Delivery schduline line number in make to order

Hi all,
i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
please give your valuable suggestion .
i would be highly thankful to u
regards
piyush

Hi
When you do the MRP Run at MD02, maintain the Delivery Schedules as 3 (schedule lines), so when ever you do the MRP Run, it will run along with the delievry date.
reward if it helps
Regards
Prasanna R

Similar Messages

  • Delivery schedule line number in make to order

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    regards
    piyush

    Hi
    When you do the MRP Run at MD02, maintain the Delivery Schedules as 3 (schedule lines), so when ever you do the MRP Run, it will run along with the delievry date.
    reward if it helps
    Regards
    Prasanna R

  • Delivery Schedule line no in Make to Order

    Hi all,
            i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    regards
    piyush

    hi
          thanks,
    i have checked MD04 peg requirement list with order route.
    every thing is ok.,schedule number is also coming but only for finished good . if three production order is there for semifinished then there is no any relation that how i can judge that this semifinished is for which FG material.means :
    FG 1             FG 2            FG 3
    SF 1              SF 2            SF 3
    SF 11            SF 22           SF 33
    How this SF 11 is linked with FG1.and schedule delivery number is there but only for FG material. planning segment is same for all the FG material.MRP element data having all the link but only for FG material.
    what is the link of SF 11 to schedule delivery line number with FG material.
    Regards

  • Delivery schedule line number in sales order is not populated in production

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    Will reward points.
    Regards
    Kumaraguru

    Hi Kumar,
    Some changes done in your PRD server.If yes then contact abap consultant regarding the same.
    Because these type of problem comes when you do transport or changes done in the system.
    Regards,
    Anil

  • Delivery schedule line number in sales order is not populated  in productio

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    Regards
    Kumaraguru

    Hi Kumar,
    Some changes done in your PRD server.If yes then contact abap consultant regarding the same.
    Because these type of problem comes when you do transport or changes done in the system.
    Regards,
    Anil

  • Schedule line disappears for Make to Order Item

    Hello,
    In make to Order process, there are 2 schedule lines created, while creating the order in VA01 transaction.
    But when i save order and see it change mode (VA02), only one schedule line with 0 quantity confirmed for the requested delivery date is seen. the order schedule line with 120 confirmed quantity for the futhur delvery date disappears.
    Can some body please comment why this is happening. I am not able to understand this.
    Will this schedule line be created after MRP run. I have also executed MD02 for MRP run, as well as created the planned order to Production order. But still the second schedule line is not getting created which was seen at the time of creating the order. 
    Regards
    Prashant

    ANy updates on this Thread............

  • Scheduling Agreement - Delivery schedule line number

    Hi,
       I am developing a report to show the Goods receipt postings for each delivery schedules of Schedule agreements.
    I am not able to find Delivery Schedules line(EKET-ETENR) in Material document table(MSEG).
    How do we exactly link the GR quantity to Scheduling agreement Delivery schedules.
    We have line item number but not delivery schedules.
    GR quantity may be posted to different delivery scheules and for some SAs when the MRP Runs it is positng randomly.
    Is there function to find the link,
    Searched EKBE, EKET, MSEG  and other tables also.
    Appreciate your help <offer removed by moderator>.
    Satya
    Edited by: Thomas Zloch on Jan 18, 2011 2:44 PM

    Hi Shravan,
        Thanks for answering, I checked those two tables EKEH, EKEK are release tables. We have some SAs without release documentation. I have to find the delivery schedules using the GR document to which delivery schedules the qty it is delivering.
    It is not posting the qty from top of schedules, for some SAs it posted randomly.
    Any other ideas or any function modules,
    In BW it is possible using extractor but we need in R/3
    Thanks,
    Satya

  • How do I get the line number of the sales order and how do I save info?

    I am trying to create a form that is able to be called from a right click on the sales order matrix and will display some of the user defined fields associated with the line.
    I've managed to create a form and add a menu option to the right click but I'm now stuck because of the following:
    1. How to I know which line the user selected? I need the REAL Line Number from the RDR1 table because I need to use it on the data filter of the form.
    2. I hard coded a line to just to see if I can load a form and it appears to load and bind the data to the controls, but how do I save changes made? There are several text fields, combo boxes, and a picture control.

    Hi Coleman,
    1. The pVal returned form a menu event does no provide the LineId, but a pVal from a Item Event does. I suggest you use a DoubleClick or Control + Click on the Line to trigger an event that you can catch and use to launch your form.
    2. Please note that if the Sales Order line is closed you'll not be able to update the values. If it's not, then you need to instantiate a Sales Order document, get the correct document with the GetByKey method and update whatever fields you need.
                    Dim oSalesOrder As SAPbobsCOM.Documents = oCompany.GetBusinessObject(BoObjectTypes.oOrders)
                    If oSalesOrder.GetByKey(docentry) = True Then
                        oSalesOrder.Lines.SetCurrentLine(pVal.Row - 1)
                        oSalesOrder.Lines.UserFields.Fields.Item("U_MyUDF").Value = ""
                        oSalesOrder.Update()
                    End If
    Regards,
    Vítor Vieira

  • Line Number in sequence for Order No

    HI,
    I am using AIA Approach to Insert data from Legacy System to Target Sysytem(Database Adapter).
    I need to insert line number in the database for eache OrderNo and for same repeated Order No, it shoud count plus 1 and if differnt Order number will come need to count from 1.
    can we achieve this using XSLT by Grouping??
    or
    we need to do query in the databse?
    I want to insert line no inthe field, if orderNo is already exist in the database it shoud count +1.
    i.e. order no is 123 count as 1
    if order no will repeate again as 123 count as 2
    if there is diffferent order no come as "xyz" count again as 1
    PLease Help me on this.
    Thanks For Advance.
    Edited by: 895089 on May 14, 2012 4:48 AM

    This can be done in XSL OR in procedure on the DB side. Performance wise better to do in procedure as mentioned by other use. You can choose to go with DB or XSL approach depending on number of orders you are expecting in a single message. If it is going to be 100s or few thousand messages then keeping it in XSL is not a problem. But if you are planning tens or hundreds of thousands of orders in the same request then better do it in stored procedure.
    How do you do in XSL?
    1. Put a for each on every unique order no. You can use xsl:Key or xslt:distinct-values() for this.
    2. Within for each unique value of order no, use position() function to pass line/order no as 1,2,3... etc. As soon as the loop moves to second iteration for the next unique order no, count will automatically start again from 1,2,3... and so on.
    Apart from slightly slower processing time, another drawback from this approach is that the data in the XML you send to DB procedure will be sorted by order numbers. All orders with same number will appear together.
    Another problem with this approach is that this will work only within one request, i.e. if the next request contains an order with same no which was already sent in a previous request, for this order the count will again start from 1. So if you want to keep the sequencing maintained across multiple requests, the easiest way to do is in the DB procedure where you can lookup in the table before inserting a new row and insert with next sequence of that order no.

  • Complete Delivery at Line item level in Sales Order

    Hello Gurus,
    While creating a sales order for some customers (the sales area tab in the customer master data has complete delivery and full delivery at item level), the complete delivery flag should be enabled and partial delivery flag at item level shoulb be C.
    We have a situation where this is not working in some cases. I need to know what user exits are copying the customer master data into the sales order fields. Please give me a lead how I can proceed with this.
    Regards,
    Balu

    Hi Balu,
    Please check user exits in program MV45AFZZ.
    i.e USEREXIT_MOVE_FIELD_TO_VBAK 
    Regards,
    Gumanti

  • How to place a delivery block at line item level from Inbound ORDERS IDoc?

    Hi EDI/ABAP Experts,
    Can anyone please tell me how to place a delivery block at line item level from Inbound ORDERS IDoc?
    I tried using exit "EXIT_SAPLVEDA_001'. But there is no LIFSP field in either of XVBEP and YVBEP structures.
    Can you guys throw some light. How to place a delivery block @ line item level on sales order from Inbound ORDERS IDoc.
    Thanks,
    Matt .

    Look into the Include: LVEDAF5A that is the only place where this exit is hit... double click on the Structures and look which structure has billling block field.. and use that..
    FORM CUSTOMER_FUNCTION_IDOC USING IDOC_DATA.
      CALL CUSTOMER-FUNCTION '001'
        EXPORTING SEGMENT = IDOC_DATA
                  DVTCOMAG = VTCOMAG
                  DXMESCOD = IDOC_CONTRL-MESCOD
                  CONTRL   = IDOC_CONTRL
        TABLES    DXBDCDATA = BDCDATA
                  DXVBAP    = XVBAP
                  DXVBEP    = XVBEP
                  DYVBEP    = YVBEP
                  DXVBADR   = XVBADR
                  DYVBADR   = YVBADR
                  DXVBPA    = XVBPA
                  DXVBUV    = XVBUV
                  DD_FLAG_P = D_FLAG_P
                  DXKOMV    = XKOMV
                  DXVEKP    = XVEKP
                  DYVEKP    = YVEKP
        CHANGING  DXVBAK   = XVBAK
                  DD_FLAG_K = D_FLAG_K
        EXCEPTIONS
                  USER_ERROR = 01.
    If you are in ECC6.0  you can also use Enhancement point : INTERPRET_IDOC_ORDERS_01 SPOTS ES_SAPLVEDA. in include: LVEDAF2U

  • Make to Order Report - Tables link

    Hi Gurus.
      I am doing one report related to Make to order scenario.in that i have to fetch  production order related to particular sale order ,item and delivery schedule line number wise.
    i am facing problem to fetch the production orders by sales delivery shedule line wise and also sub assembly production orders,
    but in Tcode MD04 i am seeing all the data..from that i got the tables MDKP,MDTB,RESB,AUPO...but i could not get the link by Delivery schedule line or dependent orders
    so, Please provide me a table link
    regards
    Raja

    For this to happen you need to transfer the stock of A1 to SO#B. This may be achieved by using the Mvt type 413 (E), this mvmt type would do the transfer. So in this way A1 is consumed.
    We had developed a Z program which would actually scan thru what we call as orphaned units (where the SO is cancelled and the units are built for the same). This Z program would then do 413 E and move the stocks to the new orders and mark the Prod orders created for the new SOs for closure.
    Hope this helps.

  • Line number of debugging script

    Dear Sir/Mam,
          i am debugging a script , how to know in which line-number i am debugging , in case of reports , we can see the line number directly if we select the " swith to classical debugger " , but in case of script , i am not able to find the line number , my script consists of 1132 lines of code. , please help me.
    Thanks in Advance,
    Dastagiri N.

    Dear Sir/Madam,
           I executed RSTXDBUG , and executable program of ME23N ( RM_MEPO_GUI ) now entered in to debugging script,
    as long as i press  F5 ( single step ) or F6 ( execute ) or F8 ( continue ) , i didnt find any line number ,
    if i found the line number , that makes me easy to modify the code.
       And also please tell me how to delete a line in editor.
                       i.e.,After clicking text element icon , while writing the code for a particular window , unfortunately i pressed enter instead of shift ,i entered in to new line , how can i erase that line  
                  please help me for these cases.
    Thanks & Regards,
    Dastagiri.

  • Serial Number assignment in Delivery Note for Make-to-order

    Hi experts,
    In our current design, we have made it obligatory to enter the serial number in the delivery note for make
    to order stocks.
    We are also implementing PP and we would like to capture
    the serial number specified in the production order and
    automatically populate the serial number in the delivery.
    Any suggestions on how I can do this is greatly appreciated.

    Hi Karun,
    Thank you for your kind advice all the time. 
    I have been looking into it but the LIPS structure does not contain the serial number field...
    I have been looking for the routine in the copy control
    but have no luck finding such routine...
    Thanks for your continuous help and assistance.

  • Delivery not created in make to order cycle

    Hi
    i am in the make to order process scenario and facing problems while creating a delivery after production order has been confirmed. The steps followed are
    1. i create an order with M1 and quantity 100 - T code : VA01
    2. i create a sales order BOM for the sales order created above and using material M1 - T cose : CS 61
    3. This is followed by a production cycle - planned order, production order and confirmation with lot size of 7.
    4. as one production order of size 7 is confirmed, the stock is generated of quantity 7 for the material M1. using MMBE i can see the stock being created.
    5. Now as i go and try and create the delivery against order created in step 1,  i get the error and that "No schedule lines due for delivery up to the selected date".
    6. When i check my order in display mode, under schedule line it shows M1 with order quantity as 100 and confirmed quantity as 0.
    Could you please advise if after the confirmation of production order, the schedule line in order will show quantity 7 and if i can delivery against it. Or is there any other way of creating the delivery.
    Thanks

    Hello,
    In MTO scenario the following happens:
    1. Sales Order is created - standard requirements type determined is KE which fetches requirements class 040. The requirements class 040 has controls for MTO & special stock indicator will have entry as "E-orders on hand".
    2. After MRP is run the system will transfer the requirements to PP, a planned order will be created which is then converted into a production order.
    3. After running the production cycle the goods will be transferred to the finished goods storage location.
    4. Now when you check in the transaction code MMBE the system will show the material stock & under the sales order stock only.
    5. But when you check the sales order -- line item schedule line, the system displays the confrimed quantity as "zero".
    Explanation:
    You created sales order for item A - 100 Quantities. Production was completed for 20 quantities. System shows sales order stock of 20 quantities only.
    When you had created a sales order for item A the system after running the availability check would have determined a delivery date by way of which it would have shown you say 2 different schedule lines as under
    Delivery Date.............Order qty............Rounded Qty...........Confirmed Qty
    01/05/2009...................100......................100............................0
    15/05/2009.....................0.........................0.............................100
    The second date the system determines taking into consideration the inhouse manufacturing time specified by you in the material master (MRP2 screen) & the other settings which aare applicable for the checking group specified in the material master.
    On 15/05/2009, if you create a delivery, the system will allow you to create the delivery irrespective of the stock in the plant. But at the time of post goods issue you will face a quantity deficit error.
    If the goods are received in the finished goods storage location before 15/05/2009 say on 10/05/2009, the system will not update the schedule line automatically & when you try to create a delivery the system will display the error "no schedule lines due for delivery".
    Solution:
    Transaction code VA02 - select the sales order number - double click on the line item - go to schedule lines - here click on the button "Item Availability" or press "Ctrl + F5" to run the availability check. As you have stock of  7 quantity, the system will display 7 quantity on the curretn date. Select the option delivery proposal to continue. Now the system will show 2 schedule lines as under
    Delivery Date.............Order qty............Rounded Qty...........Confirmed Qty
    01/05/2009...................100......................100............................0
    10/05/2009.....................0.........................0..............................7
    Save the sales order & then create a delivery. The system will not give any error.
    Note: You have to manually confirm the quantities for a make to stock sales order in case if the goods are received before the delivery date specified by the system.
    With best regards,
    Allabaqsh G. Patil
    Idhasoft Ltd.

Maybe you are looking for

  • Erase & sync dialog

    when connecting my iTouch in iTunes, this message appears: "The iPod is synced with another iTunes library. Do you want to erase this iPod and sync with this library?" I did that, but it displays it every time I reconnect. I have only ever connected

  • Create a specific user profile to Material master data

    Dear colleagues. We need create on R/3 4.6 a specific user profile for material master data, to create or modify (MM01/MM02) only the following views: 'Sales org. data 1', 'Sales org. data 2' and 'Sales:General/Plant data'. The problem is that when I

  • Preferences are not holding in IDCS3

    if you quit out of IDCS3 the preferences are not holding. tried resetting ctrl+opt+com+shft & replacing ID prefs but they will not hold after repeining the program? any sugestions?

  • Why are TV show episides for last three days not showing up for purchase on iTunes?

    TV episodes for 10/25 and 10/26 are still not showing up for purchase in iTunes. Am I the only one? The latest episodes that show up are from last Thursday. What gives?

  • Mavericks Crashes due to an Internal Messages error

    I am using a 2009 27" iMac running Mavericks 10.9.4. Occasionally the OS freezes and the following message appears: An Internal Messages error occurred. There was a problem with Messages. You need to quit and open Messages again. The mouse still move