Do we support create report on test plan

My team is using OTM to manage test case/test plan, i have some question after used for some time.
1.I want to view test case coverage of a test plan, but i find can't create report on test plan.
2.In a release we would run several test plan, i want to check test coverage/test status of each test plan, but now test status is recorded with test case, so test plans share test status.

Hello
If i'm not mistaken, you should wait next release (12.1 coming soon) to be able to report on test plans.
Are you from Oracle?
JB

Similar Messages

  • Error While Genrating Test Report in Test Plan Management

    Hi Guru's
      I am getting an authorization error while generating test report via STWB_info.
      Just i selected the test package and while click the test report i am getting this error.
    Error during authorization check
    Message no. TWBHS540
    Guide Me to solve this issue
    thanks in advance
    regards
    Anandh

    Hi,
    Please try the following:
    Start transaction SMGENDOC03
    Do not change anything but just hit the save button.
    Afterwards restart transaction STWB_2 and try again to generate again.
    Hope this helps.
    Cheers
    SH

  • Will OBIEE Support creating reports from 2 different data sources

    Hello Guys
    I am new to BI . Can anybody let me know how to create a report using 2 different data sources .
    Ex: Suppose we have 10G and SQL server , can we import tables to rpd and join 1 fact & dimension from 10G and 1 Fact from SQL server to the 10G tables . If so ,
    1) Will the repository be consistent ?
    2) Is it a best practice to do this kind of modeling ?
    3) Will it affect the performance of the reports ?
    Your advice is highly appreciated .

    Hi,
    Dont try to do this at the BI server layer. Oracle has special abilities to do this thing. So use the power of oracle to import the tables from the sql server to oracle and in the bi server just create one data source.
    you can browse for *'DBLINK'* in oracle.
    Regards,
    Karthick

  • Create Report Plan & Actual Balance Sheet

    Hi,
    I want to create report BL with plan data.
    I use t-code FSE5N to input plan but in FSI3 plan data is not come out.
    Please help me, or there's another report painter that I should use.
    I use ECC 6 btw.
    Thanks for your help.

    Hi ,
    FSE5N is old T code use new T code
    New GL Planning     GP12N
    New GL Planning- Automatic Upload     GLPLUP
    Also Refer Reports
    Annual Plan/Actual Comparison ( Always provides report upto date)     S_ALR_87012253
    Half-Year Plan/Actual Comparison     S_ALR_87012254
    Quarterly Plan/Actual Comparison     S_ALR_87012255
    Periodic Plan/Actual Comparison     S_ALR_87012256
    Hope its useful.
    Regards
    Milind Nair

  • Is it possible to import the failure cases from another test plan in MTM ?

    Hi,
    Is it possible to import the failure cases from another test plan? For example, I have created a new test plan with ID 1002. Now I want to import the failure cases from test plan with ID 1001.  Is there anyway to do this?
    Thanks,
    Leslu

    Hi Leslu,
    As far as I know, there isn’t that feature in MTM, but we could achieve that by add test cases to the test suite.
    As we know, the test case is associated to the test suite, remove the test case from the test suite won’t delete the test case, it just remove the relationship.
    So, we could base on the test cases’ id to add the test cases to a test suite of another test plan.
    The condition is:
    Work Item Type In Group Test Case Category
    ID In id1,id2 (e.g. 1,2,)
    Regards
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Test Suites and Test Plans Question

    We are using the TFS 2013 and in the Team Web Access, whenever I create a Test Plan, it creates a Test Suite with the same title. If I delete the test suite, next time I select the test plan in the test section of Team Web Access it creates another
    Test Suite again with the same title as the Test Plan.
    Why do we have this?
    Is there a way to prevent this from happening?
    Am I missing something?
    Thanks.
    YG

    Hi Yves,
    I don't find any public official document about the test suite that created with a test plan, what I mentioned is an explantation about the type of test suite. And it's not affect the testing or creating test cases/test suites/plans in team web access.
    To organize test cases in a teat plan,  you have to create test suites under the test plan and then use test suite to include test cases. Check this
    page for more information.
    Best regards,

  • Unit test plan for inbound and outbound interfaces

    I am trying to create a UNIT TEST PLAN for an interface. In this interface a flat file in IDOC format is picked up from the application server and processed using EDI_DATA_INCOMING for the relevant posting ( example : Sales order creation from a PO IDOC). IF the file is not in IDOC format then it is reformatted to the IDOC format manually.
    In second scenario(outbound), after sales order creation or billing document creation, IDOC is created which is read and a custom flat file is created and sent to a middleware.
    PLease suggest a unit test plan for these kind of scenarios or send a sample UTP if possible.
    REgards
    Nishant
    PS: points will be awarded to helpful answers.

    Unfortunately this isn't possible, the esa has only one routing table. You'll have to add specific routes for your internal networks.
    I usually avoid two-armed setups because of this and it gets even worse if you want to use virtual gateways (traffic gets sent via the internal interface with an IP from the external interface)

  • Test plan for upgrading the support packs

    Dear friends,
    We are going to upgrade the BI system with SP18.
    Please let me know the impact system will be facing with this upgrade and the test plan to take care after the upgrade.
    With Regards
    Neetu
    Edited by: Siegfried Szameitat on Oct 29, 2008 8:48 AM

    Hi,
    it will helps hopeful,
    Upgradation steps:
    1) Convert Data Classes of InfoCubes. Set up a new data class as described in SAP OSS Note 46272. 
    2) Pay attention to the naming convention. Execute the RSDG_DATCLS_ASSIGN report. 
    3) Run the report RSUPGRCHECK to activate objects. 
    4) Upgrading ABAP and JAVA in parallel may cause issues. If there is no custom development on J2EE instance, it is recommended to drop the J2EE instance and re-install the latest J2EE instance after the upgrade. 
    5) Apply SAP OSS Note 917999 if you include the Support Patch 6 with the upgrade or you will get the error at PARCONV_UPG phase. When you upgrade to a product containing Basis 700, the phase PARCONV_UPG terminates. You included Basis Support Packages up to package level 6 (SAPKB70006) in the upgrade. The job RDDGENBB_n terminates with the error RAISE_EXCEPTION. In addition to this, the syslog contains the short dump TSV_TNEW_PAGE_ALLOC_FAILED. The program SDB2FORA terminates in the statement "LOOP AT stmt_tab". An endless loop occurs when the system creates the database table QCM8TATOPGA. 
    6) Apply the OSS note 917999 if you get the following error during PARCONV_UPG phase: PARCONV_UPG terminates with TSV_TNEW_PAGE_ALLOG_FAILED
    Critical OSS Notes:
    819655 u2013 Add. Info: Upgrade to SAP NW 2004s ABAP Oracle
    820062 - Oracle Database 10g: Patchsets/Patches for 10.1.0 
    839574 u2013 Oracle database 10g: Stopping the CSS services ocssd.bin 
    830576 u2013 Parameter recommendations for Oracle 10g 
    868681 u2013 Oracle Database 10g: Database Release Check 
    836517 u2013 Oracle Database 10g: Environment for SAP Upgrade 
    853507 u2013 Usage Type BI for SAP Netwaevers 2004s 
    847019 - BI_CONT 7.02: Installation and Upgrade Information 
    818322 u2013 Add. Info: Upgrade to SAP NW 2004s ABAP 
    813658 - Repairs for upgrades to products based on SAP NW 2004s AS 
    855382 u2013 Upgrade to SAP SEM 6.0 
    852008 u2013 Release restrictions for SAP Netweaver 2004s 
    884678 - System info shows older release than the deployed one 
    558197 u2013 Upgrade hangs in PARCONV_UPG 
    632429 u2013 The upgrade strategy for the add-on BI_CONT 
    632429 - The upgrade strategy for the add-on FINBASIS 
    570810 - The upgrade strategy for the add-on PI_BASIS 
    632429 - The upgrade strategy for the add-on SEM-BW 
    069455 - The upgrade strategy for the add-on ST-A/PI 
    606041 - The upgrade strategy for the add-on ST-PI 
    632429 - The upgrade strategy for the add-on WP-PI
    Post upgrade Steps :-
    1. Read the Post Installation Steps documented in BW Component Upgrade Guide 
    2. Apply the following SAP OSS Notes 47019 - BI_CONT 7.02: Installation and Upgrade 558197 - upgrade hangs in PARCONV_UPG, XPRAS_UPG, SHADOW_IMPORT_UPG2 836517 u2013 Oracle Database 10g: Environment for SAP Upgrade 
    3. Install the J2EE instance as Add-in to ABAP for BI 7.0 and apply the Support Patch that equivalent to ABAP Support Patch.
    4. Run SGEN to recompile programs. 
    5. Install the Kernel Patch. 
    6. Missing Variants - (also part of test script) look at the RSRVARIANT table in SE16. If it is empty, then you will definitely need to run RSR_VARIANT_XPRA program - RSR_VARINT_XPRA OSS -953346 and 960206 1003481 
    7. Trouble Shootauthorizations 820183 - New authorization concept in BI               
    Regards,
    Deva Reddy

  • Test Note (Documentation Type) when creating Test Plan

    Hi Gurus.
    After we upgraded our SolMan 7.0 system from Support Pack (ST component ) level 19 to level 25,  I noticed this new field "Test Note" (Dcoumentation Type) when creating a Test Plan in transaction STWB_2.
    Initially, when I haven't chosen any project yet, this field has a list-of-values (i.e. Test Case Note, iTutor Document) but when I choose a project, the list-of-values only showing "ST". I also tried choosing another project and there is no value in the list.
    Does anyone know where this list is coming from or how I can configure this?
    It looks like project-related and but I couldn't find any settings for this.
    Can this field be turned off so it will not show in the screen?
    Thanks,
    Tess

    Hi Tess,
    The documentation type ST is the standard documentation type for test notes.
    Test notes are needed by testers to document results in detail during/after testing a test case.
    In SOLAR_PROJECT_ADMIN  there is the text menu 'GOTO - Project Template - Implementation Projects'
    and then there to the tap 'Documentation Types' to do the default settings for 'ST' for all implementation projects.
    Otherwise you'll have to change settings in the administration for each project!
    There you can assign your own documentation template for ST in the central settings.
    If you are using other project types for testing you'll have to do the same for each project type.
    Regards,
    Adelbert

  • How to create  a test plan with specific transactions (or program)

    Hello,
    I'm a new user in Sol Man !
    How to create  a test plan with specific transactions (or program).
    In my Business Blueprint (SOLAR01) I've created in 'transaction tab' the name of my specific transactions and linked it.
    In my test plan (STWB_2) those specific doesn't appear to be selected !
    Thanks in advance.
    Georges HUYNEN

    Hi 
    In solar01 you have defined but you have to assign the test case in solar02 for this test case in the test cases tab.
    When you do so expand the business sceanario node in test plan generation of STWB_2 transaction and now that will appear.
    Also visit my weblog
    /people/community.user/blog/2006/12/07/organize-and-perform-testing-using-solution-manager
    please reward points.

  • Creating ABAP Unit Tests for Report Programs

    How can we create ABAP unit test  for report programs.
    Please explain the steps?

    Hi Devendra.
    I would like to suggest some references which are as below:
    [SAP HELP - Complete ABAP unit|http://help.sap.com/saphelp_nw04/helpdata/en/a2/8a1b602e858645b8aac1559b638ea4/frameset.htm]
    [SDN - Reference for ABAP unit testing|about unit testing;
    Hope that's usefull.
    Good Luck & Regards.
    Harsh Dave
    Edited by: Harsh Dave on Jul 14, 2008 2:13 PM
    Edited by: Harsh Dave on Jul 14, 2008 2:20 PM

  • Test Plan Progress report parameter

    I'm trying to use the Test Plan Progress report but the Test Plan field is always empty therefore I cannot render the report.
    The TFS is 2013 update 4 and I tried also with the report downloaded from MSF for Agile Software Development 2013.4 template. The cube is processed with no errors.
    Any ideas?

    Looking further I noticed that the MDX query that is populating the report parameter is not returning any data.
    Could this be a breaking change for the report from the last TFS update?
    Below is the query generated by the report:
    WITH
    MEMBER [Measures].[ParameterCaption] AS
    IIF([Test Plan].[Test Plan Name].CURRENTMEMBER IS [Test Plan].[Test Plan Name].[All],
    "All (No Filter)",
    [Test Plan].[Test Plan Name].CurrentMember.Member_Caption
    MEMBER [Measures].[ParameterValue] AS
    [Test Plan].[Test Plan ID].CurrentMember.UniqueName
    SELECT
    [Measures].[Point Count Trend],
    [Measures].[ParameterValue],
    [Measures].[ParameterCaption]
    } ON COLUMNS,
    ([Test Plan].[Test Plan ID].[All], [Test Plan].[Test Plan Name].[All]) +
    Extract(
    [Test Plan].[Test Plan ID].[All],
    [Test Plan].[Test Plan Name].[All],
    [Team Project].[Project Node GUID].[All],
    [Test Case].[Area Hierarchy].[All],
    [Test Plan].[Iteration Hierarchy].[All]
    ) +
    Filter(
    CrossJoin(
    [Test Plan].[Test Plan ID].[Test Plan ID],
    [Test Plan].[Test Plan Name].[Test Plan Name],
    StrToMember("[Team Project].[Project Node GUID].&[{4dad3f77-6199-41eb-af5a-a95f93b6af18}]"),
    StrToSet("[Test Case].[Area Hierarchy].[All]"),
    StrToSet("[Test Plan].[Iteration Hierarchy].[All]")
    [Measures].[Point Count Trend]
    [Test Plan].[Test Plan ID], [Test Plan].[Test Plan Name]
    } ON ROWS
    FROM [Team System]

  • Solution Manager: Creating test plan - no test cases uploaded show up

    Hi,
    I am attempting to create test plans that include all the test case documents that I uploaded to the system.  Unfortunately, when I upload the documents, check them out and then in again, and then go to stwb_2 to create a test plan, the documents do not show up in the test plan structure.
    Why is this and is there someway to make the documents show up?
    Thank you!
    Edited by: acraver on Mar 13, 2009 6:37 PM

    Have u tried regenerating the Test plan by going to change mode and pressing the generate button after selecting the documents
    Secondly what is the status of the doc is it change
    Note whn u generate the test plan you have to chooose the Status of the Test Documents.
    Hope it solve ur problem
    Regards
    Prakhar

  • Send an e-mail after creat Test Plan STBW_2

    Hi All,
    I am working Solman 7.0 and creating Test Plan from STWB_2. But as we know is "standard" to send e-mails to resources are assigned each activity inside test plan as information about version 7 - EHP1.
    I've hust check out configuration in STBW_SET and is ok too. Maybe there are other customizing necessary to active this e-mails.
    Regards,
    Warlei Figueiredo.

    Warlei,
    See the SAP Note 1348140 - E-mail notification in test sequence does not work.
    Good luck!
    Best regards,
    Jacques.

  • Create Test Plan from Solution or Project

    Hi,
    When creating a Test Plan does it matter if it is from the Solution or a Project?
    thanks

    Hi,
    I guess the first question should be which version of Solution Manager are you using, 7.0 or 7.1.
    The process is typically to create a project, document the business process hierarchy, assign Test Cases to the business process hierarchy, and create a test plan which allows you to select the processes to be tested and the test cases.  If there are no test cases assigned to processes then the test plan cannot be created.
    A simple rule is that an Implementation Project is used to implement new business processes and during this project you document the processes including test cases.  These test cases can be assigned to a test plan and executed.  When the project passes the go-live the documentation you have created during the implementation project can be copied to a Solution. This is when the Solution is updated with documentation relating to the productive environment.
    From a documentation perspective the Solution will therefore provide all the documentation associated with the productive landscape, including the test cases you have used as a basis for your test documents in the test plan.  When you change a productive business process you can use a maintenance project to check out the documentation from the Solution, change the documentation, and then check in the changed document.
    For Test Cases the same logic applies.  If you need to change a Test Case you can check it out to the maintenance project, create a test plan for the maintenance project and perform the testing.
    The important note is that the Solution should reflect the productive environment and a project should reflect the project environment.  The benefit is control and traceability.
    Regards,
    Rich Labib

Maybe you are looking for

  • Steps to refresh content DB

    Hey SharePoint Fam, Trying to figure out easiest way to refresh main content DB every 5 months.  Have QA & Staging environment that I'd like to refresh prod content db quarterly but not sure of correct process/steps to take in sql studio.  Do i need

  • How do you recover from catastrophic change of PC and iPhone at same time?

    Long Story: 1) Upgraded from iP3G to iP4 last year, kept both. iP4 synched regularly. 3G in storage. 2) Synching PC died (motherboard) but have HDD. 3) LOST iP4 in mountains. 4) Got new PC. 5) Reactivated 3G. Now I'm trying to figure out what files t

  • How to 'client-side include for secondary menu on page'

    Hi there. The following page refers: test page for early draft The linked page is in fact a DW CS3 tmp preview file, for that reason the CSS has been pulled into the html file by DW, it won't look that way in the eventual page file. After lengthy bat

  • OS 9 & OS X Classic

    I'm currently running OS 10.4.8 and tried to install a children's game that says we have to use OSX Classic Mode. I don't have OS 9 installed. -What does that mean? -Can I open it in OS X? If so, how? -If I need OS 9 to run it, does it come on the 10

  • Encoding in weblogic server 9.1

    Please someone let me know how to set ISO encoding in startWeblogic for Weblogic server 9.1?