Creation a new plant by copying

Dear all,
I working in a project where we need to merge on plant to a new company code.
I believe that can be solve with Tcode EC02, which actually will copy all characteristics from that plant to the new one under a different company code, won't it?
This basically means that also all the information related to procedures (like release procedure), Output types for inventory management, etc, etc will be copied, meaning that we wont have to do any new development?
I assume we will still need to do some customizing like MRP Controllers and so on, or this transaction will also copy all tables?
Thanks a lot in advance for your confirmation,
Mario

Hi Suraj,
That basically means that unless we decide to create any new development/customizing everything will be exactly copy as from the original settings, am I correct?
My question comes due to the project where I'm working now. Customer basically wants to close one company code and take everything to another Company Code, therefore we will need to replicate everything as it is now (Plants, SLocations, Controlling Areas, Sales Orgs, etc).
My assumption is that when we create new plants with reference from the old one, also all values under tables will be copied, so we won't have to spend time in customizing, and we will be able to focus on other activities that may require customizing or more work.
Could you please advice me on that point?
Thanks a lot for yor time!

Similar Messages

  • Manual for creation of new Plant in SAP

    Hi Members,
    I need to test in quality finance related activities, creation of Profit center, Cost center, Standard Heirarchy, etc.. Does anyone help me with the manual for role of Finance guy in creation of new Plant..
    Rgrds,
    Ravi

    Hi Ravi,
    Please find the below link for steps to create plant with screens.
    http://www.saponlinetutorials.com/how-to-create-plant-in-sap-mm-define-plant/
    BR, Srinivas Salpala

  • Creating New plant by copying Existing

    Dear All,
    I have to create a new plant by copying existing one, I want all the configuration that exists for existing plant in new plant.
    My query is by copying plant only all the configuration for new plant will get configured. Such as account determination etc or i have to configure it manually.
    Thanks
    Nitesh

    Hi
    no for account determination
    we have to put  valuvation gruoping code 0001 or any other which you want to use  manually
    in T-code OMWD
    for copying plant we van copy storage location ,assigement to companycode and oms2 setting also get automatically copy
    Regards
    Kailas

  • Creation of new Plant in productive system

    Dear All,
               I have to create 3 new plants. the system is already productive from the last one year.
    can anybody guide what will be the effects if i create new plants and send the transport to the production system.
    what need to be looked for side effects if any?
    pl give your valuable suggestions.
    Thanks and regards
    Ajay

    If you create new plants - there is no adverse effect but you have to make sure that the plant you create is copying by the existing.
    other things if you have any custom reports based on the plant then the new plant should be included, authorization needs to be consider if any basd on the plant,
    etc

  • Creation of new plant and the impact of business

    Hi to all
    i am creating a new plant, and would like to know the impact of the plant, what are the changes to be made in the customization, i want to know what are the chages required, and let me know after unit testing and integration testing what activity to be performed, as i am at go live stage and in the production client how to extended the master data,  what is data migration how it can be done,
    thanking you

    Hi there,
    As an SD consultant, these are the things you need to take care.
    Assign the plant to the company code in OX18.
    You need to assign the new plant to the sales org / distribution channel in OVX6.
    Then assign the shipping point to plant in OVXC. If WH is active for your plant, then assign warehouse WH to plant & storage location in LE assignment.
    Reg the master data, you need to assign the material master to the new plant. Also maintain the MRP profiles, plant specific data in the MM01.
    Maintain the shipping point determination in OVL2 & storage loc determination in OVL3 (OVL3 if required)
    Check with MM, PP & FI if they need to maintain any plant specific configs. There are some configs from their end for sure. For eg for production orders, purchase orders, movement types etc.
    Reg the testing, you need to ensure that plant gets proposed automatically when a new sales order is created. Also maintain the relevent plant specific condition records.
    Similarly when PGI is done, it should update the transfer postings in MM & FI w.r.t plant.
    Even tough your project is in final stages, you have to do a regrious testing when a new plant is created. Testing cannot be compromised for time lines. It will lead to serious production issues if tsting is not properly done.
    Regards,
    Sivanand

  • Creation of new view by copying existing view in IC WebClient (BSP)

    Hi,
    we need to add a new view which will be a copy of existing view in IC web Client application. I ve created the new view & a controller for it(kepping the controller class same as that of old view).
    I have also created a new Id in the viewset runtime framework for the new view. Added this new ID in the viewset, but in the presentation layer it keeps on displaying the old view twice.
    Is there anything that I m missing out on???
    Pls help
    Thanks & regards,
    Deven

    Hi Deven,
        I think you have to create a new controller class for the new view, even if you don't want to change anything. Because in the attributes(attribute name - VIEW) of controller class you have to maintain view name.
    Hope this will help you.
    Thanks
    Swagatika

  • Creation of new COPA by copying previous Company code config

    Hi Guys:
    We have copied new COPA configuration for new company code with reference to already existing company code's config.
    I could not able to see Actual Flow of values by comparing different screens between old and new config. New config is not having flow of actual's data.
    Could someone guide me with verfication procedure to see why it has not transfferred a full config to new thing.
    Please advice.
    Thanks
    Sri

    Hi
    It is not clear what you copied for COPA configuration
    Please check whether the new co code is assigned to the same controlling area as the old ones.
    S Jayaram

  • Creation of New Plant

    Inputs reqd to create the Plant........
    Our company have only 2 modules FICO and MM Module and Version used is SAP 4.7
    I tried to create the Plant
    1. Define Plant BU35
    2. EC02 -> copied Old Plant BU01 (old plant) to BU35
    3. checked Assignment for Plant to Comp code (already assigned) but found the error "Valuation area missing in T001W -> Save again"
    In OMWD Valuation area is not listed to codify the valuation group.
    Please give me the Steps to create Plant with the related parameter to maintain Inventory management and Physical Inventory.
    Regards
    Sandeep

    Hi
    check following link
    http://www.sap-img.com/materials/procedures-for-copying-one-plant-to-another.htm

  • Error in new plant creation

    Hi,
    I have created one new plant by copying a standard plant. I copied this plant by coping all the tables from standard plant only. While creating PR for that new plant  I am getting the following error u201C Valuation Area not definedu201D.  Here the valuation area is maintained at plant level only. If I check in Account determination(Table T001k) the valuation area for that new plant not updated.
    If I check plant tables getting error " Error in foreign key dependencies.
    How to solve this issue? If any one face this kind of issue please let me know.

    Hi,
    Please check at spro log- mm valuation, wheather the plant is defined as valuation area or the company code.
    if not please aagain copy the tables to the plant by copying function and check.
    Regards,

  • Error while extending material for new plant

    Dear All,
    We have created new plant  through  copying old plant.
    But when I try to extend the material to the newly created plat system giving error message
    Tables TCURM and T001w inconsistent : notify your system administrator
    Msg no M3820
    Diagnosis
    Valuation is at plant level. However, inconsistencies have arisen because of the way in which the plant was configured in Customizing or because plants have not been assigned to a company code.
    kindly help me out to over come this issue as early as possible.
    Regards,
    murali.

    hi
    check following links
    [link1|Tables TCURM and T001W inconsistent; notify  your systems administrator;
    [link2|Tables TCURM and T001W Inconsistent;

  • Extending Material to new plants - Legal Control

    Hi All.
    I am extending a material to new plants by copying the data froma particular plant.
    Whats happening is for some plants the LEGAL CONTROIL data (Foreign Trade Import view) is automatically getting copied and populated but for some plants it is not.
    What could be the reason?
    Poitns are assured !!!

    Hi , Thanks for the reply.
    But the plants for which data is automatically getting populated , I am selecting only the Foreign Trade view and not all the views.
    Regards

  • Setup new Plant. But my New plant is not available select in ME21N & ME51N.

    Hi,
    I 've created a new plant with copy reference to existing Plant. But in ME51N and ME21N, my new plant is still not available to select. PLease advice me where I miss out?
    All setting like Create PR, RFQ, PIR, PO, release strategy. This plant no MRP run
    I've performed the configuration below:
    MM setup new plant cc5600
    MM Assign plants 5600 to company codes
    MM assign a purchasing organization to plants
    MM assign default purchasing organization to plants.
    MM Define Plant-Specific Field Selection & Screen selection
    MM Plant setting batch status management
    MM Setup release groups for PR 5600
    MM Setup release codes for PR 5600
    MM Setup release strategies for PR 5600
    MM general plant settings for Inventory Management
    MM Set price differences for subcontract order at GR
    MM Setup default value for Reservation
    MM Acc Determ. w/o Wizard -Group Together Valuation Areas
    MM setup MRP Group for plant 5600
    MM Assign Valuation area to the Business Area
    MM Maintain maintenance planning plant
    MM Assign maintenance planning plant to maintenance plant
    MM Plant parameter for MRP

    Hi,
    How to Configure a New Plant in SAP?
    Plant 0001 is the SAP default provide for your reference.
    OX14 - Define Valuation Area (Tick one only- Once your system go live, no more changes)
                 Most company take the SAP recommended choice - Value Material Stock at Plant level
                 Value Material Stock at Plant or Company Level
    If you valuate material stocks at plant level, the plant is the  valuation area.
    If you valuate material stocks at company code level, the company code is the valuation area.
    The decision you make applies to the whole client.
    OX10 - Create / Change / View Plants
    OVXB - Create / Change / View Division
    OX18 - Assign Plant to company code
                  e.g.       0001 - 0001 - All Plants
                                          Px1   - Plant Px1
                                          Px2   - Plant Px2
    OX19 - Assignment of company code to the Controlling Area
    OB38 - Assign company code to Credit Control Area
    OMJ7 - Assign business area to Plant/Valuation area and division
                 e.g. Plant Px1 - Business Area Bx1
                                                                Bx2
                 Assign Valuation area to the Business Area
                 .e.g. Valuation area Vx1 - Business Area Bx1
                                                         Business Area Bx2
    OMS0 - Assign Factory Calendar to the Plant and Business Area
    pherasath

  • Settings for the new plant under same company code

    Dear all,
    As I am into the roll out project. I need to know the necessary configuration settings from FICO (FI and Contolling Settings) point of view.
    I need this very urgently. If u have any documentation with regard to the same, u can forward to my mail id  [email protected]
    Input will be of great help and rewarded too.
    Thanks
    Niha

    Hi Neha,
    please follow the follwing steps relating to new plant in all madual.
    Steps needs to be configured
    1.New Plant to be created (Copy the new plant from the existing Plant)– Configuration
    2.Create Plant as Location - Configuration
    3.Define Shipping Point- Configuration
    4.Transport Planning Point Description to be changed – Configuration.
    5.Create a new Profit Center – Master Data
    6.Create a new Cost Center – Master Data
    7.Cost Center allocation to Shipment Cost – OKB9 – Configuration
    8.Assign Business Area to New Plant – Configuration
    9.Assign New Plant to Sales Organization & Division - Configuration
    10.Update all the GLs related to the new Plant. Default assignment to a Profit Center - 3KEI – Configuration
    11.Update Table J_1IT030K_V for Indian Tax Account Determination. - Configuration
    12.Account Assignment Category – VKOA – Assign GL Accounts to Sales Org/AcctAssgGr/AcctAsgnmt/Plant/Acct Key – Configuration
    13.Maintain Excise Registration for New Plant- Configuration
    14.Maintain Plant settings for New Plant- Configuration
    15.Maintain Excise Group for New Plant- Configuration
    16.Define GL Accounts for taxes – Configuration
    17.Specify GL account for Excise Transaction- Configuration
    18.Create all Inbound and Outbound Routes for new Plant –Configuration
    19. Assign new plant to company code.
    Please note that the above steps are for new plant by copying the existing plant and modification. If you define a new plant without copying the existing plant lot of steps are involved.
    as per FI/CO part point nos 5 to 8, 10 to 17.
    Hope this will help u, please assign the points if its helpful.
    please cheek your mail i have sent the material.
    regards
    sai krishna

  • Creation of a new plant

    Hi Gurus,
    While creating a new plant in real time, is advisable to copy a standard plant or define a new plant ? Please give reasons.
    When a plant is copied what are the various parameters that are copied to the target plant ?
    Thanks & regards,
    Surender

    Surender,
    SAP recommends creation of plant by copying. Generally when a new plant is created it should be copied from any of the existing plant which functions similar to the new plant.
    The reason for this is when creating we may miss to update all the required configuration and all the configuration tables with links would not get updated. This also reduces time of setting plant as you need to just change/add configuration where ever required in the new plant.
    But if you are a fresher trying to test in your test system... create it in create method so that you will understand in the hardway as what all needs to be configured, it will be a good learning which you will not forget. Please dont try this when you are working with a client system as this make give you lot of trouble and need lot time to resolve issues.
    Regards,
    Prasobh
    Regards,
    Prasobh

  • Copy BOM Material History to new plant

    Hi All,
            My requirement is to copy BOM Material with their history regardless of validation to new plant .I had tried with FM CSAP_MAT_BOM_CREATE and this CSAP_MAT_BOM_MAINTAIN but getting the error message Engineering change mgmt called with datathat could not be interpreted.
           Help me out ,if you have any suggestion to achieve this requirement.
    Regards,
    Albert Tigga

    Here`re some FMS
    CM_CL_P_COM_COPY_BY_BOM                                   
    CM_CL_P_COM_COPY_UPDATE_BY_BOM                            
    CP_CC_S_COPY_BY_BOM                                       
    CS_CL_S_MAT_BOM_COPY                                      
    CS_CL_S_MAT_BOM_CREATE_BY_COPY                            
    CS_RT_BOM_COPY                 Copy bill of material      
    CUCPOBOM_COPY_CONFIGURATION                               
    CUMCOBOM_COPY_INFORMATIONS                                
    API_DOCUMENT_COPY_BOM                                                                               
    Hope this’ll give you idea!!
    <b>P.S award the points.</b>
    Good luck
    Thanks
    Saquib Khan
    "Knowledge comes but wisdom lingers!!"

Maybe you are looking for

  • Links between some pages and pdf's not working: muse

    I have two sites with the same muse business catalyst name for preview. How do I create different names? Is it necessary to preview site? I am have a lot of pages that no longer link on both sites and I cannot get pdf's to link. Please help? erin pas

  • Build Applicatio​n with all files inside .exe

    Hello, I have a labview project consisting of a few classes and subvi's. Nothing really special. Now when i try to build an .exe file, i get the .exe, an application.ini, an Application.aliases and an data folder (has the classes and dll's within). W

  • Db2_all for configuring DPF databases

    Hello, is it possible to use db2_all within the db6cockpit to configure database nodes all at once or for use at CLP? Thanks Tino

  • PLCC-28 DRC Errors

    Hey all, me and my work partner have a question since when we import the part PLCC-28 (This is just a differential clock driver) the part itself has DRC erros even though is from the NI library! Design Rule Error: Net VCC Close To Net 0 Design Rule E

  • How to Change Main/Primary Partition

    How do you change the main partition. I have Disk Utility.