Hi experts,
We are configurating a scenario where in a activity should generate a followup task automatically after 30 min.
I have configured the above using the action profile and date profile. I have used the start condition as :           & planned start date from &  < & current date + time&  
( I have defined the date rule as :  planned start date from = Today + 30 min  )
and selected schedule automatically option.
The problem is the task is created only if I edit the activity after 30 min.
What more needs to be done for automatic triggering of task without opening the activity.
Is there any program needs to be running at regural intervals for automating executing of actions?
Kindly suggest me how to go about this.
Thanks in advance.
Regards,
Madhu

Thank you very much for your quick response.
I have tried by using the same condition in scheduling conditions also.
I dont think there is any problem with the conditions.Because I could able to see the task when I edit the original activity after 5 min.
The task should be generated automatically without going to the activity.
Regards,
Madhu

Similar Messages

  • Ceate idoc with some time delay

    Hi Friends,
    i am new to xi guide me How to create idoc flat file with some time delay with out using BPM

    Hi ,
    Please clearly  describe your scenario  . Then only you will get correct answers  .Already you have Opened same thread  and  answered by Vijay

  • Trouble with Serial time delay

    hi,i need help.
    my problem is that there are no output and input parameter is changing very fast,but subvi has results only when the subvi runs in the process of highlight.
    i think it might because of time delay,but i don't kown how to correct it.
    thank you very much.
    Attachments:
    电源模块串口通信初版 - 副本.vi ‏28 KB
    子vi.vi ‏26 KB

    I cannot open your VIs.  It appears that the language differences may be an issue. LabVIEW does not recognize them as valid LV files.
    Generally when a VI runs correctly with Highlight Execution on and does not run correctly with it off, it is an indication that there are timing issues in the VI.
    If you are reconfiguring the serial ports in the 54 module version, you may not be allowing enough time for port to get set up before attempting to communicate. Do you have 54 different serial ports? What kind of hardware are you using for the ports?
    Lynn

  • Step motor control with a time delay

    Hi all,
    I am trying to control a step motor to move in vertical direction by Labview2010. The specific Labview function blocks are created by the manufacturer of the step motor. Now the axis can move up/down properly but my question is that I want it to move with a time interval. For example, we set the desired position to 10mm and waiting time 1s. When I click on the start button once only the axis moves 1mm and wait 1s. Then axis moves another 1mm and wait 1s. This action will obviously repeat 10 times until the axis reaches 10mm position.
    I will be very thankful if someone could give me some hints.
    Best regards,
    Nicky
    Solved!
    Go to Solution.

    You're welcome
    You should some more to the code so that it's more reliable. There might be some miscalculation between the travel distance and the resolution, i.e. 5mm travel and 2mm resolution will give the forloop 2,5. This should be either 2 or 3. I'm not quite sure how the for loop handles this. I think it will round to nearest. You should anyways check it out. Also avoid using 0mm.
    Good look with your project 
    Regards,
    Even
    Certified LabVIEW Associate Developer
    Automated Test Developer
    Topro AS
    Norway

  • Time Delay to wait for a solenoid to open

    I have a Shutter that opens fine but I need to wait with some Time Delay before I continue to process some information.
    I am using Labview 7.0 and have a DaqPad-6016.

    It would be helpful to see your code to see exactly what you are doing.
    However, LabVIEW does have several options for waiting. I have attached a screenshot showing some of these. The time delay is especially useful with DAQ because you can wire your task's error wire through the wait. This will cause the delay to explicitly happen in between the execution of VIs.
    -Sal
    Attachments:
    wait.JPG ‏42 KB

  • Captivate created file playing with time delay

    I have an issue with some machines in the Company where Adobe Captivate files are not playing as created via Flash Player  ie where a slide should move onto another slide after a 3 seconds interval , this interval takes over 15 seconds. 
    I am not getting any error messages and the files play as required but with the serious time delay  between slides.
    The files created from Captivate are exe files.
    The strange thing is that this issue only occurs in some machines in the Company and I am unable to determine a pattern as to this issue.
    I have updated the Codec driver and the Graphic drivers on the affected machine but did not solve the issue.
    I have tested an affected file on 2 of the same model machines  (HP Desktop machines) both running Windows XP SP3 with Adobe Flash Player 10.3  and IE8.0 .
    The file played successfully on one of the machines but on the other machine there was a 10 second time lag between slides.
    I have checked Task Manager and the process is only using 2-3% of the CPU so the machine has enough CPU to run the file .
    I updated to Flash 11.1 on one of the machines and IE 9 but still encountered the same issue.
    I have disabled the Anti Virus software (McAfee) while testing on one of the affected machines and this did not solve the issue.
    All Machines have the latest approved Microsoft updates installed as required.
    The files are created using Adobe Captivate 3 and are stored locally on the affected machines
    The files created were created in captivate with a standard 30 fps option
    Can you please advise on this issue

    Welcome to our community
    As I understand things, when you launch an EXE file created by Captivate, it decompresses and temporarily installs a runtime version of the Flash Player. So I'm wondering if perhaps on these machines where the delay is occurring, if it would help to perform the following steps:
    1. Clear all temporary files
    2. Perform a defragmentation of the hard drive
    I'd try step one first and see if anything improves. Perhaps that's all that is needed. The second step is simply a good habit to get into.
    Cheers... Rick
    Helpful and Handy Links
    Captivate Wish Form/Bug Reporting Form
    Adobe Certified Captivate Training
    SorcerStone Blog
    Captivate eBooks

  • Time delay with video cht

    when I video chat with other apple users there is a time delay of 3 minutes. I can hear them speak, but it's not coordinated with their mouths. They say they get a 2 second delay. I use comcast & wonder if the problem lies there. They all have Mac OS 10.5.4 also. I also use time Capsule & wonder if that could be part of the problem.
    Joan

    i have a very similar problem with my ichat. it just started this year. The other user sees me fine, but i see them with a delay that seems to get bigger and bigger as the chat gets longer. I have tried wirelessly connecting to my airport extreme as well as hard wiring and it didnt change anything. i set the bandwith limit to 500 and the streaming speed to 1.5 mbps. i have comcast cable internet with a download speed of about 800 kb/s-1 mb/s, so i dont kno what to tell you. Maybe you have an obsolete computer. I have a suspicion that mine are messed up because i am on a power pc g5 and my friends or all on intels but who knows.

  • Excel not even open - "cannot complete this task with available resources" and then VBA run-time error randomly appear!

    Has anyone else seen the "Excel cannot complete this task with available resources" error message appear when Excel isn't even open? It keeps happening to me, and it's the strangest thing.
    It seems like interacting with Excel files sometimes prompts it - for example, I just turned on my computer this morning, checked my email, and then opened Google Chrome to upload some Excel files. Excel hasn't been opened at any point since the machine
    booted up, but this Excel error popped up while I was uploading the files.
    Checked the Task Manager because I was baffled (not that this is the first time it's happened), and there's no Excel application running, just that silly error message. Choose OK on that error and a VBA run-time error message appears (not even sure if it's
    Excel VBA or Word/Outlook but I assume it's Excel - it's the good old 1004, application-defined or object-defined error).
    Debug is greyed out, so it won't let me debug to see what the problem is. Choosing End brings the "Excel cannot complete this task with available resources" message back for one final performance.
    This happens on a not-infrequent basis: Excel isn't open, and I randomly get this set of Excel errors: 1) "cannot complete task", 2) VBA run-time, 3) "cannot complete task" again. Then it's done, until the next time it happens. Weird.
    I have 32-bit Windows 7 and Excel 2013/2010/2007/2003/2002 (I know!) but the issue only started after installing 2013. I also get the "cannot complete this task" message regularly when working in Excel (generally with Power Pivot or something legitimately
    memory-hungry though), and restarting the application does the trick. I don't mind a heads-up when I'm gobbling up too many resources, but when Excel's not even open, it's a bit ridiculous. It's like I have a zombie Excel! Does interacting with Excel files
    via upload/moving around Windows Explorer actually trigger some sort of Excel action in the background?
    Any ideas would be most appreciated!! Thank you :)

    Hi,
    As the memory error messages , it can be very generic and don't always identify the real cause of the issue. We may try to use the KB that Mr. KR mentioned above to troubleshoot it.
    On the other hand, if the file is xls format, we may convert to the new file format .XLSM and test.
    http://www.experts-exchange.com/Software/Office_Productivity/Office_Suites/MS_Office/Excel/Q_28339883.html
    Next, try to disable hardware graphics acceleration from File > Options > Advanced > Display section and disable Aero Themes (if you enabled) to check the results.
    For the hangs and crashes issues, we may use ADPlus.vbs to troubleshoot:
    http://support.microsoft.com/kb/286350/en-us
    http://www.networksteve.com/exchange/topic.php/Excel_cannot_complete_this_task_with_available_resources_error,/?TopicId=39411&Posts=1
    Please Note: Since the web site is not hosted by Microsoft, the link may change without notice. Microsoft does not guarantee the accuracy of this information.
    Hope it's helpful.
    George Zhao
    TechNet Community Support

  • Adding time phased actual work to fixed work task with finish no later than constraint

    I am using MS Project Pro 2010, no service packs are installed. I have a 40 hour fixed work task, auto scheduling is on, and I've set a finish no later than constraint 4 weeks into the future. I have assigned a single resource with assignment units of 1.0
    and Project correctly determines a 5 day duration and schedules the task from the start of the project with the task start date the same as project start date and 8 hrs per day.
    I switch to task usage view with the time phased time scale set to weeks (middle) and days (bottom) and add the actual work field. Calculate on edit is selected in project options. When I add 8 hours to day one (which matches the planned work), the planned
    work on the last day of the duration changes to 2 hours and the remaining 30 hours is spread at 10 hrs each to the three days in the middle and the duration changes to 4.2 days. Work stays the same as expected.
    The behavior I expected is that after I add the 8 hours of actual work nothing would change since remaining work is 32 hours and there are 4 days left in the schedule and the work is already scheduled for 8 hrs/day. When I continue to add actual work of
    8 hours to each day, the duration continues to go down until I’m adding 8 hours past the duration. What am I doing wrong? This behavior persists whether or not I select the "move unfinished parts…” options in the project options or not. The only way to
    achieve the expected result is to remove the constraint, add the actual work and then reapply the constraint. I assume I have missed an option that needs to be correctly set to achieve the expected (and desired) result. Thanks.

    Thanks, Julie.  I thought it was just me.  The reason for the FNLT constraint is that I'm not really scheduling projects but scheduling a single multi-unit resource in a shop environment where many projects are running through at the
    same time.  I've set up a single resource with units equal to the number of shop personnel and I'm intentionally forcing overallocations (should there be any) by levelling and by not allowing Project to move my tasks any further than externally mandated
    delivery dates.  From that, I can then see where I will need to alter shop release dates, allocate overtime, hire new workers or subcontract the work.  By entering actual work weekly, I can also see where I might have extra hours to use elsewhere
    or vice versa.  Unfortunately, a deadline will not prevent Project from moving the tasks beyond the customer provided date when leveling.  This method worked fairly well in Project 2007 even though it's not really what the software was intended for. 
    I obviously only use a fraction of Project's capabilities.  There's probably better-suited tools out there but this is the one I have and it actually does a great job at it.  I'm sure I can still make it work in 2010 but it looks like I'll have to
    modify my approach.  I'll leave the question open a while longer and see if I get any additional feedback.  If not, I'll mark it answered and move on.  Thanks, again.

  • Ending time delay with stop button

    I am trying to create a stop button to control multiple vi's at once. A problem is that my subvi has a time delay. To solve that problem the time delay is divided into multiple time delays so that I can interrupt it with a stop button.I am building off of Al S's example on the forums found here. I tried adding a global variable but it is not working. 
    Any ideas? Thank you
    Solved!
    Go to Solution.
    Attachments:
    Delay.zip ‏19 KB

    I wanted to thank everyone for their incouragement to learn notifiers. So I finally did and notifier were the solution I was looking for. I found help from DianeS with her 1st post here and from WayneS1234 with their 1st post here. 
    I am posting my code to show what I learned. I think it might help someone else. Note that this is like a block diagram with working notifiers of my larger project that I am working on.
    Attachments:
    Main VI Notifier.vi ‏21 KB
    sub VI Notifier.vi ‏14 KB

  • How can I compare folder content with time delay

    Hi all, I'm new here, with no programming skills but with a lot of LV manuals read
    So, there is a C-smth program  - no source. It writes .avi file in
    folder if event has occur, and it names that file with exact time
    (yyyy-mm-dd-hh-mm-ss) of that event. Using DAQ and program "written" in
    LV 7.1 I record voltage, but I don't need to store that if nothing new
    is written in that folder with .avi files. However if smt new is in it
    4 minutes before and 4 minutes after event has to be recorded and
    stored  by LV.
    I have no idea how to do this!
    My major problem is comparing content of the folder with that folder but say 1 sec before.
    Any suggestions?
    Izidor

    Izidor,
    You could use two different loops and share the information between them using Queues or Notifiers.  One loop could be acquiring data and sending the datapoints to a consumer loop using the above mentioned methods.  The consumer loop would then check the folder for files with recent timestamps for names and save the data to a file.
    There are examples in example finder (help>>find examples) for Queues and Notifiers.  Also press "new" at the LabVIEW Getting Started Window for looking at the producer/consumer architecture.
    I hope this helps.
    Steven T.

  • Need a sound card with time delays

    So.. I am looking for a sound card that is 7. channel (5. is still ok tough I perfer 7.) and that offers me Time aligment/time delays for EACH chanel.
    Does any of the Creative sound cards offer this?
    I browsed the creative page..but could not find any info...does maybe any other sound card offer that?
    ty.
    regards
    sergej

    I need one 2,
    I?ve bought a LCD tv a few day back and now i?m started building a media center pc.
    Now my dvd recoder allows me to adust the sound so it matches the screen?s lag.
    Is there a soundblaster card that gives you the ability to adust a delay in the sound?
    thanksMessage Edited by Pim on 0-29-200607:33 AM
    Message Edited by Pim on 0-29-200607:34 AM

  • Generate two sine waves with time delay

    I have not been using the waveform generation tools so I hope this is an easy one for somebody.  I want to create two sine waves at different frequencies say F1 = 1.00 KHz and a second at F2 = 1.20 KHz.  I know that to combine them into one I can just add them.  Them problem I have is that I want F1 to start first then a few millisecond later have F2 sum into F1.
    T0 = F1
    T0 + Delay = F1 + F2
    Is there a VI capable of a time delay?  Tried to sum individual signals together but seems more difficult because of the waveform cluster format.
    Any help is appreciated,
    Matt
    Matthew Fitzsimons
    Certified LabVIEW Architect
    LabVIEW 6.1 ... 2013, LVOOP, GOOP, TestStand, DAQ, and Vison

    Would the attached VI work for you?
    Attachments:
    Add Delayed Sinewave.vi ‏54 KB

  • Creating a Time Delay Between 2 Waveforms

    Hi,
    Please bear with me while I explain what I’m trying to do :-)   Basically, in the attached LabView file (“flow vis + trigger-m.vi”), I am generating 2 signals: a sinusoidal waveform (used to drive an actuator) and a square waveform (used as a TTL signal to trigger image capture on a CCD camera). Currently when I run the program using LabView 7, both signals are started simultaneously. I would like to introduce a time delay that can be manually specified in the VI, such that when the program is started (i.e. at time t0), the sinusoidal waveform also starts (i.e. at time t0) before the square waveform (i.e. at time t0 + delay time). In a practical sense, this means allowing the actuator to run for several seconds before capturing any images.
    It sounds like it should be quite straightforward to do, but I’m not so sure how to progress. I have begun to modify the original VI (“flow vis + trigger-m_2.vi”, as attached), but would be much appreciative of any help or suggestions on how I can complete the VI to meet the above requirement.
    Many thanks,
    Mark
    Attachments:
    flow vis + trigger-m.vi ‏939 KB
    flow vis + trigger-m_2.vi ‏895 KB

    Hi Mark,
    I forgot that all analog waveforms generated needed to have the same number of samples in a single task. By introducing a delay into your square wave, I effectively added samples that waveform. So the same number of samples added to the square wave has to be added to your sine wave. I added code that extends the number of samples of your sine wave (# delay + square wave samples). Let me know if this works for you.
    Regards
    Way S.
    NI UK Applications Engineer
    Attachments:
    flow vis + trigger-m70.vi ‏872 KB

  • How to write to one channel of a task with multiple channels? (plus other things...)

    So I have a USB-6009 DAQ.  It has 12 digital output lines.  I want one channel that is "Dev0\line0:10" which represents an address bus in my application.  And a second channel "Dev0\line11" which represents a program enable line in my application.
    I have tried creating two different tasks and adding one channel to one task and the other channel to the other task.  The only task that worked was the task with "Dev0\line0:10".  It was always the task containing that channel, regardless of the order of creation.  So then I moved on to a different method.  (I read somewhere that I should only create one task of each type.  like only 1 DO task only 1 AO task etc...  However I am also using the two analog ouputs to and have a task for each AO and they work just fine.)
    I tried add both channels to one task.  But when I needed to control only the address bus, I had to have some information for the other channel as well.  This was a little trying, but I could configure it that way.  But it turned out to be easier for me to just make one channel with all the lines and OR in the data for line11 with each write.
    I just wondered if it was possible to write to one particular channel of a task and not the other channel?  That would really be the ideal solution for me.  especially if I could write multiple samples to the one channel while I left the other channel alone.  Which brings up another complaint... Why does WriteMultiSamplePort only work if I use a DigitalMultiChannelWriter, and not if I use a DigitalSingleChannel writer even though my task only has one channel (and by the way I set up the channel as one channel for all lines)?  A perplexing issue to be sure.
    And no I can't just load all my samples into an array and write them all at once because I also have to manipulate the two analog outputs in between the various digital writes.
    I am using NI DAQmx 7.5 and C#.  I am trying to use the DAQ to program a digital switch, which has proven to be a real challenge.  In push-pull mode there is too much ringing for the switches programming port to tolerate.  But the switches interface is LVTTL, so I needed the 3.3V.  When I changed to open-collector I had to use voltage dividers to drop down to 3.3V.  But the rise time using open-collector is too slow for me the program the switch in serial mode, so I had to change to parallel.  The switch has an 11 bit multi-plexed ADDR/DATA bus.  So the DAQ I had chosen to use which had plenty of lines for the serial programming, now is strained to it's absolute limits by the parrallel interface.   ARGH.  The only output I am not currently using is the counter, and I'm going to need it if I ever want to read back from the switch.  But first I have to seperate the ADDR/DATA bus from the CS line on the DIO lines of the DAQ.  And I don't know for sure what I'm going to do about the voltage level translation when I have to go bi-directional.  Maybe I can filter out the ringing in push-pull mode?  Any thoughts on that?

    Hi Saikey,
    In most cases, you are exactly right: you can only use one task for one type of operation (i.e. only one analog input task in the same program). With the USB 6009, you can have multiple digital output tasks running at the same time. I was able to run a digital output program with two different digital output tasks configured for a USB-6009.
    However, you stated that it would be better if you had everything in a single task for your application and write data to only some of the channels. The easiest way to do this is to modify your array of output data so that only the data to that one channel is changing. So, for example, if you keep writing a 0 to the channels that do not need new data nothing will change.
    If you have to change your analog outputs during this program, you could create an event structure that would stop and restart the analog output tasks without changing the digital output data. I hope that you find this information helpful.
    Regards,
    Hal L.

Maybe you are looking for

  • Negative stock how do we get this material out of Storage Type 921

    thanks for the reply , but i am confused in t-code LB10  i have to give source storage stype can u explain step by step. thanks in advance

  • If then statement if user is on a dial-up connection to re-direct them to a static page?

    I'm designing a site with flash on the index page, and many of the users might be on a slow connection. Although the flash file is relatively small, I want them to be able to load the page as fast as possible. Any suggestions on how to re-direct them

  • Clean up after each system upgrade

    Hi, After each upgrade my system increase its disk usage. I type "pacman -Qet", and there is a lot of packets, but I'm not sure is it safe to delete them. Which is the best rule to follow about cleaning the system, using pacman? Last edited by cloven

  • Captivate 4 Quiz Slides - Misnumbering?

    Hi Everyone, I am using Captivate 4 after recent Captivate 3 upgrade. My quiz slides are "misnumbering." They appear fine in Editing mode (i.e. "1 out of 5"), but when I preview them - and even when I publish the project and load it to the LMS, the s

  • Windows Installer--NEED HELP BAD!!!

    I am getting this message: The Windows Installer service could not be accessed. This can occur if you are running Windows in a safe mode or of the Windows Installer is not correctly installed. How do i change it from out a safe mode or know if it's c