All,
Has anyone set up configuration to determine a warehouse management door for goods receipt when there is no inbound delivery? I wish to utilize door to assist in queue determination and I am unable to find the right settings for door determination on goods receipt.
Thank you,
Sandy
For making the Inbound delivery as required for processing a goods recipt, you need to use the confirmation control key in the PO.
The ASN from the Vendor vvia EDI will post as an Inbound delivery in the PO.
In the configuartion of the confirmation control key maintain the Confirmation sequence with Inbound Delivery and mark it as GR relevant and GR assignment.
SPRO - IMG - MM- Purchasing - Confimrations - Set up confimrmation control.
This setting will ensure that GR does not happen without an IBD
Similar Messages
-
Open delivery for goods receipt via RF
I am trying to do a good recepit through the RF menu. Once I click on the goods receipt , it takes me to the screen which asks for PO/delivery #, Material # and quantity.
When I enter in the PO, mat # and Qty , it gives me the error message "No Open Delivery"
So I went through the RF screen overview documentation which also says that "Material must exist in the order and in the open delivery"
Can anyone please explain what this means and how can I create an open delivery?
Thanks1) you need to create custom RF Tcode where you can design a screen to enter the batch and update it.
2) Serial number is at IM level, if you want to trace it at the WM level then you need to go for custom program.( In standard it is not possible to track serial number at bin level)
3) try doing research on LM71, LM72, LM73, LM74. LM76.
4) There is not standard RF tcode to create TO, you need develop a custom Tcode.
You need to sit with business to design the screens of this Tcode( mandatory field would be material, source storage, bin, destination storage, bin, SUT, )
you can call function module L_TO_CREATE_SINGLE) -
About multipe good receipts via MIGO
Hello,
I would like that my purchase order is delivered only once via MIGO,
Knowing that Overdelivery tolerance limit is unilimited and Delivery Completed Indicator is cheked. You know how to make PLEASE.
Best regards.
MRIn my knowledge, there is no control in MM like "No partial deliveries allowed" etc like for SD. In short, in standard SAP, GR allows partial deliveries. Onlyway, I could see is "user exit" approach. However, another way if 101 quantity should not allow "Changeability" globally (for all plants across globe in your project), I can suggest a solution via mvt type tables.....
Regards -
Attach document while Goods receipt in MIGO
Hi,
Can I attach a word or a pdf document while posting Goods receipt via MIGO.
In 'Service for Object' the option store document is not possible. It is grey out.
Do I need to do some settings to get this option so as to upload a file while posting the GR.
I am able to get the option while create/change PO but not in MIGO.
RegardsHi!
To attach business documents in MIGO you have to do a little bit customizing first...
In OAC0 check if a content repository is available.
In OAC2 enter the document type you want to attach
In OAC3 enter object type BUS2017 with your document type, content repository etc.
You can attach documents only after the posting because until then SAP has no fix document number which is the key/link to the document. So display the posted material document again and then you can attach the business document.
Greeting -
Automatic and manual batch determination at the time of Goods receipt
hi,
where i can have the settings for automatic and manual batch determination at the time of Goods receipt and goods issue..
E.g.: If i am receiving material from vendor then my requirement is system will generate batch automatically...
Where we can get this setting?
Tx
UtsDear,
You assign the batch number either
Manually
Automatically, using internal batch number assignment, refer to Customizing for Batch Management under Internal batch number assignment.
Internal batch number assignment is activated for the complete client, unless you exempt individual plants or materials using a customer exit (see Configure customer exits for intern. batch number assignment in Customizing for Batch Management).
The R/3 System informs you that the internal batch number assignment is active. You are however only informed once per transaction, for example, when you enter the first item on the multiple-entry screen.
Please refer: http://help.sap.com/saphelp_45b/helpdata/en/25/283cb44f7811d18a150000e816ae6e/frameset.htm
Regards,
Syed Hussain. -
Transfer Requirement for Goods Receipt Item
Hi All,
We are trying to create Transfer Order for Goods Receipt items using an ITS mobile application.We are using the function module L_TO_CREATE_TR to create Transfer Order by passing the Transfer Requirement from the Goods Receipt as an input to the function module. Our requirement is to create one Transfer Orde per Goods Receipt item. We need to create Transfer Order for the items simulatneously from different terminals.Since we have only one Transfer Requirement for the entire Goods Receipt document, we are not able to create Transfer Orders simultaneously because of the system lock (Transfer Requirement is locked).
Is it possible to create separate Transfer Rquirement for the individual items in the Goods Receipt via customizing/User exit.
Your guidance in this regard will be great help for us.
Regards,
ShajuHi Dirk,
Thank you for your reply.
Our enduser will be using handheld device for Transfer Order creation. The user will pick the GR item material from one storage type (902) and the Transfer Requirement will be locked at this moment.Later while placing the SU in destination bin the user will scan the destination bin and the Transfer Order will be created at the time of scanning. Till the completion of the entire process the Transfer Requirement will be locked and no one else can pick the materials of the same GR from 902 storage type.
We are trying to create Transfer Requirements for each Goods Receipt Item and we are not able to find any user exit in Goods Receipt Creation or any customizing option.
Can you please check and help us to resolve the same.
Regards,
Shaju
Edited by: shaju tv on Apr 5, 2010 11:40 AM -
Hello Gurus,
There is a Business requirement to have a separate print forms for every Inventory transactions like Goods Receipt, Goods Issue, Stock Transfer, Sub-Contracting Transfer Posting, Consignment Transfer Posting, etc.
We need to use the Transaction MB90 to print all the Inventory documents.
While checking the Output types, we find that basically WE03 is for Goods Receipt (Collective Slips) & WA03 is for Goods Issue / Transfer postings (Collective Slip)
I would like to know that inorder to assign a different Smart Form & Program (One for each of the transactions listed above) to the output types, is there a way around to work with these 2 Output types & have the 5 different Smart Forms - Programs assigned to these 2 Output types or do I need to create a copy of these output types & use them instead, one output type for each Smart form - Print program combination
Regards,
Zafar.First, you can maintain <B>PRINT ID</B> in the IMG for each movement type<BR>
Second, you can create multiple <B>OUTPUT TYPE</B> - one for each.
Third, in MN21, create ouotput records using a combination of <B>OUTPUT TYPE</B> and <B>PRINT ID</B>
<br>
Example:
GR movement types 101, 105, etc, you can have <B>PRINT ID</B> 1 and <B>OUTPUT TYPE</B> Z001
GI movmeent types 201,261, etc. you can have <B>PRINT ID</B> 2 and <B>OUTPUT TYPE</B> Z002
<BR>
Configure <B>PRINT ID</B>: IMG path: <I>Materials Management > Inventory Management and Physical Inventory > Print Control</I><BR><BR>
Configure <B>OUTPUT TYPE</B>: IMG path: <I>Materials Management > Inventory Management and Physical Inventory > Output Determination</I> -
What is the field for good receipts?
hi friends
i got the requirement to create the goods receipts
what is the field for good receipts
plz tell me how to create it
thanks in advance
Edited by: Alvaro Tejada Galindo on Feb 25, 2008 5:33 PMadapt this to your own requirements.
Structures for BAPI
data: gm_header type bapi2017_gm_head_01.
data: gm_code type bapi2017_gm_code.
data: gm_headret type bapi2017_gm_head_ret.
data: gm_item type table of
bapi2017_gm_item_create with header line.
data: gm_return type bapiret2 occurs 0.
data: gm_retmtd type bapi2017_gm_head_ret-mat_doc.
clear: gm_return, gm_retmtd. refresh gm_return.
Setup BAPI header data.
gm_header-pstng_date = sy-datum.
gm_header-doc_date = sy-datum.
gm_code-gm_code = '01'. " MB01
Write 551 movement to table
clear gm_item.
move '101' to gm_item-move_type .
move '000000000040001234' to gm_item-material.
move '1' to gm_item-entry_qnt.
move 'EA' to gm_item-entry_uom.
move '0004' to gm_item-plant.
move '4000' to gm_item-stge_loc.
move '201' to gm_item-move_reas.
Determine cost center per plant
case xresb-werks.
when '0004'.
move '0000041430' to gm_item-costcenter.
when '0006'.
move '0000041630' to gm_item-costcenter.
when '0007'.
move '0000041731' to gm_item-costcenter.
when '0008'.
move '0000041830' to gm_item-costcenter.
endcase.
append gm_item.
Call goods movement BAPI
call function 'BAPI_GOODSMVT_CREATE'
exporting
goodsmvt_header = gm_header
goodsmvt_code = gm_code
importing
goodsmvt_headret = gm_headret
materialdocument = gm_retmtd
tables
goodsmvt_item = gm_item
return = gm_return.
call function 'BAPI_TRANSACTION_COMMIT'
exporting
wait = 'X'. -
Batch Data Capture to do a Goods Receipt via transaction MIGO.
Hi All,
I have a new requirement to perform a Batch Data Capture of a goods receipt via transaction code MIGO.
Currently the BDC approach is not feasible due to the fact that screen configuration is dynamic and may differ at times between different users and user profiles.
Therefore I have tried to use function module 'MIGO_GR_CREATE' instead. However after some initial investigation it has become clear that a material document number that is generated by SAP may not be returned by this function module after successful execution of a "GR".
Therefore does anyone know any function module to use in order to do a "GR" by passing or submitting a purchase order number + purchase order line item number (and possibly a delivery note number) and get back a material document number after successful/complete execution.
Thanks.HI ,
You can use 'BAPI_GOODSMVT_CREATE' to create goods recipt.
Check this code for reference..
MOVE x_purchaseorder TO goods_mvt_tab-ebeln.
MOVE eban-bnfpo TO goods_mvt_tab-ebelp.
MOVE up_tab-feld_12 TO goods_mvt_tab-menge.
MOVE eban-werks TO goods_mvt_tab-werks.
MOVE eban-lgort TO goods_mvt_tab-lgort.
APPEND goods_mvt_tab.
LOOP AT goods_mvt_tab.
MOVE sy-datum TO y_goodsmvt_header-pstng_date.
MOVE goods_mvt_tab-ebeln TO y_goodsmvt_item-po_number.
MOVE goods_mvt_tab-ebelp TO y_goodsmvt_item-po_item.
MOVE '101' TO y_goodsmvt_item-move_type.
MOVE 'B' TO y_goodsmvt_item-mvt_ind.
MOVE goods_mvt_tab-menge TO y_goodsmvt_item-entry_qnt.
* MOVE 'PCE' TO Y_GOODSMVT_ITEM-ENTRY_UOM_ISO.
MOVE 'PC' TO y_goodsmvt_item-entry_uom_iso.
MOVE goods_mvt_tab-werks TO y_goodsmvt_item-plant.
MOVE goods_mvt_tab-lgort TO y_goodsmvt_item-stge_loc.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = y_goodsmvt_header
goodsmvt_code = ls_movement_code
testrun = y_testrun
IMPORTING
materialdocument = y_materialdocument
TABLES
goodsmvt_item = y_goodsmvt_item
return = y_return.
Regards,
Sachin M M -
Standard smartform for Goods receipt slip version 3
Hi all,
I need to copy and modify a smartform for Goods receipt slip.
How do we find out the main program(driver program) for a smartform.
<b>In my case the smartform name is /SMB11/MMGR3_A</b>
Regards,
KaushalI used /SMB11/BL_MMGR1_L in my choice and I then searched programs using /SMB11* until I found something that looked like a match in it's text.
I can only tell you that after configuring via tcode NACE application ME and output type WE03 (because again the text matched what I was wanting to do) with program /SMB40/M07DR it did give me the results I wanted. This is a specific answer and NOT the more general answer you might have really wanted. There is much discussion in forum for that more general question. Personally until SAP sees the wisdom of maintaining a table to make a more direct search key more possible rather than a full SAPSCRIPT, SMARTFORM, PDF search we have some agony to endure.
Now if can you tell me where (table & fields) number of containers found on tabstrip Quantity of tcode MIGO is stored and we can call this even.
GOITEM-ANZGEB is NOT the answer I want to hear as structure names do not count and it is not defined in any structures of the global settings.
Good Luck!!! -
No transfer exists for goods receipt reference(From ECC to SNC )
Hi All,
We are facing one issue in ECC and SNC while transferring Goods Reciept Information to SNC via ECC.
We recieved ASN information from SNC and did Goods Reciept against ASN via Inbound delivery.
Now when we used the report RSMIPROACT to transfer Goods Reciept Information it is giving message
"No transfer exists for goods receipt referenc".
I did all setting like
I ticked check box for Goods Reciept Reference and Delivery03.
Source list is maintained and also Message type STPOD is configured for Logical system.
Please can some one help me in telling me why system is not selecting any PO for transfer of GR information even tough Goods Reciept is done for PO.
OR
Is there anyotherway where we can send the Goods Reciept Information from ECC to SNC
Thanks and Regards
Raghavendra PaiHi Raghavendra ,
Make sure in We20 following setting is required:
Go to your partner type LS (logical system) and create outbound parameter:
Message Type:STPPOD
Receiver Port:<Your port number> which connects to PI from ECC
Transfer IDoc Immed checked with Output mode=2
Basic type:DELVRY03
Checked Cancel Processing After Syntax Error.
No other setting is required in above outbound parameter.
Go to RSMIPROACT report
You need enter following data:
1)Plant
2)MRP area of plant
3)If want for all material then enter * or enter list of materials
4)Enter target system (SNC system)
5)checked only Goods receipt Reference
6)In execution parameter select Update run radio button
7)Log select log complete report
8)IDoc type DELVRY03
Lastly main thing is GR date enter GR date.
When you execute RSMIPROACT report you will get this message "No transfer exists for goods receipt reference" then it will ask whether you want to change your selection click on <b>NO</b>.
Now check whether IDoc is got triggered or not?
Let me know for any clarification.
Thanks,
Nikhil -
Quality Certificate for Goods Receipt - FAIR
Hi Guys,
I’m after some advice with regards to the QM module.
We implemented QM last year to support our incoming inspection process flow.
The following dynamic rules were created via TCODE QDR1
Z01 Inspection Always
Z02 3 Inspections Plus Annual
Z03 One Off Inspection
In the material master we have actived the inspection type 01.
Next steps:
Quality Certificate for Goods Receipt
We would like to set the certification flag to identify that a first article inspection report (FAIR) is required from goods externally procured.
Today all vendors are required to provide a FAIR with the 1st off receipt for a new material or items which have not been delivered for more than 12mths.
Is it possible to set/create much a rule in QM for the 1st del to be flagged certificate required?
My initial thoughts were
1. To setup quality information records for each material + vendor with the certificate “FAIR”.
2. Then create and assign an inspection plan for the first off delivery.
Problems I can see,
1. The certificate is only required for the first delivery regardless if the material requires a 2nd 3rd or 4th del to be inspected
2. How to apply the settings and reset them when a FAIR requirement (Annual)
3. Creation of this rule would have to accommodate the current QM rules not impact?
Has anyone implement certifications in this way or could they suggest a way it could be managed.
Many Thanks
PaulHi Craig,
First thanks for the information on DMR this has solved the problem.
I do have a second question if you could it would be appreciated.
Can you change the QM control key for a PO.
In the material master I've activate QM with control key 0000 no certificate required
After raising a PO a change note is then released under this circumstances the vendors are required to provide a certificate with the PO.
To mange this I would like to change the control key in the PO - I get the error message.
Control key Z001 cannot be used here
Message no. ME554
Diagnosis
You wish to change the control key for quality management in procurement. Only the following changes are allowed:
Set current control key from material
Set existing control key of item 0000
Procedure
Is it possible to change the key at direct in the PO?
Thanks
Paul -
Alert for Goods Receipt Posting?
Dear Folks,
I am now receiving an email whenever I post a goods receipt in my system. Have any of you encountered the same email message or have any idea what is triggering this message? Below is a sample:
from Tan Hui Min <abc@xxxxx>
to Junwen Wee <cde@xxxxx>
date Thu, Apr 22, 2010 at 3:48 PM
subject Alert for Goods Receipt Posting (The triggering application determined you as a recipient)
hide details 3:48 PM (20 hours ago)
Alert ID: ##00139##
Best Regards
JunwenHi,
Check whether you have activated Indicator: Goods Receipt Message in PO and done settings for the same.
"Indicator specifying that the system is to issue an appropriate message to the buyer following each goods receipt in respect of this purchase order."
Regards,
Vikas -
Need a Badi to look the good issue status for prod order before good receipt in MIGO
Hi ,
Need a Badi to look the good issue status for compoents for prod order before good receipt in MIGO.
Example : There are 10 comps need to be issued to production order to make any assy but 6 comps were issued
and remaining 4 comps are not yet issued.,in this situation if I try to do goods receipt for prod order through MIGO.,system should populate the warning
message saying still goods issue are pending for prod order.
Please advise .
Thanks
PrasadHi Prasad,
Before trying with a BAdI, have you tried to control this behaviour thru the Order confirmation parameters (OPK4)?
Note that you can have a termination in case of having problems in the goods movements..
Take a look of this and the SAP help:
Termination of Confirmation if Incorrect Goods Movements
Controls if the confirmation is terminated in the event of incorrect goods
movements.
Use
This enables you to terminate the confirmation in the event of incorrect
items, for example, to prevent postprocessing records.
Dependencies
The indicator is only evaluated if either no process control key or one
process control key has been stored that enbles the goods movements to be posted
in dialog AND for which the "provide error handling for goods movements"
indicator is active. If there are incorrect goods movements, the system behaves
as follows:
A log is issued that gives information on the incorrect goods movements
If these incorrect goods movements are determined by inventory management,
then the option of correcting these errors is offered in the error handling
If the correction is not successful, the confirmation is terminated
Kind Regards,
Mariano -
Shift periods for goods receipt
hi gurus,
can any one help me in shift period for goods receipt,
when iam going to mb1c and posting goods receipt then it shows error that shift periods has to be done, please help me to solve this problem guys thanks in advance.Hi Chakri,
Try transaction MMPV. This is to shift periods for posting in MM. Enter the company code(s) for which you want to shift periods. Then enter the period that has to be opened and the fiscal year.
You can enter the posting date as well. In this case the system will determine the period to be opened, based on this date.
Select one of the radiobuttons. buttons one and three will cause period shifting. button two will only check whether period shifting is possible.
Greetings,
Sjaak van den Berg
Edited by: S. van den Berg on Feb 6, 2008 12:43 PM
Maybe you are looking for
-
I'm trying to change my payment information, yet everyime it asks for my password, I'll enter it but it just keeps asking? And when it finally gets through and I click on payment information, it says my session has timed out. How can I fix this? I've
-
SAP & Crystal reports connectivity
Hi SAP Gurus, I'm facing a problem while connecting ABAP query & infoset from crystal reports. I've installed crystal reports 8.5 and also SAP crystal report enterprise add on. when i want to connect to sap system from crystal reports, it aunthentica
-
Photoshop cs3 on windows xp crashing
Can anyone help w/ this issue. When I open a jpg file, and then open another one, photoshop crashes everytime - whether I drag the file into the workspace or do a file open multiple files. I updated cs3 on the adobe site... <?xml version="1.0" enco
-
Disco Viewer/+/Admin/Desktop errors out with Invalid Username and Password
Hi All, We have set up a demo environment at work to upgrade to R12 with Vision database. Discoverer Admin is patched to this level: 10.1.2.2 (Path#4960210) with EBS patch 5985072. The iAS on linux box which is running Discoverer server is patched wi
-
Weblogic startup issue in eclipse
Hi all, I am using eclipse 3.5 and weblogic 10.3.2v. I tried to setup the weblogic server in eclipse choosing oracle weblog 11gR1 Patchset1 and chose the jdk instead of jrockit. But whenever I try to start the weblogic thru eclipse I get this error -