Document type of PR from Project

Dear Experts,
i am creating material  purchase requisition from project by attaching material code in project internal activity and service purchase requisition from external activity , but for both care document is coming NB, but customer want different document type for both PR, pls suggest how it will be done
rgds
rajesh

Hi Experts ,
Is any one suggest the User Exit so that i can change the the document type for both Material PR and Service PR automatic trigger from Project System. since as per standard in both case Document type will be same as there is only option to select one document type.
rgds
rajesh

Similar Messages

  • Influence PO document type in ECC from Sourcing Cockpit in Classic Scenario

    Hello experts: we are running SRM 7.0 with ECC 6 EhP 4 in a classic scenario.
    Our business requirements are: all SC item created with reference to a catalogue item must result in a PO not subject to release strategy in ECC6 MM. For this purpose, document type ZEC has been entered under parameter BSA in tcode PPOMA_BBP.
    Due to Sourcing customizing, some Shopping carts items without source of supply are sent to Sourcing Cockpit.
    In sourcing cockpit application, buyer completes the open items by including the vendor, price, etc and create draft POs that are finally converted into backend purchase orders in ECC6. These Purchase orders, created without reference to a catalogue item should be subject to release strategy and approved by the corresponding approval body in ECC6.
    Due to that, we must change the document type in backend and enter another one which is subject to release strategy. We tried it thru badi BBP_TARGET_OBJTYPE but we could not get it. we change BE_DOC_TYPE to NB when the catalog id is blank in the SC item and follow-doc is PO. However, system always creates PO with document type ZEC
    We would like to know how to influence the PO document type when we are trying to create POs from SOCO.
    Any clue about it?
    Many thanks in advance
    Best Regards
    Valentí

    Solved

  • Separate PR document type for material from PS

    WE need to create two separate material PR document type for example WBS level-1 and WBS level-2. How can I achieve it.Any user exit or what is the simplest method.
    Zinni

    Hi
    Thanx. My project having two separate WBS element for which import trading material is required and some material required during installation , mostly consumable materials. Two separate document type is required for the purpose.
    Please give me logic how can I assign two document type for two separate WBS element.
    Zinni

  • PO Document Types when Adopting from PRs

    We are using 2 docment types for both PO's and Purchase Requisitions (NB and ZX). When using ME59N to automatically generate PO's from requisitions, the PO's get setup with the proper doc type based on the requisitions type (NB requisitions convert to an NB PO, and ZX requisitions conver to a ZX PO).
    However, when adopting a requisistion in ME21N, it always uses NB for the PO, no matter what the requisition has. Is there a way to get adopting a requisition to work like ME59N and set doc type on the PO based on the requisition's doc type?
        Thanks,
             Rick

    Std SAP is set defule doc type in the System is NB but if oyu want ZX  Doc type in ME21N then you have to create screen variant for this doc type and assign the transaction to do that
    Go To SHD0
    enter ME21N in Transaction code field
    and then enter e.g. ZME21N in Transaciton variant filed then hit create button
    it will take you to the PO create screen.
    here you enter all the value and and create the PO.
    every popup screen hit enter
    and which ever value you want to defulat to the transaction
    those values you have to check the check box of
    W.content and output only
    then save. it will ask you the object where you wan to save
    if you want to migrate to another system then use the real package other wise use $TMP for each screen (until the popup goes away)
    and save it
    Then go back to main SHD0 screen and hit goto button and select create variant transaciton and create the tcode for this variant which can be used by user

  • Conversion for plan type budgets / Forecast from Project Management

    We are doing Conversion of projects from oracle old version 11.5.10 to 12.2.3, client is using  Project management based budgets and forecast.
    I are aware there are API to migrate budgets and forecast created in project costing module but unable to find any API for migrating budgets created in Project management Responsibility.
    Can even one help me out to know the process how to perform conversion of Project management based budgets and forecast. as I am helpless and don't find any way to move further.
    I highly Appreciate if you can help me in this regards.
    Thanks,
    Mohammed

    Hello,
    I found a way to approve the budget costs and revenues using the PA Budget workflow. In order to kick off this workflow I still have to submit the budget costs or revenue. Is there anyway I can by pass this submission process? Is there an api I can use to submit the latest budget costs so it will kick off the workflow?
    Thanks
    -Nelly

  • Copying Certain document types only from project to Solution Directory

    Hello,
       We are in the process of setting up Solution Directory in Solution Manager 4.0 sp12. After creating a solution we'd like to add scenarios from multiple implementation as well as template projects based on the document type.
    We have several document types that we use in various tabs (config, testcase etc) and would like to get only a subset of document types from the soruce projects.
    When trying to use the copy options in the pop-up window the copy filter works only on the documentation tab and does not filter the documents in other tab's based on the copy option filter.
    Is there anyway we can filter the document types upon copy from project to directory. Please let me know if there is any Badi or User-exit for this functionality as well.
    Any Help is much appreciated.
    Thanks
    Rajesh Sundar

    Hi Rajesh,
    I just came across this article and I reckon it will answer your question. Please read the section Documents copied when copying a project.
    http://wiki.sdn.sap.com/wiki/display/SM/Documents+in+Solar01+and+Solar02
    Cheers
    Ganesh

  • Selecting document type for settlement CJ88

    During project or order settlement (CJ88,KO88) the document type "YP" specified in the Settlement Profile is used for the FI portion of the settlement, WBS to AUC, but the controlling entries use the default FI/CO document type.   We would like all transactions in the settlement process, both FI and CO, to use the document type YP.
    The controlling enties, settlement from WBS to WBS, post to FI through Real Time Integration CO-FI.  If I change the document type in FAGLCOFIIMG from SA to YP then the CO settlement documents begin posting as YP as desired.
    Is there a way to have Real Time CO-FI Integration select a variant by transaction type so it chooses YP for only settlement transactions?  Or is there a better way to have all settlement transactions use the same document type? 
    Thanks,
    Jeff

    Go to transaction KOT2_OPA and check against the order type that you use, which settlement profile is assigned.Then go to transaction OKO7 to change the document type for that settlement profile. Document types can be created in transaction OBA7.

  • Looking for a function that returns the currently opened document type

    Dear SAP gurus
    I have a user exit for transaction VA02. In VA02, when I click on button (Item details-configuration),
    it launches a URL in a browser. I am asked to add to the URL, values like Document Type, Document Number
    and Line Item Number.
    I can get Document Number and Line Item Number from the presently opened Sales Document by using the standard Function 'CUCB_GET_OWNER_OF_CFG'.
    However, I am not able get the value of Document Type. Is there any function that will give me
    the value of the Document type of the present document that is open.
    Any feedback/Suggestion will be highly appreciated.
    Thanks
    Ram

    If you're in a VA02 user exit, the document type should be in VBAK-AUART, if I remember the field name correctly.  I would think that ANYWHERE in VA02, that field will be available to you.
    If you want the text of the document type, forward navigate from vbak-auart data element to the domain and look at the values...there'll be a config (T) table (and you may need to add T to the end to get the associated text table) that describes the document type in your system's language,  like:
    E OR   Order
    or something like that...  Sorry, in my installation, we don't use the logistics modules, so I'm writing from memory.

  • Document type for Tcode : FIBLFFP

    Hi,
    How to change document type of document generated from Tcode FIBLFFP ? please any IMG point for this ?
    Regards.

    Hi Jehade,
    Go to the following path and check the document type maintained.(For online payments the document type is picked from here).
    Financial accounting (New)-> Bank accounting --> Business Transactions --> Payment Transactions --> Online Payments --> Define Document Type.
    Regards
    Naveen

  • Document type wise PO with refer PR

    Dear All,
    my clients requirement is that Document type wise PO creation with refer PR & Purchasing group is mandatory.
    but some document type wise PO generation withour PR & purchasing group is mandatory.
    please suggest me.
    Thanks
    Shital

    Hi,
    1. Create Seperate document types one for PO with PR and one for PO without or with PR.
    Follow the pthe SPRO->MM->Purchasing->PO->Define Document types
    Here copy from the standard document type NB and create your own.
    2. Cretae two seperate field selection grps one with PR field manadatory and one with PR field non mandatory.
    Follow the pthe SPRO->MM->Purchasing->PO->Define screen layout at doc level.
    here copy from the standard fields selection grp NBF and create your own two diffrent field selection grp.
    Then once created go to selection group Ref data item and for Purchase requisition as required entry and save it for one field sel grp and for the other as optional.
    3. Assign thease fields selection grps to document types as per your requirement.
    Follow the pthe SPRO->MM->Purchasing->PO->Define Document types
    Define new numbe ranges for your both the document types.
    hope it helps.
    Regards,
    Sujoy
    Edited by: Sujoy on Jun 24, 2009 7:09 AM

  • Posting Key and Document type

    Hello,
    I have just detected an inconsistency in one of my SAP environment (Development).  I have an invoice posted from the SD module, document type of this invoice is RV.
    If there is a reason to cancell this invoice, the transaction used is VF11. The document type in SD for this cancellation is S1. Thereafter an FI document is generated with document type AB.
    Even though the settings in both Production and Acceptance and Developement are the same.
    I have realised that the initial document when cancelled (reversed) has an FI document RV  and posting key 11. whiles in customizing the settings for posting keys and document types are different from what has been customized. Below is my current settings.
    The posting key 01 has a  reversed posting key 12 and the document type RV has a reverse document type AB. This customizing is in correct in SPRO.
    Transactions : OB41 and OBA7
    Can anyone help on this....
    Thanks
    Elvis

    Hello,
    Did you verify whether AB document type in OBA7 is marked in "Account Types allowed" the Customer checkbox?
    If not, maybe that is why it is not selecting AB as the reversal document type for RV, even though it is set up in RV document the AB document type as reverse document type.
    Other than this (if the mentioned above doesn't solve your issue), I would say there should be any user-exit that can be changing the document type, according to some specific business rule of your SAP client or even a substitution.
    I hope it helps you.
    Regards,
    Daniel.

  • Assigning of PR document types to Network and WBS Element

    Dear Experts,
    We have created Purchase Requisition document type as ZPRJ for Project system to create a automatic PR. When we run Project Builder the Auto PR will get create for Network by selecting the PR document type ZPRJ. But PR for WBS element instead of selecting ZPRJ it is selecting NB document type. Our requirement is whenever PR generate through Project builder it should create for doc. type ZPRJ.
    Please let me know how to assign the ZPRJ PR document type for WBS Element. For both document type NB & ZPRJ we have maintain same number ranges but it should select only ZPRJ document type for WBS element & Network.
    Thanks & regards
    Dhanu

    OPTT will help you.
    Regards

  • Assigning of PR document types to Network and WBS Element to create auto PR

    Dear Experts,
    We have created Purchase Requisition document type as ZPRJ for Project system to create a automatic PR. When we run Project Builder the Auto PR will get create for Network by selecting the PR document type ZPRJ. But PR for WBS element instead of selecting ZPRJ it is selecting NB document type. Our requirement is whenever PR generate through Project builder it should create for doc. type ZPRJ.
    Please let me know how to assign the ZPRJ PR document type for WBS Element. For both document type NB & ZPRJ we have maintain same number ranges but it should select only ZPRJ document type for WBS element & Network.
    Thanks & regards
    Dhanu

    OPTT will help you.
    Regards

  • Getting SES to index unknown document types in UCM?

    Hi
    We have a SES set up to crawl/index a Oracle UCM, and when configuring the crawler source we can define which document types it should crawl/index. It makes sense that SES only knows how to index the content of some known document types, but why can SES not index any document type without looking inside the actual document? I mean, it is possible to upload any document type in UCM and give it UCM specific metadata like title and so on, and it should be easy for SES to index these UCM metadata for unknown document types also.
    How can I get SES to crawl/index all unknown document types?
    Thank you
    Søren

    I've checked with our UCM connector expert, and he says all document types are passed from UCM to SES.
    So hopefully it should be just a matter of editing the crawler.dat file (found in $ORACLE_HOME/search/data/config)
    You would need to add a MIMEINCLUDE line for the mimetype of the documents you want included - if you're not sure what the mimetype is for any document, you can usually see it in the crawler log file.
    You'd also need to check that the document suffix is not in the list:
    # default file name suffix exclusion list
    RX_BOUNDARY (?i:(?:\.jar)|(?:\.bmp)|(?:\.war)|(?:\.ear)|(?:\.mpg)|(?:\.wmv)|(?:\.mpeg)|(?:\.scm)|(?:\.iso)|(?:\.dmp)|(?:\.dll)|(?:\.cab)|(?:\.so)|(?:\.avi)|(?:\.wav)|(?:\.mp3)|(?:\.wma)|(?:\.bin)|(?:\.exe)|(?:\.iso)|(?:\.tar)|(?:\.png))$You can edit this list to remove any suffixes that you do want included.

  • FEBAN change of document type

    Hi Fi guys,
    Can anyone tell me if is is possible to change the document type, when posting from FEBAN ?. It is possibe ein FEBA, but I cannot find the way to do it in FEBAN.
    Please adcvice, thanks
    Best regards
    Pernille

    Hi. Go FEBAN, Edit-Posting mode-In foreground. While posting you'll be able to change document type

Maybe you are looking for

  • HT202297 how do i get a calendar to show on the same page as my reminder as it use to be?

    How do I view a monthly calendar to the left on the same task as my reminder screen as it use to be before changes were made?

  • Basic questions about R 12.1.1 administrations fundamentals?

    Hi Forum - I am newbie in apps and I am trying to learn Administration fundamentals of Oracle Apps R 12.1.1 please bear with me for these novice questions: My Environment details: Have installed R 12.1.1 on Linux x86-64 using Rapid install. Location

  • Coumn values are overlapping...

    Hi, We are populating report [group left] by fetching values from temporary table. Actually that temp table is based on the procedure. In proc, we insert the rows for the particular column using new line character.. for eg Platform is one column name

  • Brutally slow driver download speed

    After finding out that Creative didn't support the old SB Live Platinum for Windows 8 I thought I'd never buy anything from them, but here I am getting a Sound Blaster Z. So far, so good, but there's a new driver for it so I wanted to get it and... y

  • Problem in adding image in jtable cells

    hi all. im creating a swing application using netbeans 6.0. i want to display image in cells of one column. for that i set an "image icon" directly to that cell in the "default table model", in that case it is displaying the path of that image in tha