DS board simulation version owner

Hi All,
Can some one tell me the reason for the DS board simulation version owner field not getting populated. We made some change in PB and saved them in a simulation version. When we tried to process the simulation version from /sapapo/cdpss0, its not allowing us to open it in edit mode. We have found that the field simulation version owner is blank. Any body have a hint about the potential reason for the filed not getting populated.
Thanks in advance,
Kalyan.

Dear kalyana kothamasu,
This is something strange!!
Tell me one thing, when you execute the transaction for planning board, is there any user name on overall profile and work area.
jsut check that.
Means is there any user specific overall profile or user specific work area. check that.
I think it should not affect as such, but nothing sure about APO where things can get affected......  as usual.
  Check these 2 things your issue should be solved.  since there is nothing custumisation for what you asked in the issue.
Regards,
Pravin Mukkawar

Similar Messages

  • Simulation version Error - Message no. C2323

    Dear Experts,
    I'm trying to create simulation version from operative project.
    I'm getting the following error even though I have maintained settlement rule.
    Settlement rule contains errors and has not been saved
    Message no. C2323
    Diagnosis
    You use a strategy and/or default rule to automatically determine settlement rules for orders/networks.
    The system has determined a settlement rule for NWA #46 according to the defined strategy and/or default rule. However, when checking this settlement rule, an error appeared.
    This error may occur, for example, when you want to create a settlement rule for the superior WBS element, because due to a user status on the WBS element, this is not allowed.
    System Response
    The settlement rule is not saved due to the error.
    Procedure
    Maintain the settlement rule manually for NWA #46, and check the strategy and/or default rule used.
    Please help.
    Regards,
    VINOD.V

    below is the settlement strategy parameter for network
    Manual maintenance of settlement rule
    1   Automatic generation of settlement rule
    2   Generate settlement to WBS element
    3   Copy settlement rule of the WBS element
    4   Copy settlement rule of the project definition
    5   No settlement rule
    then assign strategy to PSP/PS1
    assign network settlement profile to network type as zps1,2,3,4&5
    so just configure the strategy according to suitability then run simulation.
    Regards,
    Sanjeev

  • Hierarchical report to compare simulation version

    Hi,
    Which are the hierarchical report where simulation version can be compared?
    Thx

    Hi,
    In addition you can directly access from T Codes like CN41, CN41N, CNE5 etc.... Please see that "Version Data" is selected in the DB Profile.
    Regards,
    Arul.

  • CJV4, WBS simulation version cost in COSS and COSP by cost element

    Hi PS expert.  (-:
    IN PS When we freeze a simulation version with CJV4,  (operative data to version), sap will create new object number in table VSCAUFV_CN for each network and VSPRPS_CN for each Wbs element related to the simulation Version.
    In our environment, SAP will add record in COSS and COSP for the new object number for Network but NOT FOR THE WBS.
    Is it standard to NOT record the cost in COSS and COSP for the simulation cost of the WBS (against the new object number?)
    That mean we will able to see the simulation cost by cost element for network, but NOT FOR WBS element.
    For the WBS, we only record the cost in RPSCO by cost category.
    Is there a way to active (with an exit ..classu2026bapi) the recording of the cost of the WBS by simulation version in COSS and COSP
    Thanks you very much for your help
    Sophie

    hi sophie,
    create separate network for each wbs in project.  see if this can solve your issue.
    vengaiah chowdary

  • Integration of Simulation versions of APO & R/3

    Hi,
    I want to integrate simulation versions of APO & R/3 so that data can flow between both systems.  Is it possible?  How to do it?
    If the answer is possible, how to create simulation version in R/3 and to integrate with the simulation version of APO?
    Please reply,
    Regards,
    R. Senthil Mareeswaran.

    Hi Senthil,
    APO & R/3 Integration can only be done with active version that is version 000. Integration using simulation version is not possible.
    Regards,
    SB.

  • Simulation version

    Hi,
    On simulation i have two questions
    1. What is the significance of simulation profile. Is it required to be assigned for the project (Through project profile) before carrying out the simulation?
    2.I am trying to create simulation version in CJV4 for the project. I have created the simulation profile and assigned it to my project profile. But when i try to create the simulation version i am getting the following error
    "When you want to run a report that uses the PSJ logical database, module pools are generated for runtime optimization and memory optimization. This module pool cannot be generated since therew is an error in the logical database. This error can only occur, if the SAPDBPSJ program was changed during the runtime of your prrogram".
    Can any body help me in this?
    Rajesh

    Hi,
    Simulation profile is not mandatory. The profile controls what texts get copied from operative project to simulation. If you dont give this profile, all texts get copied into simulation.
    I would be able to help if you tell me the error message number. I hope it is not dump. In that case goto ST22 and let me know the details.
    Regards

  • Handle a Simulation Version in Background

    Hi Experts,
    we would like to modify some block data (in Heuristic fo Block maintenance) for a specified ressource BUT in a simulation version.
    To be more specific, when we go on /sapapo/cdpss0  and select a simulation version, the we click on Process in Graphic form, then select a specified ressource, click on SAP_CDPBP_03 and change some data for the block listed.
    We would like to do this in background (BAPI, MF, or others), as Batch Input doesn't seem to work for the /sapapo/cdpss0 transaction  in Graphic Form Processing.
    Is there any way to achieve that, or does the simulation functionnality only works in Transactionnal mode ?
    Thank's in advance !!!

    Hi Cousture,
    There are two ways of handling simulation version.  One in the active version and another in the inactive version.
    It is always recommendable to carry out simulation studies in active version in foreground only because once you
    adopt the changes into active version, if it is master data change, it will affect the data and users.
    That too, for graphical objects, if it is carried out in background, it leads to performance problems.
    Moreover, there is no sap std feature available for carrying out in background
    I checked the badi/bapi also and no such is available.
    Regards
    R. Senthil Mareeswaran.

  • Sales pricing from Project Simulation Version

    hi.
    Has anybody created sales pricing for the project using transaction DP 82? It does not create the sales pricing for the simulation version, even though I have provided the version key.
    The status of the simulation version of the project is CRTD. I am using the network cost planning in the simulation version of the project. Am I missing something here? I am hoping to get an answer from this community. Thanks for your help in advance.
    Regards
    Mey

    Hi
    The following are the prerequisites for the sucessful fuctioning of sales pricing for simulation versions of the project.
    1. A dynamic item processor profile (DIP profile) must have been maintained in the customer inquiry.and must be Customized for Project System.
    2.The same DIP profile must have been entered on the Sales B tab page of the item detail view in the SD order.
    3. A customer inquiry with at least one item that has to be maintained and assigned to a billing element must exist. The system determines the SD data for sales pricing from this inquiry item.
    4.You have planned costs (in concordance with cost elements) for your project version.
    If these prerequisites are met, i think it will work
    Reward if helpful
    Regards
    Murali

  • We need to copy planning..etc from simulation version 002 to version 000,

    Hi experts,
    Our simulation Version is 002 and Active Version is 000
    We need to copy planning..etc  from version 002 to version 000, how to do. Explain me  elaborate
    Regards,
    moon

    Hi Moon,
                   There are two things in Copy Version Management.
    1) Copy the master and transaction data from active to simulation version.
    Transaction - /SAPAPO/VERCOP in this you can not copy from Simulation to Active.
    2) Merge the Planning Versions.
    Transaction - /SAPAPO/VERMER in which you can copy the planning area keyfigures from simulation version to Active Version.
    Regards,
    Saurabh

  • FC req copy into Simulation version

    Hi,
    Having an interesting problem at the moment, we have PIR's created in ECC that are then reprisented by FC Req's in APO, so all is as expected.
    The issue that I am having is that if I copy the active version for a simulation version the FC Req's are being shown as Dep demand!!
    Have I missed something on the copy back process?
    Plus I have noticed that if for example the FC Req is for 10 in the active version not only does it change the element type but also splits the order down (as if rounding was being used) so I end up with 5 dependent demands of 2.
    Thanks in advance.
    Edited by: UKuser on Nov 19, 2009 2:38 PM

    Hi,
    1)For forecast coming as Dep demand, check whether the
    ATP categories, category groups are transferred
    correctly from active to simulation version.
    2) Check the logs of copy version jobs which will give
    some insight to you to act accordingly
    3) For splitting of demand, check whether the lot size,
    product split etc., are maintained accordingly and
    transferred correctly
    Regards
    R. Senthil Mareeswaran.

  • How to compare the simulation version

    Dear Experts,
    For Operative Projects we can create Simulation Versions (CJV1 / CJV4) & Project Version (CN72).
    We can compare different Project Versions with Operative Project (S_ALR_87013539 / 38).
    Similarly can we compare Simulation version with Operative Project?
    OR can we see plan cost report for simulation version?
    Please guide.
    Rajesh

    Hi,
    Simulation versions are not meant for comparison purpose. You can use Project versions for that, which are snapshots of project at that point of time.
    Simulation versions can be used to analyse 'what-if' conditions and for quotation ie pre-order analysis. Before receipt of sales order, you can create simulation project and do cost planning for quotation purpose. After receipt of sales order, this project can be made operative. In case of loss of project, you can delete simulation.
    Another case can be during execution you want to check "what happens if" kind of conditions. you can transfer operative project to simulation version, simulate reqd condition. If results are desirable, you can copy the simulation version onto current project or alternatively delete simulation.
    Regards

  • Creating Stock in Simulation version

    Hi Gurus,
    Is there a way to create to Stock with categories like CC, CK, CF etc in a simulation version.
    I am working on a project and have a requirement to see if we can create stock in simulation version? Any leads in achieving that would be highly appreciated.
    Thanks,
    Murali

    Hi Mike – Thanks for the detailed reply. I did the same and I got the below error. I think in your message I see the planning version as ‘000’ and when I use that it did create, but we want to create stocks in a simulation version.
    Error message:
    A APO_BAPI 185 Function or parameter CLASSVALUESCHAR is not supported for planning version SIM_EIS
      A APO_BAPI 185 Function or parameter STOCK-VERSION is not supported for planning version SIM_EIS
      I APO_BAPI 004 Rollback executed (see long text)
      I /SAPAPO/CIF          003 Application log (ext. no. K{M8CY4A6Q3X0800GDHYCW) for obj. APO_BAPI and sub-obj. ST_APS has been logged
    Also, an FYI, in debug mode, if we change the planning version from Simulation to active and then flip it back after the validation it is creating the stocks in the simulation version.
    I was trying  to use the standard BAPI in a LSMW to create stocks to a Simulation version to avoid creating a new custom program, hence the challenge.
    Thanks,
    Murali

  • Quotations from Project Simulation Version

    Hi experts,
    We are creating project quotations using DP81. We create multiple quotations for the same inquiry using Project Simulation Version.
    We would like to know from which version the quotation document has been created, is it possible?
    Or can you suggest any workaround?
    Thanks

    Hi,
    Both options, as in DP81 we are able to select simulations versions.
    But onces the quotations has been created we can't know the source. we know the project as is informed in the account assignment but not the simulation version we have used.
    Has anybody faced this issue before?

  • Slaes pricing using simulation version

    Hi experts,
    Is it possible to create sales pricing using simulaton version project ?

    Hi Ravi
    Thanks for your response
    Please look at the link http://help.sap.com/saphelp_erp60/helpdata/en/0b/ba853488601e33e10000009b38f83b/frameset.htm
    There is an illustration which depicts that,
    - Project P1234/version 0001 --> Project 1234 --> Project P1234/Version 0002 --> Project P1234
    As per this illustration, the project number remains same.
    As you said, the transaction CJ20N is not allowing me to transfer the simulation version to operative project.
    But, i am experiencing a dump error while trying to transfer simulation to operative in CVJ4.
    At the conclusion, i mean to say that irrespective of transaction code, this may be allowed.
    Please comment.
    warm regards
    ramSiva

  • Actual Cost on Simulation Version

    Hello
    I am creating simulation version thru CJV1. How do I plan and post actuals on that version ? I don't see that simulation version (proj defn) to do planning or to use it on PO in WBS drop down list.
    In short how do I simulation of cost on such proj versions. Once I transfer it to operative proj thru CJV4, I am able to do planning and post actual. What is the right way of using simulation versions?
    Thanks
    Sarang

    Ok got u. But then how do you paln costs on same i.e. commitment or activities labour cost etc
    Sarang

Maybe you are looking for

  • How to set password never expires for a user?

    Hello, I can't seem to find in the Administrative Console a place to enable "Password never expires". I know that if I edit the USR_PWD_NEVER_EXPIRES field in the OIM DB and put the value '1' it will work. However, I'd like to know how and if it is p

  • Help!!!  I'm locked out and My Ipod touch will NOT go into recovery mode no matter what I do...I haven't read this problem anywhere!

    My grandson got his little hands on my ipod and has locked me out. I now get the red lable of doom and it tells me I must connect to Itunes to fix it.  Problem is I don't have the orginal computer I synced up with. (It crashed about 5 weeks ago).  We

  • Share the view wtih GAF and HTML

    Hello All, I have Benefits enrollement application to be designed such that the screen is shared with GAF and a HTML. The HTML is a page designed and will remain the same through out all the steps in GAF. Please look at the picture attached. The left

  • RE:Web dynpro in ABAP -Diabling of button thru checkbox

    Hi, I have a requirement ie i have a button in a view .Also i have a check box in that view.Now my requirement is that if i check the checkbox then the button in the same view should be disabled.How to do this...................Screen shots will be h

  • How to Handle DFF Attrbute_category Column

    Hi All, I want to made DFF Attribute category column as mandatory in standard page,normally to handle normal DFF attributes like attribute1 we will handle as follows OAMessageLovInputBean cycle = (OAMessageLovInputBean)page.findChildRecursive("OrgPro