Dependent requirements in pp module

I am new to pp and leaning PP module. following terms and concept I am not able to understand
1. what we mean by dependent requirements?
2. what we mean by independent requirements?
3. what we mean by  net  requirements?
4. what we mean by total  requirements?
5. what we mean by unplanned requirements?
please explain in layman terminology. I am not able to understand definitions given by sap.
Edited by: kavita reddy on Mar 2, 2010 11:35 AM
Edited by: kavita reddy on Mar 2, 2010 11:35 AM

Hi,
To put it in simple words consider the following examples:
in a car manufacturing company, lets say Swift:
The sales department forecast the sales for swift which is sent to the production depaertment.
This requirement for the finished product is called Independent Req.
Now based on this dependent req, you will have to have the other material like tyres, engines etc.
This engine, tyres etc are forecasted based on the dependent req.
This are called Dependent Req.
Net Req: Lets say your total Dependent Req for tyres is 100 tyres, and you have 20 in stock, so 80 will become your net req.
Regards
Vinod
Edited by: Vinod Mohan on Mar 2, 2010 4:50 PM

Similar Messages

  • Function module to find out dependent requirements

    Hello Experts,
    Any function module to determine the dependent requirements for process order...
    Pls let me know.
    Regards.

    use the following FM
    MD_STOCK_REQUIREMENTS_LIST_API
    give material no and  plant and following\
    DISPLAY_LIST_MDPSX = X
    DISPLAY_LIST_MDEZX =  X
    DISPLAY_LIST_MDSUX =  x
    o/p
    MDPSX filter for the values of here DELKZ(MRP element indicator) = AR
    you will get all depnedent reservation from process order.

  • Need a Pegging module for dependent requirements.

    Hi
    Need a Pegging functional module for dependent requirements.
    There is MD_PEGGING_NODIALOG ,where we need to pass the planned order number.
    Please advise how to get the pegged requirements for dependent requirements or other MRP elements other than planned order.
    Thanks
    Prasad

    Hello,
    Function module MD_PEGGING_NODIALOG works with data structures of MRP list or current requirements/stock list. For a given material, you first need to fetch the relevant structures by the help of following FMs; BAPI_MATERIAL_MRP_LIST and BAPI_MATERIAL_STOCK_REQ_LIST. You can loop at the structures exported by these FMs and run MD_PEGGING_NODIALOG with the corresponding parameters of the MRP element you require. You can run MD_PEGGING_NODIALOG with any MRP element you like as in MD04 and MD05 transactions.
    Regards.

  • MRP: how to segregate the planned orders by dependent requirements

    Hello SAP Guru's,
    I would like to know if this is possible to make the MRP work is this way:
    - generate global planned orders (by date) for several dependent requirements, for inhouse production;
    - AND generate individual planned orders for each dependent requirement, for external procurement;
    For the moment, it is grouping the quantities of all the dependent requirements to generate a unique planned order by date.
    But we would like to get separate planned orders for each dependent requirements that are externally procured.
    Do you think it is possible to do so? and if yes, how?
    Thanks in advance for your help on this subject.
    Regards,
    Rudy

    In MD04 the demand n supply that is seen is considered as plant segment. In some cases when you plan demand n supply for a given storage location separately it is called as SLoc segment, also if you're working with MRP areas then its called mrp area segment, likewise for project & sales order.
    In short it is just a way MRP would do its planning. In normal cases, the demand n supply is in plant segment, so in this segment the least resolution that you can work with is a day, so all demand on a given day is clubbed together and a supply proposal is made (depending on the lot size).
    If you want further split on a given day, then MRP needs some way to identify the difference & this is provided by the special stock segment such as project segment. To see how it works, if you're working with PS module, ask your PS colleague to create a demand for the material from different projects for a given day. Then in MD04 you will see each project demand show up in different segment & when you run MRP, you will see the results.
    I guess more than me writing quite a lot out here, a simple test at your end should help clarify... good luck

  • Technical data for planned order dependent requirements .

    Dear All,
                  I have to call the dependent requirements created by MRP run in my report. Can anyone please tell me that where these dependent requirements are stored in the database or is there any function module to get these values?
    Thanks.

    Dear,
    RESB Reservation/Dependent Requirements Link with PBED for FG and SFG releation. Function module MD_STOCK_REQUIREMENTS_LIST_API
    Also refer this link,
    Dependent Requirements report required
    Regards,
    R.Brahmankar

  • Package requiring certain perl modules

    I just recently installed UT on my system, and found that the sourceforge project UmodPack is probably the best way to get Umod files installed. Since I'm taking an interest in making packages of software I install if I can't find it in the repos, I wanted to package this up, maybe submit it to AUR too.  However, the install requires certain perl modules to be installed from CPAN.
    From the INSTALL file:
    UmodPack requires/makes use of:
    * Perl 5 (required)
    * Tie::IxHash (required, for .ini file access)
    * Archive::Zip and Compress::Zlib (required, for zip file support)
    * Perl/Tk (optional, for the GUI)
    UNIX
    To install Perl/Tk first use "perl -MCPAN -e shell" to get into the CPAN
    shell;  and then enter "install Tie::IxHash", "install Data::Dumper",
    "install Compress::Zlib", "install Archive::Zip" and then "install Tk".
    To install UmodPack change to the directory in which the distribution
    files are unpacked.  Type "perl Makefile.PL" and then "make install".
    I am not sure how to automate this installation of perl modules within a PKGBUILD.  Does anyone have an idea as to how I would accomplish it?

    For all of the perl modules I need to install, this was sufficient to put in the build{}:
    perl Makefile.PL
    make || return 1
    make PREFIX=$startdir/pkg/usr SITEPREFIX=$startdir/pkg/usr install
    An example PKGBUILD:
    pkgname=perl-term-animation
    pkgver=2.1
    pkgrel=1
    pkgdesc="Module that provides a framework to produce sprite animations using ASCII art."
    url="http://search.cpan.org/~kbaucom/Term-Animation-$pkgver/lib/Term/Animation.pm"
    depends=('perl-curses')
    source="http://search.cpan.org/CPAN/authors/id/K/KB/KBAUCOM/Term-Animation-$pkgver.tar.gz"
    md5sums=('8bfb8225be9318f95e0b1e1718da9691')
    build() {
    cd $startdir/src/Term-Animation-$pkgver
    perl Makefile.PL
    make || return 1
    make PREFIX=$startdir/pkg/usr SITEPREFIX=$startdir/pkg/usr install

  • Deletion of (simulative) dependent requirements.

    Hello,
    I am trying to findout a BAPI (or function module) for the deletion of dependent requirements and also for simulative dependent requirements. Do you know if exists any?
    Or maybe can you tell me if I can simply delete (by DELETE statement) entries from tables RESB (depend.reqts) and MDSM (simul.depend.rqts), without having a risk of inconsistencies in the databases?
    Thanks in advance for your advice.
    Regards,
    Rudy

    Finally, I found on another post that it is not possible to change/delete dependent requirements (or simulative requirements) by a normal transaction or a normal BAPI.
    The dependent requirements do correspond to planned order and that's it...
    So, if I want to get rid of some old dependent requirements, I have to get rid of their originating planned orders.
    The same has to be applied for simulative requirements and simulative planned orders.
    The BAPI I will use for planned order deletion is: BAPI_PLANNEDORDER_DELETE.
    It works for normal planned orders and simulative ones too.
    Thanks anyway for your help.
    Regards,
    Rudy

  • NPROC:Dependent requirement not getting generated

    Hi Experts,
    We have an issue wherein we have Depedent requirement for a HALB material against FERT material requirement.But, the MD04 screen of HALB material doesn't show any Dependent requirement.
    Infact, the MD04 screen of the FERT material shows NROC in the MRP element data for the given period.
    NROC: It means that there are some errorneous components which were created by doing GR before a GI.
    I had tried executing MF47 transaction(which is COGI equivalanet in REM scenario) for clearing the errorneous components.But, i got the error as "Deficit of BA Unrestricted use". So,it means that it shall use my current stock for post processing the error componenets, which ideally shouldn't been the case as the stock was already consumed.
    Then, i found out that the BOM of FERT was not maintained.
    So,just wanna know that coz BOM of FERT is not maintained & the HALB needs to be defined as a component in the BOM of FERT in this case?
    or any other solution is there so that Depedent requirement for the HALB material reflects in MD04 screen.
    What we want: The recurring NPROC requirement which is coming for the year 2009, 2010 should permanently vanish from MD04 screen.
    Thanks,
    Rishi
    Edited by: Rishi. N. Khanduri on Jan 28, 2010 3:08 PM

    Harendra,
    Are you using "NETPL" as processing key for MD02? After 3 or 4 days is the dependent requirment getting created automatically or is it after MRP run again?
    Please provide more details,
    Regards,
    Prasobh

  • Dependent Requirements Planning

    Hey Gurus,
    I have a situation in which I have two materials that are planned with Independent requirements but also have dependent requirements against them.  these two materials are 6001116 and 6001771.  I have set the MIXED MRP indicator to "1", planning strategy "40" and MRP Dep. requirements as "1".
    6001116 is not planning the dependent requirements and is only being planned by the independent requirements.  6001771 is planing both the dependent requiremnets and the independent requirements even though I have set the MRP Dep. requirements to "1".  The only difference between these two materials is that 6001116, is a made in house product and the 6001771 is a purchased product. 
    I can't think if anything else that would control this to put me in this situation.  Do you guys have any ideas for me or things that I should check to make sure that this is working correctly?  I thought it was only the Dep requirements indicator that controlled the planning of independent reqs.

    Dear,
    You donot want dependent requirements
    to be created" for your components when MRP is run
    There are three Options:
    First Option:
    For the all respective components in MRP 4 view Input "1" for MRP Dep.Reqts
    Second Option:
    In the Basic Data 1 view maintain the X-Plant Matl Status maintain "01"(Blocked for Procurement/Whse)
    Third option,
    You can set the MRP type in material master as 'ND' (not planned) (MM02 > MRP1)
    Then Planned orders/Purchase requistions will not be created for the components
    Regards,
    R.Brahmankar

  • Planning of Dependent Requirements for BOM Components in Make to Order scen

    Hi Friends - I want to execute a full cycle Make to Stock Scenario with Materials planning using MRP.
    The scenario will include BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    To execute this I have done the following
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - NORM, and General Item Category group as NORM
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6. Now created a standard sales order for the product.
    7. Executed the MD50 for the Sales Order Item.
    Now where do I find the BOM components for this material in the Sales Order?
    After executing the planning Run MD50 I am only getting the requirements for Product only. I can't see any dependent requirements for the BOM components.
    How do I make sure that the BOM components are also planned while the product is planned?
    I have checked the component Stock Requirement List - there are no requirements generated from the Sales Order Product BOM.
    Pls help me on this. How to do this so that the raw material components are also planned?
    Thanks
    Purnendu

    Hi Dhaval, Sandeep, Ashok - Thanks a lot for your replies.
    I have checked the Planned Order Created through Planning Run.
    If I click on the Components Tab I am getting following message
    No material components were determined
    Message no. 61027
    Diagnosis
    Until now, no BOM explosion has been carried out or no BOM has been created for this material yet.
    Procedure
    Either explode the bill of material for this material, or
    create the components manually by processing the planned order in change mode.
    If I try to explode the BOM through Header Menu - Edit> Explode BOM
    I am getting the same message.
    If I click on the Bill of Material Tab - I am getting the same above messge.
    Ashok - I have tried both the Selection Method -
    Nil - Selection by Order Quant.
    1 - Selection by Explosion Date
    But with no effect.
    Waiting for your advice.
    Thanks and warm regards
    Purnendu

  • MRP Planned order generation for Order reservation excluding Dependent Requirements

    In our Project we have a requirement like for FG stage & SFG1 stage are M.T.O So after sales order are punched through  MD50 we have created Planned orders against sales orders,But dependent stages like SFG2 & SFG3 which are pure M.T.S so only Dependent requirements will get generated.Suppose for SFG1 i have partially converted planned order to Production order then for component SFG2 we get Partial Quantity as order reservation.Now requirement is if i run MRP for SFG2 system need to generate demand only for order reservation excluding Dependent requirements.Is there any possibility where we can generate demand only for order reservation.As system will create Planned order for SFG2=Dependent requirement + Order reservation

    Hi Uli,
    Suppose i have Sales order--100 kgs for FG
    B.O.M levels
    1.FG-----M.T.O
    2.SFG1---M.T.O
    3.SFG2---M.T.S
    4.SFG3---M.T.S
    5.ROH
    So if i run MRP via MD50 system would generate planned orders for FG & SFG1 level as they are M.T.O specific
    Now my requirement list would be
    FG-100kg planned order
    SFG1-100kg planned order
    SFG2-100kg dependent requirement.
    Now suppose i have partially converted SFG1 planned order to production order
    SFG1--100kg planned order to 30 kg production order
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-70kg dependent requirement & 30kg order reservation.
    Here my requirement is if i run MRP for SFG2 in MD02 as these stage is M.T.S system should provide 30 kg planned order & if we see down the line it would be like
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-30kg planned order & 70kg dependent requirement.
    SFG3-30kg planned order
    ROH-30kg Purchase req
    Client requirement is like these..

  • Dont want dependent requirement after MRP

    hi all
    I dont want dependent requirement after MRP?
    means A is a header material and B.C are the component
    after MRP run system should be created requirement of component item.
    so wht r setting  required?
    plz guide me

    Hi,
    First you ask how can you carry out settings not to get DepReq for your components than you say system should create requirements for your components.
    Please give a clearer picture of your situation and make your question more clearer.
    How do you procure your goods (if you do not use MRP)?
    If you do not want DepReq for your goods you can:
    - remove them from the BOM (use them as text item, use design BOM - I do not know your situatio)
    - you can set the MRP type in material master as 'ND' (not planned) (MM02 > MRP1)
    Please give more information.
    Thanks,
    Csaba

  • Bom Explosion/Dependent requirement

    Dear Gurus,
    In Material Master in MRP4 view there is one field under Bom Explosion/Dependent requirement individual/coll. when we select indicator 1 it generates requirements individually and when we assign indicator as 2 system cumulate the requirement,but if we keep that field blank i.e. individual and collective requirement how system decide the priority for individual and collective requirement.How system behaves in that condition.
    With Regards.

    I am asking about ROH BOM components.
    Dear ,
        Yes I know, If you maintain collective indicator for header material, IF the ROH as blank in indiv/collective indicator, ROh material behave like collective reqmt
    If you maintain individual indicator for header material, IF the ROH as blank in indiv/collective indicator, ROH material behave like individual reqmt

  • BOM Explosion/dependant requirements

    Dear All,
    I have a concern regarding the "MRP 4" view in MM.
    BOM/Explosion
    Individual / Collective requirements
    "MRP 3" view
    Availability Check
    Availability Check (Daily / Individual)
    I would like to know the effect of these settings clearly with an example please.
    Thank you in advance

    Hi,
    1. The Individual Collective indicator 1/2 indicates how to club the dependent requirements either Individula Processing or Collective Processing.
    This is generally used in MTO Scenario.
    Here, For eg., you have 2 FERT Materials, in that 1 component say xyz is same.
    If you want to club the requiremnts for for xyz for both the sales orders then you need to select 2.
    By defult system will create PurReq for xyz as Sales Order/Customer Specific.
    2. Now the Availability check:
    Specifies whether and how the system checks availability and generates requirements for materials planning.
    The availability check can be carried out in MRP for the depedendent requirements. This means that the availability check can directly check whether sufficient material is available for the production of the assembly. The availability check is initiated from planned order processing. It is not carried out automatically in the planning run for each requirement of an assembly.
    Checking Group and Checking Rule clubbed together forms the Checking control..
    Hope this helps..
    Regards,
    Siva

  • Dependent requirements

    Dear friends,
    For example I am having a Sales order for 20 items. Due to some constrains, at a time I can not produce more than 1 item. So I am creating a production order for 1 item with reference to a sales order (using CO08).
    My problem is while running MRP, system is creating the dependent requirements for all the 20items. So I want to run MRP for the production order (like MD50 for sales order). Otherwise my MRP run should not consider the Sales orders for the dependent requirements calculation.
    Dependent requirements for all the 20 items is creating a big confusion. My scenario is pure MTO. Down the line all the production is for the respective sales order only.
    Please suggest me...
    Regards.

    Hi Kodand Nag,
    Please explain your scenario once again, I get confused little bit, 
    What I understood from your last reply, u have created sale order  with order qty is 20 nos for one material. (I assume).
    Then u have created prod order for one Nos (Partially – since is capacity constraint) with reference to sale order.(CO08).
    In MTO, system consider the sale order to create dependent requirements for dependent  material.
      Here u want system to consider production order not sale order requirements  – This is not possible.
    My solution is since u have converted partially qty as Production order, order reservations should have created for dependent material, if u run the MRP for dependent material (Next one below the header material) , sale order requirements is not taken into the account only production order req. I hope i am not mistaken, else please comeback.
    Regards
    Pradeep

Maybe you are looking for

  • Help with queries in a JSP to MS Access DB

    I'm trying to use a JSP to query an MS Access database: If I create the following query in MS Access it works no problem: SELECT * FROM EMPLOYEE_VACATION WHERE Department="Laboratory"; If I try to duplicate the query in my JSP as shown below: ResultS

  • How copy/paste layers with frame animations?

    I have a movie clip (mc1) with 6 layers (under 1 mask) and some tweens. (It's just a continuous transition of pictures.) I have another movie clip (mc2) that is the same layout (different layers.) I want to combine the 2 into 1 movie clip. I tried to

  • Workspace login problem

    HI, Hyperion 11.1.1.3 Windows Server 2003 EE IE 7 http://windows2003:19000/workspace/index.jsp enter the default username: admin and password: password and get message "You must supply a valid User Name and Password to log onto the system" Here is th

  • HT2736 How can I gift a single song (i.e. not the whole album) to a friend?

    How can I gift a single song (i.e. not the whole album) to a friend?

  • HTTP-404 No DAD configuration found or no default home page

    Hi, No EBS login page was available this morning but all services appeared to be online as usual. I restarted Apps Tier and could then see login page. Now I have to find out what happened. There is nothing in the db log file, the listener log, the cc