Discount for all materials

Hello,
I would like to create a purchasing info record in SD VK11 (condition record) but for all materials.
I mean when the customer buy 1000 peaces (not depending from material) by us he receives 2% discount.
How ca I loose this problem? with VK11 or with another T.CODE.
Thanks
Dede

Go to V/06, select the condition type for discount and execute.  There tick the box "Condt.update" under the tab "Master Data". 
Next go to VK11, input the discount type and execute.  There click on magnifying lens on top and maintain the maximum value you require in the field "Upper Limit".
thanks
G. Lakshmipathi

Similar Messages

  • How to get available quantity in Inventory levels  for all materials

    Hi..All
    I am Abap Developer and i have a Requirement that to Print a report that Displays " Inventory levels (available quantity) for all materials"
    1) What tables can i use to retrive the data to get the Inventory levels (available quantity) for all materials.
    2).What are the fields can used in that tables that use ful for end user.
    Thank you,
    Madhu .
    Edited by: madhubabu rao on Oct 15, 2008 9:10 AM

    Hi,
    I'm not sure what you mean when you are speaking about inventory levels and available quantity.
    I mean that you may have stock of 100 pcs of a certain material but from an open PrdOrd can come a reservation for this component (e.g. 20 pcs) that reduces this the available quantity (to 80 pcs).
    If you want only the stock levels, you don't have to write any ABAP code, since MB52 report is designed for this purpose.
    If you want to know the available stock (considering requirements (PIR, DepReq, SO), and stock-like MRP elements (PldOrd, PurReq, PrdOrd, PO, etc)) you should check report MD04 and examine how it works, which tables it uses (ST01).
    http://iorboaz.blogspot.com/2005/04/get-md04-data.html
    Regards,
    Csaba
    Edited by: Csaba Szommer on Oct 15, 2008 9:34 AM
    Edited by: Csaba Szommer on Oct 15, 2008 9:34 AM

  • Reg: MRP Run for all Materials

    Hi Abapers,
    I have an issue where in using MD01( Material Run), i need to raise one PR for all materials below the re-order stock. Currently system creates one PR for each material below the re-order stock.
    Please throw any ideas regarding this.
    Thank you

    Hi ,
    to procure assembly take 10 days.
    And delivery date is after 2 days
    After MRP run , system will take first backward schedulling from delivery date will take 2 days and going forward scheduling and take 8 days .
    So that from current date system will take 10 days so assembly will procure easily .
    Suppose today date 19/05/2011. And delivery date is after 2 days .( on date 21/05/2011 )
    if MRP is run on 19/05/2011. System will create delivery date 29/05/2011.So assembly will be easily procure within span of 10 days from 19/05/2011 to 29/05/2011. Delivery of FG is easily available on 29/05/2011.
    Regards
    Vinod

  • Listing Conditions Values for all materials

    Hi SAP Experts,
    We need the SAP Tables which store the Conditions data like Condition types, Condition Values, Validity from date, Validity to date,   and Materials for pulling a conditons Report for all materials.
    We have checked the pricing report t-code : V\LD . But this does not give all data (it does not show all conditions).
    Appreciating your quick reply.
    Thanks and Regards,
    Umesh Karane.

    Hi,
    It is totally depend in the pricing configuration you have done for your client.
    What you can do is create a new Pricing report for your requirement.
    Follow these steps to create a Pricing report.
    To create the Pricing Report
    Tx: V/LA
    u2022 Enter Name for the List (Starting from a letter) & a Title
    u2022 Press "Forward Foot Print"
    u2022 In the new screen you have to select all key fields that should be taken into consideration in the pricing report.
    u2022 Highlight all relevant fields
    u2022 Press AND or OR appropriately
    If you select OR ; all condition tables are evaluated, that contain at least one of the selected key fields.
    If you select AND; all condition tables are evaluated, that contain all selected key fields.
    u2022 Now youu2019ll be directed to condition table list that are to be evaluated. Highlight relevant condition tables (Which you have created for your customers requirement)
    u2022 Select "Forward Foot Print" to define the screen structure for the pricing report.
    u2022 You can configure the report layout here.
    u2022 Once everything is done, save the report.
    To run a pricing report
    Transaction: V/LD
    u2022 Enter pricing report number
    u2022 Press EXECUTE
    u2022 Execute it by giving relevant data.
    You can get all values in one screen.
    Alternative option
    As an alternative to your question, you can use "Condition Information" Button option in the VK11, VK12 & VK13 transactions.
    But there you cannot see the value in the same screen.
    To view those, go to "Condition Information" button.
    BLANK All fields.
    Then Execute.
    You have to double click and go in to see the value.
    Best regards,
    Anupa

  • Info Record Not Appearing for all materials in classic scenario.

    HI ALL, 
                I am working on Classic Scenario and all the follow-on documents are getting created properly. But the problem is With SOS. Currently i am able to view the info record for only one of my material, I am also referring backend contracts through vendor list. The contracts are visible in SOS.
               Can somebody pls put a light as to why for other materials the info records is not displayed in SOS, is there a report which has to be run to get the info record into SRM from ECC. If not then how does the system bring these contracts and info record from ECC to SRM.
              I am working on SRM 5.0 and ECC 5.0.
    THANKS AND REGARDS
    Debu

    Hi
    Please read this as well.
    <u>You have created sources of supply. These could be:
    -> Contract items in Enterprise Buyer
    -> Vendor-specific prices
    For this, you have created Product Linkages in the SRM System with vendor-specific prices via the SAP Menu Master Data -> Products -> Process Products.
    -> Entries in the vendor list of Enterprise Buyer
    In Customizing you have assigned product categories to which the system is to automatically group requirements and you have scheduled report BP_SC_TRANSFER_GROUPED to run periodically.
    For more information, see the Supplier Relationship Management Implementation Guide (IMG): SRM Server -> Sourcing ->  Define Interactive Sourcing for Product Categories.</u>
    Sourcing is completely integrated with the global availability check in SAP APO and executes a vendor search. You can activate third-party order processing in the check instructions by choosing how you want the system to start sourcing and which sourcing method you want to use for it. There are two different options here:
    &#9675;     If you want the products to be delivered exclusively by external vendors, the system performs sourcing directly at the external vendors without evaluating internal locations. For this, SAP APO requires corresponding purchasing records, delivery plans and contracts that are transferred from SAP ECC.
    &#9675;     If you only want to have products delivered by external vendors occasionally, that is to say, if you are unable to deliver the product from your own warehouse stock, choose an ATP profile in which both internal and external vendors are evaluated. In this case, the external vendor is treated like an internal location in SAP APO, and is integrated into location determination in the rule-based availability check.
    You can also choose the vendor manually. If you have already specified a vendor as the source of supply in SAP CRM, SAP SCM does not carry out any further sourcing. In this case, SAP SCM merely checks the validity of this vendor and confirms the requirement in its full amount if the vendor is valid.
    For more information, see SAP Library for SAP SCM at SAP Advanced Planning and Optimization (SAP APO) -> Global Available-to-Promise (Global ATP) -> Advanced Availability Check Methods -> Third-Party Order Processing in the Global ATP -> Sourcing in Third-Party Order Processing.
    <u>Refer these links for more details -></u>
    <u>Assignment of Existing Sources of Supply</u>
    <b>http://help.sap.com/saphelp_srm50/helpdata/en/25/40f23a53cd0e04e10000000a11402f/content.htm</b>
    <b>http://help.sap.com/saphelp_srm50/helpdata/en/55/4af548688211d4977e0004ac962ee6/frameset.htm
    http://help.sap.com/saphelp_crm50/helpdata/en/fa/84944279c0c66ae10000000a155106/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/18/db183d30805c59e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/63/36f2323326da4da25d9d0a06f550a0/frameset.htm</b>
    <u>Processing Contracts</u>
    <b>http://help.sap.com/saphelp_srm50/helpdata/en/43/0f234a9e242a8be10000000a1553f6/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/5a/4cc5376848616ae10000009b38f889/frameset.htm</b>
    <u>See also</u><b>SAP Note 519794 EBP: Replication of Materials exclusively for Purchasing
    SAP Note 505030 (Restrictions for the integration of external requirements).</b>
    Regards
    - Atul

  • Creating batch for all materials

    Hi Experts,
    is it possible to create ONE batch number for all Items. It will be used for batch scrapping or something. For example , If we have some pieces from a few materials i will make transfer posting Batch to this common Batch, which I have already created.
    Regards

    Material level:
    The batch number is unique in all plants in connection with the material.
    The same batch number has the same meaning for the material in all plants. One batch number cannot have different specifications in different plants. During stock transfer to another plant, the specification of the batch is known in the destination plant even if the batch is placed into storage in that plant for the first time.
    In other words, it is possible to have a batch SCRAP for any material number.

  • Performant way to select largest uom from MARM for all materials?

    Hi people,
    I need to select (for a large number of materials) the biggest UOM from MARM.
    (biggest as in UMREZ/UMREN > other uom).
    I'd like to make it into a function module, so that I can reuse it in other programs, because I'll need it a couple of times.
    Does anyone have an idea how to go about this? I think if this has to run several thousand times for one report, I can't simply "select * from marm where matnr = my_matnr" and then compute umrez/umren for all lines, and return the biggest uom... it wouldn't be performant at all.
    Regards
    Rob

    Hi,
    sadly, that would only help me find the biggest UMREZ, wouldn't it? (I already tried "select max( umrez ) from MARM etc...", but it's not good enough since one can simply enter, say, 25 as umrez and 25 as umren, and basically create a uom that's equivalent to the BUOM)
    Regards,
    Rob

  • Inspection plan for all materials GOODS Receipt

    Hi qm experts,
    I have a scenario. How could I make an inspection plan which covers all materials with variable base unit of measure. Its because my client is using winlims for their results recording. I want to create only one inspection plan to incorporate all materials for assignment, how could I make this one. I hope anybody could answer my question.
    Regards,
    Edsel matildo
    QM Consultant

    Hi,
      Say u have different materials with different base unit of measure ( kg / ltr / ea / pc /  --- -
    etc ) And u have assigned all these material in qulity plan having only one unit of measure (say mm )for characterisrics then there is absolutely no need to maintain conversion rule for all these
    Beacuse base unit of measure is different and unit of measure is different .
    Note Conversion rule is only required if ur using alterenate base unit of measure
    Amol

  • 50% discount for all Pro using FCP Studio/Sever!

    I am a FCP Studio Pro user since version 1.0. I am have buy/download from the APP Store  the new FCP X due to the numerous BAD ratings and publicity. I urge Apple to allow all FCP Studio/Server Pro users to buy FCP X at 50% discount in order to encourage them to try and play with the new FCP...

    I was just looking at old reciepts the cheapest I can find is the 2003 upgrade that was just FCP.    $300 is pretty cheap.
    2010:
    FC STUDIO UPGRADE-INT      $299.00
    back in 2005:
    M9912Z/A  FINAL CUT STUDIO UPGRADE      580.20
    back in 2003:
    M9039Z/A     FINAL CUT PRO 4 UPGRADE FROM FC3 199.50

  • One pr for multiple materials with line items while running mrp

    Hi SAP gurus,
                  I am config the system for MRP as per my client requerement.
                     We use CBP for different RAW materialsfor example they having a 10 materials for planning,were,
             MRP type is VB,
              LOT size is FX,with Different Reorder points and fix order quantity for all materials,
             My client whant run MRP for all these materials in single time that means they whant multiple item at single levels,
            i soles these requirement with the help of Product Group(sop) and its working but when we running md02 for product group all materials have planed and they give different purchase requistion numbers for all these materials but my client Wants single purchase requistion with line items for all these materials.
         Pls give me the solution for that requirement.
    thanks and Regards,
    abhi

    this is not the way SAPs MRP run works.
    Where is the benefit for this?
    the requisitions are not even split into header and item table, it is just one table EBAN, and either way you would get exact the same number of records in EBAN.

  • Foreign trade data - Embargo for military materials for certain countries

    We make a product that can be used in the military. We do not ship anything to UN Embargo countries, we cannot ship certain materials that are military related to a list of about 20 countries, then all other countries for these military materials require an export license.
    I get how to block all UN Embargo countries for all materials and how to determine an export license by export grouping/product classification and destination country but how to I stop a sale to a particular country for a particular export group/product classification or the material group code as was suggested previously??
    It looks to me like I could use the Legal control:product classification by destination country with a specific user exit.
    Does anyone know if one of the standard user's exits cover this requirement or would I need to have one written?? Has anyone else done this in a different manner??
    Any and all help is greatly appreciated!!
    Debbie

    Hi Debbie,
      First of all you need to declare the country as embargo in thry T-CODE -"VE53".
      Most of the settings are done in sdforeign trade customs--legal control.
      Also check item category for export data in t-code "VI58".
      This VI58 would effect on your item category grp in material master and hence should block the material.
      Basically make most of the settings in legal control.
      Reward points if it helps.
    Regards
    Karan
    Message was edited by:
            Karan Bhatia

  • Delivery Split for subcontract materials in ME20

    Hi Friends
    When I try to delivery multiple materials from the same PO through ME2O, they get split into multiple deliveries. Lets say I have selected about 4 materials in one transaction, I see that 3 materials go into one delivery, 1 material  go into  separate delivery This way I now have about 2 deliveries for a single PO.
    I want to understand how this split is working and how to avoid?
    All these  below parameters are same for all the 3 materials 
    a)delivery date u2013 Same 
    b) Shipping Point - Same shipping point
    c) Shipping Condition - Same
    d) Delivery Type - LB for all
    e) Loading group - Same for all materials
    f) Route - Is also same
    Thanks In Advance
    Pala

    Hi
    My functional scope is Sales And Distribution , as  this dilivery split comes under my scope , I am investigating this issue even though I have to understand MM functionality .
      I am not able to find PO for this sub contract delivery .In SD , In VL02N, document flow starts from delivery for subcontract process , there is no display of precceeding document(PO) for this subcontract delivery .
         If I want find PO for this delivery , how  and what do I do ?
        Thanks
    Jayapala S.H

  • CK40N for ROH materials

    Dear Experts,
    Our company's scenario is: Active ML, Price control: S ; We did cost estimate for all raw materials using t-code:ck40n, why have to do ck40n to raw materil since it doesn't have BOM, what if we ignore this step, what the impacts it will be?
    Thanks

    Hi
    In ML, it is good if price control is S for all materials as per SAP recommendation..
    Once you have S, you need to have std cost in place for them... For raw materials, you can release cost from CK40N or maintain from MR21... The output is one and the same
    If you do not do any of these, then your GR, GI and all material movements will happen at zero value
    For FG/SFG which have BOM & Routings - Release  cost from CK40N... For raw materials - You can choose between CK40N or Mr21
    Regards
    Ajay M

  • Shipping point configuration for selected materials

    We have configured one working day as our rounding-up period for shipping point in the system.  This forces the material to be available one day before shipping for preparation and traffic time.  
    The abpve has worked well for us since we have been make to order company till now.  Today we are moving towards keeping stocks for seasonal and fast moving items.  Problem:  In our current configuration, we can not ship on the same day even when we have stock.  The shipping point will add the rounding-up period for all materials on a SO.
    We would like to allow for same day shipping for in-stock items, as long as ATP confirms the qty.  At the sametime, continue to add the extra day for shipping point for anything that is not in stock.
    What can we consider to allow for such flexibility.  I would appreciate any pointers or help to point a rookie in the right direction.. 
    Thank you in advance,

    hi,
    u can achieve teh stocking scenario by creating a new shiiping point with 0 lead times (i assume u will continue with the MTO scenario too). for teh other requirement check the settings in ovz9- especially the tab 'recepits in the past'.
    saurabh

  • How to take planning run for selected materials?

    We have some 50 materials for which only i want to take planning run.I try to use MRP area but it it creating problem at the time of delivery of materials.Please suggeset solution.

    Hey,
    you can resolve this issue by creating a separate MRP controller for these materials and configure the user exit key for this MRP controller at MD01. (just press F4 at user exit key and select the maintain values option) such that materials for only these MRP controller are planned.
    This however, has a drawback, ONLY materials whose MRP controller is selected would be planned:
    Eg;
    if Parent material A has two child materials in it Y and Z.
    if you assign A the MRP controller 001 <~~ and
    Y and Z have some other MRP controller, the dependent requirements generated from A would not be planned on Y & Z,
    So, if you want the planning to take place at all BOM levels for these materials you can place the same MRP controller for all materials which you want to plan separately.
    Hope this solves your issue.

Maybe you are looking for

  • Is there a file size limit for App Store downloads over wifi?

    I just gifted my friend a navigation app that is 1.4 Gb in size. Unbeknown to me, her iPhone is not tethered to a computer and therefore she only downloads apps directly to the phone via wifi. Is it possible to download a file of this size directly t

  • [Solved] Pacman fails to get packages http 403 or 404 error

    Hi, I'm not sure if I should raise this as a bug or not, or indeed if I am doing something fundamentally wrong... Pacman tells me there are updates to do, but: Using the mirror "mirrors.manchester.m247.com" I get a 404 error Using the mirror "http://

  • Year To Date for Current Fiscal Year

    Hi All, I have installed BC variable Year To Date for Current Fiscal Year 0I_CFYTD.. foloowing error occurs Variable 0I_CFYTD could not be replaced.. Do i need to write any code or Please help.....

  • Maintaining state over a number of forms

    I�m trying to get information from a number of different forms so I can then pass the information out to a cgi script, which in turn passes info to a pdf file. The problem I�m having is when a new form is loaded the information on the previous one di

  • Trying to install and configure RRAS in WIndows 2012 Server R2 but cannot

    I just installed Windows Server 2012 R2 standard and trying to install RRAS. Following these steps: To install RRAS        Perform one of the following two steps to start the Add Roles Wizard: Start Server Manager. In the main window, under Roles Sum