Difference between sales order schedule line and item level data

Hi All,
Could you please let me know what is the difference between sales order schedule line and item level data?
Thanks,
Ramya

Hi Ramya,
Sales order schedule line contains del date, order qty, rounded qty, confirmed qty, delivery qty, schedule line category, purchase requisition etc.,  ie It contains the full details of sales order data with respect to the scheduled line of delivery.  The total quantity of a sales order item can be subdivided into schedule lines that contain the various subsets with the corresponding delivering dates.
Sales order Item level data contains details of the item in the sales order like material code, net price, net value, UoM, PO details, reason for rejection if any, material group,billing date, plant etc., ie this
contains the full details of item irrespective of scheduled line.
Regards,
R. Senthil Mareeswaran.

Similar Messages

  • Mapping between Sales Order-Schedule-Line and Delivery-item

    Hi together,
    I want to extend the Datasource 2LIS_12_VCITM (Delivery-number, -item, Order-number,-item is available) by Sales Order Schedule Line.
    Could not find any ERP table (VBEP and LIPS allow a mapping only on item level) for the mapping between Sales Order Schedule Line and Delivery item yet. The use of the extractor 2LIS_12_VCSCL for the extention (e.g. infoset) afterwards is no option.
    Thanks for your help in advance!!
    Assign full points!!
    Sven

    Hi Reddy,
    thanks for your answer.
    I know that I have to add this field.. but the problem is, how to fill this field. I don't know how to map the delivery-item with the schedule line-item.

  • What is the difference between sales order with picking and without picking

    hi friends,
    i would like to know what is the difference between sales order with picking and without picking.
    thanks
    skrishnan

    Hello,
    Picking refers to preparing the right quantity and quality of goods for shipping on schedule as required by the customer.
    Once picking is configured, SAP Sd automatically generates picking lists and picking labels which can be tagged to the relevant goods. SAP can be configured to ensure that picked quantity is confirmed before goods are issued. This can be done using transaction code VSTK. In T-code VSTK, picking confirmations can be set, which ensure that goods picked for delivery are in accordance with picking slips.
    Picking thus helps in monitoring each item using the picking status. Picking is normally done in SAP SD by a shipping clerk.
    Prase

  • Manually Enter the Sales Order Schedule Line

    Dear All,
    I have a requirement where Sales Order will be created by Customer Service with Quantity and customer requested delivery date.  Subsequently Planning department will go to the sales order schedule lines and enter manually the delivery date and confirmed quantity (multiple schedule lines) based on the stock/availability.  They also need to do some changes in the shedule line if required.  But when I try, the manually entered schedule lines are disappeared.  Could any one advice how to set this up?
    Thanks,
    Regards,
    Venkat

    Hi Venkat
    A schedule line gets grade out because this has been determined . through schedule line determination. . Now in the shipping data tab you can change the schedule line tab if you want .  manually you can change the request delivery date also. 
    But it is not advisable to change the schedule line because again the affect of availability check will vary.
    But can we know for what purpose you want to change the schedule line when you create the sales order. Any reason .For what purpose you are going for that customization ?For what purpose?
    Regards
    Srinath

  • "difference between sales order and scheduling agreement "

    hi, 
    i want to know difference between sales order and scheduling agreement and where use scheduling agreement & where sales order ?
    please help
    amit

    Hi Amit,
    Its not hard to find this info at help.sap.com
    Sales Order
    Definition: Request from a customer to a company to deliver a defined quantity of products or provide a service at a certain time. The sales area that accepts the inquiry is responsible for completing the agreement.
    Scheduling Agreements
    Purpose
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity. The following graphic shows the document flow for scheduling agreements.
    Integration
    You would use this component if you had outline agreements with the customer that contained future delivery quantities of materials that would be sent at certain times within a fixed time period.
    If you work with scheduling agreements for the component supplier industry you also need to choose the "Electronic Data Interchange" (EDI) component.

  • Link between Prod Order and Sale Order schedule line

    Dear all,
    Ours is a MTO (81).
    In Scheduling Agreement / Sale Order , there are multiple schedule lines for a single item .
    Production Orders are generated for every schedule line of the Item.
    The client wants to know (for a custom developed report) , against which schedule line of the Sched Agreement/ Sale Order, the Production Order is generated ?
    This Information can be seen in MD04.But  I am not able to fetch from the tables .
    The schedule line field (KDEIN ) is not updated in AFPO table & the order no (AUFNR) is not updated in VBEP table .
    Say,
    Sale Doc No : 42000506
    Schedule line/Dely date            Order qty          Prod Order No
    06.10.09                                    500kg               100170
    15.10.09                                    300kg               100171
    Pls give your valuable inputs.
    Regards,
    Sheik

    Hi,
    Only Sales Order No & Sales Order Item No is updated in the table.
    Whereas , I want to know the Sales Order Schedule Line no.
    Regards,
    Sheiki

  • Difference between Sales Order and Stock Transfer Order(STO)

    Hi Gurus,
    What exactly is a diference between Sales Order and STO?
    Thanks and Regards
    Rohit

    Hi,
    Sales Order Stock
    Sales Order Stock are stock with Special Stock type E. It can fall into the usual stock categories such as unrestricted, blocked etc. but "belongs" to a sales order.  For example, you create a sales order for a part and assign a sales item category that generates an individual requisition, the requirement has an account assignment linking it to the sales order schedule line, you convert that requisition to a Purchase Order.
    When you receive the Purchase Order, the stock is placed in sales order stock. It will show against the sales order/sales order line. It can only be delivered against that sales order line. Any availability check etc for that material on any other sales order will not take it into account as it is not available except to the sales order line the stock is assigned to.
    Stock Transfer Order
    the cross company Stock Transport Orders can be done by:
    - Configure using transaction OMGN
    - Depending upon the sending and receiving plants, maintain sales organization and customer data in customizing.
    - Maintain the supplying plant as a vendor and attach the plant to the vendor in the Vendor Master.
    - Material type has to be HALB or HAWA.
    - Ensure that the company with sales Organization has a plant to take care of stocking.
    - The PO used is NB and not Stock Transfer PO.
       Configure SD for inter-company billing to enable picking up the pricing procedure for billing.
    - Carry Out delivery through process delivery due list and billing through process billing due list.
    Otherwise, You need  to configure your Stock Transport Order settings for your Cross-Company:
    Business Transaction to work.
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
    4. PO type (which i belive you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Compnay Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Compnay Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure.
    REgards,
    vineela

  • Interesting and an  imporatant issue at sales order schedule line.

    hi all,
    interesting and an  imporatant issue at sales order schedule line.
    i created a sales order with 10 qty.and the system proposed a two schedule lines.
    let's say to order created date is 27.11.2008.and the requested delivery date is 27.11.2008.
    but the stock is not available today then the system proposed two more schedule lines apart from the 27.11.2008.so now there are three schedule lines like below.
    schedule line date                      Material availabilyt date   delivery date                   
    27.10.2008 with zero quantity.     
    28.10.2008 with 5 qty.                28.10.2008                     29.10.2008
    02.10.2008 with 5 qty.                02.10.2008                     03.10.2008
    now the delivery and pgi already for the schedule line 28.10.2008.
    then when i run the availability check on 01.11.2008 system is over writing the material vailability date as today at the scheduleline number two.
    now i can able to view only two schedule lines only.
    schedule line date                      Material availabilyt date   delivery date                   
    28.10.2008 with 5 qty.                01.11.2008                     29.10.2008
    02.10.2008 with 5 qty.                01.11.2008                     02.11.2008
    now my concern when we reschedule the avalability check it should notchange the Material availability date of the schedule line which i already delivered.
    Regards,
    sheshukumar

    can any one repsond for this.....

  • Difference between sales order and credit order

    Hi friends,
    can any explain about difference between sales order and credit order in SAP.
    Thanks and Regards.

    Hi Narayana,
    This Depends upon your Client Requirement.
    If you are using the Credit Management to your client. then you maintain certain checks like Simple Credit, Automatic Credit at Sales Order Level.
    If the Client want a seperate Document type for Credit Sales and Normal Sales if having Purpose.
    Other wise you can use only one Document type for both,because in Standard Sap, For Cash Sale have seperate Document type.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Difference between sales order and service order?

    Hi Gurus
    Whatu2019s the Difference between sales order and service order?
    Thanks.
    Kumar

    Check below help link for defination and difference in Sales and Service order.
    http://help.sap.com/saphelp_crm70/helpdata/en/17/99fb62928c46c28c10f3ebc52fdfa8/frameset.htm
    http://help.sap.com/saphelp_crm70/helpdata/en/ce/6874bcf29742c395c5e5fae19a0c68/frameset.htm

  • Difference between Sales Order and Rush order

    Hi
    Whatu2019s the Difference between Sales Order and Rush order
    What are the customizations for Sales Order and Rush Order?
    Thanks
    Mahesh

    Hi Kumar,
    coming to customization in between SO(Rush order) and OR(Standard order).
    Go to VOV8 T.Code.
    The Rush order has the details as "Under Shipping tab",
    There will be "X" mark in the immediate delivery .
    the Rush order will be having the order related billing.
    But the Standard order can be either Order related or Delivery related.
    In Standard order after creating the order we are going to create the order we are going to create the delivery by using "VL01n" T.Code.After that we are going to create the billing by using "VF01" T.Code.
    Regards,
    Mohan.
    I think you understood if you need any other info. pls ask.

  • Sales Order Schedule line not populating in the Production order

    Queation: Is there a way to tell the system to look at the sales order, line item AND schedule line. It is displayed in MD04 but it doesn't carry over to the Production Order. We are a MTO and this information is relevant in a number of ways. 
    Please Help.

    Vickie,
    If you are using MTO scenario then when you run the MRP for the material, it will create a planned order for that sales order based on the dates calculated from the sales order schedule line (Shipping tab)...
    So now when you convert the planned order to production order, all the sales order details will get copied.
    try and revert back.
    Swapnil

  • How to control not to confirm quantity in sales order schedule line

    Hi,
    We have a problem with confirmed quantity in sales order schedule line.
    When I reject a position in a sales order, confirmed quantity still remains with quantity ( diferent to 0).
    I need in some cases that system not to confirm quantity in schedule line at item level.
    I've tried to do this with a new routine in OVB8 transaction, but it didn't work.
    Could you help me? How can I avoid the system to confirm quantity in a sales order item?
    Thanks in advance....

    Hi Lakshmipathi,
    I'm sorry. The rejection was a bad example.
    I need, in some cases, that the system doesn't confirm quantity in sales orden item. We have a custom field in sales order item and we need to confirm with 0 quantity , when that field has a specific value.
    Due to that field is a custom field, I need an exit, or rutine, or .. i don't know...to inform a standard field too ( delivery block, rejection...) something to get confirmed quantity to 0.
    I've tried with rutine in OVB8. But It didn`t work
    I've tried with delivery block, but with this all items in sales order, confirms with 0. I need at item level.
    Thanks

  • Sales order schedule line quantities in decimals

    Gurus - Required your help to resolve the following scenario.
    I'm facing with the problem where schedule lines of a sales order allocated with decimal quantities even though materials with UOM as EA(Each). For example Material A of sales qty 13 has the schedule lines allocated as 11.960 and 2.040. The delivery has been created as per the schedule lines with qty 11.960 and 2.040 and it has been pick/packed and delivered to the customer. Now, while issuing goods for the delivery, received the error message as <b>"Serial number management only allows whole numbers".</b>
    Can anyone provide what are the possible ways to round the delivered qty and issue the goods, when the delivery is complete?

    Sree - Question 1 - Why would you deliver the product and then try goods issue it (In general ;)...anyway....I know, a lot of companies do that way....
    Question 2 - How much exactly did you ship out, surely must not have shipped products in decimals, since you've EACHES defined and not KGs....or LBs...
    I would suggest finding out the correct quantities shipped out and then cancelling this delivery document....you can then go on to modify sales order schedule line accordingly and then process it again..."WHAT ABOUT PICK PACK DETAILS"....before cancelling this delivery doc out..capture the packing details (HUs) and then apply them to the new delivery doc... if you are using external system for packing HUs.....process the IDOC (or file etc) using the new delivery doc number....
    Hope you got the direction )
    Thanks
    Nikhil

  • Sales Order schedule line from CN to CP

    Hi,
    When i  update the sales order schedule line from CN to CP , the quantity is not showing in the MDO4.
    Can any one help me.
    Thanks in advance
    Suresh S

    Once the schedule line category is changed to CP,  just hit the enter key and save.  Now check in MD04
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • I have two Apple ID.  How do I combine them?

    I have two Apple ID.  How do I combine them?  I beleive that I have songs that I have gotten under each.  I want to combine them into one.

  • Password controlled guest accounts on wireless router

    I would like to be able to grant guests temporary access to my home network without giving out my permanent WEP ID.  Is there anyway that I can create a guest account, with a separate password, which I can then eliminate after their need for access i

  • Help! My premiere elements 11 freezes when I go to edit a design every time.

    I recently got a new laptop with windows 8. I installed photoshop elements 6 on it. It was freezing up so I went ahead and upgraded to 11. Same thing I go to load a design and it just freezes. I end up having to shut it down and load everything back

  • Macbook Pro 2010 killed by Mountain Lion

    First post here, so hi everyone... MBPro 2010 w/Crucial m4 SSD I downloaded ML on saturday, and went for a clean install. I used a 8gb usb thumb drive to make a bootable usb. Restart, command+R, erased the SSD (partition mac os jounaled) and then ins

  • Assign Self Registration Role...

    Hi Experts, I configured Self Registration User and is working fine. My problem comes when I assign roles for only new users automatically. I created one role "X" and I want to assign it as default for all new users only. This role is assigned with "