Creation of Purchase Requisition from a BID

Hi,
I am trying to create a purchase requisition from a bid instead of a purchase order. Does anyone have any idea on this?
Thanks
Sunny

Hello,
are you trying to create a local SC or a backend PR ?
If you are in classic mode (so PR and not SC), you could try to derive the PO flow to create a PR instead.
But this is not really clean.
The best way is to add a new button "Create PR" in quote screen (or rename the create PO if you don't use it), linked to your own fcode processing and finally call the META_REQUISITION_CREATE in SRM (instead of META_PO_CREATE).
The last point would be to create a link BID_INV>BID>PR to be displayed in document flow. You have to check if it is possible, because sometimes the system is designed for limited possible flows and does not take into account the flow you want to add.
In standard, you can create directly a backend PO only if the bid was created from a SC in the sourcing cockpit. Otherwise use local or extended PO (replicated in R/3).
If this is the case, FM BBP_PD_SC_TRANS_MULTI_BE_PO will transfer the initial SC items to next document, which is a backend PO. You would need to operate some changes here to create PR.
Rgds
Christophe

Similar Messages

  • Creation of purchase requisition from Webdynpro Java

    Hi all,
        I have a requirement that i should create purchase requisition from webdynpro java. i imported all required BAPI in the webdynpro. But i am not getting what should i have to give as input paramater. I have imported the Bapi_Requition_Create. Please help me on thin what sould be the input parameter i should pass.
    Regards,
    Shreeharsha

    Shreeharsha,
    you can check out the fm inse37 and see what are the importing and tables parameters
    Thanks
    Bala Duvvuri

  • Creation of Purchase Requisitions from Forecasting Values

    Dear Friends
    I coud do forcasting and generated the forecasting values and the values are also visible in the MD04 Stocks/Requirements List. Please guide me to create the Purchase Requisitions from the forecasting values.
    Thanks and Regards
    Suresh

    Depending on the MRP type in the material master you'll need to run either MRP or MPS.  I'd start with single item single level which will just plan the one material.  The Tcode is MD03 for MRP items and MD42 for MPS items.  It sounds like you're new to this so you should look around at the settings in the MRP1 - 4 views of the material master to understand the different settings that control the output of MRP (e.g. MRP Type, Lot Size Data, etc).  Lastly, check the MRP Control parameters that are entered when you run the MRP transaction.  Specific to your question, running it with Create Purchase Req 1 or 2 will create Purchase Reqs directly.
    Hope this helps.

  • Creation of Purchase Requisition from VA01

    Hi,
    I have a requirement to apply block Id in me52n from tranasaction VA01 while creating sales order.csan you tell me how purchase requisition is generated from VA01 as this information will help me impose block in me51n from VA01.(Prior to that i have tried various badis and user exit but none of them are really helpful).
    Thank you.

    First of all you need to define the schedule line categories and then assign them to item categories. The system will automatically creates the purchase requision based on the item category/ schedule line.
    I guess, you need to look at the copy control process between sales and purchase.
    also look at the sales order user exit (Save document prepare / Save document) in MV45AFZZ
    Good luck

  • Creation indicator purchase requisition in md02

    Hello SAP Gurus,
         This is regarding creation indicator purchase requisition in md02.In this creation indicator purchase requisition if we keep setting as 2 than it will create purchase requisition if the dates of PR are in the opening period and will create planned order  if dates of PR falls out of opening period.And it takes the opening period from schedule margin key.
         My question is , as system calculate the opening date by subtracting the number of days which we have given in opening period in schedule margin key from the order start date.suppose if order start date is 10.03.2008 and we have given the opening period of 5 days,than the opening date will be 05.03.2008 if there are no holidays between it.So how it comes that PR date will fall in opening period?I am confused that when system will create planned order and when system will create PR if we keep creation indicator purchase requisition as 2.
          Plz help me with this query.If you could explain with one example than it would be great.
                         Thanking all in advance.And obviously for suitable answer i will definately give good points.

    Hi,
    System calculates the opening date  by subtracting the number days given as opening period at SMK from order start date.
    For creation ind =2 ,
    MRP run date decides the PR / Planned order creation even if u set procurement F.
    If MRP run date falls bettwen the opening date & order start date , it will create PR only,
    If run MRP run date falls outside the opening preriod ie earlier than the order opening date, system will create planned order and it has to converted to PR
    For  examble,  Order start date is  28.03.2008 and 2 day is defined as opening period SMK for ROH.
    If u run MRP on today it will create planned order.  
    Hope u understand , ifso reward and close.
    Regards
    Pradeep

  • SNP Heuristic: Creation of purchase requisition

    Hi experts,
    we face following problem: heuristic creates purchase orders when there is no source of supply.
    Background:
    there is a forecast demand for a location product on a customer location without transport lane to the production plant due to false master data.
    The SNP heuristic generates purchase requisitions to fulfill the demand and there is no requirements shortage.
    So it is hard to recognize which forecast demands can't be fulfilled.
    Is there a parameter in material master or in a heuristic profie which disables the creation of purchase requisitions in snp heuristic when there is no source of supply.
    If no purchase requisition is created there will be a requirement shortage which can be recognised by an alert.
    Thanks for your help.
    Robert

    hi.
    As per heuristic process , the system will create a purchase requisition if there are no Tlane exists and the material's procurement type is F/X since it is a infinite planning.
    Now you can use a optimizer or CTM to restrict the system from creating purchase requisition.
    Also you can try with location heuristic.
    Hope this can help.
    regards,
    kaushik

  • Auto Creation of Purchase Requisition at Contract Level

    Hi All,
    I am having business requirement for creation of purchase requisition at contract level for third party Products.
    Brief Business requirement
    My client is in trading business of telecom product.  They are sourcing product from different-different vendors and some of the product is also supplied by him self. As a business practice the system will automatically create an Installed base as per structured by business owner once delivered the product to end customer and also assigned warranty norms.
    Once warranty is over then customer will called for contract since at the time sailing the product warranty will be liability of the company which in terns had some mutual contract with supplier (back to back replacement).
    But once the same will come under service agreement/contract on that time they want installed base selection of components should had a functionality to segregate component based on vendor because they want to calculate % margin based on net sale value of the product.(e.g 10% of net sale Value 10,0000)  not only that they also wants based on that system should automatically create Purchase requisition so that logistic department will take care of third party agreement part.
    If any body come across with such kind of business scenario. Please share the proposed solution.
    Regards
    Neeraj

    Hello,
    I noticed that this question had status answered.  We have the same requirement.... how did you resolve this?
    Best Regards
    Kristof

  • Auto PO  creation using purchase requisition

    Hi,
    I have tried the following steps for auto PO creation using purchase requisition.
    i. Maintain Auto PO in Material master Purchasing view
    ii. Select Automatic purchase order in Vendor master- Purchase data
    iii. Maintain info-record
    iv. Create PR through ME51
    v. enable source determination during creation of PR
    vi. Execute using ME59N
    But Auto PO is creating with the same document type (e.g NB) which is used while creating purchase requisition (e.g NB). Following steps have done in SPRO.
    1. SPRO - MM - Purchasing - purchase requisition - define  document type
    a. NB- PR document type LINK TO DI01- PO document type
    2. SPRO - MM - Purchasing - Purchase order - Define document type
    a. DI01- PO document type LINK TO NB- PR document type
    3. There is no linking from NB - NB & DI01 - DI01 but still it is creating auto PO with document type NB iif requisition has been created with document type NB.
    Please suggest on this . waiting for ur quick response.
    Thanks...
    ARATI.
    Thanks!
    Arati.
    Edited by: Rakesh Gupta on Aug 20, 2009 11:00 AM

    Hi
    Please check the below thread
    PR to PO  via  ME59 -Doc type issue
    Thanks/karthik

  • Purchase Requisition from CRM Service Order

    Hello Everybody,
    I am trying to create Purchase requisition from Service Order for Service(Material type DIEN) as well as Material (Material type HAWA). I have maintained all the necessary configuration in CRM as well as ECC, like in CRM,  Logistic integration we maintained settings for Purchase requisition and in ECC we have maintained Document type and schema for the purchase requisition.
    For information purpose, I have created Service Material in ECC as DIEN and item category group as LIES.
    As soon as we save the Service Order in CRM with that item category, it should create Purchase requisition in ECC and the document flow in CRM should get activated.
    Currently we are not able to create Purchase requisition in ECC.
    Kindly let me know if there’s any configuration settings missing in CRM as well as ECC or if note to be applied.
    Best regards,
    Anup Bansal

    Hi Anup,
    I am facing purchase requisition creation problem for service products from crm.
    I have seen your query which was posted on same issue, so i thought i could get some help.
    The problem here is when i am saving the service order i am getting the below message.
    Enter a (default) purchasing group for material group SUB_MC (Notification E CRM_SRV_LOG_EXT_OLTP 002).
    I have actually downloaded mat_dien materials from ecc to crm and for material purchase group is already assigned for one plant, but still not able to recognise.
    Please help me out.
    Thanks in advance.

  • Update Purchase Requisition from Sales Order

    Hi,
    My requirement is to Update Purchase Requisition from Sales Order based on the Vendor number in
    Purchase Requisition .
    I have used Userexit         :- MV45AFZB
                     Customerexit :- EXIT_SAPFV45E_002
                     BADI             :- ME_REQ_OI_EXT, ME_REQ_POSTED
    for my requirement, but in vain.
    Of these Userexit  MV45AFZB, Customerexit EXIT_SAPFV45E_002, BADI ME_REQ_OI_EXT are getting triggered in Sales order creation but, Purchase requisition is not yet triggered and we dont have the VENDOR value with which i need to do perform some checks and update the Purchase requisition.
    After I SAVE sales order, BADI ME_REQ_POSTED is getting triggered.Here, the purchase requisition is created ( not yet inserted into the database ) .I also have required VENDOR value, but in the given
    BADI ME_REQ_POSTED I can make checks according to my requirement but not able to update the new values into purchase requisition.
    Literally speaking, Iam struck up..Dont know what to do.....
    Please let me know any Userexit/BADI/BTE where I can  Update Purchase Requisition from Sales Order based on the Vendor number in
    Purchase Requisition .
    Thanks,
    Shivaa..

    Hi Max,
    It just struck to me...
    As suggested by you, I thought of calling BAPI BAPI_REQUISITION_CHANGE  from user exit USEREXIT_SAVE_DOCUMENT in MV45AFZZ .
    I f I give PReq no. , BAPI BAPI_REQUISITION_CHANGE  will take the particular PReq no., from database and then change it according to our requirements...
    But, in our scenario I am calling the BAPI BAPI_REQUISITION_CHANGE  and passing a PReq no..which doesnt exist in the d/b itself.....
    Anyways, let me try......
    Meanwhile ,please suggest any other options for resolving the issue in question......

  • Creating Purchase Requisitions from within PS (ie from network)

    When creating purchase requisitions from within Projects Systems (ie activating them from a network) is there a "standard" way to put a cost center on the Purchase Requisition?  Currently no cost center is put on the account assignment.  We are looking at doing a custom field on the network header to hold the cost center and then a user exit to take this cost center and put it on the purchase requisition (and reservations) but before we go to all this trouble thought maybe I should check to see if I am missing something obvious?  Is there a more straight-forward way to accomplish this?  We know that we cannot edit the account assignment in ME52N becuase the PR originates from the network and therefore can only be changed from the network.
    Any input welcome.  Thanks.

    Dear Laura,
    When you will create Purchase Requistion through Network, system automatically takes account assignment category as "N" i.e Network. This you can not change in ME52N transaction.
    So this is a standard practise for generating Purchase Requistion through Network in PS Module.
    As you said putting Cost Center in Network Header as a Account Assignment Category which will go up to PO creation by using some User Exit which will not be possible in PS Module as per my knowledge is concern.
    But you want to keep Cost Center as as a Account Assignement Category you need to create manual Purchase Requisition through ME51N transaction.
    Hoping this will be useful to you.
    Regards,
    Sandeep

  • Sales order - automatic creation of purchase requisition - cost assignment

    Hi
    When the sales order is released, we have an automatic creation of Purchase requisation. We have given "internal order" as the cost obect in the sales order. But when the system has created automatic purchase requisition, it has not picked internal order. What could be the reason?
    Thank you for the help.
    Thanks
    Ram

    Hi
    I feel that it is abug in the development you have carried out for creation of Purchase requisition when a sales order is relased,
    Please check the enhancement, you need to pass the values to the correct table after derivation.
    Thanks & Regards
    Kishore

  • Sales order - automatic creation of purchase requisition - CO assignment

    Hi
    When the sales order is released, we have an automatic creation of Purchase requisation. We have given "internal order" as the cost obect in the sales order. But when the system has created automatic purchase requisition, it has not picked internal order. What could be the reason?
    Thank you for the help.
    Thanks
    Ram

    Hi
    I feel that it is abug in the development you have carried out for creation of Purchase requisition when a sales order is relased,
    Please check the enhancement, you need to pass the values to the correct table after derivation.
    Thanks & Regards
    Kishore

  • Purchase requisition from sales document' not possible due to a credit bloc

    hi experts,
    i have to confirm delivery date and quantity for some purchase order items but i'm not able because i receive following message:
    Subsequent function 'Purchase requisition from sales document' not possible due to a credit block'
    Purchase requisition belongs to a sales order which has customer 10000.
    The customer 10000 was block from FD32 but now i have unblock the customer from FD32, i have assigned customer to a category risk which is only a warning. (in OVA8 risk category 002 static check, reaction C, status/block uncheck )
    There is any possiblilities to confirm quantity ?? I mean ... i understand that sales order was created when the customer was block due to credit limit exceded ... but now the customer is not blocked.
    What should i do?
    Thank you.

    Hi Dan
    If you want to  confirm the delivery date then change the static check reaction to B . in OVA8 . But if you change the static check reaction to A , you can do Delivery and billing also
    Regards
    Srinath

  • Unable to transfer Purchase Requisition from ECC to EBP

    Dear Friends.
    We are unable to transfer PR from ECC to EBP. System issue stop message in SLG1 transaction for object BBP_EXTREQ
    Stop Message Type: Document type for determined backend system is missing.
    Warning Message Type: Grant 1111 does not exist.
    As per configuration guide we have performed following setting in EBP client
    1. We have created organization unit “Entry Channel” under company code.
    2. Under Entry Channel we create Local Purchasing Organization.
    3. Under Loc Purchasing Org we created Local Purchasing Group with
        - attribute BUK as backend company code
        - attribute BSA as backend PR type (NB)
        - this group is responsible for Entry channel procurement (setting in Function tab)
    4. Under Loc Purchasing Group we assigned RFC user which is same defined as RFC user in both EBP and ECC client.
        - attribute DP_PROC_TY defined as backend ECC PO type (NB)
    5. Attribute CUR define for entry Channel.
    6. Remote connection established with the same user defined under Organization Unit
    7. Remote user has profile sap_all and sap_new authorization.
    8. Material group, Material Type and Vendors are replicated from backend system.
    9. Sourcing always allowed is set for all product categories in “Define sourcing for Product Category”.
    10. Extended Classic Scenario is active.
    11. Defined Tolerance check and assigned TOG attribute.
    Performed following setting in ECC client.
    12. Defined RFC connection and user same as defined in Organization unit.
    13. Defined profile which reference to EBP logical system
    14. Maintained table V_T160EX with Material group/Pur group/ Profile combination.
    Finally transfer Purchase Requisition from ECC to EBP via report BBP_EXTREQ_TRANSFER. Further the outbound Queue fails with status ANORETRY. Also the log displayed the error ‘Application aborted due to serious problems’
    SLG1 in EBP issues stop message “Document type for determined backend system missing” and warning message “Grant 1111 does not exist”.
    Any idea what could be the reason?
    Please help!!
    Sandeep

    Hi
    It seems there is some problem with the Configuaration settings in SRM as well as R/3 side.
    <u>Anyways, please have a look at the following links, which might help.</u>
    <b>Direct Procurement</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/b7/15d4396898042fe10000000a114084/frameset.htm
    <b>Prerequisites for External Requirements</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/18/db183d30805c59e10000000a114084/frameset.htm
    <b>Attributes for the SRM Scenario</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/84/a7e3389870c05ce10000000a114084/frameset.htm
    <b>Direct Material Scenario: Other Planned External Requirements</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/6a/4b9e3b891da20ee10000000a114084/frameset.htm
    <b>Number range settings</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/5d/fd7d3cb7f58910e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/b7/15d4396898042fe10000000a114084/frameset.htm
    <b>Define Transaction types</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/10/fd7d3cb7f58910e10000000a114084/frameset.htm
    <b>Direct Material Scenario with Planning in SAP APO</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/d3/4b9c3b122efc6ee10000000a114084/frameset.htm
    Hope this will help.
    Regards
    - Atul

Maybe you are looking for

  • How do I change the order of phone numbers in a contact?

    When I enter phone numbers for a contact on the iPhone, they seem to be stuck in the order they were entered. Is there any way to change the order using the phone interface? I sync with Yahoo Address Book. Will the order be preserved if I change the

  • How do I extract files from a TimeCapsule?

    Here is the background in note form! -bought an iMac and TimeCapsule in 2007/2008 -two weeks ago, computer started to show signs of age -upgraded to Mavericks -computer is extremely slow -was having serious issues with startup, etc -reset RAM and sta

  • Vlm 3.0 LabVIEW 2012 SP1 disabled in Installer

    Hello folks, i have a Problem with die build Installer with my new updatet vlm 3.0. I already get the the new license file for vlm 3.0 and installed it, then i made the installer for LabVIEW 2012 SP1 like i have done it with the previous versions of

  • PI7.0 PIAFUSER, PIDIRUSER, PIRWBUSER, PIREPUSER getting locked.

    Hello, I have two PI systems PID and PIQ. PID has central SLD and PIQ is configured to use central SLD during installation. The PI users in PID and PIQ have different passwords. I have noticed following users are getting locked in PID. PIAFUSER, PIDI

  • Sync does not work at all

    Just got d iPad,sync'ed the first time and I updated d software to a 10.0 iTunes, but since then when i connect d iPad to the mac book pro it does not do anything, it does not even see d ipad,I have tried to changing d USB connection to another port,