Creation of a new wbs elements to an already existing project
1. i am using BAPI_BUS2054_CREATE_MULTI to create a new wbs element in an already existing project.When this is done then i am using BAPI_PS_PRECOMMIT and then bapi_transaction_commit
so this creates the wbs element which i guess but only the element.
2. Now i need to attach the networks to it which are there in BOM so i am taking all the network data from the table afko joining it with aufk.It is giving all the network data which was there attached prior to the project but the new one it is not showing.The query is
SELECT afkoaufnr afkopronr aufkpspel aufkktext aufk~loekz
INTO (afko-aufnr, afko-pronr, aufk-pspel, aufk-ktext, aufk-loekz)
FROM ( afko AS afko INNER JOIN aufk AS aufk ON aufkaufnr = afkoaufnr)
WHERE afko~pronr = w_wbs_cur-psphi.
3.Now i am comparing this data from above to the BOM data and take the difference of the networks which are to be created.
But as the above query is not returning the new wbs so it is getting failed.
i am already using this
CALL FUNCTION 'CONVERSION_EXIT_KONPD_INPUT'
EXPORTING
input = g_znpsdata_old-project_definition
IMPORTING
output = w_wbs_cur-psphi
EXCEPTIONS
not_found = 1
OTHERS = 2.
do i need to use the other one also
Similar Messages
-
WBS Element Version Released Already Exists
Dear All,
When we create a Project by copying another Project, we get the error message " WBS Element Version Already Exists. Help.
Regards,
ShareeqHi,
When you are copying project from template then you need to select WBS triangle instead of green tick.
You will enter in the screen wherein you need to replace std WBS with the one which is to be adopted. Then select check and include so that for every activity , WBS element you will find your given nomenclature.
Try this and revert.
Regards
Keshav -
Hi, I have created a substitution rule to substitute the investment profile in my projects with a blank for any WBS which is not level one. I am not sure why this rule does not take effect immediately a new WBS is included. When I try to carry out the substitution manually, I get the error message 'Error when processing asset under construction (AuC) for WBS element'. Any ideas how I can get this substituion to work when a new WBS is added to an existing project?
You should use the substitution otherway....
I believe your project is in REL status and also you have defaulted IM profile in the project, so whenever you create a WBSE, the IM profile is inherited to the WBSE and since it is in REL status, the system will create an AUC based on your IM profile and now you are using substituition to remove the IM profile so this will cause the problem...Instead of this....try this...do not default IM profile in project, and instead of removing IM profile for all WBSE which is not level 1, use substitution to write IM profile in WBSE which is only level 1. -
Keep getting error message "FCE" can't install on this disk. A newer version of this software already exists on this disk. Have remove all FCE elements with no success.
http://www.digitalrebellion.com/fcsremover/
-
ALV Filter Selection w/ error "WBS element 0000000000000000 does not exist"
Hello,
In a few ALV reports, we have WBS Element column showed in ALV list and WBS Element defined as type BSEG-PROJK, which has conversion routine ABPSP.
When WBS Element is used for ALV list Filter, in Selection screen, error message "WBS element 0000000000000000 does not exist" is pop up as we hit Enter key or click on u201CSelection optionsu201D button with no value entered in Input fields.
We get same error even after we enter an existing WBS Element in Low selection input field and hit Enter key.
Itu2019s ok if we enter existing WBS Element value in both Low and High selection input fields.
We know we have workaround by entering both Low and High input field, and we can fix ALV reports by using character based WBS Element, such as PRPS-POSKI.
BUT, as users told me, they donu2019t have this problem before and it just happened. We checked the recent Transports and couldnu2019t see anything relevant.
Could any of you let me know if you have any clue or if thereu2019s any other way to fix it besides changing report by report.
Thank you.
SLHello,
In a few ALV reports, we have WBS Element column showed in ALV list and WBS Element defined as type BSEG-PROJK, which has conversion routine ABPSP.
When WBS Element is used for ALV list Filter, in Selection screen, error message "WBS element 0000000000000000 does not exist" is pop up as we hit Enter key or click on u201CSelection optionsu201D button with no value entered in Input fields.
We get same error even after we enter an existing WBS Element in Low selection input field and hit Enter key.
Itu2019s ok if we enter existing WBS Element value in both Low and High selection input fields.
We know we have workaround by entering both Low and High input field, and we can fix ALV reports by using character based WBS Element, such as PRPS-POSKI.
BUT, as users told me, they donu2019t have this problem before and it just happened. We checked the recent Transports and couldnu2019t see anything relevant.
Could any of you let me know if you have any clue or if thereu2019s any other way to fix it besides changing report by report.
Thank you.
SL -
Creation of sales order/wbs element
Hi SAP gurus,
While creating a sales order after entering the WBS element, I am getting an error
Profit Ctr not consistent between Plant and Material/WBS for line item 0010
can somebody throw light and help to solve.
regards
Pranav shahHi ,
check the plant for your material and in your project. both should be same.
cheers,
sumith -
Projects/WBS elements with identification "A" exist
Hi Experts,
While attempting change of project ID key length in OPSK, the following error experienced,
Please suggest the steps to change the length from 1 to 3.
The details error message:
Message no. CS084
Diagnosis: The key can only be extended, if there are no project definitions or WBS elements that are only identified with their external number by the key of the project editing mask.
Example: Project editing mask 'EB-XXX-000'. The key cannot be extended if the external number is only 'EB'.
Procedure: You can only change this by changing the external number.
Regards
ramSivaI agree with Gokul.
First you will have to archive all the projects with the existing key for coding that you want to change. Then lock the existing mask (or delete it). You cannot create a new mask with a longer key till you do this. You will then have to change the length of the key from 1 to 3 for project coding.
Hope this helps.
Regards,
Ajinkya -
Exit for replacing WBS element characters while copying from Project
Hi All,
While copying a Project from other Project/template in CJ01, we are getting only first 10 letters of a WBS element are getting replaced.
The requirement is to have replacement of letters even after 10th character in WBS element.
The SAP Note 502322 suggests to have user specific (custom) replacement logic in the user exit CNEX0033.
Anyone has worked around such requirements?? If so can you share it,,,?????
Regards
PavanHi,
While creating a Project in CJ01 by giving a template, the new Project will get created with all WBS elements from the template Project.
In standard system, the WBS Element which has more than 10 characters will get copied till 10th character only.
Now we need to work on user exit CNEX0033, so that entire WBS element name should get copied in the new Project.
Anyone has worked on such requirement???
When i create new Project in CJ01, the exit CNEXX0033 will trigger..
If so can you suggest me how to move further??
Regards
Pavan -
Closure of WBS Element - If no costs existing.
Hi,
one of the WBS element having no costs but auc created through Investment measure. But while closing the WBS element
system throwing error as follows" Go to the asset in construction for the WBS element and correct the error that appears there".
now client wants WBS to be closed without deleting AUC. Please suggest us how can i close WBS without deleting
AUC attached to it. Please advice.
Regards
Sreenivas.PTry the following method:
1. Select the WBS in Project buider
2. Select Edit - WBS Element - Invensting Programs - Asset Under Construction
3. Correct the error and directly save it.
4. Try to re-close the WBS.
Hope it works.
Regards,
Atom -
How to Create a new Project by Combining 2 already existing Projects
How to Create a new Project by Combining 2 already existing Projects
CCopy the contents of one and paste it into the other. Or duplicate the first project and then paste the contents of the second.
-
Creation of 2 new company codes in continuation with existing compny code.
Hi
Our company has got 2 locations but we are using only one company code for both the locations from the last 4 years.
Now due to expansion of business we have extended our business to one more location. So.now are planning to use 3 company codes.
Now I want to know the following things:-
1. What are the things that are to be done before creating these two additional company codes?
2. What will be the impact of these new company codes on the existing company codes?
3. How the present reports can be used for the new company codes?
4. How the GL balances will be uploaded for the new compny codes?
5. How the master data will be created for the new company codes?
6. What will be the impact of the new company codes on other modules like MM, SD and HR which are already in use?
Please guide me on the above issue co months of experience.
considering the fact that I am a fresher in SAP FI and I have
only 8 months of experience.
Regards
Vikram sairamHi Vikcy,
Company Code is legal Entity and core component in FI.
Now u r planning create new company codes, just check below:
01. Chart of Accounts:
- You may use existing chart of account for new com. code
02. Controlling Area:
- Check the feasibility of cross company code controlling or not. If you maintain one:one relation in existing controlling area, u need to create new one.
03. SD: Core component is Sale Organization. U need to assign them to ur Company Codes. So check accordingly.
03. MM/ PP: Plants and Purchasing Organization need to assign to Company Codes.
Hope it will give you idea on a whole to plan, how u need plan to go ahead.
Regards,
Venkat -
Should or can I install new photoshop elements version 13 over existing version 7?
I have a licensed download of Ver 13. My existing ver. is 7. My catalog has many photos needing reconnection, but all keywords are intact. I prefer to install alongside ver 7 - not overwrite it given internal catalog problems Can I?
Yes. They are both stand alone applications.
-
Inserting a new view in place of already existed once
Hai folks,
In Ic Webclient on crm 5.0 system i got an issue
In <b>identify customer</b> View set
i have removed the view of <b>regestered product</b>
and want to insert a view <b>bupaLongTexts</b> there(in that deleted area)
I am able to remove the view by removing the view name in the navigation links
in <b>BuPaViewsets</b> in a customized design time repository zcrm_ic_dt_rep
of a customized Run.Time. repository zcrm_ic_rt_rep.
but For inserting a new view..
I am getting fault .
I inserted the view in the navigation link flow in Product (view area content id)..
and copied customized view <b>BuPaIdentifycustomer</b> and adjusted the code for a new viewset vision.
I took care of profile settings too.
Is there any thing to take care.. and what is this <b>view area content id.</b>
Please reply this..Its my urgent requirement.
Useful answers are rewarded..
Bye..
satishHi Sathish,
Instead of doing so much thing why dont u just go to spro->crm-icwc->customerspecificmodifications and just replace the existing view with the new view of ur application.
thanks,
ashish. -
Issue in BAPI_PS_PRECOMMIT in mass creation of WBS Elements
Hi,
I am facing a issue with BAPI_PS_PRECOMMIT.
we have the following WBS Hierarchy:
S - Proj, (level1)
S-XXX WBS Element (level2)
S-XXX-001 WBS Element (level3)
I have created a program for mass creation of WBS elements creation
which uses the following BAPI's
BAPI_PS_INITIALIZATION
BAPI_BUS2054_CREATE_MULTI
BAPI_PS_PRECOMMIT
BAPI_TRANSACTION_COMMIT
The proj: 'S' and the level2 WBS element: 'S-XXX' already exist in the system.
When I run the program for delta load, so as to create the following level3 WBS elements:
S-XXX-001
S-XXX-002
S-XXX-003
The system is throwing the following errors at the BAPI_PS_PRECOMMIT:
1. Final Check of the project definition and WBS elements: Error
2. Validation unsuccessful
Pls help me on this.
Thanks,
DeepakCheck the WBS elements doesn't exist already in your system.
Here is what I coded some days back for deletion of Network Activities, most of the things are same.
You are doing for WBS element.
* Call to initialization BAPI Before Delete
CALL FUNCTION 'BAPI_PS_INITIALIZATION'.
* Call to Network Activity Deletion BAPI
CALL FUNCTION 'BAPI_BUS2002_ACT_DELETE_MULTI'
EXPORTING
i_number = t_bapi_activity-network
TABLES
it_delete_activity = l_t_del_vornr
et_return = l_t_bapiret2.
DELETE l_t_bapiret2 WHERE type <> 'E'.
READ TABLE l_t_bapiret2 INDEX 1.
IF sy-subrc EQ 0. "If error in Deletion
MOVE: f_idoc_contrl-docnum TO t_idoc_status-docnum,
l_t_bapiret2-type TO t_idoc_status-msgty,
'CNIF_PI' TO t_idoc_status-msgid,
l_t_bapiret2-number TO t_idoc_status-msgno,
l_t_bapiret2-message TO t_idoc_status-msgv1.
MOVE c_idoc_status_error TO t_idoc_status-status.
APPEND t_idoc_status.
ROLLBACK WORK.
EXIT.
ELSE. "If Delete is successful COMMIT
* Call to PreCOMMIT BAPI
CALL FUNCTION 'BAPI_PS_PRECOMMIT'
TABLES
ET_RETURN = l_t_bapiret3.
* Call COMMIT BAPI
* CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
ENDIF.
The other solution is use BAPI_PROJECT_MAINTAIN. -
WBS Element creation and link to SD process
Hi,
I am involved in aproject, where they sell services.
In this scenario, please help me understand the WBS role and linkage to SD processes.
I was trying to create a contract, wherein it prompts to create a new WBS.
I like to create new WBS element, can anyone please let me have the steps involved in this ??
Please help me understand by experts.
Thanks in advance.Hi,
WBS is required in order to plan and post revenue. Also in case of milestone billing, dates are copied from WBS in billing plan.
You can create single WBS thru tcode: CJ11. For simplicity you can give the sales order number as WBS number, enter a Project Profile.
Let me know if you face any issues. I assume that you are not interested in entire WBS structure and a single element will suffice.
Regards
Maybe you are looking for
-
Why doesn't text search work for me in Firefox 30?
Tried out the ctrl+F command, and even when I type a single character, it always come up as red. Another issue that is minor, but still very heavy on power users I'd say, is that when you ctrl+F, it doesn't highlight the search bar immediately/automa
-
System and sysaux file block corruption
Errors in file /u01/app/oracle/diag/rdbms/pdent/pdent/trace/pdent_smon_3135.trc: ORA-00604: error occurred at recursive SQL level 1 ORA-01578: ORACLE data block corrupted (file # 1, block # 91607) ORA-01110: data file 1: '/u01/app/oracle/oradata/pden
-
Hi when we r using RFC adapter on sender side it asks fgor 'RFC Program id' what we have to mention in it. Regards maheswararao
-
Hello, I just did a system copy on a sandbox, and when trying to start SAP I get the following: startsap Checking SID Database ABAP Database is not available via R3trans Starting SAP-Collector Daemon This is Saposcol Version COLL 20.95 700 - AIX v11.
-
When I play my music connected to a device, it goes white.
I plugged my iPhone into a stereo and then my screen goes white when I'm on the music app. When it goes white, it says accessory connected. Why does this happen?