Delting Objects from production system

Hello All,
I need to delete some of the Infoobjects,ODS and Infocubes from my Production system.
for e.g:
We have Inserted infoobject ZXX as data target,so it is available under infoprovider.
For this,we have update rules ZYYY.
In the Infoprovider tab: I right click on the Infoobject ZXX and selected the "Remove Infoobject as data target option".So update rules and the infoobjects were removed from the Infoprovider tab.
Also I deleted the infosource ZYYY.
While deleting the Infoobject ZXX from the Infoobject tab,it says "the update rules ZYYY still exists and hence cannot delete the data"
Please let me know,how can i delelt the Infoobject and the update rules.
Any help will be appreciated.

Hi,
Make sure that you are having prober authorizations to delete the objects. If you have, try to log on again. Also Check for Data flow upward objects from this object.
Edited by: P. Saravana Kumar on Apr 1, 2009 6:01 PM

Similar Messages

  • Transporting objects from development  system to production system

    Hi all,
    how can we transfer the object from development system to QA and QA to Production, for example creating a new sales document type,how can we transfer tthese new sales document object from development to production system.
    any one can please send me with screen shots,then it will be great help for me.
    its very urgent
    my email id is:[email protected]
    Thanks & Regards
    Ramesh chandra

    Hi Kalyan.,
                        When you want to create a new sales order type then its better to copy the existing order type from the standard one and save it in one request and then you release the request in SE09 and further it is transported by Basis people using T.code STMS
    I have sent step by step configuration with screen shots,Please go through that
    REWARD if helpfull
    Thanks & Regards
    Narayana

  • Is it possible to Delete BP's from production system

    Hi All,
    Is it possible to delete old BP numbers from production system?
    if yes please let me know the procedure and impact on the system.
    if no please let me know ,how to prevent user from entering old BP number into order.
    Thanks in advance for your help.
    Regards,
    Shaik

    Hi Shaik,
    You can delete the BP using transaction BUPA_DEL.
    Just enter the number of the BP you want to delete and then execute.
    Make sure that all the checkboxes on the selecton screen are clear.
    In case the BP has dependencies and deletion is not alowed, you will get an error message informing you of the same.
    Best Regards,
    Rishu.

  • How to make JOB CONTROL setting for delta extraction in Production system .

    Hello All,
    We are in the process to transport our development to PD server in BI . We have transported the data sources to ECC production and now we are filling the setup table for " SD BILLING BW " . After filling Setup table data in full mode through infoPackage we have to load data in delta mode .    
    How we can set our Update mode(LBWE setting) in PD server ?
    Is LBWE  T.Code authorisation required in ECC PD server to make the setting of Update mode   or   We have to set all  Job Control Paramater in Dev System at the time of transport the datasource request to ECC production .  Is our time which is set in job control of  ECC development  will be reflected in ECC production ?
    can any body tell me about how to make setting for delta extraction in Production system .
    Thanks ...

    Hi,
    How do you load the data in the development system?
    - you set up the update mode in the infopackage. There you must customize "Initialization"
    - you have to filled the setup table in the production system without laoding the data in the BW? then this step was for nothing. Filling the setup table and do the INIT in the BW, this must be together - during no changing will be done in your R/3 SD.
    Sven

  • Importing Program from Production System to DEV and QAS.

    Hi All,
    I have 3 Systems in my Landscape.
    DEV-> QAS-> PRD
    One of my Z program is running in the Production system.
    This Z program is got deleted in the DEV and QAS.
    How can I import the Program from Production System to QAS and DEV.
    Regards,
    Viji.

    hi Vijaya laxmi,
    you can goto Production system ---> SE38/ SA38 and copy the program and create the same in program using SE38 in Development system  and then transport it to Quality system.
    You can also Re-Import the Request from Production to Dev system.
    Thanks,
    Nelson
    Edited by: Nelson karunakar on Sep 18, 2008 7:15 AM

  • Issue whilel transporting from production system to quality system

    Hi All,
        I am facing issue in process chain when I transport it from production system to quality system. Process chain is related to deleting PSA logs. When transported to quality system object_type and object_name fields in display variant becomes blank. In production system it is showing 8ZXXX_CA, it should become 8ZXXX_HA in quality system.
       Thanks for your help.
    Regards,
    Shankar

    Hi,
        sorry it was frm dev system to quality system, not prod to quality.
    Regards,
    Shankar

  • How to transport CU02 objects from one system to another?

    Hi,
    How to transport CU02 objects from one system (Development) to another (Quality)?

    You need to set up the object dependency IDOC in the partner profile.Message type is KNOMAS. The transaction to send is CLD2.

  • Is it possible to transport an object from Production to DEV?

    I have some queries and workbooks in Production that I would like to archive.  I have not been able to find a method to archive, so I am wondering if I can transport the queries and workbooks from Production to DEV?  I realize the queries may not execute, but so long as I can open them up and see their definitions in DEV, I will be satisfied.
    I know this sounds a little bizarre, but is it possible to transport anything from Production to DEV?
    Thanks!

    hi
    Yes. its possible but its not recom
    you can set in production system to allow changes to obj rsa1->transport connection->click 'object changeability', and look for object type , and set to changeable.
    pls refer these below posts
    transport a query backwards, from production to development
    Re: Transporting Process Chains from Production DOWN to QA and Dev
    assign points if useful.....
    Shreya

  • Create test env from production system

    Hi,
    Please sorry,
    I am new in this area of Oracle Applications 11.5.10 and I need help in couple of questions.
    We have production system with Oracle Applications 11.5.10, APPS tier on 32bit Red Hat Linux EE 4 server, and 10.2.0.3 DB tier on 64bit Red Hat Linux EE 4 server.
    We get the 2 new servers for test Oracle Applications 11.5.10 environment with same versions of OS like production.
    First test 32bit for APPS,
    Second test 64bit for DB tier.
    Now we need to create test environment, same like production.
    Questions>
    1) What is the best way to create same env in this situation (32bit app tier, 64bit database tier). I suppose that cloning using rapid clone procedure isn't possible on this clear machines.
    2) If I need to install Oracle Applications 11.5.10 software first on both machines, is it possible to use 32bit rapidwiz installer (existing in stage) to create test db tier on this 64bit node, or not.
    I have read in the document Oracle Applications 11.5.10 - Installation Update Notes for Linux x86
    You can only install Oracle Applications on an x86-64 architecture server if the operating system is 32-bit Linux or Windows. If your operating system is 64-bit, contact your operating system vendor to obtain a 32-bit operating system before installing Oracle Applications.
    3) How to now from which stage production is created. When I try to create the stage for my test environment using perl command perl /mnt/cdrom/Disk1/rapidwiz/adautostg.pl
    I get these options:
    1 - to choose Oracle Applications
    2 - to choose Oracle Applications with NLS
    3 - to choose Oracle Database technology stack (RDBMS)
    4 - to choose Oracle Applications database (Databases)
    5 - to choose Oracle Applications technology stack (Tools)
    6 - to choose APPL_TOP
    7 - to choose National Language Support (NLS) Languages
    Because I haven't seen directory oraNLS is this 1 good choose for stage.
    Thanks, and sorry because I am new in this area.
    Regards
    Edited by: user12009428 on Sep 30, 2010 12:12 PM

    Hi,
    1) What is the best way to create same env in this situation (32bit app tier, 64bit database tier). I suppose that cloning using rapid clone procedure isn't possible on this clear machines. Use Rapid Clone.
    Rapid Clone Documentation Resources, Release 11i and 12 [ID 799735.1]
    FAQ: Cloning Oracle Applications Release 11i [ID 216664.1]
    2) If I need to install Oracle Applications 11.5.10 software first on both machines, is it possible to use 32bit rapidwiz installer (existing in stage) to create test db tier on this 64bit node, or not.Type "linux32 bash" -- See this thread for details.
    How to install 11i on Red Hat Linux 64 bit
    Re: How to install 11i on Red Hat Linux 64 bit
    You can only install Oracle Applications on an x86-64 architecture server if the operating system is 32-bit Linux or Windows. If your operating system is 64-bit, contact your operating system vendor to obtain a 32-bit operating system before installing Oracle Applications. What is the database version?
    To migrate the database from 32-bit to 64-bit you need to follow the steps in these docs (depends on your version).
    Using Oracle Applications with a Split Configuration Database Tier on Oracle 9i Release 2 [ID 304489.1]
    Using Oracle Applications with a Split Configuration Database Tier on Oracle 10g Release 2 [ID 369693.1]
    Using Oracle EBS with a Split Configuration Database Tier on 11gR2 [ID 946413.1]
    3) How to now from which stage production is created. When I try to create the stage for my test environment using perl command perl /mnt/cdrom/Disk1/rapidwiz/adautostg.pl
    I get these options:
    1 - to choose Oracle Applications
    2 - to choose Oracle Applications with NLS
    3 - to choose Oracle Database technology stack (RDBMS)
    4 - to choose Oracle Applications database (Databases)
    5 - to choose Oracle Applications technology stack (Tools)
    6 - to choose APPL_TOP
    7 - to choose National Language Support (NLS) Languages
    Because I haven't seen directory oraNLS is this 1 good choose for stage.oraNLS is only required when you want to install additional languages in addition the base English one. If you have no installed languages you can skip this one.
    Please run md5sum as per (MD5 Checksums for 11i10.2 Rapid Install Media [ID 316843.1]) to verify the integrity of the stage area directory before you run Rapid Install.
    Thanks,
    Hussein

  • How to download hierarchy from production system & recreate it development.

    Hi Gurus,
    I am working on a requirement where the updated hierarchy is present in production system & I have to create the same hierarchy with the same data in development system.
    Could you please suggest me the best way to download the same hierarchy in a file from production & create it in development system with the same data.
    Thanks & Regards
    Mayank Tyagi

    it is solved now!!!!!
    Thanks alott....

  • Maintain (SMARTFORMS) objects in production system

    Hi,
    I need to maintain special objects directly on the production system although the system is declared as non-changeable. Is there a chance to customize this without a modification? I need it to be able to maintain smartforms text-modules.
    any help is highly appreciated
    thanks in advance and regards
    Gabriel

    Hi Gabriel,
    No it is not possible.
    Regards.
    Ruchit.

  • Transporting objects from Development System to Testing,Quality and Produtn

    Hi Experts,
    We have developed one scenario in our project in Development System.
    Now we need to transport the same to Testing System and test it there and then transport to Quality system and after that to production system.
    Can any one let me know what are all the steps required for transporting like
    1) like wat are all the SLD changes to be done.
    2) Do I need to create all the SLD settings of development in testing and Quality as well.
    Also please let me know if there are any other things other than SLD settings.
    Regards,
    Pruthvi

    Hi Pruthvi,
    >But I didnt get a clear idea of what exactly needs to be done.
    Please explain kindly what exactly you are missing or did not understand. If you just want to have an overview please read: [SAP help: Transporting XI Objects|http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/content.htm]
    Regards,
    Udo

  • Reverse Transport of object from Production to either Dev / Staging

    Hi All
    I have to modify one object (report writer - group F030) but the problem is that the object in Production does not match with that in Dev / Staging, I just want to know whether the object in Production can be transported in Dev / Staging so that I can modify it there and transport back to Production. Our basis expert is saying this is not possible and the transport route is one way?????
    Thanks
    Sameer

    It is not possible and your basis expert is correct. Please see if you can just change the development object to match production first and then make the changes that you now want to apply.
    I haven't worked on report writer, but check if there is version management and if you can do a version compare between production and development. Find the version that matches production, activate that version and then make the changes.

  • How to create a transport for queries from production system

    We have a situation where the production client has been open during cutover and a user has modified queries which were previously transported into production from our development system. We now wish to 'synchronise' our systems so production can be closed (although we will use the changeability options to allow maintenance of local queries).
    Does anyone have experience of this problem? What is the best way of exporting the queries in such a way that we can import them into our development and quality systems?
    As ever, any suggestions will be gratefully received.

    Hi,
    In similar situation, we opted for manual modifications in the Dev. We made the changes in the queries as they were in Prod and then transported them from Dev to Q and then to Prod.
    This is how generally it is done.
    Regards,
    Yogesh

  • Access abap object  from external system

    In R/3 have a Business Objects how can I access this object, for example Workflow BO, from java (external system) using XI????
    My goal is create workflow´s in r/3 sending as input the workflow characteristics and then create the workflow in R/3 and sending as output the idworkflow was creatde.
    thanks in advanced.

    Dear Murali,
    Try this
    a)Start transaction SXI_CACHE.
    b)From the context menu XI Runtime Cache select Start Complete Cache Refresh.
    If you still face issue try this .
    Many actions require to access System Landscape Directory content from the Integration Builder. To optimize performance, this content is loaded into a cache so that the System Landscape Directory does not have to be accessed directly each time that System Landscape Directory content is required.
    However, this cache is not automatically updated if changes are made to the content of the System Landscape Directory. For this reason that we delete the System Landscape Directory cache if changes have been made to content in the System Landscape Directory. The cache is then filled each time that the System Landscape Directory is accessed. If we log on to the Integration Builder after we have made a change in the SLD, we do not need to delete the SLD cache.
    To clear the SLD cache, from the Integration Builder main menu, choose Environment ® Delete Cache for SLD Data.
    Once we have deleted the cache for SLD data, accessing objects in the SLD may take longer than usual initially.
    Regards
    Agasthuri Doss

Maybe you are looking for

  • Hide Repeated Key Values Setting Not Saved

    Hi Experts, We are working on BI7. Currently we are changing the Query Properties to display Repeated Key Values. However, whenever we execute the reports, all repeated key values are still hidden. When we return to BEx Designer, the setting is rever

  • AIR 2.6: Run external programs sequential (1 by 1)?

    Hi, I managed to run an external program in Adobe AIR (2.6). I'm using the NativeProcess for this. I would like to perform the following actions. Pseudo-code: execute program.exe this will return a port number set the port number as an environment va

  • Red light on 9300 keeps on blinking

    hello everyone , am having a problem with my 9300, the red led light keeps on blinking , even though there is nothing on screen. any help will be highly appreciated. i also want to instal again the os on my mobile any guidance please.

  • Catalyst 4506 and Modules in Pwr Over state

    Hello, First of all, my excuses for my bad english. I am experiencing a problem with a Cisco Catalyst 4506. The switch is filled with 48 port PoE blades (WS-X4248-RJ45V). The error we receive is: Sept 5 15:40:12: %C4K_IOSMODPORTMAN-4-INLINEPOWEROVERW

  • ITunes 11, Mac, Einstellung unterbrechungsfreie Alben, wo?

    Ich habe gerade ein Live Album im iTunes Store erstanden. Beim Abspielen sind die Titel unterbrochen, Das geht ja garnicht!! In Version 10 gab es unter "Info" im Reiter "Optionen" eine Möglichkeit die ausgewählten Titel als unterbrechungsfreies Ablum