I am facing the strange issue for which i need your expertise. The requirement is like:
1. "X" material is discontinued and "Y" is as follow-up in two plants A & B. Discontinaution group and follow-up group has also been assigned in the BOM.
2. Now The client want to reverse the settings . means "Y" should be discontinued and "X" should be follow-up in both plants A & B.
Now I have removed the discontinuation indicator and follow up material from "X" in both plants. But when I am going to discontinue the "Y" material and putting " X" as a follow-up material, The system is giving the message "The specified follow-up material results in recursiveness
Message no. M3609
Diagnosis
You have entered a follow-up material. However, the BOM explosion for the follow-up material leads to the discontinued material, resulting in unpermissible recursiveness.
Procedure
Enter another follow-up material or cancel the entry.
Please suggest me where I am missing in my settings and what is the reason for this message.
Regards
Deepak Sharma

Dear ,
Check the following  :
1.Validity of the Bill Of Material or any deletion flag is set in the present BOM.
2.Please check the following SAP notes :
Note 161742 - Consulting note: BOM recursion/low-level code 999
Note 839879 - Trace 'BOM is recursive'
Note 139517 - Recursiveness for follow-up materials
Note 42891 - Recursiveness check
Hope this will help you to figure it out
Regards
JH

Similar Messages

  • Discontinued part and follow up material

    Dear Guru,
    How to use discontinued and follow up material with effective date. I am using MTS Scenario.
    Please help.
    Regards,
    Sanjay Sahoo

    Hi Sanjay,
    refer to the below link, it should answer your query:
    Re: Discontinuation Indicator - Need Guidance
    In addition to the above details:
    In material master for the material which is being discontinued, in MRP-4 view you need to maintain discontinuation indicator, effective-out date & Follow-up material.
    If you need any additional info, revert.
    If helpful award points
    Regards,
    Vivek

  • Same discontinue and follow up material?

    I have used before this function having a follow up material with indicator 1 and effective-out date. However, this time I have 3 materials A, B, C.
    The logic I want to use is the following but I'm not sure if SAP supports this:
    A = discontinue material and B = Follow-up material. Using indicator 1
    B = discontinue material and C = Follow -up material. Using indicator 1.
    So far, SAP is not allowing me to have B as discontinue and follow-up material at the same time. Any insights?
    Thanks for your help.

    Hi Lee,
    If you try to set the discontinuation for a follow-up material, then error message "Message no. 61224 -Multi Level Discontinuation not suported" will be generated when you try to run MRP. Refer Note 398238 - Error message 61224 for parts provided
    For more information on Discontinuation data, refer Concept of Discontinuation Data - Material Master and BOM
    Thanks & Regards,
    Ramagiri

  • Trnsfr Rqmnt created via PP for discontinuation mateiral and follow up mat

    Hi,
    Production order was created and it has PN A which has been set for discontinuation (1) with follow up material B. The effective out date is in the future.
    When generating WM Picklist, TR was created for both parts and issued. On confirmation only the part marked with discontinuation was consumed.
    How can i not generated TR for the follow up part?
    Thanks
    Jithin

    In the production order components details, there is a column for Discontinuation of the components.
    If you do not want the TR to be generated for follow up material, then in the material master(MRP 4) view of the parent component remove the followup material first and then uncheck the Discontinuation column in the order.
    If you want to discontinue the parent component from now with a followup material put "5" into the column it.It also has a option of simple discontinuation as "1" where in TR for the followup material will not be generated.

  • Discontinuity and Follow-up Materials for Finish Goods

    Dear all,
    We have used for a long time the Discontinuity functionality and Follow-up Materials for Raw and Packaging materials (components in BOMs).
    We would like to use the same functionalities for Finish Goods, but after setting fields in MRP4 View, it seems not to work as it did for components.
    Is it possible to reproduce the same effect in Finish Goods as we had with components, i.e., use some kind of Discontinuity and Follow-up materials for Finish Goods?
    We currently work with R/3 V.4.7.
    Thank you all in advance for any support.
    Best Regards,
    Alberto

    Dear Alberto,
    If my understanding is correct then this discontinued material concept works only for the components and not for the finished
    product during MRP.
    Discontinuation Data Use
    In MRP, the discontinuation functionality is used to transfer dependent requirements of a component to one or several follow-up
    materials, if the requirements are no longer covered by stock. You can also define a follow-up material in the bill of material.
    Check this link to explore more.
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/b1/c044d1439a11d189410000e829fbbd/frameset.htm
    Regards
    Mangalraj.S

  • What will happen if don't set follow-up material in material mas view MRP4

    Client get the information that some materials will not manifacture until one date. After this date, client want this material can't create BOM or PO anymore.
    I gave solution for set delete flag for this material so that when create BOM or PO error happens.
    But client want to use discontinue material in material master view MRP4, so that he can enter the last date when this material is out of use.
    Will discontinue material in material master view MRP4 can meet this requirement? enter discontinuation indicator and date then after this date will not create BOM or PO.

    As per my understanding discontinuation is related only to MRP (how system handles requirements).
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b1/c044d1439a11d189410000e829fbbd/frameset.htm
    If you want to disallow the creation of BOM / PrdOrd / etc, you have to apply to the suggested material status control or to your own solution (marking the material for deletion), etc.
    n my opinion discontinuation makes sense if the real situation is also discontinuation (you have a real follow-up material). In this case you can use it to manage the requirements properly.
    Edited by: Csaba Szommer on Sep 2, 2010 1:37 PM

  • Process Order is not picking the follow-up material

    Hi Gurus,
    We have changed a BOM by discontinuing a component and giving a follow-up material with the valid from dates as 18/5/09.  and then MRP is run on that nignt  ( mrp job set to run daily in the back ground). and on 19/05/09 a Process Order is created from the planned orders genereated by the MRP run.
    now, we found that the new componenet (follow-up) is not copied into the process order, but the old compomemt (discontinued) is removed. 
    MRP parameters are correctly defined (Planning mode is set to 2) .  Please let me know if we are missing anything.
    Thanks,
    N

    Hi
    Pl ensure that the Following requirements have been met before you can use the discontinuation functionality:
    1) Both materials must be planned using MRP.
    2) The base unit of measure of the follow-up material must be the same as the base unit of measure of the discontinued material.
    3) You must enter discontinuation data for the discontinued item and follow-up data for the follow-up item.
    and Also refer the SAP link for Complete Details
    http://help.sap.com/saphelp_45b/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm
    Regards
    Brahmaji

  • Nested Material Discontinuation and follow-up possible?

    Hello Experts,
    We have a scenario where we have Material A, Material B, and Material C.
    We'd like to set to the discontinuation flag on Material A and have it follow-up with Material B.
    We'd also like to set the discontinuation flag on Material B and have it follow-up with Material C.
    We can get a 1-to-1 relationship working properly but adding another material to the mix gives us an error message stating that the material is already a follow-up material.
    Is there any way around this?  We have several older revision material that we'd prefer to use up before continuing on the active material.
    Many thanks,
    ~Adam

    Hi Adam,
    have you found solution for your issue?? I have the same problem. I've even tried put deletion flag for component A but no results.
    maybe somebody else has any clue how to deal with it??
    i'm looking forward for any help.

  • Cost-Roll take follow-up material upon discontinuation effective-out date ?

    Dear Expert,
    If we use discontinuation/follow-up material, during Cost-Roll (CK11N), SAP will take default cost from discontinued material even if follow-up material is effective. 
    <b>How to make SAP take cost of follow-up material after/on effective-out date ?</b>
    <b>Example :</b>
    Parent "A" contains component "B" qty 3, to be follow-up with component "C" upon discontinuation of "B" on effective-out dated 1st Nov'07, and like-wise to take std cost of "B' before 1st Nov'07 cost-roll.
    Thus, when I roll cost in December, I hope SAP would calculate for std cost of A to include std cost of "C" (for cost-roll after 1st Nov'07).
    <b>Setting :</b>
    <u>Material Master of "B" MRP4 view :</u>
    - Discontinuation Indicator = 1
    - Effective-out date = 1st Nov'07
    - Follow-up Material = "C"
    <u>BOM of Parent "A" :</u>
    - Component "B" indicate discontinuation group "A1"
    - Add component "C" and indicate follow-up group "A1".
    <b>Thanks for your guidance !</b>

    Hello,
    We are having the same issue: is a BOM for costing the only way to handle this ? Controlling dept. here fear they wouldn't be maintained as accurately as the production ones (and they are right). We were also thinking to set the phased out materials (B in your example) as cost irrelevant when you add to new material in the BOM...and start costing the father (A in your example) directly with the new component. I would appreciate a lot to hear other examples of dealing with this issue if anybody has.
    Thanks a lot,
    Olivier

  • Discontinuation indicator in Material Master

    Hello,
    I am using discontinuation group concept in BOM which replace 1 old material with multiple folloup materials.
    My system ( ECC5.0) does not display discontinuation indicator 2 ( discontinue group in BOM). As a workaround I am using discontinue indicator 1 in material master, which makes entry of atleast 1 folloup material in material master mandatory.
    Does anyone know how to enable discontinue indicator 2 in material master?
    Thanks,
    Ram

    Hi,
    The indicator 2 is not offered either in BOM or material master. It works as below:
    Set the discontinuation indicator as 1 for the material to be discontinued in the material master along with other required details. Now in the BOM for the discontinued material, click on discontn & specify the follow-up group as say A1. Then specify follow-up group as A1 for materials which need to follow up this material.
    Create a planned order & explode the BOM in the planned order, you will then notice the indicator 2 for the material which you discontinued in the material master & in BOM.
    Hope it clarifies your query.
    Regards,
    Vivek
    Added
    Hi Bramhankar,
    Glad to note you're now the Mentor for this forum. Best wishes & hope your knowledge continues to enrich this forum....!!!
    Edited by: Vivek on Aug 5, 2009 8:43 AM

  • Follow up material - old material's stock goes down and up

    Hello,
    I have a question related to Follow up material. Lets assume that material A is to be replaced by material B, this is specified in the MRP4 view. In the field Eff.-Out an estimate of when the last unit of material A will be received is given in.
    If material A's stock drops down to 0 then material B should kick in, but what happends if afterwards material A's stock goes up again and then both material A and B are in stock. Will SAP notice material A's stock level and use it?
    Please advice! Thanks!
    mr

    I have a question related to Follow up material. Lets assume that material A is to be replaced by material B, this is specified in the MRP4 view. In the field Eff.-Out an estimate of when the last unit of material A will be received is given in.
    If material A's stock drops down to 0 then material B should kick in, but what happends if afterwards material A's stock goes up again and then both material A and B are in stock. Will SAP notice material A's stock level and use it? \
    If you don't know the "Effective-Out Date" (MARC-AUSDT) [because your stock situation is always changing), don't define it in material master. System will try to ramp down the stock of old material first and use the new one after that.
    However, you should take measures to prevent increasing the stock from the old material. In the system you can block it for purchasing as it was told you already.
    Regards,
    Csaba

  • MRP Run with User Exit key for Follow up material

    Dear Gurus,
    I want to run MRP only for followup materials by using User exit key. For example i have a material X(with discontinued Indicator as 1) and it's follow material is Y.
    So we have a user exit key as ZFL, with coding as shown below. Now when i run MD01 with user exit key ZFL and parametre as 1, it only runs MRP for material X and not for material Y. What else we need to do so that when i run MD01 with user exit key ZFL, it shoudl consider both X and Y. 
    WHEN 'ZFL'.
    DATA : BEGIN OF ITAB5 OCCURS 0,
    KZAUS LIKE MT61D-KZAUS,
    END OF ITAB5.
    TRANSLATE USER_PAR TO UPPER CASE.
    SPLIT USER_PAR AT ',' INTO TABLE ITAB5.
    IF ITAB5[] IS INITIAL.
    EXIT.
    ENDIF.
    CLEAR: NO_PLANNING, STOP_PLANNING.
    READ TABLE ITAB5 WITH KEY KZAUS = MT61D-KZAUS.
    IF SY-SUBRC <> 0.
    NO_PLANNING = 'X'.
    ENDIF. 

    Hi Kumar,
         You can use either MRP Type, MRP Controller, MRP Group in this user exit to control the MRP run. For these set of Materials you have to assign any of same value or at least differentiate these material from other material. Then only you can control the MRP by using this user exit even though if you use different MRP Group and MRP Controller. In User Exit, you may have to add your dependent material's MRP Group/MRP Controller. Make sure that these set of materials are different than all other materials.
    If you don't have any plan to run MRP for other materials then as per Ajit suggestion you make that material's MRP type as "ND". But, in your business case they may want to activate the MRP for all the material not now but may be latter.
    Thanks

  • Full BOM component qty when follow-up material is effected.

    Dear Experts,
             How to ensure discontinuation / follow-up is implemented on FULL BOM's
             component qty, and not partial.
              Example : A requires 3B, and B is follow-up with C upon discontinuation.
                             Planned order of A should only contain 3B or 3C, not mixture eg. 1B
                             and 2C etc.
              How can the control be implemented ?

    Dear Pradeep, Rajesha & all,
          Assume BOM of "A" indicates component B qty 10 is follow-up with component C qty 10.
          Material B (say, balance 1 qty) is received into Store Y (MRP Relevant). Thus to exclude material B from MRP, we have to manually transfer stock to store X (Not MRP Relevant).
          This would mean, we have to perform manual tracking such that this store transfer is done, to force SAP to direct to material C, so that we either accept 10B or 10C in planned order and nothing else.
         Not forgetting, I could have another follow-up in another bom such that 1B = 1C. Thus, the material 1B I transfered to store X (Not MRP relevant) can actually be use in this case.
    <b>    Thus, from BOM explosion, is there a way to control discontontinuation to follow-up, based on full component qty specified in BOM ?</b>
    <u><b>My Setting as follows :</b></u>
    <b>(1)</b> Material Master of "B" : MRP4 specify (a) Discontinuation Indicator "1", (b) effective-out date, (c) Follow-up material "C"
    <b>(2)</b> In Bom of "A" (parent of "B") :
    - Item "B", indicate discontinuation group "A1"
    - Create item "C" and indicate follow-up group "A1" and qty to be follow-up upon B discontinuation.
    Thank you for your guidance !

  • The follow up material results in recurssiveness

    HI,
    I have two BOMs one is plant specific production bom
    & the other is group BOM which is engineering/design bom
         Production Bom(plant specific)     
    parent     MO     
    child 1     m1     
    child 2     m2     
         Enginering/desing bom(indepent of plant)     
    parent     MO     
    child 1     m1     
    child 2     m2     
         m3     
    So in material master  of m3  iam trying to discontinue with  discontinuation indicator 1 with follow up material MO
    The sytem is issuing the "the specified followup material results in recurssiveness"
    why the system is throwing this message though m3 is not present in the production bom (which is plant specific)

    Praveen,
    Are you trying to say that if you maintain the material BOM for M0 with M3 as component and a follow up material as M0 again..?
    It will definitely a recursive bom.
    Or is it that you are maintaining a material M3 with follow up material as M0, where the M0 bom has components as m1 and m2 and you are getting this error in this case?
    Please explain clearly..
    Sumeet

  • Follow up Material (different BUoM)

    Dear Experts,
    We have a discontinuation setup here.  The PM1 will be replaced by PM2.  PM1 (sticker) has PCE as BUoM, while PM2 (Tape) has ROL in BUoM.   I tried putting the material as Followup, but system would not allow since they both have different BUoM. 
    Please help.  Thanks!

    Dear,
    The base unit of measure of the follow-up material is the same as the base unit of measure of the discontinued material.
    But try this:
    You can use follow-up setting (set PM2 as follow-up of PM1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case PM1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when PM1's stock runs out, MRP will calculate with PM2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the BUOM of one of the related material masters or create a new material master if you cannot cope with BUOM-change).
    Check this and revert back.
    Regards,
    Alok Tiwari

Maybe you are looking for

  • Flat file to xml file

    hello I am having a scenario a flat file to XML file. in the comm. channel of the sender I made a content conversion to the file and I see in the SXMB MONI and it looks ok. the output file, is declared as a file and I recieve an empty xml file. what

  • Use of rebates in externam service management (ESM)

    Hi , we try to set-up rebates in ESM. In the IMG, there are other condition types in ESM than in the normal purchasing When I try to create a condition type for rebates in ESM (eg similar to the A001 in normal purchasing) , I get an error. Via debugg

  • Play from a DVD or a camcorder?

    I have a movie that I created with my FCP and I need to show it to a large group of people. I have a 10'x14' screen and a projector but I'm wondering what the best quality/reliability medium is to show it. It is about 35 minutes long. I thought of sh

  • Adobe Illustrator CS6 Won't Open

    I have CS6 Master Collection and all of the programs were functioning properly, but now Illustrator wont open. I have a MacBook Pro with OSX 10.9. When I click to open Illustrator, the icon in the dock bounces once, then stops. The program never disp

  • Migrating a user changed her status

    I am migrating to a new iMac. I am trying to merge users from two computers. I used migration assistant to merge all the data from my G4 PB, which went fine. Next, I ran migration assistant and connected to our G4iMac, to try to migrate my kids and m