Different creation dates on different computers

I downloaded the same photos from the same camera on the same day to my home and office computers, both into iPhoto. At home, the creation date is correct, but at work the date is wrong in every way including the year. I checked the system time and date, and that is correct. I ran TechTools pro, and found that there were other files with wrong modificatin dates, but otherwise no problems were detected. (the vast majority of file dates on my computer are correct.) We have two cameras at work, different Olympus models, and I have the same creation date problem with both of them when I download to my work computer, so I have to conclude that there is something wrong with this computer, but I can't for the life of me figure out what.

Cindy:
Welcome to the Apple Discussions. Are both computers running the same system and iPhoto versions? Are the date formats set the same on the two computers. They are set in the International pane?
First run Disk Utility and repair disk permissions. I doubt if that will do it but it's certainly won't hurt.
If you manually upload from the camera to the office computer before importing into iPhoto are the dates OK? Also try logging into another account on your office computer an trying an import into iPhoto from there. If it does import correctly then there's an issues with your primary account. It could be a bad or corrupt preference file other than iPhoto's. You can run Preferential Treatment (at VersionTracker.com) to find any obvious damaged files. Here's a method another user developed to look for incompatabilites:
Trouble Shooting Preferences
Go to HD/Users/Your_name/Library. Move the Prefs folder (in its entirety) to the desktop. Start iPhoto. Determine if problem is fixed.
If the problem IS fixed, then go to the new Prefs folder that the OS will have created and open it up. Except for those items that are obviously not related, move the contents to the old Prefs folder on the desktop, replacing what had been there. When in doubt, move the item. The worst thing that can happen is a harmless "alert" message. Then, trash what remains of the new folder. Finally, move the old (but modified) Prefs folder back to the library.
If the problem is NOT fixed, trash the new Prefs folder and move the old one back to its original location.
If none of the preveious works, a reinstall of the the combo updater that represents the latest system version on that computer might help. Follow up that reinstall with a permissions repair. Good luck.
OT

Similar Messages

  • Project Server 2010 - Different Schedule Dates for Different Users -- Same File

    We have an issue regarding users viewing the same schedule, different machines.
    The PMs have a schedule that was built in 2007 by the offshore team.  We are running Project Server 2010 corporate, and they the PMs here on site have Project Professional 2010.  Within the last couple of weeks, the PMs have noticed changes in
    the dates.
    When I open the schedule, I see the expected dates rendered in both PWA and Project Professional.  Both draft and published versions are the same regardless of where the schedule is opened for editing.  There are two PMs managing the schedules. 
    One sees what I see--the expected dates.  The other sees differences in dates--months, in fact.  Scheduled end date is 10/22/2013.   When the second PM opens the schedule, he sees a scheduled end date of 2/17/2014.
    I advised them that the offshore team needed to upgrade to 2010 due to the differences between 2007 and 2010.  Additionally, and I could be wrong, having the server run in compability mode for so long (the upgrade was done in May 2013), is not ideal. 
    (Offshore team has since updated to 2010.)
    Any thoughts on what could be causing this issue?  Corrupt version of Professional?  Settings askew?
    Thank you,
    L.D.

    My bad, I didn't know that you were not using Project Server.
    Then the file might be corrupted.
    Try the
    XML export and the
    save for sharing method to repair it.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • One Purchase Order: Different delivery dates in different ports

    Hi All
    I have a Purchase order.  The material is coming through 3 ports.  So, I need the system to automatically calculate the delivery dates into these ports.  I amso need to enter the actual delivery dates in these ports.  And finally I need to do the GR in my storage location.
    Is all this possible without ant ABAP development work?
    Regards
    Jack

    Yes, it is sort of Imports.
    I do not have full details as of Now.
    But, if we have GTS, is it feasible?  If Not, what are the options?  I dont think we have a way out in std PO.  Any pointers will be very useful.

  • Does different customized data in different clients affects job scheduling?

    Hi All,
    Does the job scheduling is client dependant or client independant.
    We have 2 development test clients. Some customization settings are differenent in these two clients. Does this affect, if I run the job in one client, it will take the customization data in that client?
    Thanks in advance,
    Regds
    Madhuri

    job scheduling is client dependent....
    Regards
    Anbu B

  • Two different Pricing date

    Hi Gurus,
    can pricing date in billing document be different for different line items?
    The scenario is two Sales orders having  two different pricing dates is combined into one delivery document. Next Invoice  is generated from that delivery document. But in Invoice the pricing date is same for both SOs which is system date or any selected date(as per choice).  Can one single invoice have two different pricing dates depending upon sales order pricing dates?
    As per my understanding the pricing date in Invoice is item based. Pls correct me if iam wrong.
    Regards,

    HI Sd
    One invoice is having one billing date only. Its not possible to have different billing date for different line item.
    But if we are copying the pricing directly from sales order without redetermination then one single invoice can have two different pricing dates depending upon sales order pricing dates.
    bye
    Edited by: Yadav on May 5, 2009 10:27 AM

  • Different Asset value dates for different depreciation areas

    Hi All
    I have a requirement for different capitalization dates in different depreciation areas for some LATAM countries .How can this be achieved?

    Hi
    Hope you can achive this requirement by entering Depreciation calculation start date in depreciation area tab of asset master against each depreciation area
    Depreciation calculation start date
    'As a general rule, the system determines the depreciation start date from the asset value date of the first acquisition posting. However, you can also manually enter a calendar date in the asset master record for the start of depreciation. In that case, the system ignores the asset value date of the acquisition posting.'
    Please check different scenarios in development system and then do it
    Regards
    Praveen PC

  • How to change pdf metadata - creation date

    I have a number of old documents that have been scanned and converted to pdf's. I would like to change the metadata in each of these to reflect the documents ORIGINAL creation date on paper (not the scan date). Is there any simple tool to do this? (Each document's date is different so I will have to manually change it.)
    I can not find a way to do this in OS X, and the tools that I have found like A Better Finder change the creation date in the File Info panel, but if I open it in Adobe Acrobat 8 the metadata remains unchanged.
    Any suggestions are greatly appreciated. Thanks.

    Thank you. I did find this also on Adobe's website. It is an option, but since I an archiving a number of documents over a 30 year creation period, each of which has a different creation date it seems cumbersome as I would have to create and save a different XML file for each pdf I wanted to update. I was hoping for a more efficient tool that accomplish the task.

  • Date creation is different from date photo taken in Finder

    Hello,
    I didn't know where to post this question. When I import photos from my Canon T3i and my iPhone4, the creation date of the photo is the date imported, not the date I took the photo. While in Finder, if I look at the photo information, the creation date is the date the photo was imported (for both the Canon and iPhone photos). I'm trying to understand why this is happening.  When I import the photos into iPhoto9, the date I took the photo is there. While that seems like the solution, it isn't since I don't import all photos into iPhoto. If I look at the photos on the memory card, the date is correct. The only time the creation date is not correct is when I import on to my iMac or MacBook.
    I'm using Snow Leopard and have no plans to upgrade to Lion.
    Thanks for your help and I apologize if I posted this question in the wrong discussion group.

    Another go at explaining it:
    There are two kinds of metadata involved when you consider  jpeg or other image file.
    One is the file data. This is what the Finder shows. This tells you nothing about the contents of the file, just the File itself.
    The problem with File metadata is that it can easily change as the file is moved from place to place or exported, e-mailed, uploaded etc.
    Photographs have also got both Exif and IPTC metadata. The date and time that your camera snapped the Photograph is recorded in the Exif metadata. Regardless if what the file date says, this is the actual time recorded by the camera.
    Photo applications like iPhoto, Aperture, Lightroom, Picasa, Photoshop etc get their date and time from the Exif metadata.
    When you export from iPhoto to the Finder new file is created containing your Photo (and its Exif). The File date is - quite accurately - reported as the date of Export. However, the Photo Date doesn't change.
    The problem is that the Finder doesn't work with Exif.
    So, your photo has the correct date, and so does the file, but they are different things. To sort on the Photo date you'll need to use a photo app.

  • Applescript to batch change creation dates (different dates each file)

    I was pointed to an older thread that almost gets me what I need, but I'm not great with applescript, so I'm lost. Basically, I have a bunch of files. The name of the files are in a yyyymmddhhmmss.extension format (such as 20040710141231.mp4). I want to set the creation date of each file to the date by which they are all named. I found the older thread with a similar script and modified it, but I know it's not all there. I can post the whole script, but I'm pretty sure my main issue is with this part:)
                        tell originalFileCreationDate
                                  set myY to year
                                  set myM to text -2 through end of ("0" & (its month as integer))
                                  set myD to text -2 through end of ("0" & day)
                                  set myHr to text -2 through end of ("0" & (its time) div 3600)
                                  set myMin to text -2 through end of ("0" & (its time) mod 3600 div 60)
                                  set mySec to text -2 through end of ("0" & (its time) mod 60 as text)
                        end tell
    I'm not sure how to write that to set the date based on the file name. Can someone point me in the right direction?
    Thanks.

    Try this instead.
    This will change the access and modification times of the file:
    set theDir to choose folder
    do shell script "
    for f in " & POSIX path of theDir & "*
    do
              n=${f##*/}
              if [[ $n =~ ^[0-9]{14} ]]; then
                       touch -t ${n:0:12}.${n:12:2} \"$f\"
              fi
    done

  • Loading of data with different granularity and its reporting

    Hi gurus,
    Please help me with this problem. We are designing a cube based on some input requirements.
    Say for example, we are trying to build a infocube which will have to be drilled down by customer © & material(M). We have 3 input datasources (Flat files) with 3 different granularities.
    First 2 rows in the below are salescustomer. Next 2 rows are SalesMaterials sold and the last row as salescustomermaterial.
    Customer     Material      Sales
    C1          -          $100
    C2          -          $200
    -          M3          $300
    -          M4          $400
    C1          M3          $500
    What is the reporting result when the query is run for sales drilled down by customer  C1 ?
    Please help !

    Hi Kapardhi,
    Based on your description it seems that you will three updat rules and in the cube you are going to  have three characteristics Customer material and sales.
    Now it depends upon the time characteristics of the cube if you have mapped from all the three data sources same type of time caharacteristic.
    make sure that the time characteristic from all the datasources should be at the same level.
    Suppose if  use 0calday in the cube and update it from the same type of date from all the datasource like "creation date".This will make the data in the cube atthe most grnaular level adn proper aggregation.
    After this you will get the following type of data in the cube for C1
    C1 M3 900.
    So when you drill down bt cuatomer you will get 900.
    Hope it helps
    Thanks

  • Sales Deal with two different validation dates for the same material

    Hi SAPers,
    I am trying to create a u201CSales Dealu201D VB31, for the same material/condition, but with two different validation dates. After the creation of the first record, I select u201CNew conditionu201D button, but the system give me the message VK104, u201Cthe condition is being processed in the current session.u201D.
    How can I solve this issue?
    Thanks in advance.
    Pedro

    We can't have multiple records for the same condition and key values valid on the same date. The condition end date is part of the primary key in the database table. The date ranges between the records cannot overlap. When you create a new record, usually the end date is set to 12/31/9999 by default. If you need to have this deal to end on a different date and a new deal to start afterwards, then first you need to change 12/31/9999 to a different date.
    Also usually I try to exit the screen between the transactions.

  • Same deliveries for different delivery dates on Po

    I have a requirement
    If we use standard SAP and have a purchase order with materials that have different planned delivery times, we are going to create multiple deliviers from the PO based upoon the delivery creation date calculation.   Since we want to ship all of these materials on the same delivery ,  we have an issue.
    Is there any workaround for this ? PL help me.
    Thanks.

    Hi,
    If you have a different delivery schedules for a material with the vendor you can go for Scheduling agreement which is good option for this.
    Because in PO if you maintain the delivery schedules in Item detail>Delivery schedule  there is no check for this delivery dates.You can inward all the stock in a single delivery which don't have a control on that dates.
    If you follow the Scheduling agreement then system will not allow you to post the stock unless the delivery date is valid.
    rgds
    Chidanand

  • Can we write data to different sheets in the same excel output file ?

    Hi,
    I am using XML publisher and generating output in the excel sheet format.
    Is it possible to write the data to different sheets on the same excel file using XMLP?
    Please let me know how to do this.
    Thanks in advance,
    Raj.

    Hi,
    No, it's not possible with 5.6.2. Excel based templates are supposed to be coming but I don't know when the release date will be.
    Thanks
    Paul

  • Not able to display data in different columns using Unicode encoding

    Hi,
    Iam using Unicode encoding in my Java appln to support Japanese characters while downloading CSV report. But using the Unicode encoding displays all data in the first column of Excel sheet.
    Please let me know how to display data in different columns using Unicode encoding in Excel sheet.

    Hi Venkat,
    After extracting data into DSO check the request whether active or not.
    Check data in DSO in contents.
    If is there any restrictions on info providers in Queries.
    Let us know status clearly.......
    Reg
    Pra

  • InfoCube Modelling-Adding data from different ODS's on to the Infocube

    Hi Experts,
    I am new to SAP BI. I have a basic doubt on Modelling the InfoCube.
    In our requirement, I have to populate data from 9 custom SAP Tables on to 9 ODS's. And, then take these data on to Infocubes.
    And, they want to reduce the number of cubes as much as possible. So, I have to combine the data from different ODS's and build 2-3 Infocubes.
    For Example.
    I am going to combine 5 ODS's data on to 1 CUBE based on Delivery number...
    there are 5 ODS with common key Delivery number. And, suppose I have added some set of fields from ODS1.
    And, now when I add other set of fields from the second ODS, WHAT WILL HAPPEN TO THE 'Delivery Number' field ??
    I will make it clear.
    I have a record in CUBE already containing Fields- : Delivery no, field_a,  field_b, field_c, field_d. Where the 'Delivery no =112333'. This record comes from ODS1.
    Now, I want to add data data from ODS2, containg fields -: Delivery no, field_e, field_f, field_g, field_h.
    And, what happens to the already existing record in CUBE with 'Delivery no = 11233'. ?
    Will the value in this info-object get overwritten ?
    OR.. will it combine the data from both the ODS's and show it as ONE record ???
    Please advice ... How will I solve this scenario ?
    Thanking You in Advance
    Shyne Sasimohanan

    Answer for your question and the suggestion.
    the data will look like as given below
    Delivery no, field_a, field_b, field_c, field_d, field_e, field_f, field_g, field_h
    11233           1           1           1          1            0           0            0            0
    11233          0           0          0             0           1           1           1          1 
    but the best way, according the design standards is creating another DSO on the top of all the DSO's and combine all the data in that DSO and send the data to Infocube. then the data will be shown as below.
    Delivery no, field_a, field_b, field_c, field_d, field_e, field_f, field_g, field_h
    11233           1           1           1          1            1           1           1          1 
    Regards,
    Siva A

Maybe you are looking for

  • Iframe of a Blob Content in Apex form/report

    Hi All I am developing a application where users will upload documents which will be stored in blob column. Now the requirement is to show the document with in the page using Iframe. Can some one please suggest the steps to show the blob content in i

  • Two problems with custom kernel

    I get two problems with my custom kernel that is not using initrd and otherwise working fine: 1) initscripts does not print anything, i.e., I see the kernel messages and after a short while the login prompt. It seems to start the daemons, however, si

  • Unable to delete queries from POV Manager

    I have Smart View cells in a word document. I would like to clear the word document of its connectivity, so I connect to Hyperion, choose POV Manager, highlight the query. However the delete icon is not available for me to delete the pre-existing POV

  • Switch on / off elements of form

    Hi I have a form with about 30 questions in it. One of the questions is about where you are from. I have two potential lists of options for this, a top level list which contains items such as europe, north america, south america etc, and another far

  • Exporting marker notes to text file in FCE

    Hello all-- Hope this isn't too basic, but can't seem to find an answer. I'm going through videos of interviews and using markers to set interesting quotes, translation points, etc. In these markers, I'm using the comments and name to highlight the t