectItem>
    </DataSources>
    Is there a way I could share a Data Source between multiple projects in Microsoft SQL Server 2012 Reporting Services?
    Thanks in advance.............
    Ione

    Hi ione721,
    According to your description, you want to create a shared data source which works for multiple projects. Right?
    In Reporting Services, A shared data source is a set of data source connection properties that can be referenced by multiple reports, models, and data-driven subscriptions that run on a Reporting Services report server. It must be within one project.
    We can't specify one data source working for multple projects. In this scenario, we suggest you put those reports into one project. Otherwise you can only create one data source for each project.
    If you have any question, please feel free to ask.
    Best Regards,
    Simon Hou

  • SCRIPT : width identical on all pages

    I am working on a SAP Script .
    I made the changes in the Script editor and saved, However when i try to activate the SCRIPT FORM it is giving a message "Page PAGE1 window MAIN: width is not identical on all pages".So the Script form is not getting activated..with out which my changes will not b reflected in the out put.Please tell me how can i make the width identical on all the pages.

    No, you can't select all items on all pages at one time. You could select all items on 1 page, and then do an operation; you can repeat with all items on each page.
    But really, it sounds like you need to change how you do a data merge. You can use data merge to put multiple items on 1 page, it will repeat and create a new set of frames for each record. Check out some tutorials on that. Here's an old one using CS3:  http://www.youtube.com/watch?v=YD_O8751Cc8

  • Backup all projects by default (and more)

    Is there any simple way to get Version Cue to backup all data on a regular basis? Or to set a default Backup Configuration for all future projects?
    Having to define Backup Configurations on a per project basis (manually, and only after project creation) seems like an invitation to disaster.
    I'm also slightly uncomfortable with the backups being kept in VC's database format, I'd prefer simply accessible PSDs. If the worst ever happens, my first priority is going to be getting crucial files back and workable, not reconstructing the entire server setup.
    What I really want (make that "need") is a unattended, nightly backup of all data.
    Ideally, this backup would be stored in a non-VC blob format (i.e. as a simple folder structure "Server/Project/File.psd") of all projects. I've been tinkering with the "vcsync" script mentioned in another thread, and it provides a good part of the required functionality. Are there any other hidden gems out there like this script?
    What are others doing? What do Adobe recommend? I'm really happy with VC's approach to the actual versioning and workgroup sharing of the large files we work with, but some kind of fully automated backup is a must...
    Thanks all, Ben

    Interested in this topic as well. So, backups are only accessible through Version Cue? I need to create archives of all projects that can still be accessible by someone who may not have Version Cue.
    Or, worse case scenario...suppose I'm archiving projects to disk for a couple years in VC database format and Adobe decides to drop Version Cue. Now I'm faced with getting all those disks back out and trying to convert them into something we can use without Version Cue.

Maybe you are looking for

  • C6-00 hard reset...

    My C6-00 has a lot of apps installed and has become quite slow. Occassionally, I get the 'memory full' error while browsing the net. So, I want to make my phone as good as new by keying in *#7370#. Before resetting, I want to know about the following

  • Watching movies on computer and Apple TV

    If I rent a movie on my MacBook Pro and start streaming it, can I move to to the living room and continue watching the movie on Apple TV.

  • Blu Ray won't turn on after server issues

    So after the last couple days of not being able to connect properly to my online streaming, now my blu Ray won't even turn on all the way. It is stuck with the thin blue line on the screen and won't do anything else. I have tried unplugging it and pl

  • Adding an additional module

    I'm looking to add an additional module into a 9216i, can anyone confirm if this can be done live, or is the mds required to be powered down. ta in advance.

  • Classic to epma migration

    Hi We are are trying to migrate the 11.x classic applications to Epma by using the option Administer->Transform classic to Epma Architect . But we are getting communication error while we are following this Approach If any one have idea please share